+ All Categories
Home > Documents > B A - NCDOTsuzanne stephens fair suzanne stephens fair william h. stephens jerry d. crawford wanda...

B A - NCDOTsuzanne stephens fair suzanne stephens fair william h. stephens jerry d. crawford wanda...

Date post: 29-Jul-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
1
S OURCE : NC ONE M AP AE RI AL DATE : F E BRUARY 2016 S OURCE : NC ONE M AP AE RI AL DATE : F E BRUARY 2016 SOURCE: NC ONE MAP AERIAL DATE: FEBRUARY 2016 TRAFFIC VOLUME DATA VOLUMES IN 100S 247 173 290 184 33 24 20 13 4 <1 28 24 19 12 <1 1 LEGEND DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 100' 0' 100' 200' 50' EXISTING ROADWAY PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED 0000 0000 PRESENT ADT FUTURE ADT PROPERTY LINES PROPOSED STRUCTURES, ISLAND, SIDEWALK, CURB AND GUTTER EXISTING ROADWAY TO BE REMOVED PROPOSED CONTROL OF ACCESS EXISTING STRUCTURES, ISLAND, SIDEWALK CURB AND GUTTER TO BE REMOVED C A PROPOSED RIGHT OF WAY EXISTING RIGHT OF WAY EXISTING UTILITY EASEMENT BUILDINGS CEMETERY PROPOSED CONSTRUCTION EASEMENT N.C. 72 U.S. 74 U.S. 74 N.C. 130 2040 ADT 2018 ADT UTILITY INFORMATION SUBJECT TO CHANGE. INCLUDING UTILITY EASEMENTS, ARE PRELIMINARY AND ARE UTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, LIMITED TO LOCATION OF MAJOR EXISTING AND POTENTIAL DISPLAYS. THE UTILITY INFORMATION SHOWN ON THESE MAPS IS UTILITIES ARE NOT SHOWN ON THESE MAPS OR ON OTHER TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED IMPACTS AND DRIVEWAY TIES BE DETERMINED DURING FINAL DESIGN USING FINAL SURVEYS. USING FINAL GROUND SURVEYS. DRIVEWAY LOCATIONS WILL ALSO DESIGNERS WILL ATTEMPT TO MINIMIZE IMPACTS WHERE FEASIBLE PRELIMINARY GROUND SURVEYS. DURING THE FINAL DESIGN STAGE, HEARING MAP ARE BASED OFF OF PRELIMINARY DESIGNS AND LIMITS OF CONSTRUCTION AND THEIR IMPACTS SHOWN ON THIS ELIMINATED. SUCH AS VIA A SIDE ROAD, ACCESS TO U.S. 74 MAY BE POINT MAY BE CONSIDERED. FOR PROPERTIES THAT HAVE ACCESS, (FOR EXAMPLE, 2000 FEET OR MORE), AN ADDITIONAL ACCESS PER PARCEL. FOR PROPERTIES WITH LARGE ROAD FRONTAGES FULL CONTROL OF ACCESS IS DEFINED AS ONE ACCESS POINT NOTE: LAKES, RIVERS, STREAMS, AND PONDS EXISTING CONTROL OF ACCESS WETLANDS ; W W W S W 95. 00' 95. 00' 60. 00' 60. 00' 60. 00' 340. 00' 30. 00' B E MC U T I L I T Y E A S E ME N T 30. 00' 30. 00' 30 . 00 ' 30. 00' 20 0 . 0 0 ' 60. 00' C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; M A T C H L I N E M A T C H L I N ES EEI N S ET INSET 25 30 35 -Y1- PC Sta. 35+23.35 -L- SC Sta. 71+65.58 -L- TS Sta. 68+65.58 20 25 30 35 40 45 50 55 60 65 70 -L- POT Sta. 68+00.00 (47.00' LT.) -RPA- POT Sta. 10+00.00 = BEGIN GRADE 1 0 15 20 25 -RPA- SC Sta. 15+65.00 -RPA- CS Sta. 18+46.23 -RPA- SRS Sta. 20+86.23 -RPA- SC Sta. 23+26.23 -RPA- PT Sta. 25+99.92 10 15 2 0 -RPB- SC Sta. 12+75.00 -RPB- CS Sta. 19+12.59 -RPB- ST Sta. 20+17.59 4 0 45 50 55 6 0 6 5 70 75 80 85 -Y1- PT Sta. 80+32.71 -Y1- POT Sta. 87+61.17 10 15 2 0 2 5 -RPC- TS Sta. 13+70.00 -RPC- SC Sta. 15+35.00 -RPC- CS Sta. 19+03.42 -RPC- SRS Sta. 21+43.42 -RPC- SC Sta. 23+83.42 -RPC- PT Sta. 27+45.28 10 1 5 20 2 5 -RPD- POT Sta. 25+25.59 -RPC- POT Sta. 29+08.20 = -Y1- PT Sta. 58+77.16 = -RPD- CS Sta. 22+89.40 -RPD- ST Sta. 23+94.40 -RPD- SC Sta. 13+35.00 -L- POT Sta. 66+02.73 (47.00' RT.) -RPD- TS Sta. 