B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 1
Mr. Chairman,
I am presenting to the Standing Committee, the estimates
of receipt and income and expenditure pertaining to the Budgets
‘A’ (Fund code 11, 12, 60, 70), ‘B’ (Fund Code 21, 22, 23) and
‘E’ (Fund Code 40) for the financial year 2013-14 in pursuance
of Sections 125 and 126E of the MMC Act, 1888. I have been
closely associated with the MCGM as Jt. Municipal
Commissioner and as an Additional Municipal Commissioner
during my earlier tenure from June 2000 to May 2005. I have
taken over as Municipal Commissioner of this august
organization and I, therefore, deem it my privilege and honour
to present the Budget Estimates of Brihanmumbai
Mahanagarpalika as the Municipal Commissioner.
Budget Estimates 2013-14
The size of the Budget Estimates and the abstracts of the
revenue account and the capital account under ‘A’ (Fund code
11, 12, 60, 70), ‘B’ (Fund code 21, 22, 23), ‘E’ (Fund code 30),
‘G’ (Fund code 40) and ‘Tree Authority’ (Fund code 50) are
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 2
given below and the details thereof are given in the Annexures I
to IV on pages 102-105
The total size of Budget Estimates for 2013-2014 is
`27578.67 crore, which is 23.27% more than Revised Estimates
2012-13.
The Estimates of the Revenue Income is `20472.61crore
vis-à-vis the Estimates for the Revenue Expenditure is
`18123.16 crore for 2013-14.
The Revised Estimates of Capital Expenditure for the
year 2012-13 i.e. `6521.02 crore as against Budget Estimates
2012-13 is `9359.76 crore. In the Budget Estimates 2013-14,
the Capital Expenditure is estimated at `9369.41 crore which is
slightly higher than the current year Capital Budget Estimates.
After budgetary reforms from 2007, we have now
provided, for the first time, previous 3 years actuals with
current year Budget Estimates and Budget Estimates for the
year 2013-14. This will help the councilors and citizens to
compare income and expenditure of past period on similar line
items, at a glance.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 3
SIZE OF BUDGET ESTIMATES – ‘A’ (Fund code 11, 12, 60, 70)
‘B’(Fund code 21, 22, 23), ‘E’ (Fund code 30), ‘G’ (Fund code 40)
and TREE AUTHORITY (Fund code 50)
(` in crore)
Details
Budget Estimates 2012-13
Revised Estimates 2012-13
Budget Estimates 2013-14
Income/
Receipts Expenditure Income /
Receipts Expenditure Income/
Receipts Expenditure
Revenue
Income 19662.87 18800.08 20472.61
Revenue
Expenditure 17127.75 15731.91 18123.16
Capital
Receipts 6918.07 3571.79 7106.06
Capital
Expenditure 9359.76 6521.02 9369.41
Total 26580.94 26487.51 22371.87 22252.93 27578.67 27492.57
Excess of
income
over
expenditure
93.43 118.94 86.10
Size of
Budget
Estimates 26580.94 26580.94 22371.87 22371.87 27578.67 27578.67
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 4
REVENUE ACCOUNT – BUDGET ESTIMATES A, B, E, G &TREE AUTHORITY
(` in crore)
Fund Code
Particulars
Budget
Estimates
2013-14
REVENUE INCOME
11 General Budget 15657.40
12 Health Budget 173.47
21 Improvement Schemes 32.81
22 Slum Clearance 2.61
23 Slum Improvement 19.73
30 Education Budget 530.28
40 Water Supply and Sewerage 4034.53
50 Tree Authority 21.78
60 Provident Fund …
70 Pension Fund …
Net Income 20472.61
REVENUE EXPENDITURE
11 General Budget 8187.47
12 Health Budget 1885.02
21 Improvement Schemes 178.44
22 Slum Clearance 4.18
23 Slum Improvement 151.88
30 Education Budget 1471.39
40 Water Supply and Sewerage 2736.41
50 Tree Authority 39.88
60 Provident Fund 7.59
70 Pension Fund 3460.90
Net Expenditure 18123.16
Revenue Surplus during the year 2349.45
Surplus transfer to Capital Account 2333.67
Surplus 15.78
Net of transfer to other budgets.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 5
CAPITAL ACCOUNT –
BUDGET ESTIMATES A, B, E, G & TREE AUTHORITY
(` in crore)
Fund Code Particulars Budget
Estimates
2013-14
Capital Receipts
11 General Budget 4162.53
21 Improvement Schemes 161.17
23 Slum Improvement 15.88
30 Education Budget
357.07
40 Water Supply and Sewerage
2409.41
Total 7106.06
Transfer from Revenue Account 2333.67
Total fund available for Capital
Expenditure
9439.73
Capital Expenditure
11 General Budget 5056.04
12 Health Budget 623.60
21 Improvement Schemes 107.02
23 Slum Improvement …
30 Education Budget 356.98
40 Water Supply and Sewerage 3224.90
50 Tree Authority 0.87
Total 9369.41
Surplus 70.32
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 6
Now, I enumerate details of provisions under Budget
Estimates A, B & E. The Budget Estimates for the year 2013-14
alongwith Budget Estimates and Revised Estimates for the year
2012-13 (Budgets A,B & E) on Revenue Account are given in
the following Table :-
Table-1 Revenue Account Budget A, B, E
(` in crore)
Particulars
Budget
Estimates
Revised
Estimates
Budget
Estimates
2012-13 2012-13 2013-14
Revenue Income 15213.15 15067.61 16452.30
Revenue Expenditure 14199.66 13065.64 14932.91
Surplus during the year 1013.49
(Surplus)
2001.97
(Surplus)
1519.39
(Surplus)
Transfer to Capital
Account 1012.50 2000.00 1518.00
Surplus 0.99 1.97 1.39
The above table shows that the Revised Estimates of
revenue income have decreased by `145.54 crore as compared
to the Budget Estimates of 2012-13. This is mainly due to the
slightly lesser than anticipated realization of revenue income
from the new source of premium against fungible FSI.
The gross income from Octroi estimated at `7000 crore in the
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 7
Budget Estimates 2012-13 has been revised to `7125 crore
based on the improved collections of Octroi.
Various amendments in Development Control
Regulations & MRTP Act made by the State Government have
resulted into a sizable increase in the municipal revenue. The
new source of premium against fungible FSI has fetched
`943 crore upto 24th January, 2013. This is expected to cross
`1150 crore by the end of current financial year. Further, the
premium charges received against additional 0.33 FSI in
suburban area have shown an increase of `45.15crore as against
the revenue collection for year 2011-12 of `229.85 crore from
this source. Similarly, the new modifications introduced in
Public Parking Lot Scheme under DCR 33(24) has netted
`90.55 crore till 24th
January, 2013.
I am pleased to inform the transition of property tax
system from Rateable Value System to Capital Value Based
System, which holds the promise of transparency, buoyancy
and equity. Fresh bills under Capital Value Based System for
year 2010-11 to 2012-13 have been served to the property
owners. The property tax bills for the year 2012-13 is
aggregating `3657.09 crore.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 8
In the year 2012-13, the Revised Estimate of Revenue
Expenditure is `13065.64 crore as against Budget Estimates of
`14199.66 crore resulting into saving of `1134.02 crore.
Likewise, revised capital expenditure is estimated at
`3844.51crore as against Budget Estimates of `6000 crore.
The revision in capital expenditure coupled with saving in
revenue expenditure being available for capital works, there is
no need to raise internal loan of `2000 crore this year as
envisaged in the Budget Estimates 2012-13.
Estimated revenue for 2013-14 at `16452.30 crore
exceeds the estimated expenditure by `1519.39 crore, out of
which funds of `1518 crore are proposed to be transferred to
the capital account.
For estimation details of various sources of income
vis-a-vis Budget Estimates of revenue income under Revised
Estimates for 2012-13 and the Budget Estimates for 2013-14,
I refer to Table 2 which gives the details of various sources of
income with comparative position of Budget Estimates for
2011-12.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 9
Table-2 - Details of Revenue Income Budget A, B, E
(` in crore)
The main increase in revenue estimates of 2013-14 is
expected from Octroi, Property Tax & Receipts from
Development Plan Department and the proposed modification in
Sr.
No.
Particulars B.E.
2011-12
R.E.
2011-12
B.E.
2012-13
R.E.
2012-13
B.E.
2013-14
1. Octroi (Net) 5700.00 6000.00 6900.00 7025.00 7740.00
2. Property Tax 2000.00 2000.00 2200.00 2156.82 2259.66
3. Receipts from
Development
Plan
1639.28 1798.02 3435.49 3240.43 3362.41
4. Interest 521.52 1005.13 1030.84 1036.89 1034.74
5. Grant-in-Aid
from Government
271.99 317.93 304.04 274.07 322.94
6. Receipts from
Roads & Bridges
112.59 153.95 116.97 253.81 307.17
7. Supervision
Charges
250.00 200.00 250.00 170.00 250.00
8. Solid Waste
Management
90.52 92.47 99.99 102.43 109.64
9. Receipts from
Hospitals &
Medical Colleges
93.61 108.57
110.45 114.87 122.33
10. Receipts from
License Deptt.
118.04 123.28 143.82 136.23 149.41
11. Receipts from
Markets &Deonar
Abattoir
63.84 60.34 70.45 39.69 126.45
12. Other Receipts 640.49 393.93 551.10 517.37 667.55
Total 11501.88 12253.62 15213.15 15067.61 16452.30
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 10
Market Redevelopment Policy. While considering this increase,
I have taken into account the current inflation rate as well as the
growth rate along with better enforcement.
As per Government of Maharashtra directives by letter
dated 03.01.2013, Octroi has to be replaced by Local Body Tax
(LBT). This reform will boost business friendly image of
Mumbai and will remove the bottlenecks associated with the
present methods of Octroi collection, thereby improving
efficiency in movement of goods. Local Body Tax (LBT) is
account based and leviable on import of articles into the limits of
Corporation for consumption, use or sale therein. In LBT
system, the traders and businessmen will be responsible for
monthly payment of tax by way of self declaration. This tax will
be paid directly to the Corporation. We have already initiated a
study with help of Economics Department of Mumbai
University and Tata Institute of Social Sciences in this regard.
The administration is making all out efforts for transition to LBT
System by 1st October 2013. This will be done through a
consultative process involving all stakeholders. The revenue
estimates from Octroi have factored in the proposed transition to
LBT System.
Continuing with the reform of the Property Tax System it
has been decided to facilitate self assessment system in the
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 11
current financial year. This System will facilitate the citizen to
work out his own property tax and to file a Property Tax Return.
Services like Tax calculator, online submission of Tax Returns,
Complaint filing etc. will be provided on MCGM web portal.
MCGM is also intending to provide Integrated Solution for
visual validation of all properties using 3600 immersive
panoramic data whereby a GIS base map will be created for user
departments with 3600 panoramic view of the properties.
This will ensure better compliances and detection of missing
properties for better realization of property tax and licensing
revenue.
It has been our endeavor to retain the premier position of
Mumbai as the favoured business destination. Reforming the
municipal tax system is a step in that direction. Transition from
Rateable Value to Capital Value has already offered relief to
Businesses and commercial entities as well as to newer
residential premises. The proposed transition from Octroi to
LBT will further improve business friendliness of the city and
bring much awaited relief to traders and commercial entities.
I, now discuss some of the important activities / services
and facilities related to Budget ‘A’, ‘B’ as well as ‘G’.
I wish to highlight the substantially increased allocation
for Operation & Maintenance (O&M) in Budget Estimates
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 12
2013-14 as compared to Revised Estimates 2012-13. This is to
enhance the efficiency and utility of assets already created to
deliver better & higher standard of services to the citizens.
This will have direct bearing on service delivery in sectors like
Health, Solid Waste Management, Markets, Roads and Slums.
In the Budget Estimates 2013-14; the O&M expenditure is
estimated at `3218.56 crore which is 29% higher than the
Revised Estimates for the year 2012-13.
While making allocations for different sectors and
activities therein, I have kept in mind the obligation cast upon
Urban Local Bodies through the XII Schedule referred to by
Article 243W of the Constitution of India and obligatory duties
under Section 61 of the MMC Act, 1888. I have proposed
allocations with a view to retain Mumbai’s status as “Urbs Prima
in Indis” and to sustain and accelerate the efforts that are already
underway in this regard. I am now discussing these programmes,
policies and initiatives at length activitywise.
Immediately after taking over the charge as Municipal
Commissioner, I reviewed the present functioning of the
municipal administration and identified areas/fields requiring
further improvements and reforms. Accordingly, some major
initiatives have been taken or being proposed which I will
present hereafter.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 13
Governance Initiatives
Improved procurement procedure in MCGM
The procurement system in MCGM is in urgent need of
reform. It has frequently come under criticism for alleged
prevalence of malpractices such as bid rigging, cartelization and
predatory pricing and variations in contracts. The system also
needs to conform to greater demand for transparency. Vendor
Management and Contract Management practices also need
significant improvement. All this is necessary to get value for
tax payers’ money from vendors and contractors.
I have, therefore, appointed a committee headed by
Additional Municipal Commissioner (Project) to go into this
aspect and prepare a road map for implementation of improved
procurement procedure in consonance with the best practices
followed around the world in public procurement, which
includes, inter alia, full disclosure, integrity pact with vendors,
best price undertaking, e-tendering and grievance redressal.
As a step in this direction, the procurement plans and
specifications of various departments are being uploaded on the
MCGM portal; and systems and policies are being put in place
to control dubious claims of extra/excess and variations by
contractors. Also for quality assurance and quality control,
system of peer review of design and estimates as well as system
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 14
of third party inspection during execution has been initiated in
Road and other sectors.
Vendor Registration
Vendor registration is mandatory in SAP System since all
work orders/purchase orders are generated through system.
In view of the government assurance in State Legislature
regarding effective vendor registration and management by
MCGM, efforts are underway to streamline the system available
in SAP. It will help detect cartelization. A dynamic record of
vendor performance and its impact on Vendor Registration
status will ensure improved accountability from vendors. Vendor
master updation is being done for providing efficient service as
well as speedy decision making.
