AY STV Report - 8-15-14 - Proposed Redactions_Redacted

Date post: 07-Aug-2018
Category:
Upload: norman-oder
View: 217 times
Download: 0 times
Share this document with a friend

of 6

Transcript
  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    1/12

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    2/12

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    3/12

      STV Construction, Inc.

    Project Date 8/11/2014Location Weekday Monday

    Client Report # 377

    Contract # Weather  

    Project # Temp. L/H

    STV Representative: William King Wind Speed

    Work hours 7:15-3:45 Precip

    297 171 1.7

    930 0.319

    DAILY CONSTRUCTION REPORT

    Atlantic YardsB2ESD

    6717 Sunny

    Tower Crane -  Active.

    Module Transportation - 3 mods brought during the day to add to 2 already in MPT that were brought 1-1/2 weeks ago.

      71/852114659

    Summary of Construction Activities

      Slight

    Module Installation - 5 mods installed. Completion % rose to 31.9% from 31.4% - 297 out of 930 mods installed in 171 work days sincemod installation began = an avg. of 1.7 mods per day. 10th floor now complete.

      0"

    Module Fabrication - Ongoing at Navy Yard, presumably working on 11th and 12th floor mods with a workforce in the low 160's.

    MEP - Some minor work left in main electrical switching room and then will be ready for Con Ed to turn on permanent power - waiting for agreater power load in building before Con Ed will allow use of permanent power.

    Other - Hoist is in operation to 5th floor.

    Additional New Observations:

    New Information received:

    Requested warranty duration for façade of FCR on 7/16. Will look up in specs.

    On 6/6/14 sent pictures of installed/discolored dry wall cross sections to Skanska to ask whether mold may be suspected. No response to

    date.

    Information previously requested: Read Skanska ec's report no. 2, sent by FCR on 6/17. In 6/19 email response to FCR's SS, whosent the 2nd report by Skanska's environmental consultant, asked whether any type of air monitoring can take place to measure potentially

    high mold spore counts in a unit where any mold is not vis ble, i.e in upper or inner layer of wallboard in ceiling/wall. Cited leak day on 6/13,

    after e.c's most recent site visit, when subsequent leak damage was not that evident. On 7/16 sent FCR's Scott Stutman a 2nd request for

    response to 6/19/14 STV questions concerning leaks/mold remediation/testing.

    Information to be requested:

    Tolerances for doors between side panels are 1-1/4" to 2-1/4". Several doors on south and east facades out of tolerance and won't close.

    Water penetration not an issue as gaskets behind them determine whether water penetrating or not - not seen as a water leak problem.

    Doors on east side wired open so won't blow/bang in the wind.

    7/29 - Informed that mods won't resume until Sept. 15. Want to fill the yard outside of Bldg 292 at the Navy Yard before resume bringing

    them over.

    7/31 - Waiting for approval by DOB of crane permit amendments for jumping crane (which won't do until shortly before mod installation

    recommences) and tieing in crane to building at 8th floor.

    Previous Information received: 7/31 - Will be bringing in hanging scaffold soon to fix flap doors on façades. As of 8/11 no scaffold.

    On 5/1/14

    New Information requested:

    7/15 - New 3rd worst water leaks, especially affecting the 7th floor even though 1-2 floors below the top of the bldg. 7/3/14 - 3rd biggest water

    leaks in center and west of building. Skanska/MG McGrath totally at a loss as to cause.

    1 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    4/12

      STV Construction, Inc.

    Manpower on Site

    Navillus

    Stearns 8

    J Supor Trucking 4

    MEP trades

    Other 

    Potain Tower Crane

    Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None

    Special instruction(s) given:

    Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed

    Major Equipment on site (I = Inactive)

    Manpower figure is rough approximation by STV.

    Previous observations: Front façade is now less than 33-35' from the ped wakway due to the 6th floor Dean St. transfer beam facadeprotruding 1-2' closer to the street than the 1st-5th floor facade. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds

    2 X the distance between the building and the ped crosswa k at Flatbush across Dean.

    10/16/13 - At Navy Yard FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of

    30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt would be sufficient for production to keep ahead

    of erection so there would be no downtime during mod erection at the B2 site.

