+ All Categories
Home > Documents > B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 ....

B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 ....

Date post: 12-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
19
1859-60. VICTORIA. B RID G E 80 RETURN to an Order of ,the Legislative Assembly, Dated 16th February, 1859, for- 1. The Materials of which the Bridges are severally constructed. 2. The Names of the Districts and Localities in which they have been erected. 3. The Date of each Contract, stating the difference (if any) between the time stipulated for and the Date of the actual completion of the work so let, distinguishing each year. 4. The Amount of the Original Estimate in each instance separately. 5. The Contract Price, or prices at which the construction of each Bridge w.as taken; also, the actual cost of the same, including all extras (if any). 6. The Total Cost of Repairs on each Bridge. 7. The Names of the Contractors. (Mr. HumJfrayJ Ordered by the Legislative Assembly to be printed, 11th February. 1860. tip JOHN I<"ElmES, GOVERNMENT PRINTER, MELBOURNE. C.-No.4.
Transcript
Page 1: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

1859-60

VICTORIA

B RID G E 80

RETURN to an Order of the Legislative Assembly

Dated 16th February 1859 forshy

1 The Materials of which the Bridges are severally constructed

2 The Names of the Districts and Localities in which they have been erected

3 The Date of each Contract stating the difference (if any) between the time stipulated for and the Date of the actual completion of the work so let distinguishing each year

4 The Amount of the Original Estimate in each instance separately

5 The Contract Price or prices at which the construction of each Bridge was taken also the actual cost of the same including all extras (if any)

6 The Total Cost of Repairs on each Bridge

7 The Names of the Contractors

(Mr HumJfrayJ

Ordered by the Legislative Assembly to be printed 11th February 1860

tip lltlut~Drit1

JOHN IltElmES GOVERNMENT PRINTER MELBOURNE C-No4

1

1 I

A RETURN in compliance with MR HUMFFRAYS motion of 16th February 1859 showing in a tabular form the following particulars relating to all BRIDGES which have been built at the public expense in the Colony of Victoria ieom 1st July 1851 to 1st January 1859 inclusive

11 Mnterials of which

the Bridges are seyerally constructed

Timber Stone and Timber

Ditto Timber Stone and Timber

Timber

Stone and Timber

Timber Stone and Timber

Timber

Ditto Ditto Ditto

- -- Z

The Names of the DIstrictsmiddot and Localities in which

they have been erected

-

MOUNT ALEXANDER ROAD

Ple ington Section

Flemington Spring Gully

Brickmakers Gully Keilor temporary Bridge Keilor Bridge

Viaduct and Embankments

Two dry gullies Keilor Plains

Gisborne Section

Aitkens Creek Campaspe south of Kyneshy

ton Campaspe at Carlsruhe

Near Manchester Arms Gap

Near Gisborne Toll-House

Two in township of Wood-end

3 The date of each Contrnct stntlng thc difference

(if any) betwcen the time stipulated for and the date of the actual completion of the work so let distinguishing c~eh year

Contrnct

June 1853

March1853

Nov 1853

Feb 1855

Dec 1853

Nov 1853

Datc of ~

Specified Completion

Not specified

Not specified

Jan 1854

~

Not specified

June 1854

June 1854

Actual

Completion

1851 1853

July 1853

Dec 1853 Dec 1853

4 Amount

of the original

estimate in each instance

sepaintely

pound

Feb 18541

1854

March 1855

July 1854

Aug 1854

1853

1853

1853

4583

fjOi5

5 The Contract Price or Prices at which

the construction of each Bridge wns taken also the actual cost of the same including all extras if any

Amount of shy

Contract

pound s d

1983 10 0

5945 0 0

5255 0 0

500 0 0

553 5 0

4511 0 0

5898 0 0

A

Actual Cost

pound

492 818

2303

700 11383

5255

500

553

4581

5898

226

1200

976

s

0 0

0

0 0

0

0

5

0

0

0

0

0

d

0 0

0

0 0

0

0

0

0

0

0

0

0

6 bull The total

Cost of Repairs on each Bridge

pound s d

32 1 9 25 0 0

148 11 4

3 2 51

30 0 0

85 0 0

25 0 0

7 The Names of the Contractors

Erected by piecework Erected by day labor

Hy Simson and others

ThosOldhamand others Thos Oldham and others

W D Scott George Holmes

Pettett Scithers John Cogan

Geo W Johnson

and

G W Johnson and Jno

Virtue (surety for William Styles) Erected by piecework

Erected by day labor

Erected by piecework

Remarks

Cost of timber not inshycluded-supplied by Supershyintendent of Bridges

Repairs in 1857 by Prout and Campbell

Piecework ~

Contractors for Keilor Bridge became insolvent and erection was comp1eted by tile Board

Repairs in 1857-8 by llrQut and Hunter and Wrc Robertson

omiddot

Two contracts

Two contracts

Repairs in 1857 by E Cherry

3

1

e

z

Aroun Alexander Road-continued pound Gisborne Section

Boggy CreekTimber June 1853 Between 29 and 30 mile postDitto June 1853

30and31Ditto June 1853 31 and 32 June 1853Ditto

193Ditto 22 and 23 May 1857 Campaspe at Kyneton Nov 1856 March 1857 I April 1857 3454Stone and Timber

Dec 1853Nov 1853 Dec 1853 Nov 1853 Dec 1853Nov 1853

Back Creell Sectioll

MarchlS54Dee 1853 Station Governors BridgeBarkers I April 1854 July 1854Stone and Timber

Creek Golden Point April 1856 Dee 1856 Ditto Back Creek Taradale Nov 1856 Feb1857Ditto Coliban I-tiver at Malmsshy March 1857 June 1857Ditto

bury Aberdeens FordForest I April 1856 Dec 1856 Ditto

RETURN in compliance with Mr Humffrays motion of 16th February 1859-eontinued

S The Contract Price or PrIces at which

construction of each Bridge was takcn also the actual cost of the 6same including nil extras if any) 7The total RemarkbullbullCost of Repairs on The Names of the ContractOrs Amounlof

1853 1854

Dec Nov 1854

DllCbull 1856 June 1857 July 1857 4000

Dec 1856

1853 1854

Dec 1853

Contract

each Bridgebull

Actnal Cost

pound s d1 pound s d o

125 125 Craig and Horn125 f 1lt oo125 200 o 0 George Holmes

2481 2 0 Grant and McLean I Two contracts

Geo Letts 150 0 0 240 0 0

Love 205 0 0 Letts Love and Co2865 0 0

Thomas Miles 2600 0 0 1910 3 9

J Reilly and Co 3557 II 4 Evans and Merry

Archibald Oughton15003 12 7

66 0 0

1010 0 0 38 0 0 60 0 0

130 0 0 354 10 8 120 0 0

George Letts 100 0 0 85 0 0

George Letts 90 0 0 George Letts

Stone and Timber Timber

Ditto Ditto Ditto Ditto Ditto

Timber Ditto Ditto

Creek

Market repairs Harcourt Smith Kangaroo King bull Sheriffs Back Creek

Castiemaine to SandkuTst Creek not named Bennet Itinnon

pound

200 2481

240 150 205

2700

1897 2600 2028

s

0 2

0 0 0 0

0 0 4

1503 12

85 0 100 0

)0 0

d

0 0

0 0 0 0

0 0 4

7

0 0 0

Ditto

f Ditto

Stone and Timber Timber

Ditto

Ditto~ Ditto f Ditto

Ditto

Ditto Ditto

Ditto Ditto Ditto

Stone and rimber Ditto

Ditto Timber

Glass Nov 1853 I Dec 1853 Pensioners Nov 1853 Store Nov 1853 Golden i Jan 1854 Camp I Jan 1854

Tiernay April1854Ravenswood March1857

Jfour small Bridges March 1857 Harneys Bridge over New April 1857

Cut 1

Castlemaine to Avoca viil Newstead and Carisorook

Deep Creek Caris brook 1 March 1853 1March 1854

Timber Loddon River at Catos I Aug 1853 1 July 1854

MaloneyS or NationalshyCampbells Creek

South Muckleford Creek Joyces Creck Loddon Punt at Newstead

Bet middotBet Creek North-stroet and Timor

creek (two) Avoca Hiver Murray River - Punt at

Maidens

Castlemaine to the Jl1urray viii Mount KOTong

Feb 1856

Dec 1856 May 1856 May 1855

April 1857 May 1858

Jan 1859

Dcc 1853 Jan 1854

March 1854 March 1854

June 1854 June 1857

June 1857 July 1857

June 1856

Feb 1857 July 1856 Dec 1855

Aug 1857 Aug 1858

Mareh1859

April1854 April 1854 May 1854

Maych1854 July 1854

July 1854 Dec 1857

Dec 1857 July 1857

June 1854 Dec 1856

March1857 March1857 Jan 1856

Sept 1857 Oct 1858

3215 1468

May 1856

March 1858

May 1854 May 1854

Oct 1856 May 1857

2184 n

March 18591 2000 Nov 1853

1 Nov 1854

Aug 1856

Nov 1858 Sept 1854 Sept 1854

Jan 1857 July 1857

110 0 9 120 0 0 280 0 0 750 0 0 400 0 0

648 0 0 1000 0 0

740 0 0 873 10 0

2591 0 1351 4

no 120 280 750 400

648 1000

740 836

2332 1351

851 2550 1785

2902 1560

1990 1000

9716

2605

0 0 0 0 0

0 0

0 0

0 4

4shy0 0

1 0

8 0

0 0 0 0 0

0 0

0 0

0 0

0 0 Omiddot

6 0

0 0

95 0 0

1 851 4

2558 2 01 1857 0 0 181 ( 0

2902 1 6 1560 0 0

1990 8 0 1000 0 0 1111 13 11

2605 4 0

2184 11 3

170 0 0 400 0 0

3880 0 0 340 0 0

George Letts George Letts George Letts William Postle Wm Postle and J W Repairs in 1855 by T

Elliott J ThompsonJ W Elliott John Davidson lortion of Contract for

road works-pound4185 Johu Davidson Amos and Co

James Small Archibald Oughton

J Musson Thomas Miles T J Thompson Repairs include wages

of puntman Archibald Oughton Joseph Hughes Portion of contract forI road works-pound49691sJ H Lawlor James Maiden Repairs include wages

bull of puntman

10397 17 91 30 0 o IGerium and Jebb 1 Repairs in 1858 by L station Four s~aIl Bridges over April 1856

bull Gulhes

Castlemaine to Tarrangower 1 Laurances Bridge over 1 Aug 1857

Loddon at Bryants Back Creek April 1854 Muckleford Creek April 1854

Castlernaine to BctllaaratI Loddon River at Guildford May 1856 Vaughans Bridge at junemiddot March 1857

tiOll of lhyers Creek and Loddon

0

4 0 McCoy

WIll Bassett

J Martindale

R Barklay and Co 58 9 0 David Brook IRepairs in 1858 by

Pickley and Grive

IT J ThompsonBell and Rutherford

Ditto

Stone and Timber

Timber Ditto

Stone and Timber Timber bull

170 400

3500 340

0 0 ~ I

0 01 0

01

--------- ----

bull

1 Materials of which

the Bridges are scverally

Timber

Timber Ditto

Stone and Timber

Timber

Ditto

Ditto

Stone and Timber

Ditto

Timber Stone and Timber

Z 11le Names of the

Districbl and LocaEtics in which they Imve been erected

Castlemaillc to Newbridge Bradford Creek bullbullbull

Sandhurst to the Murray Three small Bridges Picanninny Creek

Sandhurst to Heathcote Axe Creek AxedaJe McIvor Creek

Woodena to Lancefield Two small bridges

Kyneton to Mount Franklin Two log bridges

Avoca and Adelaide Avoca River

JJfarjborough and Amherst Creek not named at Mary-

borough One bridge and two stone

inverts

Fryers Creek Road Creek at Fryerstown

YVNEY ROAD

Kalkallo Small bria ge Creek at RockyWaterHoles

RETUalt in compliance with Mr Humffi-ays motion of 16th February 1839-continued

3 The daro of each Contract stating tho dlfferenco

(If auy) hetween the time stipulated for and the date ot tho actual completion of the work sO let distinguisl1ing each year

Contract

Dec 1858

May 1856 May 1858

Dec 1858 Dec 1858

Sept 1857

April1857

March1851

April 1858

Dec 1858

Feb 1858

May 1855 Sept 1856

Date of

~pec~ed

Feb 1859

July 1856 Sept 1858

July 1859 June 1859

Dec 1857

June 1857

Aug 1857

Sept 1858

March 1859

July 1858

Not specified Dec 1856

Actual

April 1859

Oct 1856 Dec 1858

July 1859 In progress

Dec 1857

July 1857

Sep 1857

Sept 1858

Sep_ 1859

July 1858

July 1855 Dec 1856

Amount of the original estimate In each instance

separalely

pound 400

510

3000

500

6268

400

1000

1800

5 TIle Contract 1) icc or Prlces at which

tile construetion or each Bridge was taken a1so the actual cost of the same including all extras (if any)

Amount of

Contract

pound s 397 10

3550 0 -388 18

1796 5 1200 0

495 11

474 9

5884 0

460 0

919 17

1253 0

259 0 2795 0

d 0

0 3

0 0

0

0

0

0

0

0

0 0

Actual Cost

pound s d 397 10 0

3589 6 0 388 18 3

1796 5 0 In progress

608 6 0

636 18 6

5834 0 0

460 0 0

919 17 0

1303 0 0

281 0 0 2904 16 0

6 The toinl

Cost of Repnirs on each Bridge

pound s d

10 I 0

_0lil

7 RemarksThe Names of the Contractors

C Dundas and Co

Wm Bassett Edwarti OKeefe

LeCapclain and Parsons Geo Hagley

Ol

D Syme

A Dempster

Joseph Hughes

Joseph Hughes

Joseph Thompson Portion of contract for road works-pound3250

Mansfield and Cappiter

James Bevan H Dalrymple

Timber

Ditto

Ditto

Ditto Ditto Ditto Ditto

Ditto

Ditto Ditto Ditto

Ditto

Ditto

Ditto

Ditto

Ditto

Stone and Timber

Timber

Ditto

Ditto

KiltlOre Nelsons bridge Kilmore Aug 1853

Oreek

Greens Pinch Oct 1853

Kalkallo I Two bridges Gleesons Dec 1853

Swamp 1

Kilmore Near old Pound NO 1853 South of Morriss H~tel Oc 1853 Kilmore township south Nov 1853 Faithfuls Creek May 1859

