Fieldbus Foundation India Committee Fieldbus Foundation India Committee Automation 2012 Automation 2012 Fieldbus Foundation d i i ldb i h h h Foundation Fieldbus, Easier Than You Thought Control Valve Control Valve Control Valve Control Valve “Device diagnostics” “Device diagnostics” Date: Saturday, 8 th September, 2012 Time: from 10:00 am to 04:30 pm. Venue: Automation 2012 Conference Hall, Automation 2012, NSE Grounds, Goregoan, Mumbai - INDIA Presenter : Hisashi Sasajima 1 Automation 2012 Mumbai, India 8 th September , 2012 Azbil Corporation
Transcript
Page 1: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

Fieldbus Foundation India CommitteeFieldbus Foundation – India Committee

Automation 2012Automation 2012Fieldbus Foundation“ d i i ldb i h h h ”“Foundation Fieldbus, Easier Than You Thought”

Control ValveControl ValveControl ValveControl Valve“Device diagnostics”“Device diagnostics”

Date: Saturday, 8th September, 2012Time: from 10:00 am to 04:30 pm. Venue: Automation 2012

Conference Hall, Automation 2012, NSE Grounds, Goregoan, Mumbai - INDIA

Presenter :

Hisashi Sasajima

1Automation 2012

Mumbai, India8th September , 2012

Azbil Corporation

Page 2: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

C t tContents

I. PrologueII. Possibilities of CV failureIII. CV diagnoses (Three phases with field reports)IV ConclusionsIV. ConclusionsV. Progress beyond conclusionsVI bil l ti f C t l V l i tVI. azbil solution for Control Valve maintenance

2Automation 2012

Mumbai, India8th September , 2012

Page 3: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

I. Prologue

Output signal

Valve Position

Hey, Mr. Ashok, something wrong with CV Tag # LIC013. Maintenance is required immediately!

3Automation 2012

Mumbai, India8th September , 2012

Page 4: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

I P lI. Prologue

M A h k A i d i t iOur system operator tells me something wrong

Mr. Ashok - An experienced maintenance engineery p g g

with this control valve but it is not so easy to find what is the nature of problem.pIf it is clear from the beginning, my work can be much faster and easier Is it just a dream?much faster and easier… Is it just a dream?

4Automation 2012

Mumbai, India8th September , 2012

Page 5: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

I P lI. Prologue

No, it is not a dream!

We can help you using Fieldbus technology.OK, Mr. Ashok, we are pleased to explain how to do it butbefore let’s think together why control valve is so important?g y p

Because control valve may give:-d t- severe damages onto process.

- bad influences on production and safety of entire plant

Control Valves are the HEART of the plant5

Automation 2012Mumbai, India

8th September , 2012

Page 6: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

II P ibiliti f CV f ilII. Possibilities of CV failure

Control valve failure might occur due to:-

Trim part leak Corrosion Stick by process Air leakage Actuator degradationActuator degradation Grand part degradation Others Others

6Automation 2012

Mumbai, India8th September , 2012

Page 7: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

1 Situation of control valve maintenance1. Situation of control valve maintenance

Repair or part Cleaning

Typical decision method for CV maintenance policy Maintenance

operation

Repair or part replacement

42%

Cleaning

58%

Ploperat

operation

lant tion risk

TBMDisassembly

inspection

TBM:

Result of CV overhaul maintenance

undertaken by azbil service shop

MaintenancePolicy

TBM:

Time Based Maintenance

undertaken by azbil service shop

318 minor troubles were

caused bySpent 830 man/hourPolicy

Proc

BM Daily maintenance

caused by control valve

faultto recover the troubles

cess load

BM

BM:

Daily maintenancewith on- site check

1400 minor troubles / year occurred

7Automation 2012

Mumbai, India8th September , 2012

Break-down MaintenanceA case of pulp and paper mill in Japan

Page 8: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III CV di ti (Th h )III. CV diagnostics (Three phases)

Phase-1: Real time diagnoses (online)

Phase-2: Shutdown Maintenance (offline)

Phase 3: Maintenance plan based on historical dataPhase-3: Maintenance plan based on historical data