E-governance/I.T. Initiatives
Continuing our endeavor to infuse modern technology for
good governance, we are deepening the use of SAP, introducing
paperless e-office, creating systems to exploit mobile technology
especially in citizen feedback management system and
enhancing our presence in social media. MCGM has engaged
National Informatics Centre (M/s. NIC) to implement Paperless
Office Software System called e-Office. E-office system will
help in saving of space, freeing up of human resources, greater
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 15
efficiency in file management and transparency in movement of
files/documents. It is expected that in 2013-14; most of the
departments of MCGM shall move to e-office.
E-quotation/unstar e-tender system has been established in
lieu of CWC contracting system for transparency and
accountability.
Taking into consideration deployment of additional
software systems, MCGM is required to take up the work of
hardware procurement and upgrade the same. MCGM is also
exploring the feasibility of deploying software applications on
virtualization and cloud platforms. This will ease management
of applications and scalability of applications on demand.
To cater to the need of additional bandwidth required for
commissioning of newer applications, it is necessary to adopt a
new technology called “Multi Protocol Label Switching”
(MPLS). This will provide secured access to all the roaming
users of MCGM to access various applications on the go. This is
expected to provide freedom to MCGM users to clear various
proposals / files and enhance efficiency of the decision process.
Public discourse and policy making need to rely on
quality data. There is a responsibility cast upon us by XIIth
Schedule of Constitution and by the Collection of Statistics Act
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 16
to collect and update data scientifically. For improving quality
of decision making in urban governance, MCGM needs to use as
much data in its command and “data analytics” techniques to
evolve Decision Support System rather than only being satisfied
with basic MIS. The use of such analytics will open the new
avenue of problem solving based on unbiased
interpretation/extrapolation of transaction data using scientific
methods. With this view, a dedicated Statistical Cell is being
setup. This Cell will be headed by a Director (Statistics) and will
be sufficiently staffed.
To protect our records from any mishap and for easy
retrieval of the same, document scanning has already
commenced. Approximately 80 crore papers will be scanned.
These scanned records shall be available on web in consonance
with requirements of RTI. The proposal to shift physical
records, with storage and retrieval facility, to a modern and fire
& earthquake safe record management facility is underway.
Administrative Reforms
Listing, Verification and Valuation of Assets
As a part of “Project of Budgetary and Accounting
Reforms”, the task of listing, verification and valuation of all the
assets of MCGM progressed substantially. This has resulted in
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 17
generating Assets Register, ward-wise, Asset Class-wise through
SAP System as per format prescribed in National Municipal
Accounts Manual.
Administration has started the work of obtaining Property
Cards of all municipal properties. Till date approximately 2500
property cards have been obtained. This work will help in
understanding actual status of properties of MCGM. This will
bring more transparency in the work of Asset Management and
also help in better Credit rating of MCGM.
Submission of Monthly statement of Receipt & Expenditure
as required under section 135 (1) of MMC Act.
As per provision in section 135 (1) of MMC Act of 1888,
the Receipt and Expenditure (Monthly Statement) is to be
submitted to the Standing Committee. Administration has
succeded in developing the statement on SAP system and the
said MIS for the month of April 2012, May 2012 and June 2012
was submitted to Municipal Chief Auditor on 18.01.2013.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 18
Governance Issues
I would like to delve on measures taken by me during the
year, which will continue hereafter also for good governance in
MCGM :
i) Recognizing that only ethical governance can bring good
governance, nearly 350 Group “A” Officers of different
Departments of MCGM were sent for five day training on
'Ethics in Governance' conducted by the I.C. Centre for
Governance at Panchgani. The objective of the
said training is to strengthen ethical values of the
employees. The said training programme will be continued
in the budget year and thereafter also. During the budget
year Group “B”, “C” and “D” employees are also proposed
to be covered.
ii) From the point of view of capacity building of the
employees and to improve their communication and
behavioral skills. ASCI, Hyderabad was assigned the work
of Capacity Building and Training Needs Assessment.
After online survey and detailed study, ASCI submitted
DPR to GoI amounting to `53.21 crore for a period of two
years. As per the DPR, training will be imparted to all
supervisory staff of A, B, C category and 30% of labour
staff of all departments. Each of the selected employee will
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 19
undergo training atleast once in six months i.e.
Universalization of training activity. 38 best training
institutes in India and a few from abroad have been
identified including IITs, IIMs, ASCI, Yashada, CEPT, etc.
A budget provision of `38.27 crore is made in the Budget
Estimates 2013-14.
iii) With a view to bring greater accountability and
transparency in personal conduct of senior officials,
Annual Property Returns of Municipal Officers are being
made available for general public on the MCGM website.
iv) With a view to facilitate early decision making in Projects
relating to different Departments, advice of neutral experts
in respective fields is being sought. Technical Advisory
Committees (TAC) are being constituted for each
Department. TAC have been constituted in Solid Waste
Management, Education, Water and Waste Water,
Mechanical & Electrical Sector during the current year and
the remaining will be constituted in the coming months.
v) A Committee is constituted under the Chairmanship of
A.M.C.(Projects) for strengthening and streamlining the
management of engineering cadres. To enhance the inhouse
capability of Engineering department and reduce the
dependency on external consultants, a Research & Design
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 20
Cell is proposed to be set up. It is planned to appoint post-
graduate Engineers of MCGM to this cellS.
vi) In order to establish a direct communication channel with
the public at large, it is proposed to establish 'Mahapalika
Vrutta', a MCGM news portal with state-of-the-art facility
to upload content including ideas.
Further to interact with the masses, it is also intended to
take the benefit of the social media like Facebook, Twitter and
Blogs available on the website.
Service Level Bench Marking
Under Jawaharlal Nehru Urban Renewal Mission,
Performance Indicators are set to measure and monitor the
Performance of Local Bodies for the services provided under
Water, Sewerage, Solid Waste Management and Storm Water
Drains. This is called Service Level Bench Marking. Local
bodies have to achieve and sustain the said service standard in a
phased manner.
An exercise is underway with the All India Institute of
Local Self Government to assess the present Service Level
Bench Marks of MCGM. Concerned departments have been
directed to draw up a roadmap for timely achievement of the
prescribed standards.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 21
Establishing Safety Department in MCGM
During day to day working, MCGM’s staff is
continuously exposed to various unsafe and unhygienic
working conditions while serving the citizens of Mumbai.
Hence, MCGM needs to adopt adequate safety measures.
At present Safety activities are maintained in various individual
departments and the same are monitored by the Safety Officer,
Deonar Abattoir.
To meet the objective of National Safety Policy, 2009 and
to implement safety rules prescribed under Maharashtra
Factory Rules, 1963 at all installations of MCGM covered
under Factory Act 1948, it is incumbent to create an
independent department to consolidate the safety activities of
various departments as well as to fix the responsibility for
functioning and outcome of ‘safety work’.
Initiatives for Women Safety
Empowerment of women can be achieved by empowering
the girl child. Workshop will be arranged by the SPGRC for
adolescent school girls to make them aware about the life skills
in general with special focus on self defence training such as
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 22
Judo-Karate and rifle shooting. This is proposed for the MCGM
school girls under Gender Budget as well as CSR Funds.
Green Initiative
The budget copies pertaining to all 10 funds are printed
and circulated to Standing Committee members, Municipal
Councilors and to all municipal departments. With a view to
avoid expenditure on printing of these budget books and also to
save paper, from this year it is now proposed to provide the
budget details in CD form to all municipal departments. Only
the minimum required copies for Standing Committee members
and municipal councilors shall be got printed for this year. From
the next year, it is proposed to provide the budget details in the
CD form to all including municipal councilors. All the budgetary
details will be uploaded on MCGM’s portal from this financial
year.
The agendas of various Committees as well as
Corporation are also got printed by the M.S. and circulated to all
members of the respective committees as well as the municipal
councilors. Responding to the demands of the Councilors, the
administration intends to provide such agendas in soft copy so as
to achieve the aim of “Green Governance”.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 23
e-office, digitization of records and implementation of HR
module will further deepen green governance. Energy efficiency
in several departments is being emphasized.
Artificial Ponds for Ganpati immersion
Since last few years, artificial ponds are being constructed
at major places all over Brihanmumbai for immersion of Ganpati
idols with a view to maintaining the environmental discipline.
Considering the overwhelming response to such Eco-friendly
artificial ponds for immersion of idols, sufficient provision of
` 1 crore has been proposed in B.E.2013-14.
Development Plan
Urban Planning including Town Planning
As per Twelfth Schedule of the Constitution of India
(Article 243 W), item No.1, Urban planning including town
planning is the responsibility of the MCGM. Further, as per
UDPFI guidelines issued by Ministry of Urban Development,
GOI, each ULB is required to have a department dedicated to
perform the functions of Spatial Planning to be manned by
persons having technical qualifications in this field.
In consonance with these directions; it is proposed to upgrade
existing D.P. Department by creating posts of Director (Town
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 24
Planning/Spatial Planning), Chief Planner (Town Planning),
Chief Planner (Strategic Plan) to be supported by
Dy.Chief Planners to be drawn from fields of Environmental
Planning, Mobility Planning and Housing Sector Planning.
The process for preparation of Development Plan for the
period 2014-2034 has already commenced and the first step of
preparation of Existing Land Use (ELU) Survey Map is
underway.
For supporting the planning activities, a systematic GIS
data base with accurate large scale maps and multi-dimensional
attribute data has become indispensable. Such spatially
organized data would have potential for helping and monitoring
other sectoral plans as well, such as education, healthcare, fire
protection etc. As part of this Urban Planning Cell, a full-
fledged GeoSpatial Data Infrastructure Cell is also proposed
which will facilitate creating and maintaining of updated GIS
data base including utilities mapping underneath roads to meet
all our spatial planning requirements and also to monitor all the
developments in the City.
The implementation of Auto D.C.R. in Building Proposal
Sections is also undertaken with upgradation to incorporate
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 25
changes in DCR brought about in 6th January 2012. This will
also help to convert office procedures in B.P. Department to
paperless format along with a facility for online tracking of
proposals, thereby ensuring greater accountability and
transparency in handling various requests related to building
permissions under MRTP and MMC Act.
Large no. of MHADA layouts pending approval are also
being cleared through efforts in co-ordination with MHADA and
also a policy will be worked out to scale up infrastructure in
MHADA and private layouts.
INFRASTRUCTURE FACILITIES
Roads, Bridges and Traffic Operations
Providing Roads and Bridges and street lighting, parking
lots, bus stop is the responsibility of the Municipal Corporation
as per Twelfth Schedule of the Constitution of India (Article 243
W), item no. 4 & 17. Mumbai city has 1941.16 km. length of
roads that includes 506.46 km. in the City, 927.64 km. in the
Western Suburbs & 507.06 km. in the Eastern Suburbs.
Recommendations of the Standing Technical Advisory
Committee (STAC) for roads have induced major changes in the
approach to road constructions, improvement and maintenance.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 26
In order to bring in reputed agencies for execution of road
works, package size of individual tenders is increased up to
`150 crore. Peer review by IIT Mumbai and Third Party
Inspection by internationally reputed agencies that was initiated
in 2011-12 has been continued. It has brought visible
improvement in the quality of road construction.
Program of concretization of roads and Improvement of Asphalt Roads
Acknowledging the stresses that our roads are subjected to
like digging for utilities, heavy rains etc. it has been decided to
concretize as many roads as are possible. This will not only
reduce the maintenance cost for the department but also
minimize the disturbance to normal traffic during execution of
such works.
As discussed in Budget for 2012-13, given the
requirement of treating side lanes, of any road in flexible
pavements, for utilities, only roads with 18 mtr or higher width
can be concretized. On this basis, only 3765 lane km. out of
5636 lane km. roads in MCGM can be concretized. 100%
concretization of these lanes, given the current status of the
same, can be achieved by undertaking 250 lane km. roads every
year till 2018.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 27
A provision of `714.44 crore is made in the Budget
Estimates for 2013-14.
Effective life of asphalt work is approximately seven
years. Mumbai has a total of 1870 lane km. asphalt roads.
Therefore, on an average 267 lane km asphalt roads will have to
be yearly treated. Improvement of 311.44 lane km (80.34 km) of
asphalt roads is expected in the year 2012-13. It is proposed to
improve 433.06 lane km (142.86 km) in Asphalt in the year
2013-14. Accordingly, I propose a provision of `561.20 crore for
new works of Asphalt Roads, in the year 2013-14.
Netaji Subhash Road, well known as “Queens Necklace”,
is of 4.23 km in length and was constructed almost 70 years
back. Consultants are appointed to carry out technical
investigations and intervention will be finalized with the help of
STAC. This work is proposed to be carried out in two financial
years 2013-14 and 2014-15.
Spot repairs and repairs to potholes
MCGM initiated use of cold mix technology for treatment
of spot repairs and pothole filling during monsoon in the current
year and also deployed GIS based pothole tracking and
management system. This not only enabled MCGM to reduce
the time required for executing this work technically but
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 28
administratively allowed MCGM to respond to need in an
accountable manner. Citizens also participated in the tracking
system which is proposed to be continued. An EoI has been
invited for more technologies. Technologies found suitable for
Mumbai conditions will be inducted.
Underground Utility Management
There are about 28 external agencies which have their
utilities laid under the Municipal roads. Trenching is often
carried out by these agencies, either for fault repairs or laying
new utilities. The road sub base is, therefore, disturbed due to
frequent trenching.
A policy is being framed wherein a globally accepted
system of Coordinated Placement of Utilities will streamline the
position of all utilities under the road. Shifting the respective
utilities in respective cells is expected to drastically reduce the
trenching on roads as well as damage to other utilities while
carrying out work on any one of them.
It is also proposed to levy access charges to the utility
agencies, for using the space below Municipal Roads, at
`100 per running meter of the utility, per annum, which will
fetch a revenue of about `200 crore.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 29
Quality Control Monitoring and Quality Audit of Road Works
The Cement Concrete Road Works and Asphalt Road
works are to be subjected to Third Party Quality Audit.
Accordingly in 2012-13, M/S. S.G.S. India Pvt. Ltd. is appointed
for quality monitoring & quality control of road works on day to
day basis.
Appointment of similar agencies for Third Party
Inspection of works is proposed for projects in 2013-14.
Empanelment of agencies for this audit is already underway.