Semour Two narrow bridges

) Feb1854

Whiteheads Creek March1856 Sunday Oreek Feb 1857 Punt

Longwood Longwood Bridge near Sa- June 1853

lutation Inn Creightons Creek Feb 1856

Four-mile Creek Dee 1858

Benalla Moonee Oreek on road to Dee 1853

Delatite twelve miles from Benalla

Four - mile Creek on old March1855 Sydney Road near Beshynalla

Winton seven miles from Benalla

Broken Rher Eastern branch

CreightonS Creek

June

Dec

1858

1858

Broken River Bridge

or Benalla

Ditto June 1856 Over Lagoon

April1854Ditto 1 Woolpress Creek

Not specified April 1854 I

Nov 1853 Dec 1853

Feb 1854 Feb 1854

Notspecifiedmiddot March 1854 Not specified Jan 1854 Not specified ]lteb 1854 May 1859

Not specified

May 1856 July 1857

Not specified

June 1856

March1859

March1854

May 1855

Sep 1858

Jan 1859

Sept 1856

July 1854

May 1859

Mareh1854

May 1856 July 1857

Sept 1854

Aug 1856

April1859

March1854

June 1855

Sept 1858

May 1859

Sept 1856

Oct 1854

300

1000

300 300

Old bridges

538 4523

488

629

Old bridge

Old bridge

922

-t

600 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

406 17 8

600 0 0

680 0 0

384 0 0

399 0 0

784 11 0

850 0 0

658 0 0

890 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

464 11 5

600 0 0

575 0 0

390 00

354 0 0

784 11 0

850 0 0

725 0 0

409

200

731

439

44

660

A Nelson J Williammiddot son and others

0 0

H W Oooper

Henry Elmore

J H Drew J Martindale John H Drew Alex Amos and Co

John Green and C Vanzulcicum

Thomas Miles William Allen

11

0 0

Rice Smith and others4 0

Stewart and Kerr

George Gordon

Rice and Co and B Mc1ltarlane

George Gordon

Menzies Charlton and Co

Alex Amos and Co and E Brown

0 0 Rice and Smith

Rice and Smith and others

Peter Martin

0

WH MeKay

Repurs by G M Wilshyson and Stewart and Kerr

These repairs include wages of puntman small boat ampc

Now torming part of Benalla Bridge

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 2: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

1

1 I

A RETURN in compliance with MR HUMFFRAYS motion of 16th February 1859 showing in a tabular form the following particulars relating to all BRIDGES which have been built at the public expense in the Colony of Victoria ieom 1st July 1851 to 1st January 1859 inclusive

11 Mnterials of which

the Bridges are seyerally constructed

Timber Stone and Timber

Ditto Timber Stone and Timber

Timber

Stone and Timber

Timber Stone and Timber

Timber

Ditto Ditto Ditto

- -- Z

The Names of the DIstrictsmiddot and Localities in which

they have been erected

-

MOUNT ALEXANDER ROAD

Ple ington Section

Flemington Spring Gully

Brickmakers Gully Keilor temporary Bridge Keilor Bridge

Viaduct and Embankments

Two dry gullies Keilor Plains

Gisborne Section

Aitkens Creek Campaspe south of Kyneshy

ton Campaspe at Carlsruhe

Near Manchester Arms Gap

Near Gisborne Toll-House

Two in township of Wood-end

3 The date of each Contrnct stntlng thc difference

(if any) betwcen the time stipulated for and the date of the actual completion of the work so let distinguishing c~eh year

Contrnct

June 1853

March1853

Nov 1853

Feb 1855

Dec 1853

Nov 1853

Datc of ~

Specified Completion

Not specified

Not specified

Jan 1854

~

Not specified

June 1854

June 1854

Actual

Completion

1851 1853

July 1853

Dec 1853 Dec 1853

4 Amount

of the original

estimate in each instance

sepaintely

pound

Feb 18541

1854

March 1855

July 1854

Aug 1854

1853

1853

1853

4583

fjOi5

5 The Contract Price or Prices at which

the construction of each Bridge wns taken also the actual cost of the same including all extras if any

Amount of shy

Contract

pound s d

1983 10 0

5945 0 0

5255 0 0

500 0 0

553 5 0

4511 0 0

5898 0 0

A

Actual Cost

pound

492 818

2303

700 11383

5255

500

553

4581

5898

226

1200

976

s

0 0

0

0 0

0

0

5

0

0

0

0

0

d

0 0

0

0 0

0

0

0

0

0

0

0

0

6 bull The total

Cost of Repairs on each Bridge

pound s d

32 1 9 25 0 0

148 11 4

3 2 51

30 0 0

85 0 0

25 0 0

7 The Names of the Contractors

Erected by piecework Erected by day labor

Hy Simson and others

ThosOldhamand others Thos Oldham and others

W D Scott George Holmes

Pettett Scithers John Cogan

Geo W Johnson

and

G W Johnson and Jno

Virtue (surety for William Styles) Erected by piecework

Erected by day labor

Erected by piecework

Remarks

Cost of timber not inshycluded-supplied by Supershyintendent of Bridges

Repairs in 1857 by Prout and Campbell

Piecework ~

Contractors for Keilor Bridge became insolvent and erection was comp1eted by tile Board

Repairs in 1857-8 by llrQut and Hunter and Wrc Robertson

omiddot

Two contracts

Two contracts

Repairs in 1857 by E Cherry

3

1

e

z

Aroun Alexander Road-continued pound Gisborne Section

Boggy CreekTimber June 1853 Between 29 and 30 mile postDitto June 1853

30and31Ditto June 1853 31 and 32 June 1853Ditto

193Ditto 22 and 23 May 1857 Campaspe at Kyneton Nov 1856 March 1857 I April 1857 3454Stone and Timber

Dec 1853Nov 1853 Dec 1853 Nov 1853 Dec 1853Nov 1853

Back Creell Sectioll

MarchlS54Dee 1853 Station Governors BridgeBarkers I April 1854 July 1854Stone and Timber

Creek Golden Point April 1856 Dee 1856 Ditto Back Creek Taradale Nov 1856 Feb1857Ditto Coliban I-tiver at Malmsshy March 1857 June 1857Ditto

bury Aberdeens FordForest I April 1856 Dec 1856 Ditto

RETURN in compliance with Mr Humffrays motion of 16th February 1859-eontinued

S The Contract Price or PrIces at which

construction of each Bridge was takcn also the actual cost of the 6same including nil extras if any) 7The total RemarkbullbullCost of Repairs on The Names of the ContractOrs Amounlof

1853 1854

Dec Nov 1854

DllCbull 1856 June 1857 July 1857 4000

Dec 1856

1853 1854

Dec 1853

Contract

each Bridgebull

Actnal Cost

pound s d1 pound s d o

125 125 Craig and Horn125 f 1lt oo125 200 o 0 George Holmes

2481 2 0 Grant and McLean I Two contracts

Geo Letts 150 0 0 240 0 0

Love 205 0 0 Letts Love and Co2865 0 0

Thomas Miles 2600 0 0 1910 3 9

J Reilly and Co 3557 II 4 Evans and Merry

Archibald Oughton15003 12 7

66 0 0

1010 0 0 38 0 0 60 0 0

130 0 0 354 10 8 120 0 0

George Letts 100 0 0 85 0 0

George Letts 90 0 0 George Letts

Stone and Timber Timber

Ditto Ditto Ditto Ditto Ditto

Timber Ditto Ditto

Creek

Market repairs Harcourt Smith Kangaroo King bull Sheriffs Back Creek

Castiemaine to SandkuTst Creek not named Bennet Itinnon

pound

200 2481

240 150 205

2700

1897 2600 2028

s

0 2

0 0 0 0

0 0 4

1503 12

85 0 100 0

)0 0

d

0 0

0 0 0 0

0 0 4

7

0 0 0

Ditto

f Ditto

Stone and Timber Timber

Ditto

Ditto~ Ditto f Ditto

Ditto

Ditto Ditto

Ditto Ditto Ditto

Stone and rimber Ditto

Ditto Timber

Glass Nov 1853 I Dec 1853 Pensioners Nov 1853 Store Nov 1853 Golden i Jan 1854 Camp I Jan 1854

Tiernay April1854Ravenswood March1857

Jfour small Bridges March 1857 Harneys Bridge over New April 1857

Cut 1

Castlemaine to Avoca viil Newstead and Carisorook

Deep Creek Caris brook 1 March 1853 1March 1854

Timber Loddon River at Catos I Aug 1853 1 July 1854

MaloneyS or NationalshyCampbells Creek

South Muckleford Creek Joyces Creck Loddon Punt at Newstead

Bet middotBet Creek North-stroet and Timor

creek (two) Avoca Hiver Murray River - Punt at

Maidens

Castlemaine to the Jl1urray viii Mount KOTong

Feb 1856

Dec 1856 May 1856 May 1855

April 1857 May 1858

Jan 1859

Dcc 1853 Jan 1854

March 1854 March 1854

June 1854 June 1857

June 1857 July 1857

June 1856

Feb 1857 July 1856 Dec 1855

Aug 1857 Aug 1858

Mareh1859

April1854 April 1854 May 1854

Maych1854 July 1854

July 1854 Dec 1857

Dec 1857 July 1857

June 1854 Dec 1856

March1857 March1857 Jan 1856

Sept 1857 Oct 1858

3215 1468

May 1856

March 1858

May 1854 May 1854

Oct 1856 May 1857

2184 n

March 18591 2000 Nov 1853

1 Nov 1854

Aug 1856

Nov 1858 Sept 1854 Sept 1854

Jan 1857 July 1857

110 0 9 120 0 0 280 0 0 750 0 0 400 0 0

648 0 0 1000 0 0

740 0 0 873 10 0

2591 0 1351 4

no 120 280 750 400

648 1000

740 836

2332 1351

851 2550 1785

2902 1560

1990 1000

9716

2605

0 0 0 0 0

0 0

0 0

0 4

4shy0 0

1 0

8 0

0 0 0 0 0

0 0

0 0

0 0

0 0 Omiddot

6 0

0 0

95 0 0

1 851 4

2558 2 01 1857 0 0 181 ( 0

2902 1 6 1560 0 0

1990 8 0 1000 0 0 1111 13 11

2605 4 0

2184 11 3

170 0 0 400 0 0

3880 0 0 340 0 0

George Letts George Letts George Letts William Postle Wm Postle and J W Repairs in 1855 by T

Elliott J ThompsonJ W Elliott John Davidson lortion of Contract for

road works-pound4185 Johu Davidson Amos and Co

James Small Archibald Oughton

J Musson Thomas Miles T J Thompson Repairs include wages

of puntman Archibald Oughton Joseph Hughes Portion of contract forI road works-pound49691sJ H Lawlor James Maiden Repairs include wages

bull of puntman

10397 17 91 30 0 o IGerium and Jebb 1 Repairs in 1858 by L station Four s~aIl Bridges over April 1856

bull Gulhes

Castlemaine to Tarrangower 1 Laurances Bridge over 1 Aug 1857

Loddon at Bryants Back Creek April 1854 Muckleford Creek April 1854

Castlernaine to BctllaaratI Loddon River at Guildford May 1856 Vaughans Bridge at junemiddot March 1857

tiOll of lhyers Creek and Loddon

0

4 0 McCoy

WIll Bassett

J Martindale

R Barklay and Co 58 9 0 David Brook IRepairs in 1858 by

Pickley and Grive

IT J ThompsonBell and Rutherford

Ditto

Stone and Timber

Timber Ditto

Stone and Timber Timber bull

170 400

3500 340

0 0 ~ I

0 01 0

01

--------- ----

bull

1 Materials of which

the Bridges are scverally

Timber

Timber Ditto

Stone and Timber

Timber

Ditto

Ditto

Stone and Timber

Ditto

Timber Stone and Timber

Z 11le Names of the

Districbl and LocaEtics in which they Imve been erected

Castlemaillc to Newbridge Bradford Creek bullbullbull

Sandhurst to the Murray Three small Bridges Picanninny Creek

Sandhurst to Heathcote Axe Creek AxedaJe McIvor Creek

Woodena to Lancefield Two small bridges

Kyneton to Mount Franklin Two log bridges

Avoca and Adelaide Avoca River

JJfarjborough and Amherst Creek not named at Mary-

borough One bridge and two stone

inverts

Fryers Creek Road Creek at Fryerstown

YVNEY ROAD

Kalkallo Small bria ge Creek at RockyWaterHoles

RETUalt in compliance with Mr Humffi-ays motion of 16th February 1839-continued

3 The daro of each Contract stating tho dlfferenco

(If auy) hetween the time stipulated for and the date ot tho actual completion of the work sO let distinguisl1ing each year

Contract

Dec 1858

May 1856 May 1858

Dec 1858 Dec 1858

Sept 1857

April1857

March1851

April 1858

Dec 1858

Feb 1858

May 1855 Sept 1856

Date of

~pec~ed

Feb 1859

July 1856 Sept 1858

July 1859 June 1859

Dec 1857

June 1857

Aug 1857

Sept 1858

March 1859

July 1858

Not specified Dec 1856

Actual

April 1859

Oct 1856 Dec 1858

July 1859 In progress

Dec 1857

July 1857

Sep 1857

Sept 1858

Sep_ 1859

July 1858

July 1855 Dec 1856

Amount of the original estimate In each instance

separalely

pound 400

510

3000

500

6268

400

1000

1800

5 TIle Contract 1) icc or Prlces at which

tile construetion or each Bridge was taken a1so the actual cost of the same including all extras (if any)

Amount of

Contract

pound s 397 10

3550 0 -388 18

1796 5 1200 0

495 11

474 9

5884 0

460 0

919 17

1253 0

259 0 2795 0

d 0

0 3

0 0

0

0

0

0

0

0

0 0

Actual Cost

pound s d 397 10 0

3589 6 0 388 18 3

1796 5 0 In progress

608 6 0

636 18 6

5834 0 0

460 0 0

919 17 0

1303 0 0

281 0 0 2904 16 0

6 The toinl

Cost of Repnirs on each Bridge

pound s d

10 I 0

_0lil

7 RemarksThe Names of the Contractors

C Dundas and Co

Wm Bassett Edwarti OKeefe

LeCapclain and Parsons Geo Hagley

Ol

D Syme

A Dempster

Joseph Hughes

Joseph Hughes

Joseph Thompson Portion of contract for road works-pound3250

Mansfield and Cappiter

James Bevan H Dalrymple

Timber

Ditto

Ditto

Ditto Ditto Ditto Ditto

Ditto

Ditto Ditto Ditto

Ditto

Ditto

Ditto

Ditto

Ditto

Stone and Timber

Timber

Ditto

Ditto

KiltlOre Nelsons bridge Kilmore Aug 1853

Oreek

Greens Pinch Oct 1853

Kalkallo I Two bridges Gleesons Dec 1853

Swamp 1

Kilmore Near old Pound NO 1853 South of Morriss H~tel Oc 1853 Kilmore township south Nov 1853 Faithfuls Creek May 1859