8Automation 2012

Mumbai, India8th September , 2012

Page 9: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV diagnosticsIII. CV diagnosticsPhase-1: Real time diagnoses

D t t “Z Shift Al t”“Z Shift Al t” (POS ALERT LO)Detect “Zero Shift Alert”“Zero Shift Alert” (POS_ALERT_LO)Actual feedback position is +3% (shift) although Set Point goes below 0%

ゼロ点推移

4.000

Graph visualization

1 000

2.000

3.000

%)

-1.000

0.000

1.000

ro d

rift

(%

-3.000

-2.000Zer

-4.000

2006/11/15

2006/11/22

2006/11/29

2006/12/6

2006/12/13

2006/12/20

2006/12/27

2007/1/3

2007/1/10

2007/1/17

2007/1/24

2007/1/31

2007/2/7

2007/2/14

2007/2/21

2007/2/28

2007/3/7

2007/3/14

2007/3/21

2007/3/28

2007/4/4

2007/4/11

2007/4/18

2007/4/25

2007/5/2

2007/5/9

2007/5/16

2007/5/23

2007/5/30

2007/6/6

2007/6/13

2007/6/20

2007/6/27

2007/7/4

9Automation 2012

Mumbai, India8th September , 2012

Page 10: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III CV diagnosticsIII. CV diagnosticsPhase-1: Real time diagnoses

Detect “Zero Shift Alert”“Zero Shift Alert” (POS ALERT LO)Initial zero i t l

Mull function of Plug

Detect Zero Shift AlertZero Shift Alert (POS_ALERT_LO)As a result of inspection, accumulated solid around plug and trim was found. Then the valve was cleaned up and safely re-installed to the process

point angle

θ

ゼロ点推移

4.000

Mull function of Pluginstalled to the process.

1 000

2.000

3.000

Sheet damage%) Sudden zero-shift

Stick on plug

-1.000

0.000

1.000 Sheet damage

ro d

rift

(%

Stick on seat

-3.000

-2.000Zer

-4.000

2006/11/15

2006/11/22

2006/11/29

2006/12/6

2006/12/13

2006/12/20

2006/12/27

2007/1/3

2007/1/10

2007/1/17

2007/1/24

2007/1/31

2007/2/7

2007/2/14

2007/2/21

2007/2/28

2007/3/7

2007/3/14

2007/3/21

2007/3/28

2007/4/4

2007/4/11

2007/4/18

2007/4/25

2007/5/2

2007/5/9

2007/5/16

2007/5/23

2007/5/30

2007/6/6

2007/6/13

2007/6/20

2007/6/27

2007/7/4

10Automation 2012

Mumbai, India8th September , 2012

Page 11: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III CV di tiIII. CV diagnosticsPhase-1: Real time diagnoses

Summary

• System operators realize some abnormal signals on control valves

• Serious issues should be solved immediatelySerious issues should be solved immediately• Minor issues can be recorded to do overhauling

d i th t h td i tduring the next shutdown maintenance

11Automation 2012

Mumbai, India8th September , 2012

Page 12: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV diagnosticsPhase-2: Shutdown Maintenance

Standard diagnosisT h kTo check:-1. Tightness of grand packing2. Position according to air supply

Stroke between 10% and 90% to record relation P

between position and air supply as historical data

Automatically calculates

PositionAutomatically calculatesspring range and friction

n (%)

Supply (kPa)

12Automation 2012

Mumbai, India8th September , 2012

pp y ( )System Vender: Yokogawa Electric

Page 13: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III CV diagnosticsIII. CV diagnosticsPhase-2: Shutdown Maintenance

Advanced Diagnoses

Various simulations:-

1 Travel vs Actuator pressure 1 Travel vs Actuator Pressure1. Travel vs. Actuator pressure2. Travel & SP vs. Time3. Actuator signature4 Travel signature

1. Travel vs. Actuator Pressure

Seating , Spring Range ,

4. Travel signature2. Travel & Set point vs. Time

Overshoot , Resolution

3. Actuator Signature

Friction , Spring Range , Pressure

System Vender : GE(Dresser Masoneilan)4. Signature ( travel vs. set point)

Hystersis , Dead band , Linearity

13Automation 2012

Mumbai, India8th September , 2012

Page 14: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III CV Di tiIII. CV DiagnosticsPhase-2: Shutdown Maintenance

Summary

Compare data (valve signature, step response and etc.) with those previously collected data so that daily and/or shut-down maintenance can ybe planned efficiently .

