Transcript
  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    1/15

    26 December 2013 PMI Revision 00 1

    Auxiliary SteamSystem

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    2/15

    26 December 2013 PMI Revision 00 2

    Presentation outline

    Sources of Aux steam supply

    PRDS Station

    Uses of Aux steam

    Flange and stud heating

    Rotor heating

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    3/15

    26 December 2013 PMI Revision 00 3

    SOURCES

    Auxiliary boiler. Station PRDS header (from other running units) Under unit running condition Steam for turbine auxiliary

    steam header is normally taken from extraction linesdepending on load on the turbine sources may be:

    Main steam line through pr and temp reducing valvesCRH line

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    4/15

    26 December 2013 PMI Revision 00 4

    PRDS Station

    It Consists of Set of pressure reducing cum control valves Set of temp reducing (spray) valves

    For maintaining desired pressure and temp.

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    5/15

    26 December 2013 PMI Revision 00 5

    PRDS Header

    For a 210 MW Thermal Power Unit using coal asbasic fuel, auxiliary steam is one of the importantsystems. The current practice is to have two

    different headers:- Turbine Auxiliary Steam Header Boiler Auxiliary Header

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    6/15

    26 December 2013 PMI Revision 00 6

    To turbine gland seal header. To ejector system of condenser (main as well as

    starting ejector). to Deaerator as pegging steam For flange & stud heating. Interconnection to station PRDS header for

    supplying aux steam to other units.

    Uses of Auxiliary Steamon Turbine side

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    7/15

    26 December 2013 PMI Revision 00 7

    Burner atomisation,cleaning, scavenging SCAPH charging during cold start up Regenerative air heater sooth blowing.Off Sites: HFO station: Fuel oil system heating fuel, oil

    storage tanks, pipelines, fuel oil heaters.

    Uses of Auxiliary Steamon Boiler side

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    8/15

    26 December 2013 PMI Revision 00 8

    AUX STEAM HEADER

    29/14

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    9/15

    26 December 2013 PMI Revision 00 9

    Flange, Stud RotorHeating System

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    10/15

    26 December 2013 PMI Revision 00 10

    Flange and Stud heating Used for quick starting of turbine from warm or cold start. Helps in reducing the temperature difference of the metal to

    reduce thermal stress. The device consists of jackets welded to side walls of casing

    flanges and special piping complete with fittings andmeasuring instruments for steam inlet, outlet, and drains.

    The flanges and studs are heated with live steam bled frompipelines before main stop valve (ESV).

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    11/15

    26 December 2013 PMI Revision 00 11

    Flange and Stud heating The headers, supplying steam to the flanges and studs, are

    provided with safety valves and pressure gauges forregulating pressure in the headers.

    To check the temperature difference of the metal across thewidth of casing and between flanges and studs of thecasing, thermocouples have been provided.

    Careful check of the metal temp. is required during heatingprocess.

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    12/15

    26 December 2013 PMI Revision 00 12

    Flange and Stud heating The temperature difference across the width of the casing flange should

    be within 50C. The temperature of outside flange surface should neverexceed that measured with a thermocouple at a maximum depthinside the flange.

    The difference between the flange and stud temperature should notexceed 20C and the stud temperature should never be more thanthat of the flange.

    When starting the turbine from cold or hot (temperature of metal ofthe upper half of the HP- casing being up to 250C, heating of flangesand studs is permitted provided differential expansion of the rotor is

    positive and not less than 1 mm.

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    13/15

    26 December 2013 PMI Revision 00 13

    Flange and Stud heating

    It is not permitted to operate the flange heating device:

    If the differential expansion of rotor is less than 1 mm. If the differential expansion indicating and recording

    instruments are either out of order or disconnected. In order to maintain proper tightening of flange joints, it is

    necessary to first supply steam for heating flanges and onlythen after some time to studs.

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    14/15

    26 December 2013 PMI Revision 00 14

    Rotor Heating In case the contraction of HP rotor reaches 0.8 mm

    and that of IP rotor 1.5 mm. fresh steam is suppliedto the front sealing of HP & IP turbines. In order to

    control the contractions of HP & IP rotor the steamis supplied at a higher temperature then that of theturbine casing at the front sealing till it comes undercontrol.

  • 8/13/2019 Auxiliary Steam System in Thermal Power Plant.ppt

    15/15

    26 December 2013 PMI Revision 00 15

    THANK YOU