of 10
8/13/2019 Azito Case
1/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
1
Public Private Partnerships
A Case Study
Azito Energie, Cte dIvoire
8/13/2019 Azito Case
2/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
2
Project Concept: GOCIs implementation of liberlization measures in the
context of the Strategic Framework defined by the
Structural Adjustment Program of the Energy sector
implemented in the early 80s.
Electricity distribution assigned to CIE under a concession
First IPP Contract negotiated and signed with CIPREL
Second IPP agreement signed with Azito Energie
8/13/2019 Azito Case
3/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
3
Project Description
Phase I involved the construction of 144 MW gas
powered turbine (Completed on schedule in 1999)
Phase II involved the construction of the second 144 MW Gas
powered turbine (Completed on schedule in 2000)
PS: Although out the scope of the Azito Energie project, Phase
III was planned to be launched in 2002 to be on-stream by 2004.
Project was completed on schedule and within the budget
limits for a total project cost of USD 215 million.
8/13/2019 Azito Case
4/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
4
Project Objectives:
Ensure equilibrium between Electricity Supply and agrowing Domestic Demand and Exports commitments
between the GOCI and
Ghana, Togo and Benin (Eastern interconnection);
Burkina Fasso (Nothern interconnection) and Mali at
a later stage.
8/13/2019 Azito Case
5/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
5
The underlying assumption of the reform was to establish and
maintain financial equilibrium of the Electricity Sub-sector
The GOCI undertook to return VAT collected to the system
and provide natural gas to Azito Energie free of charge.
However , it should be noted that the issue of VATis still
pending.
8/13/2019 Azito Case
6/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
6
The intitutional Framework in the Electricity Sub Sector:
Exchange Rate of January 2004
The institutional framework was defined in line with the strategic framework through thecreation of
ANARE
Agence Nationale de Rgulation du sous-secteur Electrique
SOPIE
Socit dopration ivoirienne dlectricit
SOGEPSocit de gestion du patrimoine du secteur de llectricit
8/13/2019 Azito Case
7/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
7
Findings of the SER
Despite the reform process implemented by the GOCI,
the legal and institutional framework is stillcharacterized by:
Some confusion on the role of various agencies and
the lack of clearly defined responsibilities of each
agency in the decisio-making process.
It should be noted that the FNEE which was expected to
manage the cash flows of the sub-sector has beendismantled and its role is currently assured by SOGEP.
8/13/2019 Azito Case
8/10
8/13/2019 Azito Case
9/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
9
Prospects The GOCI has initiated discussions with Azito Energy
for the implementation of Phase III (Combined Cycleturbine)
As per CIE, in order to achieve financial equilibrium
in the sub-sector, a 40% tariff increase would be noted.
The GOCI had to subsidize the sub-sector in 2006 and
2007 in order to help the sub-sector
The GOCI has decided to put a Fcfa 30 billion cap on
its subsidies for the cost of natural gas used in the
production of electricity A 10% tariff increase has also been agreed upon
8/13/2019 Azito Case
10/10
PRIVATE SECTOR DEPARTMENTPRIVATE SECTOR DEPARTMENT
10
An agreement has been reached between
the GOCI and CIE in order to liquidate
current arrears between CIE and the State
In 2007, the GOCI decided to implement an
energy saving programs.
Discussions have been initiated to assessthe the long-term viability of the use of
natural gas for the generation of electricity.