14Automation 2012

Mumbai, India8th September , 2012

Page 15: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV Diagnostics

A possible damage of bellows seal would be detected by

III. CV DiagnosticsPhase-3: Maintenance plan based on historical data

A possible damage of bellows seal would be detected byTotal_Stroke parameter. (TRAVEL_ACCUM)

This TOTAL_STROKE is as same as 40,000 times full open and full close .

Actual bellows seal after used

System Vender: Azbil

15Automation 2012

Mumbai, India8th September , 2012

Replacement period

Page 16: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV DiagnosticsgPhase-3: Maintenance plan based on historical data Example (Chemical Plant-1)

O ti f il f d i ti k liOperation failure was found in stick-slipdiagnostic function of control valve:-

According to index of gland packing deterioration:-1. Detect abnormal sliding motion of plug guide2 Detect plug bend scratch & other mechanical damages2. Detect plug bend, scratch & other mechanical damages

Detect Stick SlipDetect Stick Slip

16Automation 2012

Mumbai, India8th September , 2012

System Vender: Azbil

Page 17: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV DiagnosticsgPhase-3: Maintenance plan based on historical dataExample (Chemical plant-1)

JJun

Jul

Stick-slip

Stick-slip

Aug

Stick-slip

p movem

en

p movem

en

Stic

S operation h

nt has been

nt has been

ck-slip is no

Sep

has started

n increased

n increased

ot operated

Oct

17Automation 2012

Mumbai, India8th September , 2012

d. d. d.

d.

Page 18: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV DiagnosticsIII. CV DiagnosticsPhase-3: Maintenance plan based on Historical data Example (Chemical Plant-2)

Valve Travel Distribution support on Engineering & MaintenanceConfirm if the selected control valve size is appropriate or not by visualizing the stress index of inner valve on the condition of low travel operation

Images visualization

18Automation 2012

Mumbai, India8th September , 2012

System Vender: Azbil

Page 19: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV DiagnosticsIII. CV DiagnosticsPhase-3: Maintenance plan based on historical data Example (Chemical Plant-2)

Valve Travel Distribution support Engineering & MaintenanceValve opening level is shifting from 20-30 % to 30-40% due to clogging of air filter or CV inner parts. End user can judge that it is the best timing for maintenance.

20-30% 30-40%Images visualization

Boiler

Filter

19Automation 2012

Mumbai, India8th September , 2012

System Vender: Azbil

Page 20: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

T l hi tTravel histogram

The histogram shows how much time the valve is operated in specific segment of valve opening for one month.

FrequencyFrequency

Time0% 1000% 100%

Valve opening

Application for control valve diagnostics L tApplication for control valve diagnostics Confirm if the valve sizing is proper or not Find out trend of valve body clogging Estimate erosion of valve plug 12 months ago

2 months ago

Last month

20Automation 2012

Mumbai, India8th September , 2012

Estimate erosion of valve plug 12 months ago

Page 21: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III. CV DiagnosticsIII. CV DiagnosticsPhase-3: Maintenance plan based on historical dataExample (Chemical Plant-3)

A possible damage of bellows seal would be detected byTotal_Stroke parameter. (TRAVEL_ACCUM)

Sliding distance value could be applied as a reference value Graph visualizationGraph visualization

High pressure Chlorine gas

Globe valve (Bellows seal type)

21Automation 2012

Mumbai, India8th September , 2012

System Vender: Azbil

Page 22: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

III CV Diagnostics (Three phases)III. CV Diagnostics (Three phases)

Summary

Visualize various conditions of control valve through these analyses and historical data

Plan CV maintenance efficiently according toPlan CV maintenance efficiently according to present conditions of control valve.