    3/21 - Paper documenting DOB's approval (signed 2/2/14) of no sidewa k shed on Dean received.

    4/8 - Jury is still out on gaskets which may be under increasing stress under weight of additional floors.

     Allowable gasket tolerances: up to 1/2" out of allignment - otherwise warranty is void. Also, if too close, less than 1+1/8" from gasket plate to

    adjoining gasket plate or more than 2+1/8" between plates then warranty void. Joel caulks the 'crucifix', where 4 mods meet, to seal any

    openings.

     William King  8/11/2014 DatePrepared by William King

    2 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    5/12

      STV Construction, Inc.

    Project Date 8/12/2014Location Weekday Tuesday

    Client Report # 378

    Contract # Weather  

    Project # Temp. L/H

    STV Representative: William King Wind Speed

    Work hours 7:15-5:15 Precip

    297 172 1.7

    930 0.319

    Additional New Observations: Doing weather protection work on roof - rain expected Wed., 8/13.

    New Information received:

    Tower Crane - Inactive

    Module Transportation - No mods delivered

      71/78

    Various mateline connection work principally on lower floors. No drywall replacement work yet.

    2114659

    Summary of Construction Activities

    16 mph gusting to 33 mph

    Module Installation - 0 mods installed. Completion % at 31.9% from 31.4% - 297 out of 930 mods installed in 172 work days since modinstallation began = an avg. of 1.7 mods per day. Complete through 10th floor.

      .7"

    Module Fabrication - Ongoing at Navy Yard, presumably working on 11th and 12th floor mods with a workforce in the low 160's.

    MEP - Some minor work left in main electrical switching room and then will be ready for Con Ed to turn on permanent power - waiting for agreater power load in building before Con Ed will allow use of permanent power.

    Other - Hoist is in operation to 5th floor.

    DAILY CONSTRUCTION REPORT

    Atlantic YardsB2ESD

    6717 High Overcast, Rain Late

    Previous Information received: 7/31 - Will be bringing in hanging scaffold soon to fix flap doors on façades. As of 8/11 no scaffold.

    On 5/1/14 inquired with FCR's

    ,

    New Information requested:

    7/15 - New 3rd worst water leaks, especially affecting the 7th floor even though 1-2 floors below the top of the bldg. 7/3/14 - 3rd biggest water

    leaks in center and west of building. Skanska/MG McGrath totally at a loss as to cause.

    Requested warranty duration for façade of FCR on 7/16. Will look up in specs.

    On 6/6/14 sent pictures of installed/discolored dry wall cross sections to Skanska to ask whether mold may be suspected. No response to

    date.

    Information previously requested: Read Skanska ec's report no. 2, sent by FCR on 6/17. In 6/19 email response to FCR's SS, whosent the 2nd report by Skanska's environmental consultant, asked whether any type of air monitoring can take place to measure potentially

    high mold spore counts in a unit where any mold is not vis ble, i.e in upper or inner layer of wallboard in ceiling/wall. Cited leak day on 6/13,

    after e.c's most recent site visit, when subsequent leak damage was not that evident. On 7/16 sent FCR's Scott Stutman a 2nd request for

    response to 6/19/14 STV questions concerning leaks/mold remediation/testing.

    Information to be requested:

    Tolerances for doors between side panels are 1-1/4" to 2-1/4". Several doors on south and east facades out of tolerance and won't close.

    Water penetration not an issue as gaskets behind them determine whether water penetrating or not - not seen as a water leak problem.

    Doors on east side wired open so won't blow/bang in the wind.

    7/29 - Informed that mods won't resume until Sept. 15. Want to fill the yard outside of Bldg 292 at the Navy Yard before resume bringing

    them over.

    7/31 - Waiting for approval by DOB of crane permit amendments for jumping crane (which won't do until shortly before mod installation

    recommences) and tieing in crane to building at 8th floor.