Semour Two narrow bridges

) Feb1854

Whiteheads Creek March1856 Sunday Oreek Feb 1857 Punt

Longwood Longwood Bridge near Sa- June 1853

lutation Inn Creightons Creek Feb 1856

Four-mile Creek Dee 1858

Benalla Moonee Oreek on road to Dee 1853

Delatite twelve miles from Benalla

Four - mile Creek on old March1855 Sydney Road near Beshynalla

Winton seven miles from Benalla

Broken Rher Eastern branch

CreightonS Creek

June

Dec

1858

1858

Broken River Bridge

or Benalla

Ditto June 1856 Over Lagoon

April1854Ditto 1 Woolpress Creek

Not specified April 1854 I

Nov 1853 Dec 1853

Feb 1854 Feb 1854

Notspecifiedmiddot March 1854 Not specified Jan 1854 Not specified ]lteb 1854 May 1859

Not specified

May 1856 July 1857

Not specified

June 1856

March1859

March1854

May 1855

Sep 1858

Jan 1859

Sept 1856

July 1854

May 1859

Mareh1854

May 1856 July 1857

Sept 1854

Aug 1856

April1859

March1854

June 1855

Sept 1858

May 1859

Sept 1856

Oct 1854

300

1000

300 300

Old bridges

538 4523

488

629

Old bridge

Old bridge

922

-t

600 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

406 17 8

600 0 0

680 0 0

384 0 0

399 0 0

784 11 0

850 0 0

658 0 0

890 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

464 11 5

600 0 0

575 0 0

390 00

354 0 0

784 11 0

850 0 0

725 0 0

409

200

731

439

44

660

A Nelson J Williammiddot son and others

0 0

H W Oooper

Henry Elmore

J H Drew J Martindale John H Drew Alex Amos and Co

John Green and C Vanzulcicum

Thomas Miles William Allen

11

0 0

Rice Smith and others4 0

Stewart and Kerr

George Gordon

Rice and Co and B Mc1ltarlane

George Gordon

Menzies Charlton and Co

Alex Amos and Co and E Brown

0 0 Rice and Smith

Rice and Smith and others

Peter Martin

0

WH MeKay

Repurs by G M Wilshyson and Stewart and Kerr

These repairs include wages of puntman small boat ampc

Now torming part of Benalla Bridge

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 3: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

A RETURN in compliance with MR HUMFFRAYS motion of 16th February 1859 showing in a tabular form the following particulars relating to all BRIDGES which have been built at the public expense in the Colony of Victoria ieom 1st July 1851 to 1st January 1859 inclusive

11 Mnterials of which

the Bridges are seyerally constructed

Timber Stone and Timber

Ditto Timber Stone and Timber

Timber

Stone and Timber

Timber Stone and Timber

Timber

Ditto Ditto Ditto

- -- Z

The Names of the DIstrictsmiddot and Localities in which

they have been erected

-

MOUNT ALEXANDER ROAD

Ple ington Section

Flemington Spring Gully

Brickmakers Gully Keilor temporary Bridge Keilor Bridge

Viaduct and Embankments

Two dry gullies Keilor Plains

Gisborne Section

Aitkens Creek Campaspe south of Kyneshy

ton Campaspe at Carlsruhe

Near Manchester Arms Gap

Near Gisborne Toll-House

Two in township of Wood-end

3 The date of each Contrnct stntlng thc difference

(if any) betwcen the time stipulated for and the date of the actual completion of the work so let distinguishing c~eh year

Contrnct

June 1853

March1853

Nov 1853

Feb 1855

Dec 1853

Nov 1853

Datc of ~

Specified Completion

Not specified

Not specified

Jan 1854

~

Not specified

June 1854

June 1854

Actual

Completion

1851 1853

July 1853

Dec 1853 Dec 1853

4 Amount

of the original

estimate in each instance

sepaintely

pound

Feb 18541

1854

March 1855

July 1854

Aug 1854

1853

1853

1853

4583

fjOi5

5 The Contract Price or Prices at which

the construction of each Bridge wns taken also the actual cost of the same including all extras if any

Amount of shy

Contract

pound s d

1983 10 0

5945 0 0

5255 0 0

500 0 0

553 5 0

4511 0 0

5898 0 0

A

Actual Cost

pound

492 818

2303

700 11383

5255

500

553

4581

5898

226

1200

976

s

0 0

0

0 0

0

0

5

0

0

0

0

0

d

0 0

0

0 0

0

0

0

0

0

0

0

0

6 bull The total

Cost of Repairs on each Bridge

pound s d

32 1 9 25 0 0

148 11 4

3 2 51

30 0 0

85 0 0

25 0 0

7 The Names of the Contractors

Erected by piecework Erected by day labor

Hy Simson and others

ThosOldhamand others Thos Oldham and others

W D Scott George Holmes

Pettett Scithers John Cogan

Geo W Johnson

and

G W Johnson and Jno

Virtue (surety for William Styles) Erected by piecework

Erected by day labor

Erected by piecework

Remarks

Cost of timber not inshycluded-supplied by Supershyintendent of Bridges

Repairs in 1857 by Prout and Campbell

Piecework ~

Contractors for Keilor Bridge became insolvent and erection was comp1eted by tile Board

Repairs in 1857-8 by llrQut and Hunter and Wrc Robertson

omiddot

Two contracts

Two contracts

Repairs in 1857 by E Cherry

3

1

e

z

Aroun Alexander Road-continued pound Gisborne Section

Boggy CreekTimber June 1853 Between 29 and 30 mile postDitto June 1853

30and31Ditto June 1853 31 and 32 June 1853Ditto

193Ditto 22 and 23 May 1857 Campaspe at Kyneton Nov 1856 March 1857 I April 1857 3454Stone and Timber

Dec 1853Nov 1853 Dec 1853 Nov 1853 Dec 1853Nov 1853

Back Creell Sectioll

MarchlS54Dee 1853 Station Governors BridgeBarkers I April 1854 July 1854Stone and Timber

Creek Golden Point April 1856 Dee 1856 Ditto Back Creek Taradale Nov 1856 Feb1857Ditto Coliban I-tiver at Malmsshy March 1857 June 1857Ditto

bury Aberdeens FordForest I April 1856 Dec 1856 Ditto

RETURN in compliance with Mr Humffrays motion of 16th February 1859-eontinued

S The Contract Price or PrIces at which

construction of each Bridge was takcn also the actual cost of the 6same including nil extras if any) 7The total RemarkbullbullCost of Repairs on The Names of the ContractOrs Amounlof

1853 1854

Dec Nov 1854

DllCbull 1856 June 1857 July 1857 4000

Dec 1856

1853 1854

Dec 1853

Contract

each Bridgebull

Actnal Cost

pound s d1 pound s d o

125 125 Craig and Horn125 f 1lt oo125 200 o 0 George Holmes

2481 2 0 Grant and McLean I Two contracts

Geo Letts 150 0 0 240 0 0

Love 205 0 0 Letts Love and Co2865 0 0

Thomas Miles 2600 0 0 1910 3 9

J Reilly and Co 3557 II 4 Evans and Merry

Archibald Oughton15003 12 7

66 0 0

1010 0 0 38 0 0 60 0 0

130 0 0 354 10 8 120 0 0

George Letts 100 0 0 85 0 0

George Letts 90 0 0 George Letts

Stone and Timber Timber

Ditto Ditto Ditto Ditto Ditto

Timber Ditto Ditto

Creek

Market repairs Harcourt Smith Kangaroo King bull Sheriffs Back Creek

Castiemaine to SandkuTst Creek not named Bennet Itinnon

pound

200 2481

240 150 205

2700

1897 2600 2028

s

0 2

0 0 0 0

0 0 4

1503 12

85 0 100 0

)0 0

d

0 0

0 0 0 0

0 0 4

7

0 0 0

Ditto

f Ditto

Stone and Timber Timber

Ditto

Ditto~ Ditto f Ditto

Ditto

Ditto Ditto

Ditto Ditto Ditto

Stone and rimber Ditto

Ditto Timber

Glass Nov 1853 I Dec 1853 Pensioners Nov 1853 Store Nov 1853 Golden i Jan 1854 Camp I Jan 1854

Tiernay April1854Ravenswood March1857

Jfour small Bridges March 1857 Harneys Bridge over New April 1857

Cut 1

Castlemaine to Avoca viil Newstead and Carisorook

Deep Creek Caris brook 1 March 1853 1March 1854

Timber Loddon River at Catos I Aug 1853 1 July 1854

MaloneyS or NationalshyCampbells Creek

South Muckleford Creek Joyces Creck Loddon Punt at Newstead

Bet middotBet Creek North-stroet and Timor

creek (two) Avoca Hiver Murray River - Punt at

Maidens

Castlemaine to the Jl1urray viii Mount KOTong

Feb 1856

Dec 1856 May 1856 May 1855

April 1857 May 1858

Jan 1859

Dcc 1853 Jan 1854

March 1854 March 1854

June 1854 June 1857

June 1857 July 1857

June 1856

Feb 1857 July 1856 Dec 1855

Aug 1857 Aug 1858

Mareh1859

April1854 April 1854 May 1854

Maych1854 July 1854

July 1854 Dec 1857

Dec 1857 July 1857

June 1854 Dec 1856

March1857 March1857 Jan 1856

Sept 1857 Oct 1858

3215 1468

May 1856

March 1858

May 1854 May 1854

Oct 1856 May 1857

2184 n

March 18591 2000 Nov 1853

1 Nov 1854

Aug 1856

Nov 1858 Sept 1854 Sept 1854

Jan 1857 July 1857

110 0 9 120 0 0 280 0 0 750 0 0 400 0 0

648 0 0 1000 0 0

740 0 0 873 10 0

2591 0 1351 4

no 120 280 750 400

648 1000

740 836

2332 1351

851 2550 1785

2902 1560

1990 1000

9716

2605

0 0 0 0 0

0 0

0 0

0 4

4shy0 0

1 0

8 0

0 0 0 0 0

0 0

0 0

0 0

0 0 Omiddot

6 0

0 0

95 0 0

1 851 4

2558 2 01 1857 0 0 181 ( 0

2902 1 6 1560 0 0

1990 8 0 1000 0 0 1111 13 11

2605 4 0

2184 11 3

170 0 0 400 0 0

3880 0 0 340 0 0

George Letts George Letts George Letts William Postle Wm Postle and J W Repairs in 1855 by T

Elliott J ThompsonJ W Elliott John Davidson lortion of Contract for

road works-pound4185 Johu Davidson Amos and Co

James Small Archibald Oughton

J Musson Thomas Miles T J Thompson Repairs include wages

of puntman Archibald Oughton Joseph Hughes Portion of contract forI road works-pound49691sJ H Lawlor James Maiden Repairs include wages

bull of puntman

10397 17 91 30 0 o IGerium and Jebb 1 Repairs in 1858 by L station Four s~aIl Bridges over April 1856

bull Gulhes

Castlemaine to Tarrangower 1 Laurances Bridge over 1 Aug 1857

Loddon at Bryants Back Creek April 1854 Muckleford Creek April 1854

Castlernaine to BctllaaratI Loddon River at Guildford May 1856 Vaughans Bridge at junemiddot March 1857

tiOll of lhyers Creek and Loddon

0

4 0 McCoy

WIll Bassett

J Martindale

R Barklay and Co 58 9 0 David Brook IRepairs in 1858 by

Pickley and Grive

IT J ThompsonBell and Rutherford

Ditto

Stone and Timber

Timber Ditto

Stone and Timber Timber bull

170 400

3500 340

0 0 ~ I

0 01 0

01

--------- ----

bull

1 Materials of which

the Bridges are scverally

Timber

Timber Ditto

Stone and Timber

Timber

Ditto

Ditto

Stone and Timber

Ditto

Timber Stone and Timber

Z 11le Names of the

Districbl and LocaEtics in which they Imve been erected

Castlemaillc to Newbridge Bradford Creek bullbullbull

Sandhurst to the Murray Three small Bridges Picanninny Creek

Sandhurst to Heathcote Axe Creek AxedaJe McIvor Creek

Woodena to Lancefield Two small bridges

Kyneton to Mount Franklin Two log bridges

Avoca and Adelaide Avoca River

JJfarjborough and Amherst Creek not named at Mary-

borough One bridge and two stone

inverts

Fryers Creek Road Creek at Fryerstown

YVNEY ROAD

Kalkallo Small bria ge Creek at RockyWaterHoles

RETUalt in compliance with Mr Humffi-ays motion of 16th February 1839-continued

3 The daro of each Contract stating tho dlfferenco

(If auy) hetween the time stipulated for and the date ot tho actual completion of the work sO let distinguisl1ing each year

Contract

Dec 1858

May 1856 May 1858

Dec 1858 Dec 1858

Sept 1857

April1857

March1851

April 1858

Dec 1858

Feb 1858

May 1855 Sept 1856

Date of

~pec~ed

Feb 1859

July 1856 Sept 1858

July 1859 June 1859

Dec 1857

June 1857

Aug 1857

Sept 1858

March 1859

July 1858

Not specified Dec 1856

Actual

April 1859

Oct 1856 Dec 1858

July 1859 In progress

Dec 1857

July 1857

Sep 1857

Sept 1858

Sep_ 1859

July 1858

July 1855 Dec 1856

Amount of the original estimate In each instance

separalely

pound 400

510

3000

500

6268

400

1000

1800

5 TIle Contract 1) icc or Prlces at which

tile construetion or each Bridge was taken a1so the actual cost of the same including all extras (if any)

Amount of

Contract

pound s 397 10

3550 0 -388 18

1796 5 1200 0

495 11

474 9

5884 0

460 0

919 17

1253 0

259 0 2795 0

d 0

0 3

0 0

0

0

0

0

0

0

0 0

Actual Cost

pound s d 397 10 0

3589 6 0 388 18 3

1796 5 0 In progress

608 6 0

636 18 6

5834 0 0

460 0 0

919 17 0

1303 0 0

281 0 0 2904 16 0

6 The toinl

Cost of Repnirs on each Bridge

pound s d

10 I 0

_0lil

7 RemarksThe Names of the Contractors

C Dundas and Co

Wm Bassett Edwarti OKeefe

LeCapclain and Parsons Geo Hagley

Ol

D Syme

A Dempster

Joseph Hughes

Joseph Hughes

Joseph Thompson Portion of contract for road works-pound3250

Mansfield and Cappiter

James Bevan H Dalrymple

Timber

Ditto

Ditto

Ditto Ditto Ditto Ditto

Ditto

Ditto Ditto Ditto

Ditto

Ditto

Ditto

Ditto

Ditto

Stone and Timber

Timber

Ditto

Ditto

KiltlOre Nelsons bridge Kilmore Aug 1853

Oreek

Greens Pinch Oct 1853

Kalkallo I Two bridges Gleesons Dec 1853

Swamp 1

Kilmore Near old Pound NO 1853 South of Morriss H~tel Oc 1853 Kilmore township south Nov 1853 Faithfuls Creek May 1859