New Technological Interventions for Quality Assurance and Control
RMMS
As indicated in last year's budget, RMMS has been
implemented. All the roads have been numbered and have been
assigned Road Engineers to have clear responsibility for good
condition of the roads. At the same time, to empower these
engineers to expeditiously respond to requirements of road
maintenance works powers for ‘Administrative approval’ and
‘Tender Sanction’ are delegated to REs and above.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 30
Road Scanners for Quality Control of Road Works
and Utility Mapping and Management
Proposal to appoint agencies for geometric mapping, sub-
surface layers / structure and utility mapping and management
by using road scanners is underway. It is proposed to carry out
GPR survey before any excavation permission is granted for
road. Also, the inspection of Roads, three months before their
Defect Liability Period (DLP) get over, as a system, for checking
depression, cracks, rutting on the road surface and conditions
below road surface, will be carried out using this technology.
The audit of newly improved roads to check the profile of layers,
depression, cracks etc. on road surface will be carried out, using
this technology.
While inviting new tenders, conditions of ‘Sensor Based
Rollers’, ‘Vehicle Tracking System’, ‘Automation of Asphalt &
RMC plants’ is made mandatory which will provide online real
time data of road works. This will ensure quality control of
Road works.
Mumbai Coastal Road Project
Government of Maharashtra had appointed a Joint
Technical Committee under the Chairmanship of the then
Municipal Commissioner, to explore the possibility of
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 31
construction of Coastal Road in Mumbai. The Committee
submitted its report to Government of Maharashtra on 29th
December, 2011. The Committee has recommended two options
for construction of Coastal road of approximately 35.6 KM.
length. The Mumbai Coastal Road project is proposed with the
components of road on reclamation, road on stilt and traffic
tunnel.
To kick start the project, Request For Proposal (RFP) for
selection of consultants for preparation of feasibility report, DPR
preparation, report on environmental studies for obtaining
MOEF clearance and Bid Process Management for Mumbai
Coastal Road project has been invited by MCGM.
Removal of Bottleneck and establishing Missing Links of D.P. Roads
In order to smoothen the traffic flow in Mumbai, City and
Suburbs, a comprehensive policy for removal of bottleneck,
establishing missing links of D.P. roads, providing alternative
accommodation, compensation to the PAP’s has been framed.
A dedicated cell has been established to expedite implementation
of this policy. This will ensure that all the DP roads come to
corporation as soon as possible and we do not have to wait for
request for the development permission in the adjoining plots to
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 32
get these roads as setback. A Budget provision of `15 crore is
made in B.E. 2013-14 for this purpose.
Traffic
Pay and Park Facilities
MCGM runs the pay and park facilities at 129 locations in
Greater Mumbai. To operate these pay and park schemes
effectively, MCGM has taken over 47 Pay & Park sites in ‘A’
ward and running it departmentally as per the Hon. High Court
orders. It is proposed to roll out web based parking system
which will help in reducing the number of complaints of
overcharging. This system will also provide data of vehicles in
case of mishaps such as vehicle thefts/bomb-blasts etc.
Study will be conducted to introduce special schemes like
Resident Parking Permits, differential charging for parking
depending upon the location and time of the day. A provision of
`2 crore is proposed for feasibility study in financial year
2013-14.
Public Parking under DCR 33(24)
The new D.C. Regulation 33(24) stipulates for
development of Public Parking Lots (PPL) to be handed over to
MCGM by private owners / developers in lieu of additional FSI.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 33
The Government has so far approved PPL on 32 locations which
are in various stages of approval/execution. It will facilitate
parking for approx. 31500 vehicles.
Traffic Simulation
Instead of acquiring data for individual traffic and parking
related projects, it is proposed to do a comprehensive traffic
snapshot of whole city by acquisition of city wide traffic data.
It is proposed to do this kind of study periodically every 5 years.
Traffic & Simulation studies for the roads for which new
Regular lines/Roads Lines are to be prescribed have been made
mandatory to enable scientific and evidence based decisions on
road widths for RL prescription. This will also aid in
ascertaining parking requirements of the area before sanctioning
PPL or intervention for traffic improvement by projects like Fly
overs or FOBs. Similarly, to assess the need of parking as well
as its impact on traffic in surrounding areas, simulation of traffic
in and around PPL has also been made mandatory for parking
lots with more than 500 parking capacity. I propose a Budget
Provision of `5 crore for this purpose in the year 2013-14.
Area Traffic Control (ATC)
World Bank assisted ATC project is already implemented
in the city to improve traffic signals at 253 traffic junctions.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 34
A provision of `5 crore has been made for the upgradation of
remaining 373 Traffic Signals in the Greater Mumbai. The work
of the upgradation of the signals will be taken in hand in a
phased manner i.e. upto 2017-18.
A budget provision for the year 2013-14 amounting to
`1.32 crore has been proposed for the installation of Digital
countdown timer on non-conventional traffic signal in Suburbs.
A budget provision for the year 2013-14 amounting to
`2 crore has been proposed to exhibit the travel time on existing
variable Message Display Board installed at various junctions in
Greater Mumbai.
Bridges
MCGM has a total of 261 bridges. STAC has
recommended creation of a post of Chief Engineer (Bridges)
along with a technical wing under it. A proposal is being
submitted for approval of the Corporation.
STAC has recommended that every five years; a detailed
inventory of these bridges must be carried out to ensure that
remedial measures, if any, can be taken up in time. It is proposed
to carry out this inventory comprehensively in the year 2013-14.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 35
A comprehensive program for resurfacing of 20 bridges
has been undertaken at the cost of `41 crore. The technical
methodology of resurfacing has been recommended by STAC.
Two major bridges underway are Jogeshwari North and
Jogeshwari South. A provision of `50 crore for construction of
ROB at Jogeshwari (South) and `50 crore for Jogeshwari
(North) has been proposed in the Budget Estimates of 2013-14.
Total provision for bridges has been stepped up from
`297 crore in BE 2012-13 to `320 crore in BE 2013-14.
Proposed provision for expenditure in Budget 2013-14 (` in crores)
a) Capital Budget
1) Asphalt Roads 877.51
2) Cement Concrete Roads 770.03
3) Traffic Operation 32.40
4) Bridges 320.12
Total : Capital Budget 2000.06
b) Revenue Budget 650.68
Total Budget provision proposed (a + b) 2650.74
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 36
Storm Water Drains
MCGM had been improving its Storm Water Drain
network based on modified BRIMSTOWAD report with the
help of Government of India grant of `1200 crore. Out of total
58 works under this BRIMSTOWAD Project, 15 works have
been completed, while 39 works are in progress. Out of 4 works
yet to be tendered, one work i.e. Dadar–Mahim diversion, needs
to be dropped for now, as its need is to be re-established after
up-dation of BRIMSTOWAD Master Plan. Remaining works
relate to pumping stations and are expected to be undertaken in
ensuing financial year.
Under the BRIMSTOWAD Project, the work of design
and construction and comprehensive operation & maintenance of
storm water pumping stations at various outfalls at Haji Ali,
Love Grove, Cleave Land Bunder and Irla have been
undertaken. While Haji Ali and Irla pumping stations have been
performing for last three monsoons, efforts are being made to
ensure that Love Grove and Cleaveland Bunder Pumping
stations commence operations during 2013 monsoon.
Construction of pumping station at Britannia Outfall,
Reay Road and at Gazdharband will be started in the year
2013-14. The process of land acquisition and procedure for
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 37
obtaining permission of MoEF for construction of SWD
Pumping Stations at Mahul and Mogra is in progress. All efforts
will be made to commence operations of all these pumping
stations by monsoon of 2014.
A provision of `171 crore is proposed in Budget Estimate
for 2013-14 for all pumping station works.
Total expenditure incurred till date on BRIMSTOWAD is
`1262.47 crore (excluding 10% supervision charges, 6% water
charges and 3% sewerage charges). However, due to increased
width and depth of the drains due to change in design
parameters, requirement of unconventional technology
especially in tidal zone and passage of time – particularly due to
encroachment issues, total financial requirement of the project
increased to `3884.61 crore for which revised DPR is submitted
to Director (WS&LSG), Ministry of U.D., Government of India
and is being pursued.
However, as the city needs to complete these works to
preclude situation like July 2005 from recurring, MCGM has to
go ahead with the full implementation plan for which a provision
of ` 671.02 crore has been made in the year 2013-14. Liability
of BRIMSTOWAD works on MCGM budget will continue up to
the year 2014-15.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 38
In Western Suburbs due to various works of Storm Water
Drains, water logging incidences in Mogra Nalla system,
Dahisar Nalla system, Rajendra Nagar Nalla system, Mhatre
Nalla system, Oshiwara Nalla system and Irla Nalla system will
be minimized.
In Eastern Suburbs due to various works of Storm Water
Drains, water logging incidences in Bombay Oxygen Nalla
system, Mahul Creek system, Refinery Nalla system Chembur,
Usha Nagar Nalla system, Wadavali Nalla system, Somaiya
Nalla system, Laxmibaugh Nalla system will be minimized.
MCGM has also undertaken Non-BRIMSTOWAD works
for improvement of Storm Water Drain network. In the year
2012-13; tenders for Improvement of SWD network to abate the
localized flooding at 26 different locations in City area in Zone-I
& Zone-II and at Raoli Reservoir Nalla are invited. During the
year 2012-13, expenditure of `242 crore has been incurred on
the Non-BRIMSTOWAD Project works. During the year
2013-14; provision of `443.60 crore is made. It is proposed to
complete 95 project works which include ongoing works and
new works under Non-BRIMSTOWAD works.
Besides efficient and effective desilting and cleaning of
storm water drains, safety of personnel is also paramount.
Therefore, mechanized cleaning of such drains is being done by
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 39
upgrading machineries. Roadside Open Drain Desilting (RODD)
machine with silt container, Robotic Multipurpose excavator
machine and Vehicle mounted suction-cum-jetting machine with
recycling facility are in use.
Mithi river under MCGM jurisdiction is being improved
for augmenting its water carriage capacity under direction of
Mithi River Development and Protection Authority set up by
GOM. In this project, about 4,38,000 cu.m. silt has been
removed and 5,38,000 cu.m of rock is excavated upto
31.10.2012. Construction of retaining wall for a length of 9.1 km
out of 21 km is completed. Work order for 4.2 km retaining
wall has been issued. Deepening of the Mithi River upto 95%
has been completed. The work of 465 mtr. out of 1325 mtr. of
Group No. 2 and the work of 750 mtr. out of 2800 mtr. of Group
No. 4 has been completed. Tender for balance length of 7.8 km.
of remaining Group No. 1, 3 and 5 for training of Mithi River
will be invited after removal of encroachments. Total
expenditure of Mithi River work is `525 crore up to December
2012.
Comprehensive development of Storm Water passage
through Mithi river System also envisages construction of 11
bridges, out of which construction of bridge at Krantinagar is
completed and construction of bridges at 4 places i.e. Ashok
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 40
Nagar, Bamandaya Road, Kurla Kalina Road and C.S.T. Bridge
are under progress. The work of construction of bridge at
B.K.C. is undertaken by MMRDA. Total expenditure on
Bridges on Mithi River is `16 crore upto December 2012.
A provision of `45.00 crore has been proposed in Budget
Estimate of 2013-14 for widening of Mithi River and other
rivers, nalla systems and construction of retaining wall on both
sides of nalla. Comprehensive DPR has been submitted to
Government of India through MMRDA for funding for Mithi
River development.
A provision of `1114.62 crore is made in Budget
Estimates for 2013-14 for Storm Water Drain works.
Health and Medical Services
Health Sector continues to be an area of focus and it has
been my conscious effort to allocate substantial funds to
various important aspects of health care.
(` in crores )
Particulars B.E. for 2012-13 B.E. for 2013-14
Revenue Expenditure 1690.23 1885.02
Capital Expenditure 651.42 623.60
Total : 2341.65 2508.62
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 41
Mumbai Aarogya Abhiyan
`cegbyeF& Deejesi³e DeefYe³eeve'was launched on 7th
April, World
Health Day in 2010. What began as a campaign for outreach
services to slum population has since then grown into a
comprehensive programme to provide quality health care in
primary, secondary and tertiary sectors. This year, I propose to
further augment the Mumbai Aarogya Abhiyan by addressing
gaps in health care in the areas of Mental Health, Diabetes, TB,
Dialysis and diagnostic facilities such as MRI & CT Scan.
Malaria Control Programme :-
Emphasizing on concepts of Health Posts and Dispensary
linkage and door to door disease surveillance for early detection
and correct treatment along with effective vector control
measures, MCGM was, I am happy to note, able to remarkably
control and reduce the prevalence of malaria in Mumbai.
Particulars 2010 2011 2012 % reduction
(in comparison
with 2010)
Cases 76755 39822 16086 79
SPR 5.5 2.4 1 82
Deaths 145 69 45 69
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 42
Health Post Dispensary Linkage
The concept of ‘health post - dispensary linkage’ has been
expanded for early detection and timely medication for Diabetes
& T.B. MCGM has now proposed to expand this concept for
detection of anemia in adolescent girls and distribution of free
iron and folic acid tablets to them.
Aarogya Camps
Innovative outreach campaign launched by MCGM during
monsoon 2011 for slums & slum like areas of Mumbai for
combating Malaria and other monsoon illness has since then
been expanded for early detection of Diabetes, TB and other
diseases of high prevalence in the society.
Dispensary Upgradation Programme
Under this programme, 130 dispensaries will be branded
to ensure qualitative primary healthcare service delivery.
I have also proposed adequate provision to upgrade
33 existing dispensaries by introducing diagnostic facilities,
thereby increasing number of dispensaries with diagnostic
facilities to 85.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 43
I have also proposed adequate provision to introduce 13
new dispensaries in areas identified through a gap analysis done
by Public Health Department of MCGM.
Maternity Homes Upgradation Programme
68752 out of 167000 ( 41.17 %) babies born in Mumbai
are born under a MCGM roof. Realizing the need to upgrade
the services provided in Maternity Homes, I propose to upgrade
5 Maternity Homes, one in each zone of Eastern Suburbs and
Western Suburbs to the level of Mother and Child Hospital
thereby ensuring 24 X 7 health care services for the mother and
new born.
Life Long commitment for diabetic care
Acknowledging the wide spread prevalence of Non
Communicable Diseases (NCDs.), such as Hypertension and
Diabetes, MCGM has so far launched 55 dispensaries, thus
becoming the first Corporation to offer life long medication for
diabetes at the primary health care level.