    1 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    6/12

      STV Construction, Inc.

    Manpower on Site

    Navillus

    Stearns 8

    J Supor Trucking

    MEP trades

    Other 

    Previous observations: Front façade is now less than 33-35' from the ped wakway due to the 6th floor Dean St. transfer beam facadeprotruding 1-2' closer to the street than the 1st-5th floor facade. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds

    2 X the distance between the building and the ped crosswa k at Flatbush across Dean.

    10/16/13 - At Navy Yard FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of

    30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt would be sufficient for production to keep ahead

    of erection so there would be no downtime during mod erection at the B2 site.

    3/21 - Paper documenting DOB's approval (signed 2/2/14) of no sidewa k shed on Dean received.

    4/8 - Jury is still out on gaskets which may be under increasing stress under weight of additional floors.

     Allowable gasket tolerances: up to 1/2" out of allignment - otherwise warranty is void. Also, if too close, less than 1+1/8" from gasket plate to

    adjoining gasket plate or more than 2+1/8" between plates then warranty void. Joel caulks the 'crucifix', where 4 mods meet, to seal any

    openings.

    Potain Tower Crane (I)

    Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None

    Special instruction(s) given:

    Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed

    Major Equipment on site (I = Inactive)

    Manpower figure is rough approximation by STV.

     William King  8/12/2014 DatePrepared by William King

    2 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    7/12

      STV Construction, Inc.

    Project Date 8/13/2014Location Weekday Wednesday

    Client Report # 379

    Contract # Weather  

    Project # Temp. L/H

    STV Representative: William King Wind Speed

    Work hours 9:00-5:00 Precip

    297 173 1.7

    930 0.319

    Additional New Observations:

    New Information received: Went to site but only talked to Skanska at ground level. Skanska reported minor water infiltration at buildingperimeter from heavy rains late Tuesday/early Wed. Will go back to personally inspect on Thursday.

    Tower Crane - Inactive

    Module Transportation - No mods delivered

      68/82

    Various mateline connection work principally on lower floors. No drywall replacement work yet.

    2114659

    Summary of Construction Activities

    20 mph gusting to 41 mph at night

    Module Installation - 0 mods installed. Completion % at 31.9% from 31.4% - 297 out of 930 mods installed in 173 work days since modinstallation began = an avg. of 1.7 mods per day. Complete through 10th floor.

      7/8"

    Module Fabrication - Ongoing at Navy Yard, presumably working on 11th and 12th floor mods with a workforce in the low 160's.

    MEP - Some minor work left in main electrical switching room and then will be ready for Con Ed to turn on permanent power - waiting for agreater power load in building before Con Ed will allow use of permanent power.

    Other - Hoist is in operation to 5th floor.

    DAILY CONSTRUCTION REPORT

    Atlantic YardsB2ESD

    6717 Rainy early, then cloudy, then sunny

    Previous Information received: 7/31 - Will be bringing in hanging scaffold soon to fix flap doors on façades. As of 8/11 no scaffold.

    On 5/1/14 inquired with FCR's Linda Chiarelli whether a tower crane might be used for conventionally built B3 which could also be used for

    arena green roof. To date, no response, just that cranes won't be coming now until Sept. New FCR status meeting scheduled for Thursday,

    7/24.

    New Information requested: Update from FCR on Skanska's e.c.'s review of mold potential/remedies/building bill of health.

    7/15 - New 3rd worst water leaks, especially affecting the 7th floor even though 1-2 floors below the top of the bldg. 7/3/14 - 3rd biggest water

    leaks in center and west of building. Skanska/MG McGrath totally at a loss as to cause.

    Requested warranty duration for façade of FCR on 7/16. Will look up in specs.

    On 6/6/14 sent pictures of installed/discolored dry wall cross sections to Skanska to ask whether mold may be suspected. No response to

    date.

