7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 1/31
Im rovin Water Securit in WaterIm rovin Water Securit in Water
StressedStressed BagmatiBagmati River Basin,River Basin,
Ram Kumar Shrestha & Rabindra Ra
Ram Kumar Shrestha & Rabindra Ra
NepalNepal
(Engineer)Government of Nepal
Ministry of Urban Development
(Engineer)Government of Nepal
Ministry of Urban Development
High Powered Committee for Intregated Development ofBagmati Civilization (HPCIDBC)
High Powered Committee for Intregated Development ofBagmati Civilization (HPCIDBC)
www.bagmati.gov.np
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 2/31
ContentsContents
ntro uct on
Ba mati Action Plan
Status of Activities
Future Plan
e way orwar
Conclusion
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 3/31
Nepal
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 4/31
P a r t
U p p e
Basin in Nepal d l e p a r t
M i
e r P a r tTotal Catchment area :
3750 sq. km.
L oTotal length of the river inNepal : 220km
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 5/31
Bagmati River in Kathmandu Valley
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 6/31
A few length of Bagmati River in KV
6
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 7/31
Water Use – Drinkin
Water ResourceDevelopment and
Irrigation andothers
Water Resource – surface
Upper BagmatiRiv r B in
Water Quality
Flood Control
River Area
Management
Riverfront environment
Solid waste
squatter andencroachment of the river
illegal sand mines
Water Resource
Middle andLower Bagmati
Management
Flood Control
River Basin Water Disaster Mitigation Debris flow
Watershed conservation
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 8/31
Importance of Bagmati River
agma ver an swatershed is veryimportant for Nepal,
Pashupatinath
, ,
culturally, economically,socially and
.
Kathmandu, the capitalcity, situated on thebanks of Bagmati.
The length of BagmatiDhap Sunarighat
within Kathmandu Valleyis 45 km.
People bathing at Guheswori Gaurighat
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 9/31
Issues/Problems of Bagmati in Kathmandu
Decrease in river flow Disposal of untreated waste Encroachments of river
Solid waste dumping on river sand extraction Haphazard urbanization
growth
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 10/31
Discharge of Bagmati River
28.76
34.75
25
30
35
c s
• Highdifference in
12.53
15.4218.77
15
20
c h a
r g e C u m
e weather
flow
1.98 3.443.22
0
5
10 D i s
• Watershorta e in
G o k a r n a J o r p a t
T i l g a n g a S h
a n k h a m u l
B a b a r
m a h a l
T h a p a t h a
l
S u n d a
r i g h a t
K h o k a m a
Location
dry season
Dry Season Discharge m3/s Monsoon Discharge m3/s
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 11/31
600
500
300
D ( m g / L )
200 B
Sundarijal Gokarna Jorpati Guheshwori Tilganga Minbhawan Sankhamul Thapathali Teku Dovan Sundarighat0
Dec. 3 8 18 13 130 320 220 430 250
Jan. 2 17 44 26 220 320 178 256 350 280
Feb. 3 14 46 15 147 310 190 335 410 370Mar. 7 8 49 12 198 277 234 247 460 352
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 12/31
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 13/31
agma c on an
developed by HPCIDBC & NTNCwith the financial support of UNEP
.
Bagmati Action Plan was approvedby the Government of Nepal inAugust 2009.
It envisages HPCIDBC as the leadimplementing agency for riversystem env ronment mprovement
in Kathmandu.
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 14/31
Bagmati Action Plan …….
Natural ConservationZone 1
Peri UrbanZone 3
Down Stream
Zone 5
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 15/31
Bagmati Action Plan …….
Clean, green and healthy river system inKathmandu valley; that is full of life and valuedby all.
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 16/31
Policy formulation and Planning for restoration of Riversystem n t e cap ta c ty, at man u a ey
Construction of infrastructure to protect and restore the
• Construction of sewer system
• Construction of waste water treatment plant• Construction of access road and green belt
Defining the river alignment and width of flow regime
Monitor and regulate the activities along the river sidearea
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 17/31
40
5041 46
40
20
3029
0
10
Year 1 Year 2 Year 3 Year 4 Year 5
3.8 4 . .
