Date post: | 13-Apr-2017 |
Category: |
Engineering |
Upload: | wahiduzzaman-khan |
View: | 717 times |
Download: | 0 times |
AUTOMATED RAILWAY
SIGNALING & TRACK
CHANGINGA Project of
EEE 304: Digital Electronics Laboratory
PREPARED FOR PREPARED BYAhmed ZubairLecturer, BUET
&Upal MahbubLecturer, BUET
Noor-A-Junnat (0806139)Imam-uz-zaman 0806140)Ashfiqul Hamid (0806141)Partha Sarathi Sarker (0806142)Ruponti Nath (0806143)Mohammad Wahiduzzaman Khan (0806144)
OUTLINE
Objectives Why necessary? Features Diagram Implementation Costs
getting acquainted with real life digital logic design and implementation practices
digitally implementing the total signaling process and track changing process in a railway system
employing combinational and sequential logic circuitry to shape a purposeful gadget
WHY NECESSARY
WHY NECESSARY A lot of people depend on the
railway for transportation Railway is broadly used for
transporting goods also Technological implementation
in this field is essential Saving time is also another
primary concern Manual control of railway
system is hazardous & time-consuming
FEATURES Compatible for the speed measurement
of trains. Provision for automated signaling. Ensures security by excluding manual
operation system. Ensures a smooth and safe track
changing process where only one train have to be stopped only for some minutes.
Schematic Diagram
COSTS The primary cost incurred is 2500Tk. The application of digital technology in
this case is not very costly. So it is affordable.