    Information previously requested:Read Skanska ec's report no. 2, sent by FCR on 6/17. In 6/19 email response to FCR's SS, who

    sent the 2nd report by Skanska's environmental consultant, asked whether any type of air monitoring can take place to measure potentially

    high mold spore counts in a unit where any mold is not vis ble, i.e in upper or inner layer of wallboard in ceiling/wall. Cited leak day on 6/13,

    after e.c's most recent site visit, when subsequent leak damage was not that evident. On 7/16 sent FCR's Scott Stutman a 2nd request for

    response to 6/19/14 STV questions concerning leaks/mold remediation/testing.

    Information to be requested:

    Tolerances for doors between side panels are 1-1/4" to 2-1/4". Several doors on south and east facades out of tolerance and won't close.

    Water penetration not an issue as gaskets behind them determine whether water penetrating or not - not seen as a water leak problem.

    Doors on east side wired open so won't blow/bang in the wind.

    7/29 - Informed that mods won't resume until Sept. 15. Want to fill the yard outside of Bldg 292 at the Navy Yard before resume bringing

    them over.

    7/31 - Waiting for approval by DOB of crane permit amendments for jumping crane (which won't do until shortly before mod installation

    recommences) and tieing in crane to building at 8th floor.

    1 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    8/12

      STV Construction, Inc.

    Manpower on Site

    Navillus

    Stearns

    J Supor Trucking

    MEP trades

    Other 

    Previous observations: Front façade is now less than 33-35' from the ped wakway due to the 6th floor Dean St. transfer beam facadeprotruding 1-2' closer to the street than the 1st-5th floor facade. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds

    2 X the distance between the building and the ped crosswa k at Flatbush across Dean.

    10/16/13 - At Navy Yard FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of

    30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt would be sufficient for production to keep ahead

    of erection so there would be no downtime during mod erection at the B2 site.

    3/21 - Paper documenting DOB's approval (signed 2/2/14) of no sidewa k shed on Dean received.

    4/8 - Jury is still out on gaskets which may be under increasing stress under weight of additional floors.

     Allowable gasket tolerances: up to 1/2" out of allignment - otherwise warranty is void. Also, if too close, less than 1+1/8" from gasket plate to

    adjoining gasket plate or more than 2+1/8" between plates then warranty void. Joel caulks the 'crucifix', where 4 mods meet, to seal any

    openings.

    Potain Tower Crane (I)

    Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None

    Special instruction(s) given:

    Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed

    Major Equipment on site (I = Inactive)

    Manpower figure is rough approximation by STV.

     William King  8/13/2014 DatePrepared by William King

    2 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    9/12

      STV Construction, Inc.

    Project Date 8/14/2014Location Weekday Thursday

    Client Report # 380

    Contract # Weather  

    Project # Temp. L/H

    STV Representative: William King Wind Speed

    Work hours 8:00-5:00 Precip

    297 174 1.7

    930 0.319

    DAILY CONSTRUCTION REPORT

    Atlantic YardsB2ESD

    6717 Sunny, Dry

    Tower Crane - Inactive

    Module Transportation - No mods delivered

      70's

    Various mateline connection work principally on lower floors. No drywall replacement work yet.

    2114659

    Summary of Construction Activities

      Slight

    Module Installation - 0 mods installed. Completion % at 31.9% from 31.4% - 297 out of 930 mods installed in 174 work days since modinstallation began = an avg. of 1.7 mods per day. Complete through 10th floor.

    Module Fabrication - Ongoing at Navy Yard, presumably working on 12th floor mods with a workforce in the low 160's.

    MEP - Some minor work left in main electrical switching room and then will be ready for Con Ed to turn on permanent power - waiting for a

    greater power load in building before Con Ed will allow use of permanent power.

    Other - Hoist is in operation to 5th floor.

    Additional New Observations: Visually verified that there was very little water penetration into the 10th floor or lower floors as a result ofthe rain Tuesday night.

    New Information received:

    Requested warranty duration for façade of FCR on 7/16. Will look up in specs.

    On 6/6/14 sent pictures of installed/discolored dry wall cross sections to Skanska to ask whether mold may be suspected. No response to

    date.