22Automation 2012

Mumbai, India8th September , 2012

Page 23: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

IV C l iIV. Conclusions

• Control valve diagnoses through Fieldbus are valuable . Fieldbus suits for real time notice since the data transmitting speed is much fasterspeed is much faster.

• Offline maintenance with various simulations is useful on data comparison with those collected in the past.

• Condition based maintenance it is important to analyze• Condition based maintenance, it is important to analyze historical data collected through valve positioner. Fieldbus is highly recommended collecting various data on control valve.

23Automation 2012

Mumbai, India8th September , 2012

Page 24: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

V. Progress beyond conclusionsV. Progress beyond conclusionsa.) Device diagnostics

• Fieldbus Foundation has ever solved users’ requirements to define “Standard Diagnosticrequirements to define Standard Diagnostic Profile” and “Standard Transducer Block”.

• Fieldbus Foundation wishes end users to try and evaluate fieldbus diagnoses more in order toevaluate fieldbus diagnoses more in order to improve functions on the basis of user-friendliness and interoperability.and interoperability.

Continuing Device Diagnostics Continuing Device Diagnostics Enhancements for End Users Enhancements for End Users

24Automation 2012

Mumbai, India8th September , 2012

Page 25: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

V P b d l iV. Progress beyond conclusionsb.) Fieldbus Foundation works with NAMUR (FF912)

Using the power of FOUNDATION Fieldbus, and considering NAMURrequirements, the new standard diagnostic profile aim to:

Standardize the integration of diagnostic information G t l bl i f ti t th

25Automation 2012

Mumbai, India8th September , 2012

Guarantee valuable information to the user

Page 26: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

V. Progress beyond conclusionsV. Progress beyond conclusionsc.) NAMUR Recommendation NE107

NE107 “S lf M it i d Di i f Fi ld D i ”NE107: “Self-Monitoring and Diagnosis of Field Devices”

Diagnosis results must be reliable Diagnosis results must be reliable

The diagnosis results must always be viewed in the context of the li iapplication.

Internal diagnosis categorized into 4 standard status signalsInternal diagnosis categorized into 4 standard status signals

Configuration should be free, as reactions to a fault in the device may be very different depending on the user's requirementsmay be very different depending on the user s requirements

The plant operator to see only these status signals

Detailed information can be read out by the device specialist

26Automation 2012

Mumbai, India8th September , 2012

Page 27: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

NAMUR NE 107 Di ti C bilitNAMUR NE 107 Diagnostics Capability

27Automation 2012

Mumbai, India8th September , 2012

Page 28: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

V. Progress beyond conclusionsV. Progress beyond conclusionsd.) Device diagnostic alarms (NE107) scope

PlantDiagnostics

Step 4Field

Performance

Device Diagnostics Support Function

d

p PerformanceDiagnostics

Step 3D i

•Device status•Diagnostics to host system

process andequipment

Step 3

Fisher

DeviceDiagnostics

St 2Asset Management

actuators, elementsvalves, connections

Step 2

CommunicationsDiagnostics Device

Management

electronicsStep 1

Management

FF Device Status

communications

Fisher

28Automation 2012

Mumbai, India8th September , 2012

Control System

Page 29: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

FOUNDATION™ for

Safety Instrumented FunctionsSafety Instrumented Functions

(SIF)

29Automation 2012

Mumbai, India8th September , 2012

Page 30: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

SIF End User Demonstration ParticipantsEnd User Demonstration Sites

BP G l ki h G H ll L i S l

SIF End User Demonstration Participants

BP – Gelsenkirchen, Germany – Honeywell Logic SolverChevron – Houston, TX – Emerson Logic SolverSaudi Aramco – Dhahran – Triconex Logic Solver and Yokogawa Logic SolverShell Global Solutions Amsterdam HIMA Logic Solver