12+30.00 = BEGIN GRADE -RPD- POT Sta. 10+00.00 10 -SRA- PCC Sta. 12+29.37 -SRA- PT Sta. 13+74.06 -SRA- PC Sta. 10+13.71 -SRB- PC Sta. 10+00.00 -SRB- PT Sta. 12+23.37 -SRB- POT Sta. 14+38.21 -Y1- Sta. 73+70.97 (12.00' RT) -SRB- POT Sta. 10+13.24 = BEGIN GRADE -RPA- POT Sta. 26+22.13 END GRADE -RPB- POT Sta. 24+96.92 -RPA- POT Sta. 26+96.75 = -Y1- PC Sta. 64+90.45 = -L- Sta. 38+00.00 (47.00' LT.) -RPB- TS Sta. 11+70.00 = BEGIN GRADE -RPB- POT Sta. 10+00.00 -L- Sta. 35+00.00 (47.00' RT.) -RPC- POT Sta. 10+00.00 = BEGIN GRADE -RPC- POT Sta. 28+33.58 END GRADE -RPD- POT Sta. 24+50.97 END GRADE -Y1- Sta. 43+00.48 (12.00' RT) -SRA- POT Sta. 10+00.00 = BEGIN GRADE -RPA- TS Sta. 14+00.00 -RPB- POT Sta. 24+22.30 END GRADE 15 10 PUBLIC MEETING MAP P U B L I C M EET I NG M A P R O B E S ON C OUN T Y ROBESON COUNTY RO B E S O N C OUN T Y DESIGN DATA SCALE P U B L I C M EET I NG M A P D E C E M B E R 2018 DECEMBER 2018 D E C E M B E R 2018 DIAMOND INTERCHANGE WITH ROUNDABOUTS U.S. 74 / N.C. 130 INTERSECTIONS TO A CONVERSION OF THE U.S. 74 / N.C. 72 AND D I A M OND I N TE RC H A NGE W I T H R OUN DA B OU T S U . S . 7 4 / N . C . 1 30 I N TE R S E C T I O N S T O A C ONV E R S I ON O F T H E U . S . 7 4 / N . C . 72 AN D D I A M OND I N TE RC HANG E W I T H R OUNDA B OU T S U . S . 74 / N. C . 130 I N TE R S E C T I ON S T O A C ONV E R S I ON O F T H E U . S . 74 / N . C . 72 AND 8% = Max. Superelev. = 75 mph Design Speed Interstate = Functional Class. T I P NO . 53 087 . 1 . 1 ( R- 5751 ) TIP NO. 53087.1.1 (R-5751) T I P NO . 53087 . 1 . 1 ( R - 5751 ) C C C C C C F F F F F F C F C C C C C C F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F C C F C C F F C C F F F F F F F B A D C TRACEY LYNN HORNE KENNETH HAYES HORNE BYRON B. WALTERS KENNETH HAYES HORNE KENNETH HAYES HORNE SUZANNE STEPHENS FAIR SUZANNE STEPHENS FAIR SUZANNE STEPHENS FAIR SUZANNE STEPHENS FAIR CYNTHIA G. LOCKLEAR VERNIE A. LOCKLEAR RICHARD SHAWN TAYLOR WILLIAM H. STEPHENS WILLIAM H. STEPHENS WILLIAM H. STEPHENS WILLIAM H. STEPHENS WILLIAM H. STEPHENS GLADYS MARIE BRITT TONY BRITT ET UX WILLIAM H. STEPHENS SUZANNE STEPHENS FAIR MARY E. CALDER FRED K. CALDER, SR. BARBARA CALDER CAIN MARY E. CALDER FRED K. CALDER, SR. BOBBY L. BARDEN WILLIAM E. STEPHENS ANNE F. RICH JULIA F. SMITH SUZANNE STEPHENS FAIR SUZANNE STEPHENS FAIR WILLIAM H. STEPHENS JERRY D. CRAWFORD WANDA CRAWFORD SHEARLDIAN FAULK DANIEL C. FAULK RODNEY CLEVELAND IVEY SUZANNE STEPHENS FAIR MDAYYAD AL-NASRA STEPHENS WILLIAM E. FAIR SUZANNE STEPHENS ANN IVEY CHARLES IVEY I ND I AN L AND F A R M X I V , LL C -L- Sta. 26+00.00 BEGIN PROJECT -L- Sta. 75+85.00 END PROJECT -Y1- Sta. 32+00.00 BEGIN CONSTRUCTION -SRB- Sta. 14+00.00 END CONSTRUCTION -Y1- Sta. 84+00.00 END CONSTRUCTION -SRA- Sta. 13+15.00 END CONSTRUCTION 74 74 72 130 130 -L- -L- - Y 1 - - Y 1 - - Y 1 - - S R A - - S RB - - R P A - - R P B - - R P C - - R P D - T O O R R U M T O L U M B E R T ON CEMETERY FAIR STEPHENS SUZANNE T O W H I TE V I LLE TO LUMBERTON ANNE F. RICH JULIA F. SMITH ANNE F. RICH JULIA F. SMITH I ND I AN L AND F A R M X I V , LL C NORTH CAROLINA STATE OF
Transcript
Page 1: B A - NCDOTsuzanne stephens fair suzanne stephens fair william h. stephens jerry d. crawford wanda crawford shearldian faulk rodney cleveland ivey daniel c. faulk suzanne stephens