    Information previously requested: Read Skanska ec's report no. 2, sent by FCR on 6/17. In 6/19 email response to FCR's SS, whosent the 2nd report by Skanska's environmental consultant, asked whether any type of air monitoring can take place to measure potentially

    high mold spore counts in a unit where any mold is not vis ble, i.e in upper or inner layer of wallboard in ceiling/wall. Cited leak day on 6/13,

    after e.c's most recent site visit, when subsequent leak damage was not that evident. On 7/16 sent FCR's Scott Stutman a 2nd request for

    response to 6/19/14 STV questions concerning leaks/mold remediation/testing. On 8/13 sent 3rd request.

    Information to be requested:

    Tolerances for doors between side panels are 1-1/4" to 2-1/4". Several doors on south and east facades out of tolerance and won't close.

    Water penetration not an issue as gaskets behind them determine whether water penetrating or not - not seen as a water leak problem.

    Doors on east side wired open so won't blow/bang in the wind.

    7/29 - Informed that mods won't resume until Sept. 15. Want to fill the yard outside of Bldg 292 at the Navy Yard before resume bringing

    them over.

    7/31 - Waiting for approval by DOB of crane permit amendments for jumping crane (which won't do until shortly before mod installation

    recommences) and tieing in crane to building at 8th floor.

    Previous Information received: 7/31 - Will be bringing in hanging scaffold soon to fix flap doors on façades. As of 8/11 no scaffold.

    On 5/1/14 inquired with

    ,

    4.

    New Information requested:

    7/15 - New 3rd worst water leaks, especially affecting the 7th floor even though 1-2 floors below the top of the bldg. 7/3/14 - 3rd biggest water

    leaks in center and west of building. Skanska/MG McGrath totally at a loss as to cause.

    1 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    10/12

      STV Construction, Inc.

    Manpower on Site 20-25

    Navillus

    Stearns

    J Supor Trucking

    MEP trades 15-20

    Other 5-10

    Potain Tower Crane (I)

    Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None

    Special instruction(s) given:

    Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed

    Major Equipment on site (I = Inactive)

    Manpower figure is rough approximation by STV.

    Previous observations: Front façade is now less than 33-35' from the ped wakway due to the 6th floor Dean St. transfer beam facadeprotruding 1-2' closer to the street than the 1st-5th floor facade. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds

    2 X the distance between the building and the ped crosswa k at Flatbush across Dean.

    10/16/13 - At Navy Yard FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of

    30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt would be sufficient for production to keep ahead

    of erection so there would be no downtime during mod erection at the B2 site.

    3/21 - Paper documenting DOB's approval (signed 2/2/14) of no sidewa k shed on Dean received.

    4/8 - Jury is still out on gaskets which may be under increasing stress under weight of additional floors.

     Allowable gasket tolerances: up to 1/2" out of allignment - otherwise warranty is void. Also, if too close, less than 1+1/8" from gasket plate to

    adjoining gasket plate or more than 2+1/8" between plates then warranty void. Joel caulks the 'crucifix', where 4 mods meet, to seal any

    openings.

     William King  8/14/2014 DatePrepared by William King

    2 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    11/12

      STV Construction, Inc.

    Project Date 8/15/2014Location Weekday Friday

    Client Report # 381

    Contract # Weather  

    Project # Temp. L/H

    STV Representative: William King Wind Speed

    Work hours 8:00-4:00 Precip

    297 175 1.7

    930 0.319

    DAILY CONSTRUCTION REPORT

    Atlantic YardsB2ESD

    6717 Sunny, Dry

    Tower Crane - Inactive

    Module Transportation - No mods delivered

      70's

    Various mateline connection work principally on lower floors. No drywall replacement work yet.

    2114659

    Summary of Construction Activities

      Slight

    Module Installation - 0 mods installed. Completion % at 31.9% from 31.4% - 297 out of 930 mods installed in 175 work days since modinstallation began = an avg. of 1.7 mods per day. Complete through 10th floor.

    Module Fabrication - Ongoing at Navy Yard, presumably working on 12th floor mods with a workforce in the low 160's.