This commitment for life long care of diabetic patient is
now proposed to be further strengthened by introducing a
Central Database for Diabetes, which will facilitate hand holding
of diabetes patients.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 44
24 X 7 help line for stress, depression and mental well being
Looking at the current trend of one in five persons (20%)
requiring counseling for mental well being at some point of
time, MCGM proposes to introduce a 24 X 7 helpline for
counseling for issues relating to stress, depression and various
mental health concerns. This helpline will not only offer
counseling services, but will be linked to 24 X 7 OPDs in our
major hospitals.
MCGM also proposes to introduce special mental health
related OPD in 24 of its dispensaries.
Blueprint Mumbai for Tuberculosis reduction and control
Campaign against TB and especially DR TB (Drug
Resistant TB) introduced by MCGM in the year 2012 is further
proposed to be strengthened this year by introduction of
State-of-Art diagnostic facilities such as Gene Expert at Sewri
TB, Govandi Shatabdi in Eastern Suburbs and Cooper in
Western Suburbs. Similarly, I have also proposed to expand the
treatment capacity for D.R. TB patients. India’s first hospital for
D.R. T.B., 200 bedded hospital in Sewri TB campus will be
ready for commissioning this year. I have also proposed to
establish a T.B. hospital at the existing T.B. clinic plot at
Bandra.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 45
Dialysis Services
Acknowledging the prime need for more dialysis services
in the Suburbs, MCGM is in the process of finalizing Public
Private Partnership (PPP) arrangement for commissioning 50
dialysis beds in early 2013.
Similar additional/another 50 dialysis beds would be
commissioned in 2013-14 in peripheral and major hospitals such
as Cooper Hospital, Kandivali Shatabdi Hospital, Ajgaonkar
Trauma Hospital and K.E.M., Nair and LTMG Hospital.
Diagnostic services
First two MRI centers in suburbs at Kandivali Shatabdi
and Govandi Shatabdi will be commissioned in 2013. MCGM
proposes to further augment diagnostic services in the suburbs
by introducing new CT scan and MRI centers under Public
Private Partnership (PPP) arrangement which is in process.
Peripheral Hospitals
Cooper Hospital, Kandivali Shatabdi Hospital and
Ajgaonkar Trauma Hospital will be commissioned in July,
August and September 2013 respectively thereby creating
620 additional beds in the suburbs. This will help in
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 46
bridging the gap between the demand for and supply of
secondary level health care in the suburbs.
While Phase I (150 beds) of redevelopment of Bhagvati
Hospital is currently underway, work for 600 bedded
Phase II is proposed to be undertaken. Adequate budget
provision has been made for the same.
I have also made adequate budget provision for
upgradation of Govandi Shatabdi and K.M.J. Phule
Hospital at Vikhroli in Eastern Suburbs.
Adequate budget provision has also been made to
augment existing peripheral hospitals by addition of
Neonatal Intensive Care Unit (NICU) beds, emergency &
trauma beds and dialysis services.
Paying beds for the middle class
While major & peripheral hospitals of M.C.G.M. have
been traditionally catering to the health needs of 60%
Mumbaikars living in slum and slumlike localities, and high end
hospitals cater to those who could afford them, there is a felt
need for budget hospital beds, to cater to the needs of the
sizeable middle class population.
M.C.G.M. has, therefore, proposed to introduce, for the
first time, paying beds for middle class in its about to be
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 47
commissioned Cooper Hospital, Kandivali Shatabdi Hospital
and Jogeshwari Trauma Hospital. Similarly, Phase II at Bhagvati
Hospital is also being planned keeping in view the need for
budget paying beds for the middle class.
Shiva Arogya Suraksha Kavach Yojna
I have received a report on the proposed ‘Shiva Arogya
Suraksha Kavach Yojna’ from the ex-Director of Medical &
Health Services. The report will be examined for its
implementability in the budget year.
Major Hospitals
At the helm of our three tier health care system are our
major hospitals handling a daily combined OPD of 13,000
patients and combined bed strength of 4939.
75 bedded chemotherapy services will be initiated at
Nair Hospital from February 2013, thereby reducing
substantially the current waiting period of about 3
months for chemotherapy.
I have also proposed adequate budget provision for
procurement of state-of- art linear accelerator and PET
C.T. scanner which will facilitate initiation of
radiotherapy services at Nair Hospital within this
budget year. M.C.G.M. proposes to upgrade Nair
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 48
Hospital into a centre of excellence for advance cancer
care.
I have proposed adequate budget provision to further
augment health facilities in Sion Hospital in order to
develop it into a specialized centre for Trauma Care
and Emergency Services.
The first 22 storeyed hostel building of KEM Hospital,
which is also M.C.G.M.’s tallest building has been
commissioned in Sept, 2012, I have proposed adequate
budget provision for the second 22 storeyed building
which will house residents and provide low cost
dormitories for patient’s relatives. I have also proposed
adequate budget provision of `20 crore to further
strengthen diagnostic facilities in KEM Hospital.
Appointment of an Infection Control Consultant
Realizing the importance of infection control through
effective engineering interventions, rigorous implementation of
infection control measures, in patient care interaction and by
community awareness, MCGM has appointed an Infection
Control Consultant, whose prime mandate is to control and
minimize spread of infection in our hospitals.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 49
Mumbai University of Health Sciences
With a view to further augment, strengthen and improve,
primary, secondary and tertiary health care in Mumbai,
M.C.G.M. has also appointed a committee to explore the
feasibility of establishing a University for Health Sciences and a
new Medical College in the suburbs.
Crematorium
Beautification and up-gradation of crematorium
I have proposed a budget provision of `2 crore for
beautification of crematoriums.
I have also proposed a budget provision of `4.94 crore
for conversion of wood based crematoriums into PNG
based green crematoriums. M.C.G.M. will, in the next
5 years, endeavor to convert all its wood based
crematoriums into green crematoriums, based on
natural gas.
Public Health Department has also initiated a gap
analysis study to identify areas which would need
development of Hindu / Muslim / Christian
crematoriums in the coming years. The findings of the
study will be incorporated in the D.P. revision exercise
currently underway.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 50
Department of Animal Welfare
Recognizing the need for humane and ethical treatment of
animals, MCGM has proposed to create a department of Animal
Welfare to be manned by qualified veterinarians.
Education
The total size of Budget Estimates for 2013-14 of
Budget ‘E’ (Fund Code 30) is `2472.53 crore. Important
schemes/projects pertaining to Education sector are :-
Participation of NGOs in municipal schools
For infusing dedication and talent from NGO sector into
the municipal school education system, MCGM has recently
framed a policy of partnership. There are following four types of
public partnership –
1. Full Support Management with private partners/
teachers.
2. Full school support from private partners with our
teachers in the school.
3. Specific service partnership
4. One time school input by N.G.O.
The Corporation has approved this policy on 24.01.2013.
This policy will be implemented from the ensuing
academic year 2013-14.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 51
Virtual Classrooms
Education Department of MCGM introduced interactive
education through virtual classroom project in 80 secondary
schools in the year 2011-12. Interactive education imparted
through these virtual class rooms has proved very effective and
useful for students. In the year 2012-13, this project is extended
to 400 more primary and secondary schools. A budgetary
provision of `6.50 crore and `20 crore is proposed for secondary
schools and primary schools, respectively.
Right to Free and Compulsory Education Act of 2009
Right to Free and Compulsory Education Act of 2009
came into force from 01.04.2010. The State Govt. has
implemented the ‘Maharashtra Right of Free and Compulsory
Education Right Rules’ w.e.f. 11th
October, 2011.
The provisions of R.T.E. Act mandate facilities like, a
classroom for every teacher, separate toilets for boys and girls,
drinking water facility, school playground, compound wall for
every school premises. I am happy to state that in all the MCGM
schools, separate toilets for boys and girls, safe drinking water
and sufficient classrooms are made available. In 1,099 schools,
compound walls have been constructed and the construction of
compound walls is underway in remaining 54 schools.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 52
Implementation of RTE Act, 2009 will enable MCGM to
have Pupil-Teacher ratio as 40:1 in Primary and 35:1 in upper
primary schools. Training of teachers, evaluation of teachers
and schools will enhance quality of education in coming future.
Survey of children upto 14 years of age, out of school
children, children belonging to disadvantaged group and weaker
section will be carried out. This will bring the ‘out of school
children’ in mainstream of education as well as child’s tracking
of academic performance will also be possible.
Education for Specially Challenged/Cancer prone children
The MCGM is running 17 special schools for Specially
Challenged 839 Children. Educational facilities are being made
available to the Cancer Prone Students at Jagannath Shankar
Sheth Municipal school with the assistance of “Can Kid”
society. At present 50 Cancer Prone Students are studying in
this School.
Solid Waste Management
Solid Waste Management is an important activity which
undergoes major changes with changing rules and regulations
related to protection of environment, pollution control and CRZ
regulations etc. Necessary changes are, therefore, required to be
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 53
brought in the ways we collect, transport and process Municipal
Solid Waste. As per new norms, we are replacing BS-III
vehicles with new BS-IV compliant SWM vehicles and
identifying new techniques for processing MSW. The major
schemes which will be implemented in 2013-14 in SWM deptt.
are as follows:-
Cleanliness Programme
Mumbai cannot be cleaned without properly cleaning the
slums. Slum adoption scheme is being replaced by more
inclusive and better supervised “Swachha Mumbai Prabhodhan
Abhiyan”. Under this new scheme; every unit will cater the
services of cleanliness to 750 persons instead of 1000 earlier. In
this scheme more emphasis is given on awareness program
through community participation in segregation of waste,
reduction in use of plastics and eradication of mosquito breeding
spots in slums etc. We have made budget provision of `60 crore
for implementation of this scheme in 2013-14.
Further to achieve the service level benchmark of 100% of
household collection, the cleanliness programme is being
extended even to MHADA, MMRDA R&R colonies, BPT
colonies and also Common House Gullies (CHGs). There is a
proposal for amendment of MMC Act by insertion of Section
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 54
365 (A) enabling MCGM to recover the service charges from
land owners like MHADA, MMRDA, BPT in lieu of cleaning
their areas. A necessary budget provision for Cleaning MMRDA
R & R colonies (`1.71 crore) for mechanized sweeping at
Bandra-Kurla Complex and other roads (`5 crore) and for
cleaning Common House Gullies (`10 crore) is proposed.
Also special emphasis will be given to cleanliness of 43 tourist
spots by deploying extra manpower and machinery for which
total budget provision proposed is `1.80 crore.
Collection & Transportation
For ensuring 100% coverage of collection and
transportation of Municipal Solid Waste, real time GPS tracking
system is proposed to be implemented. At present, the scheme is
being implemented on pilot basis in 2 wards. In this scheme,
Geo fencing of collection spots and tracking of garbage
collection vehicles will become possible on real time basis.
Modernized closed refuse transfer stations at 3 locations
are proposed to be built to improve surrounding conditions and
to reduce long distance travel of all refuse vehicles. Budget
provision of `15 Cores is proposed for the purpose.
At present 37 nos of sites are provided with stationary
compactors having capacity of 15 MT each. It is now proposed
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 55
to install stationary compactors at 10 more sites for which
budget provision of `5.35 cores is proposed. Additional 38 mini
compactors and 117 large compactors which will be BS-IV
standard compliant will replace outlived compactors in the
budget year and for which budget provision of `44 crore is
proposed.
Scientific processing of MSW
The provisions of environment protection laws and CRZ
regulations require that we process the entire MSW generated in
Mumbai in a legally acceptable proper scientific manner.
We have already started erecting projects for processing the
entire 6500 TPD [Tonnes Per Day] MSW since 2009-10 on
DBOOT [Design, Built, Own, Operate & Transfer] basis. The
technology to be used will be Bio-methanisation at Mulund,
Bioreactor and composting at Kanjur and composting at Deonar.
Besides, the existing haphazardly dumped MSW at Deonar is to
be scientifically closed as we have already done at Gorai.
The projects are however behind schedule and measures
are being taken to expedite their implementation. The possibility
of alternative projects of MSW processing viz. waste-to-energy
project and decentralized processing of MSW through public
participation are also being explored.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 56
A provision of `100.80 crore is made for these projects in
the Budget Estimates 2013-14 (Some components of this project
is sanctioned under JNNURM).
Ashray Yojana
The welfare of conservancy labour is important to us. We
need to improve the condition of conservancy labour colonies.
There are about 6,000 conservancy staff quarters at 39 locations
for 28,018 conservancy staff. Earlier, it was decided to
undertake development on PPP basis. But, under this scheme
only 21,000 staff quarters were becoming available after
deducting saleable FSI. Moreover, such projects take too long
time to complete. Therefore, now it is proposed to develop these
Municipal plots phase-wise with Municipal Fund only. It is
proposed to utilize 4 FSI subject to approval of State
Government so that we can accommodate all our 28018
conservancy staff. The cost of the project will be approx
`1800 crore and will require about 6 years to complete. As a first
step in this direction, it is proposed to reconstruct buildings at
Walpakhadi, Gautam Nagar, Panchsheel Nagar and Cochin
Street for which provision of `50 crore is proposed in the
ensuing budget.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 57
Service Level Bench Marking
Ministry of Urban Development Govt. of India has
prescribed Service Level Benchmarks [SLBs] for Solid Waste
Management sector which interalia includes :- 1) 100%
Household coverage, 2) 100% Efficiency of collection, 3) 100%
Extent of collection of MSW, 4) 80% Extent of recovery of
Solid Waste collected, 5) 100% Extent of scientific disposal of
MSW, 6) 80% Efficiency of redressal of customer complaints,
7) 100%Extent of cost recovery in SWM services, 8) 90%
Efficiency in collection of SWM charges.
We have already appointed All India Institute of Local
Self Government as an Agency to study and suggest measures
for achieving these SLBs. To begin with, we have targeted to
achieve SLBs relating to house to house collection and
segregation of MSW at source by March 2014 and March 2015
respectively.
Environment Protection
As per XIIth
Schedule of the Indian constitution, the local
bodies have been assigned the responsibility of ‘Environment
protection, promotion of ecological aspects and urban forestry'.
The Environment section under SWM department is engaged in
monitoring the air, water, and noise pollution in the City and
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 58
publish Environment Status Report (ESR). We intend to increase
volume of statistics and scope of information in ESR in order to
make it more useful. In 2013-14, we are going to increase the
effectiveness of this department by implementing following
schemes:-
1) At present, the various ambient air pollutants are
measured at seven fixed monitoring stations and by a
mobile van at three different locations. During next
financial year, it is proposed to install three more modern
automatic air monitoring stations, for which budget
provision of `4 crore is proposed.