Semour Two narrow bridges

) Feb1854

Whiteheads Creek March1856 Sunday Oreek Feb 1857 Punt

Longwood Longwood Bridge near Sa- June 1853

lutation Inn Creightons Creek Feb 1856

Four-mile Creek Dee 1858

Benalla Moonee Oreek on road to Dee 1853

Delatite twelve miles from Benalla

Four - mile Creek on old March1855 Sydney Road near Beshynalla

Winton seven miles from Benalla

Broken Rher Eastern branch

CreightonS Creek

June

Dec

1858

1858

Broken River Bridge

or Benalla

Ditto June 1856 Over Lagoon

April1854Ditto 1 Woolpress Creek

Not specified April 1854 I

Nov 1853 Dec 1853

Feb 1854 Feb 1854

Notspecifiedmiddot March 1854 Not specified Jan 1854 Not specified ]lteb 1854 May 1859

Not specified

May 1856 July 1857

Not specified

June 1856

March1859

March1854

May 1855

Sep 1858

Jan 1859

Sept 1856

July 1854

May 1859

Mareh1854

May 1856 July 1857

Sept 1854

Aug 1856

April1859

March1854

June 1855

Sept 1858

May 1859

Sept 1856

Oct 1854

300

1000

300 300

Old bridges

538 4523

488

629

Old bridge

Old bridge

922

-t

600 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

406 17 8

600 0 0

680 0 0

384 0 0

399 0 0

784 11 0

850 0 0

658 0 0

890 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

464 11 5

600 0 0

575 0 0

390 00

354 0 0

784 11 0

850 0 0

725 0 0

409

200

731

439

44

660

A Nelson J Williammiddot son and others

0 0

H W Oooper

Henry Elmore

J H Drew J Martindale John H Drew Alex Amos and Co

John Green and C Vanzulcicum

Thomas Miles William Allen

11

0 0

Rice Smith and others4 0

Stewart and Kerr

George Gordon

Rice and Co and B Mc1ltarlane

George Gordon

Menzies Charlton and Co

Alex Amos and Co and E Brown

0 0 Rice and Smith

Rice and Smith and others

Peter Martin

0

WH MeKay

Repurs by G M Wilshyson and Stewart and Kerr

These repairs include wages of puntman small boat ampc

Now torming part of Benalla Bridge

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 4: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

3

1

e

z

Aroun Alexander Road-continued pound Gisborne Section

Boggy CreekTimber June 1853 Between 29 and 30 mile postDitto June 1853

30and31Ditto June 1853 31 and 32 June 1853Ditto

193Ditto 22 and 23 May 1857 Campaspe at Kyneton Nov 1856 March 1857 I April 1857 3454Stone and Timber

Dec 1853Nov 1853 Dec 1853 Nov 1853 Dec 1853Nov 1853

Back Creell Sectioll

MarchlS54Dee 1853 Station Governors BridgeBarkers I April 1854 July 1854Stone and Timber

Creek Golden Point April 1856 Dee 1856 Ditto Back Creek Taradale Nov 1856 Feb1857Ditto Coliban I-tiver at Malmsshy March 1857 June 1857Ditto

bury Aberdeens FordForest I April 1856 Dec 1856 Ditto

RETURN in compliance with Mr Humffrays motion of 16th February 1859-eontinued

S The Contract Price or PrIces at which

construction of each Bridge was takcn also the actual cost of the 6same including nil extras if any) 7The total RemarkbullbullCost of Repairs on The Names of the ContractOrs Amounlof

1853 1854

Dec Nov 1854

DllCbull 1856 June 1857 July 1857 4000

Dec 1856

1853 1854

Dec 1853

Contract

each Bridgebull

Actnal Cost

pound s d1 pound s d o

125 125 Craig and Horn125 f 1lt oo125 200 o 0 George Holmes

2481 2 0 Grant and McLean I Two contracts

Geo Letts 150 0 0 240 0 0

Love 205 0 0 Letts Love and Co2865 0 0

Thomas Miles 2600 0 0 1910 3 9

J Reilly and Co 3557 II 4 Evans and Merry

Archibald Oughton15003 12 7

66 0 0

1010 0 0 38 0 0 60 0 0

130 0 0 354 10 8 120 0 0

George Letts 100 0 0 85 0 0

George Letts 90 0 0 George Letts

Stone and Timber Timber

Ditto Ditto Ditto Ditto Ditto

Timber Ditto Ditto

Creek

Market repairs Harcourt Smith Kangaroo King bull Sheriffs Back Creek

Castiemaine to SandkuTst Creek not named Bennet Itinnon

pound

200 2481

240 150 205

2700

1897 2600 2028

s

0 2

0 0 0 0

0 0 4

1503 12

85 0 100 0

)0 0

d

0 0

0 0 0 0

0 0 4

7

0 0 0

Ditto

f Ditto

Stone and Timber Timber

Ditto

Ditto~ Ditto f Ditto

Ditto

Ditto Ditto

Ditto Ditto Ditto

Stone and rimber Ditto

Ditto Timber

Glass Nov 1853 I Dec 1853 Pensioners Nov 1853 Store Nov 1853 Golden i Jan 1854 Camp I Jan 1854

Tiernay April1854Ravenswood March1857

Jfour small Bridges March 1857 Harneys Bridge over New April 1857

Cut 1

Castlemaine to Avoca viil Newstead and Carisorook

Deep Creek Caris brook 1 March 1853 1March 1854

Timber Loddon River at Catos I Aug 1853 1 July 1854

MaloneyS or NationalshyCampbells Creek

South Muckleford Creek Joyces Creck Loddon Punt at Newstead

Bet middotBet Creek North-stroet and Timor

creek (two) Avoca Hiver Murray River - Punt at

Maidens

Castlemaine to the Jl1urray viii Mount KOTong

Feb 1856

Dec 1856 May 1856 May 1855

April 1857 May 1858

Jan 1859

Dcc 1853 Jan 1854

March 1854 March 1854

June 1854 June 1857

June 1857 July 1857

June 1856

Feb 1857 July 1856 Dec 1855

Aug 1857 Aug 1858

Mareh1859

April1854 April 1854 May 1854

Maych1854 July 1854

July 1854 Dec 1857

Dec 1857 July 1857

June 1854 Dec 1856

March1857 March1857 Jan 1856

Sept 1857 Oct 1858

3215 1468

May 1856

March 1858

May 1854 May 1854

Oct 1856 May 1857

2184 n

March 18591 2000 Nov 1853

1 Nov 1854

Aug 1856

Nov 1858 Sept 1854 Sept 1854

Jan 1857 July 1857

110 0 9 120 0 0 280 0 0 750 0 0 400 0 0

648 0 0 1000 0 0

740 0 0 873 10 0

2591 0 1351 4

no 120 280 750 400

648 1000

740 836

2332 1351

851 2550 1785

2902 1560

1990 1000

9716

2605

0 0 0 0 0

0 0

0 0

0 4

4shy0 0

1 0

8 0

0 0 0 0 0

0 0

0 0

0 0

0 0 Omiddot

6 0

0 0

95 0 0

1 851 4

2558 2 01 1857 0 0 181 ( 0

2902 1 6 1560 0 0

1990 8 0 1000 0 0 1111 13 11

2605 4 0

2184 11 3

170 0 0 400 0 0

3880 0 0 340 0 0

George Letts George Letts George Letts William Postle Wm Postle and J W Repairs in 1855 by T

Elliott J ThompsonJ W Elliott John Davidson lortion of Contract for

road works-pound4185 Johu Davidson Amos and Co

James Small Archibald Oughton

J Musson Thomas Miles T J Thompson Repairs include wages

of puntman Archibald Oughton Joseph Hughes Portion of contract forI road works-pound49691sJ H Lawlor James Maiden Repairs include wages

bull of puntman

10397 17 91 30 0 o IGerium and Jebb 1 Repairs in 1858 by L station Four s~aIl Bridges over April 1856

bull Gulhes

Castlemaine to Tarrangower 1 Laurances Bridge over 1 Aug 1857

Loddon at Bryants Back Creek April 1854 Muckleford Creek April 1854

Castlernaine to BctllaaratI Loddon River at Guildford May 1856 Vaughans Bridge at junemiddot March 1857

tiOll of lhyers Creek and Loddon

0

4 0 McCoy

WIll Bassett

J Martindale

R Barklay and Co 58 9 0 David Brook IRepairs in 1858 by

Pickley and Grive

IT J ThompsonBell and Rutherford

Ditto

Stone and Timber

Timber Ditto

Stone and Timber Timber bull

170 400

3500 340

0 0 ~ I

0 01 0

01

--------- ----

bull

1 Materials of which

the Bridges are scverally

Timber

Timber Ditto

Stone and Timber

Timber

Ditto

Ditto

Stone and Timber

Ditto

Timber Stone and Timber

Z 11le Names of the

Districbl and LocaEtics in which they Imve been erected

Castlemaillc to Newbridge Bradford Creek bullbullbull

Sandhurst to the Murray Three small Bridges Picanninny Creek

Sandhurst to Heathcote Axe Creek AxedaJe McIvor Creek

Woodena to Lancefield Two small bridges

Kyneton to Mount Franklin Two log bridges

Avoca and Adelaide Avoca River

JJfarjborough and Amherst Creek not named at Mary-

borough One bridge and two stone

inverts

Fryers Creek Road Creek at Fryerstown

YVNEY ROAD

Kalkallo Small bria ge Creek at RockyWaterHoles

RETUalt in compliance with Mr Humffi-ays motion of 16th February 1839-continued

3 The daro of each Contract stating tho dlfferenco

(If auy) hetween the time stipulated for and the date ot tho actual completion of the work sO let distinguisl1ing each year

Contract

Dec 1858

May 1856 May 1858

Dec 1858 Dec 1858

Sept 1857

April1857

March1851

April 1858

Dec 1858

Feb 1858

May 1855 Sept 1856

Date of

~pec~ed

Feb 1859

July 1856 Sept 1858

July 1859 June 1859

Dec 1857

June 1857

Aug 1857

Sept 1858

March 1859

July 1858

Not specified Dec 1856

Actual

April 1859

Oct 1856 Dec 1858

July 1859 In progress

Dec 1857

July 1857

Sep 1857

Sept 1858

Sep_ 1859

July 1858

July 1855 Dec 1856

Amount of the original estimate In each instance

separalely

pound 400

510

3000

500

6268

400

1000

1800

5 TIle Contract 1) icc or Prlces at which

tile construetion or each Bridge was taken a1so the actual cost of the same including all extras (if any)

Amount of

Contract

pound s 397 10

3550 0 -388 18

1796 5 1200 0

495 11

474 9

5884 0

460 0

919 17

1253 0

259 0 2795 0

d 0

0 3

0 0

0

0

0

0

0

0

0 0

Actual Cost

pound s d 397 10 0

3589 6 0 388 18 3

1796 5 0 In progress

608 6 0

636 18 6

5834 0 0

460 0 0

919 17 0

1303 0 0

281 0 0 2904 16 0

6 The toinl

Cost of Repnirs on each Bridge

pound s d

10 I 0

_0lil

7 RemarksThe Names of the Contractors

C Dundas and Co

Wm Bassett Edwarti OKeefe

LeCapclain and Parsons Geo Hagley

Ol

D Syme

A Dempster

Joseph Hughes

Joseph Hughes

Joseph Thompson Portion of contract for road works-pound3250

Mansfield and Cappiter

James Bevan H Dalrymple

Timber

Ditto

Ditto

Ditto Ditto Ditto Ditto

Ditto

Ditto Ditto Ditto

Ditto

Ditto

Ditto

Ditto

Ditto

Stone and Timber

Timber

Ditto

Ditto

KiltlOre Nelsons bridge Kilmore Aug 1853

Oreek

Greens Pinch Oct 1853

Kalkallo I Two bridges Gleesons Dec 1853

Swamp 1

Kilmore Near old Pound NO 1853 South of Morriss H~tel Oc 1853 Kilmore township south Nov 1853 Faithfuls Creek May 1859

Semour Two narrow bridges

) Feb1854

Whiteheads Creek March1856 Sunday Oreek Feb 1857 Punt

Longwood Longwood Bridge near Sa- June 1853

lutation Inn Creightons Creek Feb 1856

Four-mile Creek Dee 1858

Benalla Moonee Oreek on road to Dee 1853

Delatite twelve miles from Benalla

Four - mile Creek on old March1855 Sydney Road near Beshynalla

Winton seven miles from Benalla

Broken Rher Eastern branch

CreightonS Creek

June

Dec

1858

1858

Broken River Bridge

or Benalla

Ditto June 1856 Over Lagoon

April1854Ditto 1 Woolpress Creek

Not specified April 1854 I

Nov 1853 Dec 1853

Feb 1854 Feb 1854

Notspecifiedmiddot March 1854 Not specified Jan 1854 Not specified ]lteb 1854 May 1859

Not specified

May 1856 July 1857

Not specified

June 1856

March1859

March1854

May 1855

Sep 1858

Jan 1859

Sept 1856

July 1854

May 1859

Mareh1854

May 1856 July 1857

Sept 1854

Aug 1856

April1859

March1854

June 1855

Sept 1858

May 1859

Sept 1856

Oct 1854

300

1000

300 300

Old bridges

538 4523

488

629

Old bridge

Old bridge

922

-t

600 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

406 17 8

600 0 0

680 0 0

384 0 0

399 0 0

784 11 0

850 0 0

658 0 0

890 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

464 11 5

600 0 0

575 0 0

390 00

354 0 0

784 11 0

850 0 0

725 0 0

409

200

731

439

44

660

A Nelson J Williammiddot son and others

0 0

H W Oooper

Henry Elmore

J H Drew J Martindale John H Drew Alex Amos and Co

John Green and C Vanzulcicum

Thomas Miles William Allen

11

0 0

Rice Smith and others4 0

Stewart and Kerr

George Gordon

Rice and Co and B Mc1ltarlane

George Gordon

Menzies Charlton and Co

Alex Amos and Co and E Brown

0 0 Rice and Smith

Rice and Smith and others

Peter Martin

0

WH MeKay

Repurs by G M Wilshyson and Stewart and Kerr

These repairs include wages of puntman small boat ampc

Now torming part of Benalla Bridge

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 5: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