    MEP - Some minor work left in main electrical switching room and then will be ready for Con Ed to turn on permanent power - waiting for a

    greater power load in building before Con Ed will allow use of permanent power.

    Other - Hoist is in operation to 5th floor.

    Additional New Observations:

    New Information received:

    Requested warranty duration for façade of FCR on 7/16. Will look up in specs.

    On 6/6/14 sent pictures of installed/discolored dry wall cross sections to Skanska to ask whether mold may be suspected. No response to

    date.

    Information previously requested: Read Skanska ec's report no. 2, sent by FCR on 6/17. In 6/19 email response to FCR's SS, who

    sent the 2nd report by Skanska's environmental consultant, asked whether any type of air monitoring can take place to measure potentiallyhigh mold spore counts in a unit where any mold is not vis ble, i.e in upper or inner layer of wallboard in ceiling/wall. Cited leak day on 6/13,

    after e.c's most recent site visit, when subsequent leak damage was not that evident. On 7/16 sent FCR's Scott Stutman a 2nd request for

    response to 6/19/14 STV questions concerning leaks/mold remediation/testing. On 8/13, sent 3rd request.

    Information to be requested:

    Tolerances for doors between side panels are 1-1/4" to 2-1/4". Several doors on south and east facades out of tolerance and won't close.

    Water penetration not an issue as gaskets behind them determine whether water penetrating or not - not seen as a water leak problem.

    Doors on east side wired open so won't blow/bang in the wind.

    7/29 - Informed that mods won't resume until Sept. 15. Want to fill the yard outside of Bldg 292 at the Navy Yard before resume bringing

    them over.

    7/31 - Waiting for approval by DOB of crane permit amendments for jumping crane (which won't do until shortly before mod installation

    recommences) and tieing in crane to building at 8th floor.

    Previous Information received: 7/31 - Will be bringing in hanging scaffold soon to fix flap doors on façades. As of 8/14 no scaffold.

    On 5/1/14

    7/15 - New 3rd worst water leaks, especially affecting the 7th floor even though 1-2 floors below the top of the bldg. 7/3/14 - 3rd biggest water

    leaks in center and west of building. Skanska/MG McGrath totally at a loss as to cause.

    1 of 2

  • 8/20/2019 AY STV Report - 8-15-14 - Proposed Redactions_Redacted

    12/12

      STV Construction, Inc.

    Manpower on Site 20-25

    Navillus

    Stearns

    J Supor Trucking

    MEP trades 15-20

    Other 5-10

    Potain Tower Crane (I)

    Contract changes, claims, deficiencies, RFI's, RFP's reported to STV by FCR: None

    Special instruction(s) given:

    Materials Delivered other than Mods (Observed)Equip. Arr./ Departure-Observed

    Major Equipment on site (I = Inactive)

    Manpower figure is rough approximation by STV.

    Previous observations: Front façade is now less than 33-35' from the ped wakway due to the 6th floor Dean St. transfer beam facadeprotruding 1-2' closer to the street than the 1st-5th floor facade. Flatbush façade is 12' from the edge of the sidewalk shed. Height exceeds

    2 X the distance between the building and the ped crosswa k at Flatbush across Dean.

    10/16/13 - At Navy Yard FCR stated that first mods would arrive on site in late December/early January and that there would be a backlog of

    30-40 (1-2 floors worth) to 80 (3 floors worth) mods completed at that time which it was felt would be sufficient for production to keep ahead

    of erection so there would be no downtime during mod erection at the B2 site.

    3/21 - Paper documenting DOB's approval (signed 2/2/14) of no sidewa k shed on Dean received.

    4/8 - Jury is still out on gaskets which may be under increasing stress under weight of additional floors.

     Allowable gasket tolerances: up to 1/2" out of allignment - otherwise warranty is void. Also, if too close, less than 1+1/8" from gasket plate to

    adjoining gasket plate or more than 2+1/8" between plates then warranty void. Joel caulks the 'crucifix', where 4 mods meet, to seal any

    openings.

     William King  8/15/2014 DatePrepared by William King


Recommended