+ All Categories
Home > Documents > B Baan Pak Kham A S E ucation - childsdream.org fileently 62 studen 5 in primary lev inable...

B Baan Pak Kham A S E ucation - childsdream.org fileently 62 studen 5 in primary lev inable...

Date post: 11-Jun-2019
Category:
Upload: lamthuan
View: 213 times
Download: 0 times
Share this document with a friend
1
Fac Nam Lev No. No. No. Size Bud Con Pro Loc Map Pho Uns Get cts me vel of students of teachers of class rooms e of building dget nstruction period ject manager cation p otos safe, in particular tting to the village Baan Pak K Primary 62 2 4 224 m2 USD 14,635 Jun 08 – De Tai Xaiyaburi, L r during the rainy e is an adventure Kham 5 ec 08 Laos y season e Baan P Description Baan Pak Kha established in 1 are only 52 fam its income from There are curr offers grade 1 Having a susta reduce the drop Implementatio The proposed s m2. Child’s Dre The community for the land pr villagers. Child’s Dream district down, a for transportatio shop will be pa material will be This is conside the country. Budget Item Construction m Finishing mater Labor Interior / Furnitu Transportation Child’s Dream A Total *Steady price incr Beneficiaries Not really know Pak Kh am is a rather y 1987 only and th milies living in this m agriculture and rently 62 studen 5 in primary lev ainable education pout rate betwee on school building w eam will provide n y is also involved reparation. Stone will purchase a about 100 km fro on of the materia aid directly via a provided by the ered a ‘low risk’ p materials rials ure Administration rease for building m wing what’s going ham young village for heir first school w s village with a to selling of wood. ts enrolled and vel. n facility is impor en primary and se will have 4 class new school furni d in this project b es and wood fo and pay all the om Baan Pak Kh al. The workers’ Thai bank accou government sinc project as long a material poses a ce g to happen r Laotian standa was opened 10 y otal of 227 inhab looked after by rtant in order to econdary educat s rooms with a to ture for all the ro by providing som or the walls will required constru am. The shop in wages will be p unt as well as in ce this is an offic as we do not inte In THB 303,049 0 71,429 50,100 21,429 22,300 468,307 ertain risk to the bu Project Mana Charuwan Phaisantham Nickname: Ta tai@childsdre +66 (0)87 874 Tai has be Dream for 4 overseeing o Cambodia. B r A c S u E d ards. The settlem years later in 199 itants. The villag y 2 teachers. Th attract more chil tion. otal space of app ooms. me free labor, in also be provide uction material i n Paklay will also paid in cash. The cash. As usual, cial government s erfere in internal In USD 9,470 0 2,232 1,566 670 697 14,635 dget (iron/cement) ager ai eam.org 4 2934 en working fo years. She is our projects in L roadening ccess to ustainable ducation ment was 97. There e derives he school ldren and prox. 224 particular ed by the n Paklay o arrange e material teaching school. affairs of In % 64 0 15 11 5 5 100 r Child’s currently Laos and
Transcript

FacNam

Lev

No.

No.

No.

Size

Bud

Con

Proj

Loc

Map

Pho

Uns

Get

cts me

vel

of students

of teachers

of class rooms

e of building

dget

nstruction period

ject manager

cation

p

otos

safe, in particular

tting to the village

Baan Pak K

Primary

62

2

4

224 m2

USD 14,635

Jun 08 – De

Tai

Xaiyaburi, L

r during the rainy

e is an adventure

Kham

5

ec 08

Laos

y season

e

Baan P

Description Baan Pak Khaestablished in 1are only 52 famits income fromThere are curroffers grade 1 –Having a sustareduce the drop

ImplementatioThe proposed sm2. Child’s DreThe communityfor the land prvillagers. Child’s Dream district down, afor transportatioshop will be pamaterial will be This is considethe country. Budget Item

Construction m

Finishing mater

Labor

Interior / Furnitu

Transportation

Child’s Dream A

Total *Steady price incr

Beneficiaries

Not really know

Pak Kh

am is a rather y1987 only and th

milies living in thism agriculture and rently 62 studen– 5 in primary levainable educationpout rate betwee

on school building w

eam will provide ny is also involvedreparation. Stone

will purchase aabout 100 km froon of the materia

aid directly via a provided by the

ered a ‘low risk’ p

materials

rials

ure

Administration

rease for building m

wing what’s going

ham

young village forheir first school ws village with a toselling of wood. ts enrolled and

vel. n facility is imporen primary and se

will have 4 classnew school furnid in this project bes and wood fo

and pay all the om Baan Pak Khal. The workers’Thai bank accougovernment sinc

project as long a

material poses a ce

g to happen

r Laotian standawas opened 10 yotal of 227 inhab looked after by

rtant in order to econdary educat

s rooms with a toture for all the roby providing somor the walls will

required construam. The shop inwages will be p

unt as well as in ce this is an offic

as we do not inte

In THB

303,049

0

71,429

50,100

21,429

22,300

468,307 ertain risk to the bu

Project ManaCharuwan

Phaisantham

Nickname: Ta

tai@childsdre

+66 (0)87 874

Tai has beDream for 4 overseeing oCambodia.

B r

A c

S u

E d

ards. The settlemyears later in 199itants. The villag

y 2 teachers. Th

attract more chiltion.

otal space of appooms. me free labor, in

also be provide

uction material in Paklay will alsopaid in cash. The

cash. As usual, cial government serfere in internal

In USD

9,470

0

2,232

1,566

670

697

14,635 dget (iron/cement)

ager

ai

eam.org

4 2934

en working fo years. She is

our projects in L

roadening

ccess to

ustainable

ducation

ment was 97. There e derives

he school

ldren and

prox. 224

particular ed by the

n Paklay o arrange e material

teaching school. affairs of

In %

64

0

15

11

5

5

100

r Child’s currently

Laos and

Recommended