Ditto

f Ditto

Stone and Timber Timber

Ditto

Ditto~ Ditto f Ditto

Ditto

Ditto Ditto

Ditto Ditto Ditto

Stone and rimber Ditto

Ditto Timber

Glass Nov 1853 I Dec 1853 Pensioners Nov 1853 Store Nov 1853 Golden i Jan 1854 Camp I Jan 1854

Tiernay April1854Ravenswood March1857

Jfour small Bridges March 1857 Harneys Bridge over New April 1857

Cut 1

Castlemaine to Avoca viil Newstead and Carisorook

Deep Creek Caris brook 1 March 1853 1March 1854

Timber Loddon River at Catos I Aug 1853 1 July 1854

MaloneyS or NationalshyCampbells Creek

South Muckleford Creek Joyces Creck Loddon Punt at Newstead

Bet middotBet Creek North-stroet and Timor

creek (two) Avoca Hiver Murray River - Punt at

Maidens

Castlemaine to the Jl1urray viii Mount KOTong

Feb 1856

Dec 1856 May 1856 May 1855

April 1857 May 1858

Jan 1859

Dcc 1853 Jan 1854

March 1854 March 1854

June 1854 June 1857

June 1857 July 1857

June 1856

Feb 1857 July 1856 Dec 1855

Aug 1857 Aug 1858

Mareh1859

April1854 April 1854 May 1854

Maych1854 July 1854

July 1854 Dec 1857

Dec 1857 July 1857

June 1854 Dec 1856

March1857 March1857 Jan 1856

Sept 1857 Oct 1858

3215 1468

May 1856

March 1858

May 1854 May 1854

Oct 1856 May 1857

2184 n

March 18591 2000 Nov 1853

1 Nov 1854

Aug 1856

Nov 1858 Sept 1854 Sept 1854

Jan 1857 July 1857

110 0 9 120 0 0 280 0 0 750 0 0 400 0 0

648 0 0 1000 0 0

740 0 0 873 10 0

2591 0 1351 4

no 120 280 750 400

648 1000

740 836

2332 1351

851 2550 1785

2902 1560

1990 1000

9716

2605

0 0 0 0 0

0 0

0 0

0 4

4shy0 0

1 0

8 0

0 0 0 0 0

0 0

0 0

0 0

0 0 Omiddot

6 0

0 0

95 0 0

1 851 4

2558 2 01 1857 0 0 181 ( 0

2902 1 6 1560 0 0

1990 8 0 1000 0 0 1111 13 11

2605 4 0

2184 11 3

170 0 0 400 0 0

3880 0 0 340 0 0

George Letts George Letts George Letts William Postle Wm Postle and J W Repairs in 1855 by T

Elliott J ThompsonJ W Elliott John Davidson lortion of Contract for

road works-pound4185 Johu Davidson Amos and Co

James Small Archibald Oughton

J Musson Thomas Miles T J Thompson Repairs include wages

of puntman Archibald Oughton Joseph Hughes Portion of contract forI road works-pound49691sJ H Lawlor James Maiden Repairs include wages

bull of puntman

10397 17 91 30 0 o IGerium and Jebb 1 Repairs in 1858 by L station Four s~aIl Bridges over April 1856

bull Gulhes

Castlemaine to Tarrangower 1 Laurances Bridge over 1 Aug 1857

Loddon at Bryants Back Creek April 1854 Muckleford Creek April 1854

Castlernaine to BctllaaratI Loddon River at Guildford May 1856 Vaughans Bridge at junemiddot March 1857

tiOll of lhyers Creek and Loddon

0

4 0 McCoy

WIll Bassett

J Martindale

R Barklay and Co 58 9 0 David Brook IRepairs in 1858 by

Pickley and Grive

IT J ThompsonBell and Rutherford

Ditto

Stone and Timber

Timber Ditto

Stone and Timber Timber bull

170 400

3500 340

0 0 ~ I

0 01 0

01

--------- ----

bull

1 Materials of which

the Bridges are scverally

Timber

Timber Ditto

Stone and Timber

Timber

Ditto

Ditto

Stone and Timber

Ditto

Timber Stone and Timber

Z 11le Names of the

Districbl and LocaEtics in which they Imve been erected

Castlemaillc to Newbridge Bradford Creek bullbullbull

Sandhurst to the Murray Three small Bridges Picanninny Creek

Sandhurst to Heathcote Axe Creek AxedaJe McIvor Creek

Woodena to Lancefield Two small bridges

Kyneton to Mount Franklin Two log bridges

Avoca and Adelaide Avoca River

JJfarjborough and Amherst Creek not named at Mary-

borough One bridge and two stone

inverts

Fryers Creek Road Creek at Fryerstown

YVNEY ROAD

Kalkallo Small bria ge Creek at RockyWaterHoles

RETUalt in compliance with Mr Humffi-ays motion of 16th February 1839-continued

3 The daro of each Contract stating tho dlfferenco

(If auy) hetween the time stipulated for and the date ot tho actual completion of the work sO let distinguisl1ing each year

Contract

Dec 1858

May 1856 May 1858

Dec 1858 Dec 1858

Sept 1857

April1857

March1851

April 1858

Dec 1858

Feb 1858

May 1855 Sept 1856

Date of

~pec~ed

Feb 1859

July 1856 Sept 1858

July 1859 June 1859

Dec 1857

June 1857

Aug 1857

Sept 1858

March 1859

July 1858

Not specified Dec 1856

Actual

April 1859

Oct 1856 Dec 1858

July 1859 In progress

Dec 1857

July 1857

Sep 1857

Sept 1858

Sep_ 1859

July 1858

July 1855 Dec 1856

Amount of the original estimate In each instance

separalely

pound 400

510

3000

500

6268

400

1000

1800

5 TIle Contract 1) icc or Prlces at which

tile construetion or each Bridge was taken a1so the actual cost of the same including all extras (if any)

Amount of

Contract

pound s 397 10

3550 0 -388 18

1796 5 1200 0

495 11

474 9

5884 0

460 0

919 17

1253 0

259 0 2795 0

d 0

0 3

0 0

0

0

0

0

0

0

0 0

Actual Cost

pound s d 397 10 0

3589 6 0 388 18 3

1796 5 0 In progress

608 6 0

636 18 6

5834 0 0

460 0 0

919 17 0

1303 0 0

281 0 0 2904 16 0

6 The toinl

Cost of Repnirs on each Bridge

pound s d

10 I 0

_0lil

7 RemarksThe Names of the Contractors

C Dundas and Co

Wm Bassett Edwarti OKeefe

LeCapclain and Parsons Geo Hagley

Ol

D Syme

A Dempster

Joseph Hughes

Joseph Hughes

Joseph Thompson Portion of contract for road works-pound3250

Mansfield and Cappiter

James Bevan H Dalrymple

Timber

Ditto

Ditto

Ditto Ditto Ditto Ditto

Ditto

Ditto Ditto Ditto

Ditto

Ditto

Ditto

Ditto

Ditto

Stone and Timber

Timber

Ditto

Ditto

KiltlOre Nelsons bridge Kilmore Aug 1853

Oreek

Greens Pinch Oct 1853

Kalkallo I Two bridges Gleesons Dec 1853

Swamp 1

Kilmore Near old Pound NO 1853 South of Morriss H~tel Oc 1853 Kilmore township south Nov 1853 Faithfuls Creek May 1859

Semour Two narrow bridges

) Feb1854

Whiteheads Creek March1856 Sunday Oreek Feb 1857 Punt

Longwood Longwood Bridge near Sa- June 1853

lutation Inn Creightons Creek Feb 1856

Four-mile Creek Dee 1858

Benalla Moonee Oreek on road to Dee 1853

Delatite twelve miles from Benalla

Four - mile Creek on old March1855 Sydney Road near Beshynalla

Winton seven miles from Benalla

Broken Rher Eastern branch

CreightonS Creek

June

Dec

1858

1858

Broken River Bridge

or Benalla

Ditto June 1856 Over Lagoon

April1854Ditto 1 Woolpress Creek

Not specified April 1854 I

Nov 1853 Dec 1853

Feb 1854 Feb 1854

Notspecifiedmiddot March 1854 Not specified Jan 1854 Not specified ]lteb 1854 May 1859

Not specified

May 1856 July 1857

Not specified

June 1856

March1859

March1854

May 1855

Sep 1858

Jan 1859

Sept 1856

July 1854

May 1859

Mareh1854

May 1856 July 1857

Sept 1854

Aug 1856

April1859

March1854

June 1855

Sept 1858

May 1859

Sept 1856

Oct 1854

300

1000

300 300

Old bridges

538 4523

488

629

Old bridge

Old bridge

922

-t

600 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

406 17 8

600 0 0

680 0 0

384 0 0

399 0 0

784 11 0

850 0 0

658 0 0

890 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

464 11 5

600 0 0

575 0 0

390 00

354 0 0

784 11 0

850 0 0

725 0 0

409

200

731

439

44

660

A Nelson J Williammiddot son and others

0 0

H W Oooper

Henry Elmore

J H Drew J Martindale John H Drew Alex Amos and Co

John Green and C Vanzulcicum

Thomas Miles William Allen

11

0 0

Rice Smith and others4 0

Stewart and Kerr

George Gordon

Rice and Co and B Mc1ltarlane

George Gordon

Menzies Charlton and Co

Alex Amos and Co and E Brown

0 0 Rice and Smith

Rice and Smith and others

Peter Martin

0

WH MeKay

Repurs by G M Wilshyson and Stewart and Kerr

These repairs include wages of puntman small boat ampc

Now torming part of Benalla Bridge

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 6: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

--------- ----

bull

1 Materials of which

the Bridges are scverally

Timber

Timber Ditto

Stone and Timber

Timber

Ditto

Ditto

Stone and Timber

Ditto

Timber Stone and Timber

Z 11le Names of the

Districbl and LocaEtics in which they Imve been erected

Castlemaillc to Newbridge Bradford Creek bullbullbull

Sandhurst to the Murray Three small Bridges Picanninny Creek

Sandhurst to Heathcote Axe Creek AxedaJe McIvor Creek

Woodena to Lancefield Two small bridges

Kyneton to Mount Franklin Two log bridges

Avoca and Adelaide Avoca River

JJfarjborough and Amherst Creek not named at Mary-

borough One bridge and two stone

inverts

Fryers Creek Road Creek at Fryerstown

YVNEY ROAD

Kalkallo Small bria ge Creek at RockyWaterHoles

RETUalt in compliance with Mr Humffi-ays motion of 16th February 1839-continued

3 The daro of each Contract stating tho dlfferenco

(If auy) hetween the time stipulated for and the date ot tho actual completion of the work sO let distinguisl1ing each year

Contract

Dec 1858

May 1856 May 1858

Dec 1858 Dec 1858

Sept 1857

April1857

March1851

April 1858

Dec 1858

Feb 1858

May 1855 Sept 1856

Date of

~pec~ed

Feb 1859

July 1856 Sept 1858

July 1859 June 1859

Dec 1857

June 1857

Aug 1857

Sept 1858

March 1859

July 1858

Not specified Dec 1856

Actual

April 1859

Oct 1856 Dec 1858

July 1859 In progress

Dec 1857

July 1857

Sep 1857

Sept 1858

Sep_ 1859

July 1858

July 1855 Dec 1856

Amount of the original estimate In each instance

separalely

pound 400

510

3000

500

6268

400

1000

1800

5 TIle Contract 1) icc or Prlces at which

tile construetion or each Bridge was taken a1so the actual cost of the same including all extras (if any)

Amount of

Contract

pound s 397 10

3550 0 -388 18

1796 5 1200 0

495 11

474 9

5884 0

460 0

919 17

1253 0

259 0 2795 0

d 0

0 3

0 0

0

0

0

0

0

0

0 0

Actual Cost

pound s d 397 10 0

3589 6 0 388 18 3

1796 5 0 In progress

608 6 0

636 18 6

5834 0 0

460 0 0

919 17 0

1303 0 0

281 0 0 2904 16 0

6 The toinl

Cost of Repnirs on each Bridge

pound s d

10 I 0

_0lil

7 RemarksThe Names of the Contractors

C Dundas and Co

Wm Bassett Edwarti OKeefe

LeCapclain and Parsons Geo Hagley

Ol

D Syme

A Dempster

Joseph Hughes

Joseph Hughes

Joseph Thompson Portion of contract for road works-pound3250

Mansfield and Cappiter

James Bevan H Dalrymple

Timber

Ditto

Ditto

Ditto Ditto Ditto Ditto

Ditto

Ditto Ditto Ditto

Ditto

Ditto

Ditto

Ditto

Ditto

Stone and Timber

Timber

Ditto

Ditto

KiltlOre Nelsons bridge Kilmore Aug 1853

Oreek

Greens Pinch Oct 1853

Kalkallo I Two bridges Gleesons Dec 1853

Swamp 1

Kilmore Near old Pound NO 1853 South of Morriss H~tel Oc 1853 Kilmore township south Nov 1853 Faithfuls Creek May 1859

Semour Two narrow bridges

) Feb1854

Whiteheads Creek March1856 Sunday Oreek Feb 1857 Punt

Longwood Longwood Bridge near Sa- June 1853

lutation Inn Creightons Creek Feb 1856

Four-mile Creek Dee 1858

Benalla Moonee Oreek on road to Dee 1853

Delatite twelve miles from Benalla

Four - mile Creek on old March1855 Sydney Road near Beshynalla

Winton seven miles from Benalla

Broken Rher Eastern branch

CreightonS Creek

June

Dec

1858

1858

Broken River Bridge

or Benalla

Ditto June 1856 Over Lagoon

April1854Ditto 1 Woolpress Creek

Not specified April 1854 I

Nov 1853 Dec 1853

Feb 1854 Feb 1854

Notspecifiedmiddot March 1854 Not specified Jan 1854 Not specified ]lteb 1854 May 1859