EmersonHIMA Logic Solver

Asset Management

Basic ProcessControl System

Shell Global Solutions – Amsterdam – HIMA Logic Solver

Logic Solver

HIMAHoneywell

Invensys - TriconexYokogawa

Logic SolverEngineering Workstation

Management Control System

Level SIF Protocol

ValveMagnetrol

Siemens MilltronicsProtocol

Pres H1 Network BIFFIEmerson

ABBE+HSmar

Moore

Other ProvidersFieldbus Diagnostics

RisknowlogyWestlock

AzbilYokogawa Moore

MTLP+F

RuggedComSofting

TÜV RheinlandTÜV SÜD

TempSmar

30Automation 2012

Mumbai, India8th September , 2012

TempSmar

Page 31: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

Control Valve Stroke Test(Partial Stroke Test)

PST CompleteTimeout (Sec)PST Start

PST Break outTime out (Sec) PST

CompletePST Stroke Travel

100

CompletePST Stroke TravelTimeout

(Sec)

Valve Stroke

(%)

PSTStroke Travel (%)

PSTPSTPST(%) PSTPause(Sec)

PSTRumpRate

(%/Sec)

PSTBreak

outTime(S )

0

(Sec)

31Automation 2012

Mumbai, India8th September , 2012

Transient Time(Sec)

Page 32: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

St d d T d Bl kStandard Transducer Blocks

Pressure Block Completed and in ITK 5.0 Temperature Block Completed and in ITK 5.1 Positioner Block (PST/FST) Completed in in ITK 5.2

N t Bl k• Next Block Flow Transducer with High Performance Totalizer

Validation Complete Publication completed Mar 2011 Validation Complete. Publication completed Mar 2011 Support scheduled for ITK 6.1

PST – Partial Stroke Test; FST – Full Stroke Test

32Automation 2012

Mumbai, India8th September , 2012

Page 33: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

St d d T d Bl kStandard Transducer Blocks

Pressure Block Completed and in ITK 5.0 Temperature Block Completed and in ITK 5.1 Positioner Block (PST/FST) Completed in in ITK 5.2

N t Bl k• Next Block Flow Transducer with High Performance Totalizer

Validation Complete Publication scheduled Mar 2011 Validation Complete. Publication scheduled Mar 2011 Support scheduled for ITK 6.1

PST – Partial Stroke Test; FST – Full Stroke Test

33Automation 2012

Mumbai, India8th September , 2012

© 2011 Fieldbus Foundation

Page 34: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

Device / Host RegistrationDevice / Host Registration

34Automation 2012

Mumbai, India8th September , 2012

Page 35: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

ITK 6 Test CoverageITK 6 Test Coverage

35Automation 2012

Mumbai, India8th September , 2012

Page 36: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

FDI Cooperation LLCFDI Cooperation LLCFDI Cooperation LLCFDI Cooperation LLC

Automation 2012Mumbai, India

8th September , 2012

Page 37: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

D i I t tiDevice Integration

Commissioning OperationCommissioning

Engineering MaintenanceGeräteintegrationGeräteintegration

GeräteintegrationGeräteintegration

Field DeviceAutomation System

With the Device Integration, a Host can get access (from a central location) to the Device functions and information.

With devices getting more complex the device integration becomes a must

37Automation 2012

Mumbai, India8th September , 2012

With devices getting more complex, the device integration becomes a must

Page 38: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

A Common ApproachFDI is supported by Manufacturers and Foundations

H i d

Device Package

H i d AdvancedEDDL

Harmonized

HarmonizedEDD

Advanced Features(optional)

EDDL

ABB FDT Group Invensys ABB Emerson Endress + Hauser

FDT Group Fieldbus Foundation HART Communication Foundation

Invensys Siemens Yokogawa

Honeywell OPC Foundation PROFIBUS/PROFINET International

38Automation 2012

Mumbai, India8th September , 2012

Page 39: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

FDI C ti LLCFDI Cooperation LLC

39Automation 2012

Mumbai, India8th September , 2012

Page 40: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

T t A i l D i D iTarget: A single Device DriverFDI Device Package StandardFDI Device Package Standard

(mandatory)

40Automation 2012

Mumbai, India8th September , 2012

WPF: Windows Presentation Foundation

Page 41: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

VI bil l ti f t l l i tVI. azbil solution for control valve maintenance

• Improve the maintenance performance of Control valves in the plant life cycle.Control valves in the plant life cycle.