2) The ambient noise levels in Mumbai are observed beyond
acceptable limits at some places. At certain sensitive
places in Mumbai, it is necessary to measure noise levels
for continuous time period. It is, therefore, proposed to
purchase 10 nos. of integrated noise measuring machines,
for which budget provision of `40 lacs is proposed.
Further to identify measures for combating noise pollution
technical consultant will be appointed, for which budget
provision of `10 lacs is proposed.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 59
Removal of encroachment
Unauthorized constructions, hawkers, hoardings and
banners are the areas of concern.
As regards regulations of hawkers, though the draft policy
is already prepared and published in early 2010, final policy can
be passed only after amendment to Section 313 of the MMC
Act. The matter is being pursued with the Govt. for finalizing
the said amendment at the earliest. Once the policy is in place;
the guidelines of the National Hawkers’ Policy will be relied
upon for marking hawking zones at appropriate places and in
unoccupied market places that have come under accommodation
reservation policy. The requirement of hawking plazas will also
be considered at the time of framing new D.P.
For the purpose of early detection of unauthorized
constructions and subsequent action against these, under relevant
provisions of the MMC and MRTP Acts, detail guidelines have
been issued. For effectively dealing with unauthorized
constructions, it is proposed to notify the Assistant Engineers of
Building and Factory and Building Proposal departments as
Designated Officers under amended Section 351(1) of the MMC
Act and amended Section 53(8) of the MRTP Act. Pursuant to
Hon. High Court directives in W.P. No.2950 of 2012, a
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 60
mechanism for expeditious and effective action against
unauthorized constructions is being set up. The requisite
augmentation of manpower and logistic support will be
undertaken very soon.
Uneven and haphazard advertisement hoardings and
banners in almost every nook and corner of the city are
hampering aesthetic aspects. It has, therefore, become necessary
to control and regulate their mushrooming growth. As a first
step in this direction, it is intended to make the city “banner
free” i.e. hereafter no banner of any kind is being proposed to be
permitted to be installed at any place in the city, barring some
exceptions. Similarly, some parts of the city especially the areas
falling in the heritage precincts are being intended to be
gradually made hoarding free.
These measures coupled with zero garbage drive under
cleanliness programme of the SWM department discussed
here-in-before by me, will, I presume, enhance the aesthetic feel
of the City.
Ban on Plastic
Use of plastic is hazardous to the environment as well as
to the health of Mumbaikars. Considering this, use of plastic
bags is banned in all the Municipal offices and markets. Entry
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 61
to the Municipal offices is being denied to the
Visitors/Employees carrying plastic bags.
Dadar Chaityabhoomi
Every year on Mahaparinirvan Din of Bharatratna
Dr. Babasaheb Ambedkar (6th December), thousands visit Dadar
Chaityabhoomi. MCGM prepares a free booklet highlighting the
contributions of Dr. Babasaheb Ambedkar along with rare
photographs of important aspects of his life. For all the
arrangements, MCGM spends around Rs.2 crore.
Modernization of Veermata Jijabai Bhosale Udyan – Zoo
Veermata Jijabai Bhosale Udyan and Zoo, spread over 53
acres and established in 1862, is a Heritage Grade II(B) site. It
has been accorded recognition by Central Zoo Authority of India
(CZA) as a Medium Zoo. CZA has approved the master layout
development plan and the animal collection plan. Theme for the
development is ‘Living Together’. Its hybrid nature of a
botanical garden as well as zoo is being maintained. All the
existing heritage structures of the premises are being preserved
and restored. All trees and green areas are being kept as it is by
going for acrylic glass panels and not moats to segregate areas
for animals and viewers. Development is being planned in two
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 62
phases with provision of `75 crore in the financial year 2013-14.
The plan includes creation of 24 new enclosures and induction
of 5 new exotic species including Humboldt Penguins. Physical
extension by approximate 7 acres with integration of adjacent
area of Mafatlal Mill is expected in next few months.
Currently construction works of Interpretation Center,
Zoo Hospital, Peripheral Compound wall and Internal Road
network as well as conservation of Heritage structures is
underway.
Garden Department
To ensure better accountability in the development of
gardens and to ensure that there is enough budgetary provisions
for these works, it has been decided to classify gardens and open
spaces currently maintained by garden department into Head
Quarter Gardens and Ward Gardens. This classification is
largely on the basis of the size and importance of these gardens.
For head quarter gardens, totaling 163 in number, budget of
`37.18 crore is being provided. A lumpsum grant of `14.15
crore is proposed for ward gardens.
It is need of the hour to recycle and utilize sewer water
after treatment by natural processes for non-potable use, for
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 63
gardens. This will save clean potable water. A provision of
`3 crore has been made for this purpose.
It is planned to start tree census work in the current year
2012-13 and will be completed in the year 2013-14. It is also
proposed to do an area mapping for Mangroves to record current
status of this natural resource. It is proposed to map the main
features of existing open spaces and gardens as part of
comprehensive green resource mapping.
MCGM is planning to undertake development of creek
areas, mangrove parks and to give fillip to urban forestry.
A new project to conserve and develop water bodies of the
city is proposed with a budget provision of `3 crore to begin
with.
It is proposed to initiate a Sports Development Program
and implement it at the ward level by allocating `25 crore for the
same in the Budget Estimates.
Access roads being created under BRIMSTOWAD for
maintaining and cleaning of major nalas and rivers are being
proposed for green development to make new public areas
available to citizens. It is also being proposed to carry out tree
plantation on lands that are under possession of MCGM but
earmarked for some other buildable reservations but not
expected to be developed in near future. This plantation will be
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 64
carried out with a condition that once development is
undertaken, these trees will be transplanted. This is to ensure
that these lands are put to good green use in the intervening
period and also that these are protected against encroachments.
A major tree plantation drive resulted in plantation of
65,000 saplings in entire Mumbai. Late Shri Laxmikant Berde
Garden of 2000 sq. mtr. area has been developed at Versova. A
small garden of approx. 1500 sq. mtr. area has been specially
designed for pet animals. A beautiful garden is developed in
Goregaon named after ‘Shahid Vijay Salaskar’ which has many
life-sized sculptures of wild animals. Theme garden with approx.
area of 10000 sq. mtr. at Charkop sector 3 is developed with
sculptures made of fiber-glass of Indian musical instruments. In
S ward, Priyadarshini Garden of area 7000 sq. mtr. is under
development. Development of garden plot at Kent Residency,
Borivali, RG plot at Upper Govind Nagar, Goregaon, Rajaram
Udyan at Jogeshwari and RG plot at Poonam Nagar, Andheri
have also been taken in hand. Hedgewar Garden at Ghatkopar is
also undertaken for development in Eastern Suburb.
Estate Department
Estate department has implemented SAP based RE
module for better discharge of its basic duties of maintenance
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 65
and development of estates owned and managed by
MCGM. This module has been deployed in all wards since
1st October 2012.
Scanning and digitization of records like Lease Deeds,
Plot files, Tenancy agreements etc. has begun. Till today about
15 lakhs documents have been scanned and digitized. More than
90 lakhs documents is still to be digitized. The record room has
been completely renovated and modernized.
Upto 29th January, 2013, a capital income of `149.08
crore has been realized against premium. This is the highest
realization for Estate Department.
Estate department has been made the Nodal agency for
taking over PAP tenements and make them liveable before
allotment to families affected under various development
schemes. A provision of `40 crore is made in Budget Estimates
of 2013-14 for this purpose.
A comprehensive survey of staff quarters and other
buildings under Estate department has been undertaken by P&D
department. A provision of `81.98 crore has been made in
Budget Estimates for 2013-14 for buildings in urgent need of
improvement.
In current financial year, Estate department has
undertaken major policy initiatives to curb discretions and to
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 66
standardize development conditions for estate properties as
below :
1) Policy to decide on the option of 33(7) or 33(9) on a plot
where both are applicable,
2) Policy to charge for owner’s interest on loading of
additional FSI acquired by a lessee under some scheme of
government,
3) Policy to allow development on schemes combining estate
as well as private plots,
4) Policy to protect Corporation’s interest in reservations in
33(10) schemes etc.
All these are expected to expedite development of estate
lands.
Mumbai Fire Brigade
It has been M.C.G.M.’s conscious endeavour to
continuously enhance Mumbai Fire Brigade’s fire fighting
and rescue capabilities. In order to further augment the
same, I have proposed the budget allocation of
`53.27 crore for latest fire fighting and rescue equipments
and vehicles in year 2013–14.
Considering the rapid rise in high rise buildings in
Mumbai, I have proposed budgetary allocation of
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 67
`57 crore for one of 90 mtrs. height and three of 81 mtrs.
height hydraulic platforms and equipments for high rise
buildings.
Mumbai Fire Brigade has in the past years been making
conscious efforts to make Mumbai’s beaches safe during
monsoon. Beach safety units have been set up under
Mumbai Fire Brigade to man each of the 6 beautiful
beaches of Girgaum, Dadar, Juhu, Versova, Aksa and
Gorai. I have proposed a budget provision of `4 crore to
augment these beach safety units.
Mumbai Fire Brigade has carried out a gap analysis and
has accordingly prepared a perspective plan for setting up
26 new Fire Stations in the next five years. Conscious
efforts will be made to implement the perspective plan in
a time bound manner.
With a view to emphasize fire safety through prevention,
I have established a Fire Safety Cell which will ensure
effective implementation of the Maharashtra Fire
Prevention and Life Safety Measures Act. It will give
special attention to Government buildings and high
footfall buildings. It will monitor the property owners’
statutory obligations to conduct bi-annual fire inspections
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 68
by registered agencies and monitor timely compliance of
deficiencies.
In view of the sizeable population residing in informal
settlements with high densities that periodically face the
trauma of fire accidents, I have directed MFB to consult
experts to devise a Slum Fire Prevention and Fire Fighting
System comprising of community awareness and tailor-
made machinery and methodologies for firefighting.
Municipal Markets
92 existing municipal markets are visited by a vast
majority of Mumbaikars regularly.
MCGM has in the past, taken up redevelopment of
municipal markets. Amendments to the redevelopment
policy, based on ready reckoner rates, is expected to result
in enhanced revenue for MCGM. This revised policy, it is
hoped, will enable more markets to be redeveloped.
Cleanliness and upkeep of MCGM’s markets has always
been a cause for concern. I have proposed adequate
budget provision to outsource the cleanliness,
maintenance, upkeep and security of municipal markets
which will make shopping in these markets a pleasurable
and welcome experience.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 69
75 markets have come to MCGM under the
accommodation reservation policy. It is proposed to allot
Galas in these markets which will enable hawkers,
vendors and educated unemployed to get market places at
reasonable rates.
I have also proposed a budget provision of `61.49 crore
for the capital works like repairs /construction / reconstruction /
restoration of municipal markets.
DeonarAbattoir
Recognizing the need to modernize and reconstruct the
Deonar Abattoir, MCGM will be taking up a complete
modernization programme of Abattoir for which I have proposed
a budget provision of `15 crore.
Demands have been made in the past to establish smaller
Abattoir Units in the City and in Eastern Suburb. I have asked
the concerned officers to study the feasibility of the same.
Poverty Eradication Initiatives
A survey on urban poverty notified in 2011-12 in Mumbai
shows almost five lakh (493,855) households as ‘Below Poverty
Line’. Swarn Jayanti Shahri Rojgar Yojana (SJSRY), a Central
Government sponsored scheme is being implemented for the
upliftment of the urban poor. In order to impart greater
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 70
momentum to its implementation, it has been decided to
strengthen the Urban Poverty Eradication Cell at all Ward
Offices. Ward level CDOs have been directed to create SHG’s,
to give them training, to give them revolving fund, sponsor the
proposal to Banks for microfinancing and marketing support. It
is proposed to support nearly 9-10 thousand groups in the year
2013-14. This effort will be further augmented through Gender
Budget.
For implementing programs under Gender Budget, Self
Help Groups (SHGs) of women remain our primary thrust area.
I propose to introduce concepts of Revolving Fund, Loan and
Subsidy based schemes and the Janashri Bima Yojna (Group
Insurance Scheme) on the lines of SJSRY, for the SHGs formed
under Gender Budget Scheme.
Capacity Building and Skill Upgradation are crucial for
sustainable employment generation. Keeping this in mind
I propose to continue with the Employable Training Scheme in
the year 2013-14. We will continue with our efforts and expect
to train a further 75000 beneficiaries in the coming year.
Providing marketing facilities is necessary for any
livelihood generation scheme. To further expand the marketing
set up I propose to start a permanent exhibition centre, on the
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 71
lines of the Delhi Haat, where SHGs from Mumbai and all over
Maharashtra would get a platform to showcase their products.
Initiatives for Senior Citizens
Senior citizens comprise a significant proportion of our
population. We are in the final stages of rolling out a Senior
Citizens’ Policy. I propose to make budgetary provision of
`2.20 crore for recreation centres, and other initiatives
exclusively targeted for the benefit of our senior citizens.
Setting up of CSR Cell
As per the guidelines issued by the Ministry of Company
Affairs, the corporate sector is mandated to set aside 2% of their
net profit towards Corporate Social Responsibility initiatives.
Many corporate houses are now coming forward and showing
keen interest in assisting causes related to health, education,
environment and livelihood in Mumbai. In order to leverage the
CSR funds and establish a channel for tapping this resource, I
propose to create a dedicated CSR Cell in MCGM that would
serve as a single platform for corporates and PSUs to interact
with CSR Hub.
The Tata Institute of Social Science will be assisting us in
this initiative and would help prepare a menu of projects and
activities that would be eligible for CSR funding. An interested
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 72
corporate or PSU could choose to contribute to any of these
activities or projects.
Arts and Culture of Maharashtra
Theatre, crafts of pottery and weaving, music, literature,
poetry, regional foods --- all mixed in the cauldron that makes
the city today.
The MCGM and Bombay Chamber of Commerce &
Industry have joined hands by registering ‘Mumbai Arts &
Crafts Foundation Trust’ to showcase Maharashtra in Mumbai,
bring awareness and revival of the traditional arts, crafts &
culture of the State, develop a tourism centre and encourage &
open world markets to these artisans.