Not specified

May 1856 July 1857

Not specified

June 1856

March1859

March1854

May 1855

Sep 1858

Jan 1859

Sept 1856

July 1854

May 1859

Mareh1854

May 1856 July 1857

Sept 1854

Aug 1856

April1859

March1854

June 1855

Sept 1858

May 1859

Sept 1856

Oct 1854

300

1000

300 300

Old bridges

538 4523

488

629

Old bridge

Old bridge

922

-t

600 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

406 17 8

600 0 0

680 0 0

384 0 0

399 0 0

784 11 0

850 0 0

658 0 0

890 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

464 11 5

600 0 0

575 0 0

390 00

354 0 0

784 11 0

850 0 0

725 0 0

409

200

731

439

44

660

A Nelson J Williammiddot son and others

0 0

H W Oooper

Henry Elmore

J H Drew J Martindale John H Drew Alex Amos and Co

John Green and C Vanzulcicum

Thomas Miles William Allen

11

0 0

Rice Smith and others4 0

Stewart and Kerr

George Gordon

Rice and Co and B Mc1ltarlane

George Gordon

Menzies Charlton and Co

Alex Amos and Co and E Brown

0 0 Rice and Smith

Rice and Smith and others

Peter Martin

0

WH MeKay

Repurs by G M Wilshyson and Stewart and Kerr

These repairs include wages of puntman small boat ampc

Now torming part of Benalla Bridge

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 7: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

Timber

Ditto

Ditto

Ditto Ditto Ditto Ditto

Ditto

Ditto Ditto Ditto

Ditto

Ditto

Ditto

Ditto

Ditto

Stone and Timber

Timber

Ditto

Ditto

KiltlOre Nelsons bridge Kilmore Aug 1853

Oreek

Greens Pinch Oct 1853

Kalkallo I Two bridges Gleesons Dec 1853

Swamp 1

Kilmore Near old Pound NO 1853 South of Morriss H~tel Oc 1853 Kilmore township south Nov 1853 Faithfuls Creek May 1859

Semour Two narrow bridges

) Feb1854

Whiteheads Creek March1856 Sunday Oreek Feb 1857 Punt

Longwood Longwood Bridge near Sa- June 1853

lutation Inn Creightons Creek Feb 1856

Four-mile Creek Dee 1858

Benalla Moonee Oreek on road to Dee 1853

Delatite twelve miles from Benalla

Four - mile Creek on old March1855 Sydney Road near Beshynalla

Winton seven miles from Benalla

Broken Rher Eastern branch

CreightonS Creek

June

Dec

1858

1858

Broken River Bridge

or Benalla

Ditto June 1856 Over Lagoon

April1854Ditto 1 Woolpress Creek

Not specified April 1854 I

Nov 1853 Dec 1853

Feb 1854 Feb 1854

Notspecifiedmiddot March 1854 Not specified Jan 1854 Not specified ]lteb 1854 May 1859

Not specified

May 1856 July 1857

Not specified

June 1856

March1859

March1854

May 1855

Sep 1858

Jan 1859

Sept 1856

July 1854

May 1859

Mareh1854

May 1856 July 1857

Sept 1854

Aug 1856

April1859

March1854

June 1855

Sept 1858

May 1859

Sept 1856

Oct 1854

300

1000

300 300

Old bridges

538 4523

488

629

Old bridge

Old bridge

922

-t

600 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

406 17 8

600 0 0

680 0 0

384 0 0

399 0 0

784 11 0

850 0 0

658 0 0

890 0 0

310 0 0

1075 0 0

300 0 0 300 0 0 235 0 0 400 0 0

476 0 0 3443 0 0

1171 16 0

464 11 5

600 0 0

575 0 0

390 00

354 0 0

784 11 0

850 0 0

725 0 0

409

200

731

439

44

660

A Nelson J Williammiddot son and others

0 0

H W Oooper

Henry Elmore

J H Drew J Martindale John H Drew Alex Amos and Co

John Green and C Vanzulcicum

Thomas Miles William Allen

11

0 0

Rice Smith and others4 0

Stewart and Kerr

George Gordon

Rice and Co and B Mc1ltarlane

George Gordon

Menzies Charlton and Co

Alex Amos and Co and E Brown

0 0 Rice and Smith

Rice and Smith and others

Peter Martin

0

WH MeKay

Repurs by G M Wilshyson and Stewart and Kerr

These repairs include wages of puntman small boat ampc

Now torming part of Benalla Bridge

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 8: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

~

RETURN in compliance vithMr Humffrays motion of16th February 1869-continued I

3 The unte of each Contract staling the difference

(if any) hctwcen the tinlC stipulated for and the 1 2 date of the actual completion of the work so let distinguishing each yearMaterials of wh1ch

DbtriCl~~J~~r~l~~i~ Wich 1shy llw llridgM Dato ofare severally constructed lIeY have been ereeled

Ipcclfied

AclualContract Completion

I Sydney Road-continued

July 1854 I Oct 1854 Benalla

Timber j Creekadjoining~milewest April 1854 Ditto I Broken ltiver leb 1857 July 1857 Nov 1858

~ f IF~ur Mil~ Creek

Ditto

I Broadford June 1853 Not specified Aug 1853Ditto Dry Clik bull

-~

i Si bullbull Thc Contract Price Or Prices at which

Amount the construction of each Bridge was taken also the actual cost of the

of the same including all extras (if any)original estimnte Amouut ormiddotin each r-

instance shy

separately Contract Actual Cost --shy

I pound pound $ d pound 8 d

623 0 0 623 0 0 5501 4641 11 6 4641 11 6

Old bridge

I 270 0 Q ~70 0 0

I

6 The total

Cost of Repairs on each Bridge

pound $ d

226 12 6

162 0 0

7

The Names ofUle Contractors RemlU~

_ t

-~-

-shy WHMeKay T Lloyd and T Miles Estimate includes road work C Bennington

Repairs in 1854 bull

Rice and Smith Repairs in 1854-5 by Geo Gordon and W bull

Ditto Sunday Creqk June 1853 Not specified Sept 1853 650 0 0 650 0 0 371 19 0 Rice and Smith Humphreys

Repairs in 1856 by

Ditto Dry Creek April1857 June J857 I Junc 1857 650 585 13 4 585 13 41 Stewart and Kerr Stewart and Kerr

Estimate includes road

EUToa I

work bull

Ditto 1 One middotMile Creek ~~ April 1853 Notspeciied May 1854 1260 O 0 1260 0 0 824 0 0 Rice and Smith and

Ditto rwo Mile Creek April 1853 Notspeciied April 1854 1176 15 0 1176 15 0 55 5 0 others

Rice and Smith and

Ditto

Ditto

Ditto

JtourlrIile Creek seven Creeks or

Bridge Violet Creek

Euroa

April 1853

May 1853

Not specified

Not specified

Feb1854

leb 1854

Old bridge

5294

1845

7

0

4

0

5294

1845

7

0

4

0

384 0

595 12

45 0

0

8

0

others G Bennington bull p k middot Rice and Smith

others Rice and Smith

and

and

Ditto

Ditto

Wangaratta Plank Road

Mackeys Creek between Wangaratta and Beech-worth

March1853

April 1854

I Notspeclfied

Notspecifed

Dec iS53

May 1854

4600 0

84 16

0

0

4600 0

84 16

0

0

I

1722 11

10 0

8

0

others

Menzies a~d Cronk W Brown and others

~1cFariane and Drover

Repairs by piecework bull

Ditto Ditto

OYens Hiver and branch One Mile Creek near Wanshy

garatta

March1854 April 1853

June 1854 July 1853

I Dec 1854 i June 1854 I

I

550 _0 900middot 0 g

550 0 932 2

0 0

13 4 6

Menzies and Cronk Menzies and Cronk

00

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 9: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

Ditto 1 Wodonga Creek between May 1853 Belvoir and Albnry

Ditto Reids Creek on Beeehworth Feb 1854 road I m 18 ch north of Wangaratta) April 1854

Ditto Ditto l-agoon near Reids Creek

Ovens River and branch Oct 1854~ adjoining plank road Ovens Hiver at Murphy-Ditto Feb 1854

street Timber Three Mile Creek April 1854

Ditto ISpring Creek at Beechworth March 1856 Ditto Heidg Creek at Wooished July 1856 Ditto Stony Creek betwren Wan- April 1856

garatta and Beechworth

Hodgsons Creek Jan 1857 Ditto Ditto

Deep Creek on rod to the May 1857 Buckland

Ditto Buckland Hiver March1857 Ditto Reids Creek betWeen Wanshy April1857

garatta and Beecnvorth Ditto Wooragee on roaa between April 1858

Beechworth andWodongoI four bridges Ditto King River bullbull Aug 1858

Stone and Timber Hughes Creek Avenal April 1859 Commissioners Creek Dec 1858

Ditto to complete Dee 1859

LOWER GOULBURN ROAD

Timber Shepparton and McGuires Punt on the Goulburn

MERTON AND MANSshyFIELD I

Timber Delatite March 1857

KYNETON ROAD

KiInore March 1854 Union street Kilmore town-

ship Bridge south of do

Not specified

Aug 1854

July 1854 Jan 1855

Feb 1855

Not specified

May 1856 Oct 1856 May 1856

March 1857 July 1857

July 1857 June 1857

July 1858

Jan 1859 Jnne1859 Yay 1859

Nov 1854

June 1855

June 1855 June 1855

Feb 1855

June 1854

July 1856 OCt 1856 July 1856

July 1857 Aug 1857

Sept 1857 Nov 1857

Nov 1858

9000

Old bridge

1139

454 509

1402 1878

2889shy

July 1859 i June 1859 I 4000

2000

In progress I

II July 1854 i

June 18571 June 1857 i 945

Oct 1854 Oct 1854 300 Old bridge Old bridge_

2950 0 0

6000 0 0

1498 0 0 485 0 0

7000 0 0

1052 10 0 1282 0 0

482 0 0

533 5 0 453 15 0

1195 6 0 1797 15 0

2028 17 0

2488 0 0 4316 0 0 3000 0 0

1260 7 6

955 0 0

942 7 I

300 0 0

2950 0 0

6159 16 0

1604 4 0 485 0 0

8946 5 8

1103 16 0 1295 15 0

556 8 2

533 5 0 517 5 0

1480 1 8 1797 15 0

1955 17 0

2488 0 0 4316 0 0 1572 6 0

955 0 0

1137 12 11

394 18 0

48 15 0

6 5 0

1377 0 0

125 0 0

13 5 0 4middot 4 6

56 4 0

281 5 0

477 18 5

80 0 0

51 10 0

Hugh Keon and Men-I Two contracts zies and Cronk

L J Towers

L J Towers L J Towers

Menzies and Cronk

Menzies and Cronk

Menzies and Charlton Ditto

Menzies and Charlton and Shaw and Co

Robert Menzies Robert Menzies

Wakeford and Co John Sullivan

E B Garven

Smith and Banks Hugh Dalrymple John Mathison Atchison and Lumsden

Sherbourne Sheppard

Thos Fletcher and Co

WH McKay Stewart and Kerr and

others H W Cooper

Embankment was washshyed away on completton and Bridge was subsequenlly lengthened

co

Two contracts Contractor unable to

complete

Repairs inclu4e hut washyges of puntman ampc

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 10: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

_-+rshyRETURN in Icompliance withmiddotmiddotMr Humfflay) middotmotion middotofmiddot16th February middot1859-continued

J -1 j f I I 3

1 J I Z

are severally constrneteu1 tucy uayc OUCH CIU1lmt

j KILMORE TO HEATHshy

COTE

The dale of each Contract stating the difference (if any) hetween the time stipulated for and the date of tlIc actunl completion of the work so let distinguishing each year

Nov 1853 Nev 1853 Aug 1853 l1~rch 1856 March1856 April 1857

June 1857 Aug 1857

March1854

July 1858

March1854

Sep 1856

March1858

May 1854

Not specified Not specified Not specified May 1856 May 1856 June 1857

j

July 1857 Dec 1857 Oct 1854

Oct 1858

Se~t 1854

Dee 1856

July 1858

July 1854

Feb 1854 Feb 1854 Jan 1854

May 1856 Aug 1856 June 1857

gt

Sept 1857 April 1858 q~t 1854

Oct 1858

Sept 18~~

Dee 1856

July 1858

Aug 1854

5 The Coqtract Price or Prices at which i

the construction or each Bridge was 10

Amount taken also the actual cost of theof the same including ~l extras jf any~_I~f_~f

pound s dpound

400 0 0400 350 0 0350 350 0 0350

574 b 0668 448 10 0505

pound s d

400 0 Oi 350 0 0 350 0 01 574 0 0 448 10 Omiddot

Timber Ditto Ditto Ditto Ditto Ditto

Ditto

Ditto

Timber Ditto Ditto

Ditto

Ditto

Timber

312 8 4 312 8 4304

Old bridge

Old bridge

779 9 0 449

369 1 01000 459 8 0

middot650 459 8 0

d 0 650 0 265deg

397 15 0397 15 0450

100 0 0300 0 0u

~ I I

6 I

Tbe total I 7 RemarksCost of Repairs on The Names of the Contractors1 each Bridge

pound 8 d f I

J Williamson 7 4 0 16 16 0

J Williamson 61 17 6 J Williamson

Geo Gordon Geo Gordon ~tewart ~nd Kerr

I

233 8 0 Stewart and Kerr 1 Repairs in 1857bull 0

861 0 b JWilUamson and others

4~bull

I~avid Symebull

I~H McKay

I 292 10 01 326 8 o I I~eomiddotmiddot ~l~orthouse~ bull J

546 18546 18

1350 0 o i733 15 0

Stone and Timber I High ~treet

B~oadmeadous Road Stone and Timber I MooneeMoonee Creek

Stubb and Newburn and others

42 0 0 Geo Smith 1 Repairs in 1857 by J t Teague

Ki11I0Ie Creek at KilplOrjl Rytuls_ Creek Sutherland Creek Kilmorc Creek Kurkurruck Creek Greeul~sPinch

I Pyalong

MollisonS smull creek

bullbull Mollisons large creek

BRANCH ROADS

Heathcote Cmnpaspc Rivcr Fords Creek Delatite Kilmore Creek west of Kilmiddot

more King Parrot preek two

bridgesSouth of Kilmore for farm-

ing purposes

DISTRICT

Creek Road I Punt on the Yarm at Hcidelshy

berg I

Brighton Road

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 11: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

-----------

Timber

Timber

Stone and Timber

Timber

Stone and Timber

Timber Timber

Ditto

Ditto Stone and Timber

Boroondara Four~ogBridges ~

CRurch street GirderBridgeovertheYarra

estimated total 90st

Actual cost vigt shyAbutments -

Ditto Scaffolding Workshop Iron Girders

Cartage to site Wages of ar~isaJls riveting

ima erecting ironwork too~ ampc

Dandenong Road

Eummemmering Creek Deep Creek

Bulla Bulla Jacksons Creek Sunbury

Gardiners Creek Road Over Gardiners Creek

Prahran

Gleiferry Road Glenferry Bridge

Gippsland Road Cardinia Creek

HawMQ7n Road Lower Hawthorn UpperHawthorn HaWtJlO7n and Bulleen Roads Over Yarranear toll