SO

UR

CE:

NC

ON

E

MA

P

AE

RIA

L

DA

TE: F

EB

RU

AR

Y 2016

SO

UR

CE: N

C

ON

E

MA

P

AE

RIA

L

DA

TE: F

EB

RU

AR

Y 2016

SOURCE: NC ONE MAPAERIAL DATE: FEBRUARY 2016

TRAFFIC VOLUME DATA

VOLUMES IN 100S

247173

290184

3324

2013

4<1

2824

1912

<11

LEGEND

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

100' 0' 100' 200'

50'

EXISTING ROADWAY

PROPOSED ROADWAY

EXISTING ROADWAY TO BE RESURFACED

0000

0000 PRESENT ADT

FUTURE ADT

PROPERTY LINES

PROPOSED STRUCTURES, ISLAND, SIDEWALK,

CURB AND GUTTER

EXISTING ROADWAY TO BE REMOVED

PROPOSED CONTROL OF ACCESS

EXISTING STRUCTURES, ISLAND, SIDEWALK

CURB AND GUTTER TO BE REMOVED

C

A

PROPOSED RIGHT OF WAY

EXISTING RIGHT OF WAY

EXISTING UTILITY EASEMENT

BUILDINGS

CEMETERY

PROPOSED CONSTRUCTION EASEMENT

N.C. 72

U.S. 74 U.S. 74

N.C. 130

2040 ADT2018 ADT

UTILITY INFORMATION

SUBJECT TO CHANGE. INCLUDING UTILITY EASEMENTS, ARE PRELIMINARY AND AREUTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS,LIMITED TO LOCATION OF MAJOR EXISTING AND POTENTIALDISPLAYS. THE UTILITY INFORMATION SHOWN ON THESE MAPS ISUTILITIES ARE NOT SHOWN ON THESE MAPS OR ON OTHERTO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED

IMPACTS AND DRIVEWAY TIES

BE DETERMINED DURING FINAL DESIGN USING FINAL SURVEYS. USING FINAL GROUND SURVEYS. DRIVEWAY LOCATIONS WILL ALSODESIGNERS WILL ATTEMPT TO MINIMIZE IMPACTS WHERE FEASIBLEPRELIMINARY GROUND SURVEYS. DURING THE FINAL DESIGN STAGE,HEARING MAP ARE BASED OFF OF PRELIMINARY DESIGNS ANDLIMITS OF CONSTRUCTION AND THEIR IMPACTS SHOWN ON THIS