This will adhere to the traditional architectural style of
Maharashtra, and be called the ‘Mumbai Wada’. The ‘Mumbai
Wada’ will take about 18 months to complete after receipt of
requisite permissions. It is also proposed to develop Textile
Museum at India United Mill 2 & 3 at Kalachowki.
Auditoriums / Theatres
Upgradation of Annabhau Sathe Open Air Theatre
The Annabhau Sathe Open Air Theatre is situated in the
Veermata Jijabai Bhosale Udyan which is a Heritage Building.
The project of enclosing this Open Air Theatre is proposed to be
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 73
undertaken from MCGM funds. A provision of `1 crore is
proposed therefor in the Budget Estimates 2013-14.
The provisions are proposed in the Budget Estimates
2013-14 for the structural repairs / improvement of the following
sports centers, auditoriums / theatres.
(` in crores)
Improvement of Birla Krida Kendra 1.25
Structrual repairs to Dinanath Mangeshkar
Natyagriha and Market Building, Vileparle
4.00
Repairs in Prabhodhankar Thakre Natya Mandir,
Borivali
0.25
Reconstruction of Priyadarshani Indira Gandhi
Sports Complex, Mulund
5.00
Reconstruction of Shahaji Raje Bhosale Sports
Complex, Andheri
5.00
It is also proposed to construct a Natya Mandir in
Goregaon (West) near Topiwala Market and one at Shahaji Raje
Krida Sankul in Andheri (West).
Now I present the Budget 'G'.
INTRODUCTION
Supply of good quality water in adequate quantity to the
citizens and to dispose the waste water scientifically is the
obligatory duty of MCGM. Daily 3500 million litres of water is
supplied to about 12.5 million citizens of Mumbai. Still,
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 74
I observe that there are areas receiving inadequate water supply
and areas receiving water supply in late night hours. Complaints
on contaminated water supply though minimized but not
eliminated. Key issue for improvement to the water supply
distribution system is efficient management. I plan to achieve
this by enhancing the skill of operating personnel, introducing
latest technologies in management of water supply with the
assistance of inhouse experts and national/international experts.
Specific fields in sight are leakage detection and reduction in
loss of water, flow and pressure management, mapping of utility
on GIS base map, establishing an appropriate data generation,
compilation and monitoring system and achieving the service
level benchmarks prescribed by the national government.
Estimated loss of water is about 30% of total supply which
is about 900 mld. loss of water cannot be totally eliminated but
can be reduced. I propose to reduce water loss from 30% to
25% in the year 2013-14 by adopting water demand
management technics. District Metering Zones have now been
identified. Bulk consumption will be measured, monthly mass
balancing of water consumption in District Metering Zones will
be done, areas of higher loss of water will be subjected to
intense leakage control activity. Staff working in Leak Detection
Units will be adequately trained. This will result not
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 75
only in reduction in contamination of water supply but also in
additional availability of about 150 mld of water supply for
distribution. Improvement in water supply in the perpetually
short supply areas can be achieved. It will also be possible to
supply water at convenient hours changing odd hours of water
supply.
Steps have been initiated to enhance sewer collection
efficiency and treating the waste water to SW II standards before
its final disposal to the sea or creek, as the case may be, since
this will result in improved coastal waters as well as reduction in
non point sources of pollution. Seven Waste Water Treatment
Facilities (WwTF) are to be constructed in a phased manner
under MSDP, meeting the current environmental standards, out
of which three WwTFs are on the anvil.
Size of Budget ‘G’, Fund Code 40
The revenue and capital receipts proposed for Budget
Estimates 2013-14 is `6443.94 crore while revenue and capital
expenditure proposed is `6443.76 crore.
Balancing of Budget
The Revised Budget Estimates for the year 2012-13 is
initially into deficit as there was net shortfall of `1563.27 crore
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 76
which is met by withdrawal from Depreciation Fund,
contribution from Asset Replacement & Rehabilitation Fund and
Accumulated Surplus. Similarly, the position of Budget
Estimates for 2013-14 is also initially in deficit as there is a
shortfall of `2329.82 crore, even after anticipating the additional
revenue on account of increase in tariff by 8% and revenue on
account of additional water from Middle Vaitarna Dam. Though
the work of Middle Vaitarna is nearing completion stage, the
work for construction of tunnel from Gundavali to Bhandup
Complex costing `2887.25 crore and the work of replacement of
Tansa pipeline costing `1431.88 crore are in full swing.
Moreover, after meeting the Revenue Expenditure, the Revenue
Income is not sufficient to cover this entire capital expenditure.
Therefore, Budget for the year 2013-14 is being balanced by
tapping Reserves amounting to `2330 crore with meagre surplus
of `0.18 crore.
The comparison of Budget Estimates 2013-14 with
Budget Estimates 2012-13 is given below :-
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 77
(` in crore)
Particulars B.E.2012-13 R.E.2012-13 B.E.2013-14
Sources
Anticipated Revenue 4428.02 3713.82 4034.53
Government Grant … … …
Development Charges 86.91 76.91 79.41
Withdrawal from
Reserves
1769.22 1563.92 2330.00
Total Sources (A) 6284.15 5354.65 6443.94
Applications
Revenue Expenditure 2924.83 2677.88 3218.86
Capital Expenditure 3358.60 2676.12 3224.90
Total Applications (B) 6283.43 5354.00 6443.76
Surplus/ Deficit (A-B) 0.72 0.65 0.18
WATER SUPPLY
Population of Mumbai is 12.5 million (Census 2011) with
water demand at 4200 mld. Present supply is 3500 mld. The
projected water demand is 6000 mld for the year 2031. Middle
Vaitarna Project under JnNURM was partially commissioned in
October 2012 resulting in augmenting present water supply from
3425 mld to 3500 mld. Rainfall was less than normal in
monsoon of 2012. Rainfall recorded was about 77% in Tansa
and Modak Sagar catchment and about 84% in Bhatsa and
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 78
Upper Vaitarna catchment. Even then partial commissioning of
Middle Vaitarna helped in bringing in additional 75 mld water to
Mumbai. Full commissioning of Middle Vaitarna Project in
October 2013 will augment water supply to Mumbai by 380
mld.
Even after commissioning of Middle Vaitarna Project the
gap in demand and supply of water for 2031 is 2120 mld. To
meet this gap, augmentation in water supply to Mumbai by
developing Damanganga-Pinjal Water Supply Schemes has been
undertaken. This scheme has two components. Damanganga-
Pinjal River Link Project is being implemented by National
Water Development Agency (NWDA) of Government of India.
DPR for this project is at completion stage. Pinjal Water Supply
Project will be implemented by MCGM. Feasibility Report for
Pinjal Water Supply Scheme has been completed. RR-studies,
Environmental Impact Assessment studies are in progress. Both
these projects are expected to be completed in 7 years.
Tunnels in progress: ( 37.55 km)
Gundavali to Bhandup tunnel of 5500 mm. dia and 15.1
km long is in progress. 7 km long boring has been
completed. Progress is as per schedule and expected to be
completed by December 2014.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 79
Maroshi to Ruparel via Vakola and Mahim tunnel is of
3000 mm. dia. and 12.25 km long. Tunnel boring activity
is completed. Maroshi to Vakola section will be
commissioned by May 2013 and the remaining sections
by December 2013. This will improve water supply to
areas in A, C, D, G/South, G/North, K/East and H/East
wards.
Powai to Veravali Reservoirs tunnel is of 2200 mm. dia.
and 2.2 km long and Powai to Ghatkopar Reservoirs
tunnel is of 2200 mm. dia. and 4.4 km Long. These
tunnels replace the existing inlets to Veravali Reservoirs
and Ghatkopar Reservoirs, respectively that have gone
below Link Roads posing maintenance problems. Work
commenced from February 2012. Work is expected to be
completed by May 2016.
Malabar Hill to Cross Maidan tunnel via S.K. Patil Udyan
of 2200 mm. dia. and 3.6 km long was partially
commissioned in March 2012 thereby improving water
supply in Kalbadevi area. These tunnels will be fully
commissioned in February 2013 to further improve water
supply in A, C and D wards.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 80
These four tunnels are costing `3893.47 crore.
A provision of `1069 crore is made in the Budget Estimates
for 2013-14.
Tunnels planned: (14.1 km)
Chembur to Trombay Reservoirs (5.1 km long) -
Feasibility studies are in progress. Tenders will be
finalised by October 2013 and construction will take 4
years. Estimated cost of work is `265 crore.
Chembur to Wadala to Parel (9.0 km long) -
Supplements to existing 1800 mm dia water main from
Amar Mahal, Chembur to Kings Circle supplying water to
F/South, F/North, B and E Wards meets the increased
water demand of these wards including 60 mld water
demand of MMRDA Development at Wadala. Estimated
cost of this tunnel is `460 crore. Feasibility studies have
been undertaken. Work order is expected to be issued by
October 2013 and would take about 6 years for
completion.
A provision of `82.38 crore including consultancy is
made in the Budget Estimates for 2013-14 for both these
tunnels.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 81
Replacement/ Rehabilitation of Trunk Mains:
Rehabilitation of old Bhandarwada Inlet from Mahim to
Reay Road (10 km long and estimated to cost `80 crore) is being
carried out in two phases. Phase-I is rehabilitation from Mahim
to Dharavi and Sewree to Reay Road (5 km long) for which
tenders are being invited. A provision of `12 crore is made in
the Budget Estimates for 2013-14.
Tansa Mains Outside Mumbai
Work of replacement of 2 nos. of Tansa Mains of 1800
mm. dia., having length of 42 km each, are being replaced by a
single main of 2750 mm. dia. Work completed so far is 27 km.
Work is expected to be completed by December 2013. A
provision of `300 crore is made in the Budget Estimates for
2013-14.
Tansa Mains in Mumbai
Tansa Mains, 12.5 km long from Bhandup to Maroshi, are
being replaced by 2400 mm dia. Main. Work will be carried
out in two phases. First phase of replacement of 9 km long
mains between Bhandup & Powai is put to tender and will
take 3 years to complete. A provision of `50 crore is made in
the Budget Estimates for 2013-14.
Tansa Mains, 12 km long from Mahim to Nana Chowk, will
be rehabilitated in two phases. It is proposed to rehabilitate
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 82
deploying latest insitu rehabilitation technology so as to
cause least inconvenience to the traffic. Expression of
Interest has already been invited. A provision of `9 crore is
made in the Budget Estimates for 2013-14.
Tansa Mains, 12 km long from King Circle to Kala Chowky
will be replaced in two phases. Tenders for Phase-I consisting
of 3 km long from King Circle to Hindamata are being
invited. A provision of `18 crore is made in the Budget
Estimates for 2013-14.
Rehabilitation/Replacement of Distribution Mains
70 km of distribution mains are being replaced/
rehabilitated in 2012 -13. It is proposed to rehabilitate/replace
20 km of water mains and lay 25 km of new distributory mains
in the year 2013-14. A provision of `94.05 crore is made in the
Budget Estimates for 2013-14.
Reconstruction of Old Reservoirs/ Construction of New
Reservoirs
Reconstruction of Worli and Bhandup Reservoirs and
construction of new reservoir at Malad, at a total cost of
`125 crore, are in progress. A provision of `42.20 crore is made
in the Budget Estimates for 2013-14.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 83
Formation of DMZ, Water Audit and Management of water
distribution
149 Bulk Flow Meters have been installed on Outlets of
Service Reservoirs. 33 Flow Meters are being relocated in the
Water Supply Distribution System to measure quantity of water
supplied to each ward. This work will be completed by March
2013. Further, water distribution zones in each ward have been
identified. Water supply to each zone will be linked to the Bulk
Flow Meters and quantity of water supplied to each water
distribution zone will be measured. Consumer connections in
each water supply zone have been tagged to the zone. This will
enable to estimate unaccounted for water. Action plan to reduce
unaccounted for water will be drawn starting from zone having
high level of unaccounted for water. This will also help in
planning equitable distribution. Arrangement for estimation for
unaccounted for water will be completed by April 2013.
Reduction in Unaccounted for Water
Leak Detection Setup is being revived to reestablish
planned implementation of Leak Detection and reduction works.
Each unit will be headed by Sub-Engineers/Asstt. Engineers
with adequate staff, material, equipment and machinery. This
system will ensure to achieve objective of reduction in loss of
water from 30% to 25 % in the year 2013-14. A provision of
`57 crore is made in the Budget Estimates for 2013-14.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 84
Universal Metering of Consumer Connections
The basic requirement of Water Audit is accurate
measurement of water supplied to consumers. A policy decision
has been taken to provide meters on all consumer connections.
There are 3,70,813 metered water connections and about 70,000
unmetered water connections, especially in island city. 1,29,775
AMR meters have been procured and 75,059 meters have been
installed on the connections. Installation of balance AMR
meters is in progress and is likely to be completed by December
2013. Installation of AMR meters on water connections in slum
areas was not feasible as AMR meters are to be housed in a
chamber to protect meter against damage. Decision has been
taken to provide robust mechanical meters on all the remaining
water connections to achieve cent percent functional meters on
connections. Expression of Interest has been invited. Tenders
will be invited by April 2013. Installation of meters will start by
October 2013. It would take about 2 years to complete
installation. Survey of unmetered connections has been
undertaken to establish feasibility of metering these connections.
A provision of `23 crore is made in the Budget Estimates for
2013-14.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 85
24 x 7 water supply
24x7 Water Supply System was started in ‘T’ Ward
Mulund, except High level areas on Guru Govind Singh Road,
from January 2012 onwards. On commissioning of 3000 mm.
water main laid on Eastern Express Highway, 24 x 7 water
supply system has been started in Bhandup (East), Vikhroli
(East) from May 2012. Pant Nagar, Ghatkopar (East) will be
covered under 24 x 7 water supply system in monsoon of 2013.
Release of water supply at Normative Demand
Water supply at normative demand of 135 lpcd could not
be released due to delayed monsoon and inadequate rainfall in
monsoon 2012. This will be implemented from October 2013
on full commissioning of Middle Vaitarna Project.