A) Early detection of

OperationStartup

C) Fast commissioningControl valve abnormalities

ValstafffunctionValstaff

functionfunction

Turnaround Maintenance

ShutdownB) Assistance in reducing valve maintenance costsCV data

41Automation 2012

Mumbai, India8th September , 2012

valve maintenance costsCV data Analysis Service

Page 42: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

S t fi tiSystem configuration

PLUG-INDCS

DCS HMI

DCS Device Management

System

DCS Controller Required system environment to use PLUG-IN Valstaff

Case Vender DCS Device Mgt. System

1 A bil H DEO IFO

Required system environment to use PLUG IN Valstaff

1 Azbil Harmonas-DEO IFO

2 Yokogawa CENTUM PRM*AVP 303/203

AVP 302/202

* PRM t b R3 10 l t t i t ll PLUG IN V l t ff

42Automation 2012

Mumbai, India8th September , 2012

* PRM must be R3.10 or later to install PLUG-IN Valstaff.

Page 43: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

Fast commissioning Automated CV step response test

Step response test for 42 CVsSt tt SP Step response test for 42 CVs

With IFOConventional methodStep pattern SP

Completed in 45 minutes

Valve travel

Require 2 persons for 8 hours.

Visualize CV motion abnormalityVisualize CV motion abnormality

By comparing with the past test resultthe past test result on millisecond level.

43Automation 2012

Mumbai, India8th September , 2012

Page 44: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

A. Certain and fast commissioninggLoop check progress status

• Grasp the progress status of loop check work at a glance• Grasp the progress status of loop check work at a glance.– Visualize devices which are not completed loop check.

Check itemsList of field device

接続確認

Checked date and time + the result: OKChecked date and time + the result: not OK

44Automation 2012

Mumbai, India8th September , 2012

No check

Page 45: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

B. Early detection of the field device problemsy pa. Device status monitoring 365 days/yr, 24 hours/day

Retrieval condition of device alert historyy

Retrieval and filtering condition for d i i di ti

Segment1Segment1

device indication

List of device

Segment2Segment3Segment4Segment5

Segment2Segment3Segment4Segment5

List of device alert history

Device Tree Segment6Segment7Segment8

Segment6Segment7Segment8

Device Tree

45Automation 2012

Mumbai, India8th September , 2012

Full-time monitoring to all devices

Page 46: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

B. Early detection of the field device problemsa. Device status monitoring 365 days/yr, 24 hours/day

• Grasp the status of all devices at a glance G asp e s a us o a de ces a a g a ceSegment1

Segment2Segment3Segment4Segment5Segment6Segment6Segment7Segment8

Symbols of device status recommended by NAMUR NE 107 Full-time monitoringNAMUR NE 107 Full time monitoring

to all devices

46Automation 2012

Mumbai, India8th September , 2012

Page 47: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

B. Early detection of the field device problemsa. Device status monitoring 365 days/yr, 24 hours/day

• If the symbol shows abnormal status, confirm the detail ystatus and device parameters without going out into the plant field.

Segment1Segment1

Segment2Segment3Segment4Segment5

Segment2Segment3Segment4Segment5Segment6Segment7Segment8

Segment6Segment7Segment8

47Automation 2012

Mumbai, India8th September , 2012

Page 48: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

B. Early detection of the field device problems

• Configure/calibrate field

a. Device status monitoring 365 days/yr, 24 hours/day

• Configure/calibrate field devices in the control room.Support multi vender• Support multi-vender devices by using FDT/DTM technologiestechnologies.

48Automation 2012

Mumbai, India8th September , 2012

Page 49: Automation 2012Automation 2012 - Fieldbus Foundation · Automation 2012Automation 2012 ... Sti S c operation h t has bee n ... historical data collected through valve positioner.

Thank you for your attention!!Thank you for your attention!!

Hisashi SasajimaA bil C tiAzbil Corporation

“Human centered automation”

49Automation 2012

Mumbai, India8th September , 2012

Human-centered automationURL http://jp.azbil.com