ELIMINATED.SUCH AS VIA A SIDE ROAD, ACCESS TO U.S. 74 MAY BEPOINT MAY BE CONSIDERED. FOR PROPERTIES THAT HAVE ACCESS,(FOR EXAMPLE, 2000 FEET OR MORE), AN ADDITIONAL ACCESSPER PARCEL. FOR PROPERTIES WITH LARGE ROAD FRONTAGESFULL CONTROL OF ACCESS IS DEFINED AS ONE ACCESS POINT

NOTE:

LAKES, RIVERS, STREAMS, AND PONDS

EXISTING CONTROL OF ACCESS

WETLANDS

;

W

W

W

S

W

95.0

0'

95.0

0'

60.0

0'

60.0

0'

60.0

0'

340.0

0'

30.0

0'

BEMC UTIL

ITY EASEMENT

30.0

0'

30.0

0'

30.00'

30.0

0'

200.00'

60.0

0'

CA

C A

C A

C A

C

A

C

A

C

A

C

A

CA

CA

CA

C

AC

A

C

A

C

A

C

A

;

;

;

; ;

;;

;

;

;

;

;

;;

;

; ;

;; ;;

;

;

; ;;;

;

;

;

MATCHLINE

MATCHLINE SEE INSET

INSET

25

30

35 -Y1- PC Sta. 35+23.35

-L- SC Sta. 71+65.58-L- TS Sta. 68+65.58

20

25

30

35

40

45

50

55

60

65

70

-L- POT Sta. 68+00.00 (47.00' LT.)

-RPA- POT Sta. 10+00.00 =

BEGIN GRADE

10

15

20

25

-RPA- SC Sta. 15+65.00

-RPA- CS Sta. 18+46.23

-RPA- SRS Sta. 20+86.23

-RPA- SC Sta. 23+26.23

-RPA- PT Sta. 25+99.92

10

15

20

-RPB- SC Sta. 12+75.00

-RPB- CS Sta. 19+12.59

-RPB- ST Sta. 20+17.59

40

45

50

55

60

65

70

75

80

85

-Y1- PT Sta. 80+32.71

-Y1- POT Sta. 87+61.17

10

15

20

25

-RPC- TS Sta. 13+70.00

-RPC- SC Sta. 15+35.00

-RPC- CS Sta. 19+03.42

-RPC- SRS Sta. 21+43.42

-RPC- SC Sta. 23+83.42-RPC- PT Sta. 27+45.28

10

15

20

25

-RPD- POT Sta. 25+25.59

-RPC- POT Sta. 29+08.20 =

-Y1- PT Sta. 58+77.16 =

-RPD- CS Sta. 22+89.40

-RPD- ST Sta. 23+94.40

-RPD- SC Sta. 13+35.00

-L- POT Sta. 66+02.73 (47.00' RT.)

-RPD- TS Sta. 12+30.00 =

BEGIN GRADE

-RPD- POT Sta. 10+00.00

10

-SRA- PCC Sta. 12+29.37

-SRA- PT Sta. 13+74.06

-SRA- PC Sta. 10+13.71

-SRB- PC Sta. 10+00.00

-SRB- PT Sta. 12+23.37

-SRB- POT Sta. 14+38.21

-Y1- Sta. 73+70.97 (12.00' RT)

-SRB- POT Sta. 10+13.24 =

BEGIN GRADE

-RPA- POT Sta. 26+22.13

END GRADE

-RPB- POT Sta. 24+96.92

-RPA- POT Sta. 26+96.75 =

-Y1- PC Sta. 64+90.45 =

-L- Sta. 38+00.00 (47.00' LT.)

-RPB- TS Sta. 11+70.00 =

BEGIN GRADE

-RPB- POT Sta. 10+00.00

-L- Sta. 35+00.00 (47.00' RT.)