Over Yarra below old bridge -abutments

To complete erection 1I

April1856

April1856 April 1855 Dec 1856 Sept 1856 Jan 1857

July 1856

I1farelt 1857 March1857

April 1857

Oct 1856

Oct 1853

May 1857

June 1856

Oet1856 July 1855

March1857 Sept 1856

Jan 1857

Sept 1856

Aug 1857 June 1857

Sept 1857

Jan 1857

Dec 1853

Dec 1857

June 1856

lYIarch 1857 Oct 1855

March1857 Sept 1856 Jan 1857

Nov 1856

Oct 1857 Sept 1857

1851

Dee 1857

March 1857

1852

Dec 1853

1851

Feb 1858l

52245

Old bridge

2868 2914

Old bridge

40000

408 0 deg

10745 0 0 7235 0 1830 deg

158 deg deg deg 0 150 0 0

2690 16 0 1594 0 0

4762 13 4

010000 0

22766 5 0

408 deg I

0

10988 19 5 7677 0 7 2054 9 6

158 0 0 735116 0

191 17 6 8973 10 1

37395 13 1

352 15 0

3029 10 0 3154 14 6 ~ k _

4869 4 4

300 0 0

400 0 0

400 0 0

5720 0 0

10065 3 0

In progress I

400 0 0

Fitzgerald and Hughes

I

W C Cornish J Davis R Fitzgerald R Fitzgerald Purohased In Englaud by

colonial Agon-Gcneral J R Neave

bull I Repairs in 1854 by C

Roberts Simon Oldham

532 6 o J and N Campbell

This estimate includes approaches

Cost of approaches pound 16504 ISs 8d

Portion of contract for roadworks pound1699

Repairs by J Moore B Armitage and others

Estimate includes apshyproaches now in progress bull

3745 19 11

Evans and Merry

Erected by Superintenshydent of Bridges

William Elliott

Thomas Falls

Erected by Superinten dent of Bridges

Armitage and Wareing

Erected by Acting Colonial Engineer

J McKenzie J Bourne and Co

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 12: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

-------

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

3 The date of each Contract statin~ difference 4

(if any) between the time stipulated and the Amountdate of the actual complcti~m of the work so letI Z distinguishing each year ~

The X nines of and Localities in whicb

Are acvernllY constructed I the) have been erected

Contract

Melbourne District-continued Hddelberg to Essendon

Decbull 1858 Ditto I Merri Creek at Pentridge

Stone and Timber I Darebin Creek Feb 1857

Ditto to complete I Nov 1857

Heidelherg and Plenty Jan 1854 Stone and Timber I Merri Crcek May 1854 Ditto to complete

Nov 1854 Ditto fencing approaches Ditto pain ting

Sept 1854 Ditto gravellingroadwal Nov 1854

Timber 1 Plenty River 1 Nov 1853

Timber

Ditto Ditto Ditto

Ditto Stone and Timber

To complete erection Feb 1857

Melbourne and Ballaarat Four Bridges over Lerdershy

derg and Connoida Creek Near Connoida Creek Upper Werribee Ballan Three small Bridges over

Creeks Lal-Lal Creek Werribee between Madding-

ley and Bacchus Marsh

Dec 1853

Dec 1853 Dec 1853 Nov 1853

Dec 1854 March1857

Date of

April 1859 June 1857

March1858

Aug 1854

Not speci fied Not specified Not specified

1Not specified I June 1 J Ditto Diamond Creek bull Feb 1854 May 1854 Aug 1854

of the orlgillnl

estimate in each instance

Aetual seplUntely Completion I

pound

July 1859 3500

March 1858

Sept 1854

Dec 1854 Oct 1854 Dec 1854

1854

S The Contract Price or Prices at which

the construction of each Bridge was taken also the actual cost of tho I 6 sarne~~_cluding aU extrasmiddot if any

Amount of

shyContract Actual CostI pound s d1 pound s d

290 17 10 I 2992 17 10 3568 15 1 1333 8 7

2661 16 deg 2661 16 deg 4465 1216 14deg deg deg 7900 8016 0 0deg 0

60 0 0 60 0 0 116 0 0 116 0 0 60 0 0 60 0 0

9468 14 0

1405 0 01 1569 0 0 1120 0 01 1210 0 0

Stone and Timber Greensborough Dec 1858 May 1859 5000 1 4666 2 6 In progress

Johnson-street 8000 0 9816 15 9Stone and Timber I Over the Yarra-abutments 1 June1856 I Nov 1856 IMarch18571t250OO ~

1 13595 0 15541 11 6

Tho total 7 Rem8lkaCost of RepairS on IThe N8Ille8 of the ~-------- I

each Bridge

IJohn Robertson H Scott 1 Contractor became inshy

solventIJoseph Holmes

W L Lindsay 1 Contractor became inshysolvent

Robertson Martin and Smith I

lo)Bond and Excelts Rickard and Williams Benjamin Smith

IJoshua HiggsJoshua Higgs Brown and Nancarrow

I Geo Holmes and Co 50 0 o i Geo Holmes and Co

237middot0 OlD and W Anderson

Sept 1857

Not specified

Not specified Not specified Not specified

Not specified June 1857

Nov 1857

Sept 1854

Sept 1854 Sept 1854 Feb 1854

March1855 July 1857

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 1985 0 0

1783 0 0

700 0 0 415 0 0 575 0 0

260 0 0 2287 1 8

D and W Anderson D and W Anderson John Craig

Wm Warburton Itourkc and Munro

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 13: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

o

~ ~01gt-

l

ltI

Djerriwarrh Creek

Three Bridgcs over Creeks

Nov 1858

Oct 1858

March 1859

Dec 1858

June 1859

Jan 1859

2730 2583 16

2690 0

6

0

2583 16

2670 0

6

0 Robert Barbour

Evans and Darker

Portion of contract pound8123 8s 7d

Timber

Ditto Stoue and Timber

Melbourne and Geelo9 Werribee at Wyndham

Fishermans Gully Tea Tree Creek

Feb 1854

Oct 1853 April1854

April1854

Not specified Not specified

April 1854 i

Nov1853 I Sept 1854

1650 0

500 0 3029 15

0

0 0

1650 0

500 0 3029 15

0

0 0

79 17 0 Geo Holmes

R McClure Geo Hohnes and Co

Repairs in 1857 by S Fraser

Two contracts

Timber North JJIelboJTne

Near Flemington April 1867 May 1857 June 1857 1158 0 0 1184 3 9 Joseph Holmes

Timber

Stone and Timber

Point Nepean Road Four small Bridges Two BddgCs Mordialloc

and Frankston Ditto to complete

Pascoe Vale Road Moonee Moonee Creek Pascoe Vale Creek

March1857 Oct 1853

Oct 1854

Jan 1858 June 1857

Aug 1857 Jan 1854

Jan 1855

April1858 Oet 1857

Aug 1857

Jan 1855

June 1858 Dec 1857 1144

2104 4 3965 10

1020 0

1409 11 1194 13

0 8

0

6 3

2358 8 1995 0

1020 0

1378 9 1317 18

middot0 oj

0

6 3

624 0 0

Jenkin Rees Stephen Barton

T J Thompson

Wakeford and Cowdery E Sheffield

Became insolvent

Cononuke CreekBridge at ltrankston removed to a site further from the se in 1857 by D Higgins at bull oost of pound624

Two contracts

Timber Richmond Ptnt Road I

Two large Punts foot punt boat ampc

1853 1251 0 6 205 5 10 Chas Jordan and Curle and Co

D

Ditto

Ditto

Sandridge Road Over Creek

Snapper Point Road Baleombes Creek bullbull Oct 1856 Dee 1856

1851

Dec 1856 225 0 0 225 0 0

Erected by Acting Colonial Engineer

Arbut Brown

Ditto

Ditto

Studley PlInt Road Studley Punt

Bridge oyer watercourse April 1854shy Not specified Juiy 1854 700 0 0

893 10

695 0

6

0

38 10 0 Erected by Acting Colonial Engineer

Geo Holmes

Timber Upper Yarra Road

Four Log Bridges June 1857 Not specified Aug 1857 175 0 0 223 3 0 Dunn and Co

Stone and Timber Ditto

Timber

Upper Plenty Merri Creek Dnrebin Creek Barbers Creek

Oct 1856 Sept 1854 Oct 1857

March1857 Nov 1854 Dec 1857

July 1857 Dec 1854 Jan 1858

4839 12 2255 0

251 0

0 0 0

5075 7 2255 0

251 0

0 0 0

T Cameron and Co Hartley and Sykes Arbut Brown

CQ

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 14: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

RETURN incomplhince with Mr Humffiays motion of 16th February 1859-continued

I 2 The NDCS of tbe

DIstricts and Localities in which they have been erected

each year

Date of ----- shy

Contract Specifi~d

Completion

March 1857 Not specified April 1857 June 1857

April 1858 Sept 1858

April 1857 Nov 1857

~lclbourlle District-continued

Western Port Eummemmering Creek Yallock and Tobin YaUock

Creeks Three Bridges Tooradin

Inlets Over three Inlets

Wliamslown Road I Stony Creek

GEELONGBALLAARAT AND

WESTERN DISTRICT Barrabool Hills

Ballaarat

I Ballaarat toJfelbournc via Oeswicks Creek

Y~rrowee Hivcr IDItto approaches

Oct 1853 Feb18501

June 1858 Oct 1858

lfay 18~8 July 1858 May 18~8 June 1858

IlCtunl completion of the work so let 1Materials of which

the Bridges nrc severally constructed

Timber Ditto

Ditto

Ditto

Timber July 18531 Not specified 1 Oct 1853

Stone and Timber 1Kardinia Creek

Stone and Timber 1Bridge at Sebastopol

bull Stone and Timber

Ballaarat to Darriwill I Stone and Timber I Moorabool River at Russells Dec 1858

Ballaarat to Sireatllam Timber I 1wo Briilges at I May 1857shy

Winters and Smythes Creek at Darshylots

Ballaarat to Raglan Two Bridges Trewallo and I March 1856 1

Yam Holes Creeks I Dittoapproaches April1857

3

May 1859

Oct 1857

July1856

May 1857

5 The Contraet Price or Prices at which

the cOUlltruction of each Bridge Wll

taken a]BO tbe aetua cost of the I same includinll all extras if any

Amount of

Aetua] Completion

April 1857 Oct 1857

June 1859

Jan 1858

Feb 1854

Dec 1858

July 1858 Sept 1858

June 1859

I Oct 1857

Jan 1857

July 1857

Imiddot 9

Amount of the

original estimate in each instance

separately

pound

4500

I

1124

1200 3000

3500

The ttal 7

RemarksCost ofllepalrs on IThe Names of the Contractorsl eacb Bridge

Contract

pound s 191 0

2420 0

2725 11

780 0

940 0

1255 19

1176 13 2276 9

3500 0

1430 6

1500 0

1159 0

Actual Cost

d pound s 0 191 0

656 0

0 2420 0

0 2725 11

0 1042 10

0 1120 14

1255 196

1176 13 0 6

2276 9

0 3550 0

1617 138

0 1500 0

0 1231 5

d 0 0

0

0

0

41

61

6 0

0

2

1

30 0 Arbut Brown Arbut Brown

Arbut Brown

Samuel Anderson

IHenry Simpson

0

1William Ross

1Joseph lfartindale

I Estimate includes road formation

IIshy

1 Portion of contract for pound3986 7s 6d

Evans and Barker Gregor and Hiley

William Elliott

27 10 o I Rourke and Munro

ID Baillie

William Owen

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 15: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

April1857

June 1858

Ballaarat to Horsham or Lexton to Wimmera

Timber I Two Bridges at Elmhurst and Crowlands

Ballaarat to Amherst Timber I Glendarnel Creek

Ballaarat to Calltlemaine Stone and Timber Creawicks Creek

Bunin1Jong to Streatham

March1858 I July 1858 July 1858

April~ 1855 INot speqifted May 1855Timber Mount Emu Creek

Balian and Mount Blackwood1 Timber Koyamninnah Creek

Oape Otway Road Stone and Timber Salt Creek Timber Deans Creek near J~ake

Modewarre

Camperdown Stone and Timber I Timboon Creek

jCressy to Darlington

Timber Lengthening Elephant Bridge at Darlington

Oolac Road Waurm Ponds

Ditto Colac Bridge

Ditto Pontoon Bridge

Ditto Deans Creek Ditto Borangorac Creek

Stone and Timber Birregurra Creek

June 1857

Nov 1853 Dec 1853

Jan 1854

Dec 1853

June 1854 April1854 May 1854

July 1857 I Aug 1857

Feb1854

NtciJII

March1854

Jan 1854

INot speeified Nov1854 Sept 1854

Feb 1854 May 1854

May 1854

Jan 1854

Nov 1853 Nov 1851

May 1853

July1854 I Dec 1854 Sept 18541

1500

1843

1004

0I 1507 12

Itgt 1464 0 01

998 18 0

580 0 0

50 0 0

616 1 0

460 0 0

3960 0 0 1987 0 0

1507 12 0

1430 0 0

998 18 0

580 0 0

168 15 0

839 0 0 142 0 0

616 1 0

460 0 0

911 deg 01

3100 0 o I

350 0 3960 0 010 1987 0 0

308 0

6001 15

5 0

Aug 1857 Nov 1857

Sept 1858 Oct 1858

Matthews and Littleton

Wm Arthur and Co

Armitage and Westoot

William Warburton

Moore and Hill

Thomas Carroll Edward Howe

Clt

J and W Collier

0 I C Wyatt and McKinnon

John Repairs by J H Bowshyman in 1857

I Erected by piecework Destroyed by flood in IReplaced by Pontoon

1852 4 I John McKinnon and

others

ILittle and Moore o Moore and Robinson

John McKinnon

Bridge Thcse repairs include

I working xpenses since tnshypletlon and expense of re moving bridge to new Site

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 16: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

RETURN in compliance with Mr Humpoundfrays motion of 16th February 1859-continued ~I --~---------- I

3 I The date of each Contract stating the difference

1 (if nny) betwCen the time stipulated for and the 1 I z date of the actual completion of the work so let

