RECENT CASE STUDIES

Page 2: Axiom Case Studies

WALNEY – DONG ENERGY POWER UK LTD Overview The Client is responsible for lifting equipment on two Offshore Substations (OSS) at Walney 1 and 2 Offshore Wind Farms. A third party survey had considered all items to be unfit for service and had quarantined them. Axiom were tasked initially with fault finding and then with executing suitable maintenance and repair to bring all items back into service. A later mobilisation was used to provide an assessment of platform coating condition.

Inspection Baseline survey and identification of material requirements Thorough Examination and Test of all items post repair NDT of critical welds (Eddy Current Inspection) Close Visual Inspection of exterior steel coating condition Maintenance and Repairs

Procurement (completed £3k under budget) Replacement of hoist ropes, load hooks and support / limit rollers Lubrication and full service Upload of all reports to ViewCert

Page 3: Axiom Case Studies

DEEP SEA METRO 1 – OPHIR ENERGY PLC Overview Axiom assisted Ophir Energy Plc with demobilisation of equipment from Odfjells Deep Sea Metro 1 drillship at the end of their 2014 drilling campaign, offshore Tanzania. The project culminated in a 12 day mobilisation utilising 10 POB across day and nightshifts, with all works completed safely and on schedule.

Project Planning Offshore Site Survey and In-country Liaison Project Critical Path and Resource Identification Workpack Preparation and Lift Plans for Removal of: All Third Party Drillign Equipment and Modules Aft ROV Hardening

Site Execution The site team included a rope access capability and comprised a Project Manager, LOLER Focal Point, Riggers, Welder / Platers, Mechanical Fitters and Electricians. Axiom provided all project equipment

Page 4: Axiom Case Studies

TOTAL HOOK UPS – ROSSETTI MARINO UK LTD Axiom were pleased to support client Rosetti Marino during the hook up phases of the new Total West Franklin and Elgin B jackets during 2013 and 2014. ‘Around the clock’ inspection services were provided including: Ultrasonic Testing (UT) of Superduplex Close Visual Inspection (CVI) Magnetic Particle (MPI)and Dye Penetrant Inspection (DPI) Positive Material Identification (PMI) Hardness Testing, Radiography and internal root CCTV surveys . CONTRACT SUPPORT – CONOCOPHILLIPS UK LTD Axiom supplied a back to back rotation to the Judy Platform during 2012/13 to support the incumbent inspection body with additional rope access NDT capability during a fabric maintenance corrosion assessment campaign.

The requirement was for a two person rope access team, with back to backs, one of whom needed to be an IRATA III Rope Access Supervisor, with both qualified to PCN II standard in Ultrasonic Thickness checking.

Page 5: Axiom Case Studies

EMEC – OPENHYDRO LTD Overview The Client operates a test tidal turbine (shown left raised above water for inspection) at the EMEC site, offshore Orkney. Modifications are planned and Axiom was tasked to complete a full Topside Structural Inspection. Use of rope access avoided the originally planned scaffolding and works in this remote location were successfully completed during a tight weather window using a small multi-disciplined team.

The survey included: Close Visual Inspection of the full structure

NDT of all critical welds using ECI followed by MPI

Wall thickness measurements of steel work (UT)

Coating condition assessment

Quality control of site welding

Page 6: Axiom Case Studies

NEXEN SCOTT – KCA DEUTAG DRILLING LTD Overview Axiom provided a full package of support services to the Scott rig reactivation project Works spanned two years from 2013 – 15 and were brought to a close by a two week period of 24 hour working with 13 POB No incident or accidents were sustained

Rigbuilding Removal and Replacement of all Drilling Equipment Derrick Remedials and Maintenance Cable management upgrade (left) Handrail replacement Removal of redundant (DROPS hazard) equipment Rope access support to derrick piping upgrade Padeye installation Post Start Up – Emergency Repairs to Fastline Sheave

Derrick Inspection API 4G Structural Survey Baseline Derrick DROPS Inventory and Inspection Book Upload of all reports to ViewCert

Page 7: Axiom Case Studies

TOTAL ELGIN – TOTAL E&P UK LTD Overview Working directly for the Operator (Total E&P UK Ltd), Axiom provided multi-disciplined rope access NDT teams to execute Annual Structural Topside Inspection of the Elgin and Franklin assets between 2010 – 12, culminating in the inspection of the Elgin PUQ Flare Stack.

Detection of Fatigue Cracking through Conductive Coatings For this project, Axiom developed an Eddy Current procedure that enabled testing to be carried out through Thermal Sprayed Aluminium (TSA) – the first time that this has been done.

Fully approved by Total E&P (UK) Ltd, this technique enabled the inspection to be done in a relatively short period of time and more importantly avoided damage to the existing coating.

The same technique has now been successfully used for inspection of risers and a similar approach has enabled us to test through galvanised coatings – ideal for rapid inspection of critical load path items (pad-eyes etc) on offshore drilling derricks.

Page 8: Axiom Case Studies

TOTAL DUNBAR Overview Working for both the Operator (Total E&P UK Ltd) and Drilling Contractor (KCA Deutag Drilling Ltd), Axiom provided a full package of support services to the 2015 Dunbar shutdown Works were completed by a 6 person rope access team within a very tight schedule

Maintenance Repair of Flare Stack pipework – 6G stainless steel welding Removal of tar deposits and loose debris

Inspection Derrick Structural Survey (API 4G) Baseline Derrick DROPS Inventory and Inspection Book Critical Load Path and Annual NDT (API 8B) Flare piping survey Compilation of Drilling Facilities Integrity Anomaly Register Upload of all reports to ViewCert Rope access assistance to inspection of Flexible Hose Assemblies Recertification of offshore containers

Page 9: Axiom Case Studies

AXIOM OFFSHORE SERVICES

GLASGOW HEAD OFFICE 72 – 74 CLIFFORD LANE CESSNOCK GLASGOW G51 1NR 0141 427 3302

ABERDEEN OFFICE UNIT 3 BURNBANK BUSINESS UNITS

SOUTERHEAD ROAD, ALTENS ABERDEEN

AB12 3LF 01224 895 155

www.axiomoffshore.co.uk


Recommended