-RPC- POT Sta. 10+00.00 =

BEGIN GRADE

-RPC- POT Sta. 28+33.58

END GRADE

-RPD- POT Sta. 24+50.97

END GRADE

-Y1- Sta. 43+00.48 (12.00' RT)

-SRA- POT Sta. 10+00.00 =

BEGIN GRADE

-RPA- TS Sta. 14+00.00

-RPB- POT Sta. 24+22.30

END GRADE

15

10

PUBLIC MEETING MAP

PU

BLIC

ME

ETIN

G

MA

P

RO

BES

ON

CO

UN

TY

ROBESON COUNTY

RO

BES

ON

CO

UN

TY

DESIGN DATA

SCALE

PU

BLIC

ME

ETIN

G

MA

P

DE

CE

MB

ER

2018

DECEMBER 2018

DE

CE

MB

ER

2018

DIAMOND INTERCHANGE WITH ROUNDABOUTS

U.S. 74 / N.C. 130 INTERSECTIONS TO A

CONVERSION OF THE U.S. 74 / N.C. 72 ANDDIA

MO

ND IN

TE

RC

HA

NG

E

WIT

H

RO

UN

DA

BO

UTS

U.S. 7

4 / N.C. 13

0 IN

TE

RS

EC

TIO

NS

TO

A

CO

NV

ER

SIO

N

OF

TH

E

U.S. 7

4 / N.C. 7

2 A

ND

DIA

MO

ND IN

TE

RC

HA

NG

E

WIT

H

RO

UN

DA

BO

UTS

U.S. 74 / N.C. 13

0 IN

TE

RS

EC

TIO

NS

TO

A

CO

NV

ER

SIO

N

OF

TH

E

U.S. 74 / N.C. 72 A

ND

8%=Max. Superelev.

= 75 mphDesign Speed

Interstate=Functional Class.

TIP

NO. 5

3087.1.1 (R

-5751)

TIP NO. 53087.1.1 (R-5751)

TIP

NO. 53087.1.1 (

R-5751)

C

C

C

C

C

C

F

FF

F

F

F

C

F

C

C

C

C

C

C

F

F

F

F

F F

F

F

F

F

F

F

F F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C C

F

C

C F

F C C F

F

F

F

FF

F

B A

DC

TRACEY LYNN HORNEKENNETH HAYES HORNE

BYRON B. WALTERS

KENNETH HAYES HORNE

KENNETH HAYES HORNE

SUZANNE STEPHENS FAIR

SUZANNE STEPHENS FAIR

SUZANNE STEPHENS FAIR

SUZANNE STEPHENS FAIR

CYNTHIA G. LOCKLEARVERNIE A. LOCKLEAR

RICHARD SHAWN TAYLOR

WILLIAM H. STEPHENS

WILLIAM H. STEPHENS

WILLIAM H. STEPHENS

WILLIAM H. STEPHENS

WILLIAM H. STEPHENS

GLADYS MARIE BRITTTONY BRITT ET UX

WILLIAM H. STEPHENS

SUZANNE STEPHENS FAIR

MARY E. CALDERFRED K. CALDER, SR.

BARBARA CALDER CAIN

MARY E. CALDERFRED K. CALDER, SR.

BOBBY L. BARDEN

WILLIAM E. STEPHENS

ANNE F. RICHJULIA F. SMITH

SUZANNE STEPHENS FAIR

SUZANNE STEPHENS FAIR

WILLIAM H. STEPHENS

JERRY D. CRAWFORDWANDA CRAWFORD

SHEARLDIAN FAULKDANIEL C. FAULKRODNEY CLEVELAND IVEY

SUZANNE STEPHENS FAIR

MDAYYAD AL-NASRA

STEPHENSWILLIAM E.

FAIRSUZANNE STEPHENS

ANN IVEYCHARLES IVEY

INDIAN LAND FARM XIV, LLC

-L- Sta. 26+00.00

BEGIN PROJECT -L- Sta. 75+85.00

END PROJECT

-Y1- Sta. 32+00.00

BEGIN CONSTRUCTION

-SRB- Sta. 14+00.00

END CONSTRUCTION

-Y1- Sta. 84+00.00

END CONSTRUCTION

-SRA- Sta. 13+15.00

END CONSTRUCTION

74 74

72

130

130

-L- -L-

-Y1-

-Y1-

-Y1-

-SRA-

-SRB-

-RPA-

-RPB-

-RPC-

-RPD-

TO

ORR

UM

TO LUMBERTON

CEMETERY

FAIR

STEPHENS

SUZANNE

TO WHITEVILLE

TO LUMBERTON

ANNE F. RICHJULIA F. SMITH

ANNE F. RICHJULIA F. SMITH

INDIAN LAND FARM XIV, LLC

NORTH CAROLINA

STATE OF

Recommended