Quality control in water supply
Consultants, NEERI have recommended measures for
upgradation of laboratories for testing of water samples at
Bhandup Complex and at G/North ward. Upgradation works are
in progress. A provision of `0.49 crore is made in the Budget
Estimates for 2013-14.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 86
Reduction in contamination of water supply
Major sources of contamination of water are leaky
consumer connections and surcharged sewerage system. Bunch
of connections on passages in Slum Colonies, old and corroded
GI pipelines existing in house gullies and GI pipelines more than
15 years old are the sources of contamination of water supply. I
propose to lay suitable size of water mains on passages of Slum
Colonies and remove bunch of connections, renew pipelines in
house gullies with the co-operation of beneficiaries and renew
consumer connections more than 15 years old. Locations of
surcharge of sewers have been identified and works to reduce
surcharge will be carried out in 2013-14. A provision of
`0.75 crore for removal of bunch of connections and `6 crore for
reduction of surcharge of sewers is made in the Budget
Estimates for 2013-14.
Old and corroded water pipes in the water distribution
network also not only cause contamination of water supply but
also increase loss of water. Condition assessment of such water
mains will be carried out by CCTV survey and mains will be
replaced or rehabilitated. A provision of `.0.80 crore is made in
the Budget Estimates for 2013-14.
Water Distribution Improvement Programme
Achievement of equitable distribution, reduction in higher
losses in the water distribution system, reduction in
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 87
contamination of water supply, establishment of Leakage
Detection and Reduction Cell, set up of permanent pressure and
flow regulation and monitoring stations, utility mapping on GIS
platform and upgrading skills of the water works staff and pro-
active action to ensure efficient management of water supply
need an integrated approach. I propose to involve renowned
water operators in achieving this objective. Offers will be
invited from Water System Operators for suggesting measures,
monitoring implementation and performance in all above
activities. A provision of `40.50 crore is made in the Budget
Estimates for 2013-14.
Enhancement of Rainfall in catchment areas supplying water
to Mumbai :
Delayed monsoon in 2012 led to measures to be taken for
cloud seeding to enhance rainfall. Plans for cloud seeding were
finalised in association with Indian Institute of Tropical
Meteorology (IITM), Pune and Indian Meteorology Department
(IMD), Mumbai. Agency for cloud seeding was also near
finalisation. Cloud seeding could not be undertaken as monsoon
set in. However, it has been proposed to conduct scientific study
of clouds throughout monsoon every year in next five years.
IITM and IMD have agreed to assist MCGM in conducting these
studies. Agency for cloud seeding will also be selected and kept
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 88
ready for seeding clouds at a short notice. A provision of
`5 crore is made in the Budget Estimates for 2013-14.
Removal of encroachments adjacent to trunk mains in
Mumbai
The Hon. High Court has directed that the encroachments
within 10 mts. of trunk mains supplying water in Mumbai be
removed in a phased manner. 15789 huts exist within 10 mts. of
trunk mains in Mumbai as per the report submitted to the Hon.
High Court in 2009. First phase consisted of removal of 2090
huts. 2062 huts were demolished in G/North and S wards of
which 847 eligible residential families and 54 commercial units
have been rehabilitated. Second phase of removal of hutments in
N, T and M/West wards has been initiated. 4604 hutments are
to be removed by March 2013. Adequate tenements to
rehabilitate eligible families are available.
Initiatives for water distribution for Gaonthans and slums
Present policy is to grant water connections to structures
in existence prior to 17.04.1964, declared as tolerated structures,
in Gaothans. There are requests for water connections to the
structures constructed post 17-04-1964 in Gaothans. I propose to
grant water connections on humanitarian grounds to structures
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 89
constructed after 17-04-1964 but prior to 01.01.1995 (in line
with the policy of GoM for slums) for which necessary
amendment will be proposed in water charges rules.
Water supply to the slum dwellers located on elevated
areas, where water cannot gravitate, is made available through
the Suction Tank & pumping arrangement installed by MCGM
and handed over to the association of slum dwellers for
operation and maintenance. However, it is observed that such
schemes are unmanageable for the larger group of slum
dwellers. I propose to provide the storage tank, pumping facility
and allied works and undertake the operation and maintenance of
this facility through MCGM for large size slum colonies by
levying value added service charges. This policy will also be
made applicable for the colonies of rehabilitated slum dwellers
where additional suction tank and pumping arrangement is
needed due to the topographic reasons. Necessary amendment
will be proposed in the water charges rules for this initiative.
Powai Lake Rejuvenation
Powai Lake, a prominent picnic spot along Adi
Shankaracharya Marg was beautified and landscaped in the past.
However, due to rapid urbanization of surrounding localities and
waste discharge there is siltation, pollution and growth of
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 90
unwanted vegetation and water hyacinth. This is a serious threat
to survival of the lake.
A Joint Action Committee comprising of experts from
IIT- Powai, officials from Forest & MPCB and other
stakeholders is formed to prepare a blue-print to rejuvenate the
Powai Lake and save it from further deterioration. A provision
of `1 crore is made in the Budget Estimates for 2013-14.
Powai Multimedia Show (Laser)
I propose to facilitating the development of theme based
Multimedia Project set up involving laser effects of video
projects on water screen in Powai Lake at Nature Park – Powai.
The project set up as a permanent installation is proposed for
development through private sector investment (on Design,
Build, Finance, Operate & Transfer basis). Show theme consists
of story board related with historical, cultural & family
entertainment.
SEWERAGE
Status of Sewerage System
The old sewage Disposal arrangement of Mumbai is more
than 130 years old. The 1500km long sewage network also
includes 50 pumping stations, 7 treatment plants having capacity
of 5600 MLD and 54600 manholes, daily collecting 1700 MLD
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 91
sewage. The collected sewage is disposed off in the sea through
three marine outfalls at Colaba, Worli and Bandra and through
the Lagoons at Versova, Bhandup and Ghatkopar. The sewage
collected at Malad is disposed off in the Malad Creek after
preliminary treatment. 65% sewage of the developed area is
being collected through the sewerage network.
It is proposed to complete the second stage of Mumbai
Sewage Disposal Project by the year 2025, as per the extended
Master Plan prepared in the year 2002 at an estimated cost of
`10,600 crore (base price of year 2010).
Sewage Collection and Conveyance System Improvement
Non developed D.P. roads due to existing slums, uneven
topography, lack of adequate cross connections underneath
Railway lines/Highways/Rivers/Nallas and undersized sewers
are the major reasons for un-sewered areas. MCGM is
committed to improve collection and conveyance of sewage
from the present 65% to 80% by year 2015 as follows:
Exhaustive survey and linking its results with ground
challenges faced by sewerage operations department
has helped identify any bottlenecks, missing links,
undersize lines and invert level differences. All these
are being tackled in a phased manner.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 92
Work of 28.60 km of trunk and pipe sewers in
unsewered areas is being completed this year by open-
cut method, out of the planned 55.64 km. It is proposed
to execute the work of 11.5 km. length by open cut in
2013-14 &15.5km in 2014-15.
In the year 2007, it was proposed to lay sewer lines for
a length of 26.60 km. at the cost of `394.65 crore by
micro tunneling method wherever sewer line passes
through Railway tracks/ Highway /Nallas/ Rivers.
Work of 14.74 km. is completed. Now a total of 24.77
km of sewer lines is to be laid by micro tunneling (that
includes 10.31km of earlier plan of 2007). It is
proposed to complete 13.81 km length in the financial
year 2013-14 and 10.96 km in 2014-15 by micro
tunneling. This will give relief to various localities of
Kurla, Chembur, Ghatkopar, Tilak Nagar, Dahisar and
Bhandup.
A provision of `181.35 crore is made in the Budget
Estimates for the year 2013-14 for laying and upsizing
of sewer lines by open cut and micro tunneling
techniques.
The work of laying of 13 km long and 1.8 to 3.5 mt dia
priority sewer tunnel from Don Bosco school to
Goregaon Pumping Station and then from Marve Road
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 93
junction Link road upto Malad WwTF will be taken in
hand in 2013-14. Expected cost of the work is
`470 crore and is likely to be completed by 2016. This
will give relief to a large area from Goregaon to
Dahisar. A provision of `15 crore is proposed in the
Budget Estimates for 2013-14. It is also proposed to
carry out the work of providing main sewer line (by
tunneling) from JayBharat to Kherwadi Drop Shaft.
Due to this, Bandra(West) region will get major relief.
A provision of `5 crore has been made in the Budget
Estimates for 2013-14.
In existing MHADA layouts, which are/will undergo
redevelopment, MCGM in consultation with MHADA
on mutually agreeable terms will upgrade the sewerage
network in a time bound manner.
It is proposed to check feasibility for disposal of
sewage generated in slums to the nearest available
municipal sewerage network and prepare a plan of time
bound execution resulting in improved hygiene in
slums.
Condition Assessment of non-man entry sewers
Due to condition assessment and after removal of sludge/
silt in the pipes, flow of sewage enhances and after observing the
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 94
shortcomings in the structure of pipelines, further planning to
overcome the difficulties can be easily worked out. 273 km of
Condition Assessment of non-man entry sewers in City areas is
being completed by the end of current year out of the planned
360 km and remaining 87 km will be completed in 2013-14.
From the current year, survey of 855 km length of non-man
entry sewers in suburbs is started at an estimated cost of
`44.90 crore. Work of 110 km is completed so far and remaining
work will be completed by 2014. After Condition Assessment
of 745 km of non-man entry sewers in suburbs and the
remaining in City, work of rehabilitation of damaged sewers will
be undertaken in a phased manner. A provision of `22 crore is
proposed in the Budget Estimates for 2013-14 for the condition
assessment of sewer lines in city and suburb area.
Tender is invited for rehabilitation of 23 km of non-man
entry sewer lines in city and suburbs [8 km by Pipe Bursting,
5 km by CIPP method & 10 km by MWSL method]. This work
is likely to be completed by 2014-15. A provision of `20 crore is
proposed in the Budget Estimates for 2013-14.
Condition Assessment of man entry sewers
Man entry sewers of 45 km in City are of brick masonry
in ovoid and circular shape. These sewer lines were built prior to
independence. Rehabilitation of 30 km of Man Entry sewers is
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 95
completed by GRP lining so far in the city and suburb area.
Work of rehabilitation of additional 3.50 km amounting to
`22 crore is being completed in the year 2012-13. Additional
work of condition assessment and repairs of 27 km man entry
sewer lines is proposed to be taken up and is likely to be
completed in 2014-15. A provision of `7 crore is proposed in
the Budget Estimates for 2013-14.
Effective Preventive Maintenance of Sewer Lines and
Sewage Pumping Stations
In order to enhance mechanization in cleaning of sewers
and to do away with human contact to sewage, it is proposed to
purchase various sewer cleaning machines for each ward and
main sewer divisions. It is also proposed to hire high capacity
suction units, high capacity suction cum jetting units with
recycling facility for the main sewer divisions. A provision of
`26 crore is proposed in the Budget Estimates for 2013-14.
The silt removed from sewer lines during desilting is
required to be dried up before its disposal. A Silt Drying
machine is proposed to be purchased for which `4 crore is
proposed in the Budget Estimates for 2013-14.
In the last 25 years, there has been an exponential growth
in sewerage infrastructure in suburbs. The strength of drainage
staff will be increased suitably in suburbs in the coming
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 96
financial year. It is also proposed to outsource some part of
maintenance activities to substantially reduce the number of
drainage complaints.
The Inventory/mapping of street connections, sewer &
grease traps is already initiated at ward level. This will help in
effective sewer maintenance.
During recent study of all 49 pumping stations, it is
revealed that augmentation for 14 of the pumping stations is
necessary, to maintain the sewage level in wet well of these
pumping stations at optimum level. After augmentations, the
surcharged condition in some of the sewer line networks will be
reduced substantially and there will be reduction in siltation in
the sewer network.
Improvement of existing 5 old pumping stations, namely
(1) Afgan Church (2) Nepean Sea Road (3) Chinchpokli
(4) Bramhanwadi and (5) Vallabh nagar is proposed and
provision of `10.35 crore is made in the Budget Estimates for
2013-14.
Flow meters along with SCADA System is proposed to be
installed at 49 sewage pumping stations for which a provision of
`3 crore is proposed in the Budget Estimates for 2013-14.
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 97
Recycle/Reuse of Treated Water for Gardening
A Mini Sewage Treatment Plant is proposed at Banganga
Pumping Station to recycle/reuse sewage for which `2.40 crore
is proposed in the Budget Estimates for 2013-14. Initially, it
will give 1.5 mld treated water and the same will be utilised for
gardens at Raj Bhavan, Malabar Hill, Priyadarshini Park and
gardens situated in nearby vicinity. Feasibility studies for more
such decentralized treatment facilities are being undertaken.
Sewerage Data Improvement
Sewerage data of the existing system is available on GIS at
Sewerage Utility Management Centre (SUMC) however the
same is being updated. The data of condition assessment of
sewers is being collected in soft format for integration with
SUMC. The data of sewer trap/street connections will also be
uploaded into SUMC. This will be further integrated with the
property data with assessment department and layered on the
base map of GIS developed by NIC, to enable more effective
monitoring of sewerage maintenance activities.
Improvement in Sewage Treatment Facilities
Though the existing sewage disposal facilities are
fulfilling the standards of Dissolved Oxygen (DO) and Bio-
Chemical Oxygen Demand (BOD) as per SW-II standard of 1
km from sea face, the present level of coliform per 100 ml of
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 98
Sewage is 5000 to 10000 CFU. MCGM proposes to enhance the
quality of treatment to 100 CFU per 100 ml. at all 7 treatment
plants at Colaba, Worli, Bandra, Versova, Malad, Bhandup,
Ghatkopar in a phased manner.
MCGM is presently complying with the standards
established/ fixed by Maharashtra Pollution Control Board (100
mg./ltr of BOD and 100 mg/ltr of suspended solids) by way of
biological process at Versova, Bhandup & Ghatkopar lagoons.
Modifications to the existing facilities at Bhandup and
Ghatkopar by year 2016, will lead to compliance of MPCB
standards of 20 & 30 mg/ltr of BOD & Suspended Solids
respectively. This will improve the water quality of Thane creek
and Arabian Sea. The estimated value of this work is `953 crore
including updation/improvement of pumping stations. Pre-
qualification documents for Ghatkopar & Bhandup WwTF have
been received. Additional lagoon will be constructed at Versova
to cover additional sewage flow. This work will be initiated after
getting the necessary clearance from MoEF.