I dlstinguislling each year Materials of which The Nnmc of theI Ithe Bridges Districts or Localities in Wllich Date of

are severally constructed they have been erected ~________

1 t Spccilled1 II Contract Completion

------------- 1

i Geelong B~niiUrat andWestern [I I District-continued

I Colac Road Stol)e and Iron i Over Barwon D~lJ-r Pontoon Ju)e ~856 Iec 1856

II Br~dge-4butments Jan 1857 May 1857

Iron Girders Abutments - to complete

middotc 1 ~ bull gt

Nov1857 Feb 185S Wages of Artisans Tools

amp0

Stagingf6reertion

Dec 1858 March 1859iorth~pproaches

SQuihapproaches bull i Dec 18pS I March ~S59

Geeloflg to Ballaarat I Timber Batcsfor~ Bridge 1

March 1859 ford

Timber Moorabool j1iverat Fyans- Sept 1853 July 1854 ford 1

Ditto No I WiIlinmsons Creek

Stone and Timber Moorabol River at Bates-I Dec 1858

bullbullbull I July 1853 Not specified

nitto iNomiddot2 ditto Aug 18531 Not specified Stone and Timber I No3 ditto nt Corduroy March 1854 May 1854 Timber I Frame Bridge and two log lIay 1854 July 1854

Bridges over Williamsons Creek between Corduroy and Iuninirong I

Ditto Williamsons Creek two Nov 1854 I Fcb 1855 miles from Corduroy

Ditto July 1854I Leighat Ba~laarat Feb 1854

Ditto On Plank road I Nov 1854 April1855 I

Actual shyCompletion

June 1858 June 1856

Aiig 1858

July 1859

J~ly 1l9

July 1859

Sept 1854

July 1853

Aug 1853 Dec 1854 Aug 1854

Feb1855

Aug1854

Aug 1855

4

pound

Old bridge 4000

2100 800

544

-_ __ __ _--shy5

lhc Contract Price or Prices nt which the construction of each Bridge was taken also the actual cost of the same including aU extrus if any

Amount of

Contract Actual Cost

pound s d pound S d

14~~4 14

14800 0

1866 0

6

0

0

1140 0 0

15163 14 6 15938 11 8

1881 0 0 13897 1 1

3017 11 0 2703 2 6

3261 11 4 332~ 3 10

1859 of pound6000 is now In53945 i37 course of expenditure to complete the work---I J McKinnon and others 175 9 0

3885 19 6 I3885 19 6 David Barry 1

12612 16 n 12848 15 3 186 1 8 H Rourke and J and Two contracts middotW Collier and Co

352 12 0

I

352 12 0 i I H Rourke and Baker and Davis

260 0 0 H Rourke and others 1916 0 9 1916 0 9 5 0 o IJohnmiddotPotter bull

670 0 0 670 0 0 Davidson and Dalshy Portion of Contract for rymple

3 0 o pound3327

700 0 0 700 0 o Jand W Collier and co Portion of contract for pound8206

414 0 0

5 0 0

500 0 o JandWCollierandCo Portion of cont-act for 1 pound9699

1050 0 0 1050 0 o J and W Coilieritnd COi Portion of contract for ( I pound23045

6 7The totul RemarksCost o(Repalrs on IThe ltames of the Contractors

each Bridge

I 1 ~J

Qriplls and yo bull Contract cancelled by theBoard 0

Pettigrew and McCann Purchased in England

by Colonial agent-General bull ~i 1middot

Ol

An additional Vote in

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 17: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

Geelong to Steiglitz BalIan (I 1 and Mount Egerton

Ditto Moorabool River at Wal- March 1856 May 1856 May 1856 989 1142 2 8 1142 2 8 John McKinnon

f I f laces I Sutherlands Creek Ditto April 1857 July 1857 July 1857 879 19 6 852 3 0 Simon Frazer Ditto Ditto Dec 1858 March 1859 May 1859 445 18 7 445 18 7 Simon Frazer~ Stone and Timber Ditto June 1856 Septl856 Sept lS56 I 1525 1431 4 0 1435 r4 0 Barry and Ewart Timber Ditto at Steiglitz bull Dec 1858 March 1859 JunelS59 590 o 0 590 0 0 David Barry

shy ( Lower We~tern Road

Timber Leigh 1851 Erected by Superinshytendent of Bridges

374 0 ~O

Ditto Foxhowe Bridge over Gnar- Oct lS53 rOoFeb 1854 April1854 1795 0 0 1875 0 0 0 0 John McKinnonkeet Ponds at Foxhowe I

Stone and Timber Over Woady Yallock at Feb 1854 JulylS54 June 1855 5400 0 0 William Ross5484 12 Cressy-Timber 70 00Erection May 1854 Aug 1855 Jan i855 7145~15 0 7262 0 0 John McKinnon

Nov1854 Notspecified MarchlS55 644 12 2 Henry Rourke 2995 Feb 1855 I May 1855 Dec 1856 1656 0 O 1901 0 0 EWaring andD Bailliel E Waring unable to completeEmu Creek or Marida Yal- March 18571 SeIlt 1857 1967 0 0 1854 0 omiddot S H Bowman Contractor became in-

lock Bridge at faylors solvent1 rRiver 20 miles from Camperdown

To complete July 1858 692 0O~t 18581 OCt 1~~8 IJ I IDavid Darry I692 0 0Newtown to A~My II o I Timber I Western Gully 1853 250 0 E~c~ed by day la~

Pollocks Ford Road Stone and Timber I Barwon River -Dec 1857 Julr1858 I 0 0 449 4 5 i Hector McLean I Contract cancelled7500 1Dec 1858 April1859 April1859 4 7430 13 fO RourkeMullrQ and Co iupper estern lwaa Timber Fishermans Gully Oct 1853 837 6 i6 Erected by piecew-()rk

Ditto Lengthening Upper Woady May 1853 Notspecifled Nov 1853 733 l4 0 733 14 0 C Wyatt and John McYalloak Bridge at Pitfield Kinnon

Ditto Teesdale Bridge Native H11t Jan 1854Sept 1853 Feb 1854 775 17 9Creek at Shelford~i

751 17 0 Hon gtuk15 o 0 Timber 1541 J - - (Erection Oct 1853 March1854 June-1854 898 0 0 898 0 0 John McKinnon

Ditto Bannockburn Bridge over Feb 1855Nov1854 sept ~1855 151S 0 0 1537 16 0 12 o 0 Malcolm Munro Bruces Creek

Stone and Timber Streathani Bridge over Fiery Feb 1854 July 1854 Dec 1854 3610 5900 0 0 5900 0 0 Armstrong and middotWin-Creek at Streatham

Ditto Shelford Bridge May 1855 Old 516 19 2 bridge

Ditto Nalangil Creek about 10 MarchIS59Dec1858 293 0 0May 1859 293 0 0milell from Pittleld

Ditto Lesser Woady Yalloak Pit shy March1856 Dec 1856 Jan 1857 4109 3850 0 0 3877 0 0 440 0 o IRourke and Munro IRepairs in 1858 byfield or McJIillans Bridge Simon Fraser

-l

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 18: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

1 Materials of which

the Bridges are severally constructed

Timber

Stone and Timber Ditto Ditto Ditto

Z The Names of the

Districts and Localities in which they have been erected

BELFAST PORTLAND AND MAIN WESTERN DISTRICT

Hopkins River at Hexshyham

Ditto at Dobies station Ditto at Ross station Ditto at McWilliams

Ditto at Wickliffe or Farshy rells station

Timber Ditto temporary Boat at I Fairy and Bogers station

Ditto Ditto Punt at mouth Stone and Timber MOYle lliver at Belfast

Ditto at Hosebrook Mashysonry

Erection

Timber

Ditto Ditto

Wannon River at dish

Ditto at Redruth Spring Creek at Id

e

Cavenc

n~ farm

Stone and TiTimber Stone and Ti

mber

mber

Ditto near BelfasConcongela Creek Mustons Creek

mut

t

atmiddot Carashy

Ditto near Hexham Ditto Ditto

Glenelg River at Harrow To complete

Ditto Ditto at Dartmoor Timber Ditto at Casterton

Stone and Timber Emu Cre~k at Panmure

RETURN in compliance with Mr Humffrays motion of 16th February 1859-continued

S The date of each Contract stating the difference

3 The Contract Price or Prices at which

(if any) between the time stipulated for and the 9

the construction of each Bridge was Amount taken also the actual cost of thednte of the actual completion of the work so let 6of the same including all extras if anydistinguishing each year 7

Remarkamporiginal The total

Cost of Uepairs on IThe N amcs of the Contractors each Bridge

Amouut ofDnte o~

Actual --1 sl~flYSpeCified Contract Actual Cost 1__________________

pound s d pound 8 dpound pound s d

2419 2 0 C S Baillie 2397 0 o

Alex Amos and Co 1800 0 o 1793 15 o 1738 4 0

Mason and McKiernan 5000 0 o

1670 0 0 5247 2 0 Thomas Robertson

2660 0 o 2806 5 0 Barry and Ewart

230 0 0 Manifold and Bostock I Wages of puntman inshy cluded 00

750 0 o J and R Pilkington 3800 0 o

800 0 0 John Mason

1688 15 o 3800 0 0

Broadbent imd Nichols 1688 15 0

John McKinnon and N Billing

2430 0 o

3288 Omiddot 03288 0 o

Geo Johnson2467 0 0

Richards and Co 1000

510 0 o 510 0 0 1045 0 o 1005 0 0 John Canny Including pound45 local subshy

scription 2613 0 o Daniel Hourigan

526 0 o 2613 0 0

Jenkin Collier 2590 0 o

526 0 0 Daniel Hourigan2590 0 0

B Wycherly and Co 4784 17 o

958 1 o 958 1 0 Geo Johnson

1030 0 o 3747 8 0

Dunbar White and Campbell

4000

1030 0 0

John Ross and Co 200 0 0

3014 1 6~014 6 James Kirkby Erected by J as Kirkby

about 1850 at his own cost the sum ofpound200 was allowed In 1853 as remuueratlonJohn Hughes1150 0 o 1150 0 0

Contract

Dec 1857

Dec 1858 Dec 1858 eb 1854 Sept 1856

July 1853

Sept 1854 Oct 1853 Feb 1854

May 1855

Jan 1855

Dcc 1858 Dec 1858

Dec 1858 Dec 1858 Dtc 1858

Dec 1858 Tuly 1857 Dec 1858

Dec 1858

Dec 1858

Completion Completion

June 1858

March 1859 March 1859 July 1854

May 1857

Not specified

Aug 1858

May 1859

Dec 1854 May 1857

Nov 1854

Not specified I Feb 1855 May 1854 July 1854

Sept 1855

March 1855

Not specified I Jan 1859

March 1859 March 1859 March 1859

March 1859 Feb 1858

April 1859

July 1859

May 1859 o

Oct 1854 July 1854

Oct 1855

Sept IB55

April 1859 April 1859

June 1859 March 1859 July 1859

May 1859 June 1858 April 1859

July 1859 Nov 1853

Aug 1859

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription

Page 19: B RID G E 80 - Parliament of Victoria · 2013-01-11 · 1859-60. VICTORIA. B RID . G . E . 80 . RETURN to an Order of ,the . Legislative Assembly, Dated 16th February, 1859, for 1.

Ditto

Timber

bI ltl

gtshy~ g ~

2lt ~ oj IO 1lt1 III IO -Q 0

~ sect Smiddot

Merra River at Dennington I Oct 1856 March 1857 I Jlme 1857

Wannon River at Tahara Dec 1856 Aug 1857 Feb 1858

Woodford Bridge

GIPPSLAND

Alberton and Welshpool Albert River ) March 18541 JulY1854 June 1855

Lower Coast Road I Two Punts at McLennans IMarch 1853 INotspecified 1Nov 1854

Straits and Mitchell River Bruthen Creek near Wood-

side

Main Central Road Avon River Stratford Sale Morass

Ditto to complete Thomson River near Sale Tarra River Tarraville Merrimans Creek township

of Shadbrook Ditto at Gifford LaTrobe-River Flooding Creek Sale

Melbourne Road Moe Swamp Four small Bridges FernI Tree Gullies Two Bridges Tarwon Hiver

and Shady Creek Morewe1l River leedy Creek Taralgon Creek

Main Western Road Bruthen Creek at Bruthen Merriman Creek ncar Mershy

ton Ditto approaches Tara Creek at Carpenters

South Boundary Road Muddy Creek at Tarraville

I April 1855 I June 1855 Sept 1855

July 1858 May 1856

Sept 1858 Dec 1856

June 1859

Feb 1857 Dec 1857 Feb 1858 Nov 1857 Jan 1858 Feb 1858 Feb 1855 June 1855 Nov 1855 May 1857 July 1857 Aug 1857

Scpt 1853 Aug 1857 Sept 1853

Jan 1854 Jan 1858 Jan 1854

June 1854 May 1858 Feb 1854

April 1856 May 1857

July 1856 June 1857

I Oct 1856 1 Oct 1857

Oct 1857 Jan 1858 April 1858

Dec 1858 Dec 1858

July 1859 Notspecified

I July 1859 Sept 1859

Feb 1858 May 1858 June 1858

Sept1858 OCt 1858 Oct 1858 Feb 1855 May 1855 July 1855

Jan 1859 Feb 1859 Feb 1859 Sept 1855 Oct 1855 Oct 1855

March 1857 July 1857 Dec 1857

Old bridge

2500

350

1800

1400 2250

325

200

6904 0

2162 0

2800 7

1240 0

300 0

1400 0 4583 3

3600 0 1150 0 2500 0

414 0

150 0

01

o I

I

6 I

1 0 3

0 0 0 0

0

8028 G

2184 16

2800 7

1240 0

300 0

1400 0 1404 0

4073 6 1150 0 2738 0

414 0

400 0

8

8

6 I

1 0 0

9 0 0 0

0

519 18

325 0

157 16

10 0

o IJoseph Dobson

Robert Gow bull I

o IRepairs in 1854 Geo Johnson

I Charles Lucas

71 John McKenzie

W Catchpole and Nunn

Arbut Brown Thomas Oldham

P and H McArdell W H McKiernan Searle and Jones Joseph Teague

o IEdward Watson

by

Repairs in 1858 by Alex Amos and Co

Under the supervision oftbe Portland District Road Board

B

bullbull j Contractor i complete

unable to

-O

1500 300

1430 350

0 0

0 0

1430 350

0 0

0 0 8 0 o

2203 800

2305 870

0 0

0 0

2305 870

0 0

0 0

480 480 0 0 480 0 0

Edward Watson David Weir

McClure and Hinckley Rees and Jones Portion ot contract

pound1610 Rees and Jones

1100 175 250

898 10 199 19 240 16

8 0 0

898 10 199 19 240 16

8 0 0

John CobainISam S Bury L J Michell

400 250

340 150

0 0

0 0

340 0 177 6

0 0

Thomas Miles Philip OMara

100

120

225 0 100 0

150 0

0 01

01

225 0 100 0

150 0

0 0

0

MeKenzie and Co Edward Martin

R Searle

One half of cost raised by local subscription

One-third of cost raised by local subscription


Recommended