Required BudgetMUSD
Expected AllocationMUSD
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 18/31
Activities Carried out byHPCIDBC
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 19/31
Activities Carried out by HPCIDBC …………..
Conservation of water recharge areas, Dhap (origin of Bagmati)
Be
fo
e
No
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 20/31
Construction of sewer lines reen belts access roads alon the
Activities Carried out by HPCIDBC…………..
river, river demarcation and bank protection work
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 21/31
Activities Carried out by HPCIDBC …………..
pera on o as e a er rea men an a u eswor
Ca acit : 16.3 MLD
Guheswori to Tilganga Tunnel
length : 572 m Dia: 2mDrying Bed
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 22/31
the Waste Water Treatment Plant, HPCIDBC
1200
1400 Influent
Effluent
800
1000
O D
m g / l
400
600
0
200
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 23/31
Activities Carried out by HPCIDBC …………..
Now Before
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 24/31
Tow ards a Bagmat i Rive r Bas in Road Map
Where we are? Where do we get there? Where do we want to go?
Water resource Develo & im lement a Sociall environmentalldevelopment
dangerouslyunsustainable in theupper Watershed
sustainable Water
resource Mgt. systemfor deep GW use
& economically
sustainable WS & WWTPin the valley
Lane 1
River environmentmanagement
almost out of
Develop and implementcomprehensive River
Environment Mgt. system
Clean, green & healthyriver system that if ful
of life & valued by allLane 2con ro
Rapid andunsustainable urban
Sustainable WaterResource development
Infrastructure in thelower basin and disaster
development inlower basin
Limited capacity and
& Irrigation Water useManagement
support a step wise
mgt. creatingopportunities outside KV
Multi-stakeholdersresources rom
Governmental institution &civil society to bring
adequate response to basinissues
approach for bldg. inter-sector collaboration,
awareness & appr.Decision
mechanisms for
integrated management
of water resources in thebasin
Lane 4
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 25/31
mp ementat on on agmat pr nc p e
VisionClean, green and healthy
WaterInduced
that is full of life and valued by all .
Water
RiverEnvironmentManagement
sasterManagement
resourceManagement
n u ona se up
Infrastructure
Information
Foundation of
Four "I"s
Involvement of Stakeholders
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 26/31
Fut ure Plan
Rainwater harvesting, Ground water recharge andlivelihood development in buffer zone.
Augmentation of river discharge by constructingdam in upper Bagmati.
Watershed Management activities in upper
Bagmati. (ADB/PPTA/8050)
Dam Height Storage Yield
Nagmati Dhap 18 m 0.7 mcm 24 l/s
Nagmati 60 m 5.0 mcm 230 l/s
Bagmati 50 m 3.4 mcm 200 l/s
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 27/31
Fut ure Plan …..
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 28/31
Proposed WWTP in Kathmandu
Gokarna)
Guheshwor i
Madhyapur Thimi )
B al k u m ar i 2 16 M L D
Sundarighat
397 MLD
NakhuChovar
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 29/31
The Way Forward
Developing HPCIDBC as a subsidiary RiverBasin Organization (RBO) for Kathmandu
a ey.
Institutional Strengthening and capacity.
Defining organization for Bagmati Basin.
7/29/2019 AWW2013: Improving Water Security in Water Stressed Bagmati River Basin in Nepal by Rabindra Ray and Bharat Bahadur Kc
http://slidepdf.com/reader/full/aww2013-improving-water-security-in-water-stressed-bagmati-river-basin-in 30/31
Conclusion
• Bagmati River and its tributaries environmentalsituation has not deteriorated IRREVERSIBLY. Itcan e regenera e env ronmen a y w suppor
from Development Partners, Donor Agencies, CivilSociety, NGOs and INGOs etc.
• As Bagmati attaches spiritual and emotional
important temples, shrines, ghats, etc. are locatedalong the river banks and are used for different
cultural and ritual purposes), conservation of riversis very important for the protection of both naturalresources and rich cultural herita e of the Valle .