To overcome the difficulty of inadequate space at Bandra
and Worli and further to comply with the revised standards of
MPCB, High Quality Chemically Enhanced Primary Treatment
Process (CEPT) is proposed. Hence, the expected standards will
be achieved in the year 2017 instead of 2014. Request for
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 99
Proposal (RFP) are now invited for Colaba WwTF where 20/30
mg/ltr of BOD/SS level is proposed to be achieved. Colaba
WwTF work is expected to be started in 2013 and will be
completed by 2015; a provision of `20 crore has been provided
in the Budget Estimates for 2013-14 for the same.
Malad WwTF having estimated cost of `700 crore is
proposed to be completed/commissioned by 2017. MPCB has
insisted to maintain the standard of 50/50 mg/ltr of
BOD/suspended solids at Malad as in the case of Worli and
Bandra. The treated sewage from Versova Lagoon as well as
Malad WwTF will be carried through two stub tunnels upto
Bhati Village and from there the same will be disposed off in the
sea through Erangal marine outfall (4.5 km long, 3.7 mt dia and
60 mt deep). Malad WwTF needs MoEF clearance for land.
It is also proposed to undertake construction of dry
weather sewage interceptors on pilot basis in Malad zone at
Piramal Nagar Nalla, Goregaon and Pushpa Park Nalla near
Liberty Garden, Malad. The estimated cost for these works
comes to `13.50 crore and a provision of `2 crore is proposed in
the Budget Estimates for 2013-14.
After completion of the above stated works, MCGM will
be in a position to achieve the Revised Standards prescribed by
MPCB by the year 2017. The cost of improvement of standards
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 100
of wastewater treatment & disposal facilities is expected to be
`3058 crore (base price of year 2012).
Open Defecation Free Mumbai and Slum Sanitation
Programme
MCGM has undertaken a demand based Slum Sanitation
Programme Phase-II for slum dwellers in Mumbai with support
from Community Based Organizations. Under ongoing contracts
of Lot-8, 183 community toilet blocks (4723 Seats) have been
constructed and handed over to local Community Based
Organization (CBO) for operation and maintenance. Balance
6 community toilet blocks (126 seats) are in progress. The
tenders for Lot-9 contract in six zones for construction of 210
community toilet blocks (4200 seats) have been awarded. Under
this contract, as per the demand received from Slum Dwellers,
local CBOs have been formed and work orders for construction
of toilet block for 96 nos. (2646 seats) have already been issued
to the contractors.
MCGM proposes to make Mumbai “Open Defecation
Free” in next five years. A gap analysis in the Toilet facilities
has been undertaken. A detailed survey of all existing Toilet
Blocks has also been taken up and will be completed in the next
six months. Construction of all required toilets will be completed
in next five years. It is decided to include all slum dwellers
residing on various Government lands such as Railways,
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 101
Airport, Salt Commissioner, Forest etc. along with the Private
lands. Efforts are being made to obtain No Objection
Certificates from these agencies to construct toilets.
While concluding my statement on the Budget, I would
note here that neither any hike in the rates of the present
taxes is proposed nor any new taxes have been imposed in
the Budget Estimates for 2013-14.
Looking forward to your wholehearted participation and co-
operation, I present for consideration and approval of the
Standing Committee the Budget Estimates for a surplus Revenue
and Capital Budget ‘A’ (Fund Code - 11, 12, 60, 70), a balanced
Budget ‘B’ (Fund Code - 21, 22, 23) and surplus Budget ‘G’
(Fund Code - 40) for the year 2013-14.
Thank you,
Mumbai Sitaram Kunte
Date : 04th
February, 2013 Municipal Commissioner
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 102
ANNEXURE - I Revenue Income - Budget Estimates ‘A’, ‘B’, ‘E’,
‘G’ & Tree Authority
(` in crores)
Sr.
No.
Sources of Revenue Income
Budget
Estimates
2013-14
1. Octroi (Net) 7740.00
2. Property Tax 3955.81
3. Water & Sewerage Charges 1279.49
4.
Receipts from Development Plan
Department 3362.41
5. Grant-in-Aid from Government 322.94
6. Income from investments 1370.72
7. Supervision Charges 502.58
8. Solid Waste Management 109.64
9. Receipts from Roads & Bridges 307.17
10 Receipts from License Department 149.41
11.
Receipts from Hospitals & Medical
Colleges 122.34
12.
Receipts from Markets &Deonar
Abattoir 126.45
13. Other Receipts 1123.65
Total 20472.61
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 103
ANNEXURE – II Revenue Expenditure - Budget Estimates ‘A’, ‘B’, ‘E’,
‘G’ & Tree Authority.
(` in crores)
Sr.
No.
Items of Revenue Expenditure
Budget
Estimates
2013-14
1. Establishment Expenses 10131.58
2. Administrative Expenses 884.50
3. Operation and Maintenance 3095.88
4. Interest and Finance Charges 84.70
5. Programme Expenses 157.27
6. Revenue Grants, Contributions and
Subsidies 2793.48
7. Provisions and write-off 380.19
8. Transfer to Reserve Fund – Other 107.24
9. Refund of taxes 488.32
Total Revenue Expenditure 18123.16
Transfer to Capital Account 2333.67
Total 20456.83
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 104
ANNEXURE – III
Budget Estimates A, B, E, G, & Tree Authority
Department-wise Summary
(` in crores)
Deptt.
Code
Department
Budget Estimates 2013-14
Total Revenue
Expenditure
Capital
Expenditure
18 Information Technology
Department
117.74 121.88 239.62
21 Disaster Management Cell 8.56 3.04 11.60 24 Assessor & Collector Department 785.45 52.66 838.11 30 Education Department 1587.95 285.17 1873.12 31 Solid Waste Management Deptt. 1653.13 260.30 1913.43 32 Transport Department 401.28 63.31 464.59 33 Storm Water Drains Department 284.52 1114.62 1399.14 34 Mechanical & Electrical Deptt. 63.17 68.40 131.57 35 City Engineer’s Department 388.00 205.85 593.85 37 Development Plan Department 36.75 739.38 776.13 38 Fire Brigade Department 153.15 160.51 313.66 41 Garden Department 187.11 213.11 400.22 42 Market Department 65.33 63.78 129.11 43 Deonar Abattoir Department 32.32 19.78 52.10 44 Roads & Traffic Department 643.07 1679.94 2323.01 45 Bridges Department 7.61 320.12 327.73 46 Printing Press Department 44.00 17.91 61.91 47 Health Department 552.89 126.87 679.76
Major Hospitals 624.77 208.42 833.19 Medical Colleges 220.46 17.14 237.60 Specialised Hospitals 116.60 34.00 150.60 Peripheral Hospitals 358.96 180.43 539.39
49 Water Operation Department 1513.90 649.31 2163.21 50 Water Supply Project Department 36.01 1894.13 1930.14 51 Sewerage Operation Department 764.92 209.79 974.71 52 Sewerage Project Department 30.49 181.35 211.84 53 Mumbai Sewerage Disposal
Project 15.61 274.46 290.07
Other Department 7429.41 203.75 7633.16 Total 18123.16 9369.41 27492.57 Contribution to Capital Account 2333.67 Total 20456.83
B U D G E T E S T I M A T E S A , B & G 2013-14
M U N I C I P AL C O R P O R AT I O N O F G R E AT E R M U M B AI 105
ANNEXURE – IV Capital Accounts –Budget Estimates A, B, E, G & Tree Authority
(` in crores)
Sr.
No.
Particulars Budget
Estimates
2013-14
CAPITAL RECEIPTS
1 Loan : 2993.00
2. Grants 200.00
3 Contribution from Development Fund 317.63
4 Sale proceeds/ premium of land and
building
161.17
5 Accumulated Surplus 802.00
6 Withdrawal from Special Fund :
Assets Replacement Fund 1100.00
Land Acquisition and Development
Fund
450.00
Primary School Building Maintenance
Fund
114.10
Primary School Building Construction
Fund
5.00
Asset Replacement & Rehabilitation
Fund
535.00
Total : 6 2204.10
7 Other Receipts 428.16
Total : 1 to 7 7106.06
8 Contribution from Revenue Account 2333.67
Total -Capital Receipts 9439.73
9 Capital Expenditure 9369.41
Surplus during the year 70.32
i
ii
iii
Budget Share
Sr.No. Sources of Income/Receipts Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Revenue Income 20472.61 74
2 Loan 2993.00 11
3 Grants 200.00 1
4 Withdrawal from special fund 2204.10 8
5 Contribution from Development Fund 317.63 1
6Contribution from Accumulated
Surplus802.00 3
7 Other Receipts 589.33 2
Total 27578.67 100
SIZE OF BUDGET ESTIMATES 'A','B', 'E', 'G' AND TREE AUTHORITY
iv
1
2
3
4 5
6 7 INCOME / RECEIPTS
Sr. Items of Budget Share
No. Expenditure Estimates in
2013-2014 Rupee
(Rs.in crore)
1 General Budget 13243.51 48
2 Health Budget 2508.62 9
3 Improvement Schemes 285.46 1
4 Slum Clearance 4.18 ...
5 Slum Improvement 151.88 1
6 Education Fund 1828.37 7
7 Water Supply & Sewerage Disposal 5961.31 22
8 Tree Authority 40.75 ...
9 Provident Fund 7.59 ...
10 Pension Fund 3460.90 12
11 Excess of Income over expenditure 86.10 ...
Total 27578.67 100
SIZE OF BUDGET ESTIMATES 'A','B', 'E', 'G' AND TREE AUTHORITY
v
1
2 3 4
5
6
7
8 9
10 11 EXPENDITURE
Budget Share
Sr.No. Sources of Revenue Income Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Octroi (Net) 7740.00 38
2 Property Tax 3955.81 19
3 Water & Sewerage Charges 1279.49 6
4 Receipts from Development Plan Department 3362.41 16
5 Grant-in-Aid from Government 322.94 2
6 Interest on Investment 1370.72 7
7 Supervision Charges 502.58 2
8 Solid Waste Management 109.64 1
9 Receipts from Roads & Bridges 307.17 1
10 Receipts from License Department 149.41 1
11 Receipts from Hospitals & Medical Colleges 122.34 1
12 Receipts from Markets & Deonar Abattoir 126.45 1
13 Other Receipts 1123.65 5
Total 20472.61 100
REVENUE INCOME-BUDGET ESTIMATES 'A','B', 'E','G' AND TREE AUTHORITY
vi
1
2
3
4
5
6
7 8
9 10 11 12 13
Sr. Items of Budget Share
No. Revenue Expenditure Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Establishment Expenses 10131.58 50
2 Administrative Expenses 884.50 4
3 Operation & Maintenance 3095.88 15
4 Interest and Finance Charges 84.70 ...
5 Programme Expenses 157.27 1
6 Revenue Grants,Contributions and Subsidies 2793.48 14
7 Provisions and Write-off 380.19 2
8 Transferred to Capital A/c 2333.67 11
9 Other Expenses 107.24 1
10 Refund of Property Taxes 488.32 2
11 Excess of Income over expenditure 15.78 ...
Total 20472.61 100
REVENUE EXPENDITURE -BUDGET ESTIMATES 'A','B', 'E', 'G' AND TREE AUTHORITY
vii
1
2
3
4
5
6
7
8
9 10 11
Budget Share
Sr.No. Sources of Capital Receipts Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Loan 2993.00 32
2 Grants 200.00 2
3 Contribution from development Fund 317.63 3
4 Receipts from Premium of land and buildings 161.17 2
5 Contribution from Revenue A/c 2333.67 25
6 Accumulated Surplus 802.00 8
7 Withdrawal from special fund 2204.10 23
8 Other receipts 428.16 5
Total 9439.73 100
CAPITAL RECEIPTS -BUDGET ESTIMATES 'A','B', 'E', 'G' AND TREE AUTHORITY
viii
1
2
3
4
5
6
7
8
Sr. Items of Budget Share
No. Capital Expenditure Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Traffic Operations, Roads & Bridges 2000.06 21
2 Storm Water Drains 1114.62 12
3 Solid Waste Management & Transport 323.61 3
4 Health Budget 623.60 7
5 Water Supply 2543.44 27
6 Sewage Disposal 665.60 7
7 Fire Brigade & Disaster Management 163.56 2
8 Information Technology 121.88 1
9 Market & Deonar Abattoir 83.56 1
10Repairs to Mun.Properties & Slum Improvement
(Budget-B)107.02 1
11Repairs to Primary School Buildings
(Budget E)356.98 4
12 Others 1265.48 13
13 Excess of Income over Expenditure 70.32 1
Total 9439.73 100
CAPITAL EXPENDITURE -BUDGET ESTIMATES 'A','B', 'E', 'G' AND TREE AUTHORITY
ix
1
2
3
4 5
6
7
8
9
10
11
12 13
x
xi
Budget Share
Sr.No. Sources of Revenue Income Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Octroi (Net) 7740.00 47
2 Property Tax 2259.66 14
3 Grant-in-Aid from Government 322.94 2
4 Interest on Investment 1034.74 6
5 Receipts from Development Plan Department 3362.41 20
6 Receipts from Roads & Bridges 307.17 2
7 Receipts from License Department 149.40 1
8 Solid Waste Management 109.64 1
9 Supervision Charges 250.00 1
10 Receipts from Hospitals & Medical Colleges 122.34 1
11 Receipts from Markets & Deonar Abattoir 126.45 1
12 Other Receipts 667.55 4
Total 16452.30 100
REVENUE INCOME-BUDGET ESTIMATES 'A','B' & 'E'
xii
1
2
3
4
5
6
7
8 9 10 11 12
Sr. Items of Budget Share
No. Revenue Expenditure Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Establishment Expenses 8561.42 52
2 Administrative Expenses 492.33 3
3 Operation & Maintenance 2401.37 15
4 Interest and Finance Charges 17.12 ...
5 Programme Expenses 155.67 1
6 Revenue Grants,Contributions and Subsidies 2801.63 17
7 Transfer to Capital A/c 1518.00 9
8 Other Expenses 15.05 ...
9 Refund of Property Taxes 488.32 3
10 Excess of Income over Expenditure 1.39 ...
Total 16452.30 100
REVENUE EXPENDITURE-BUDGET ESTIMATES 'A','B' & 'E'
xiii
1
2
3
4
5
6
7
8 9 10
Sr. Budget Share
No. Particulars Estimates in
2013-2014 Rupee
(Rs. in crore)
1 Internal Loan 2000.00 32
2 Contribution from Revenue Account 1518.00 25
3 Withdrawal from Special Funds 1669.10 27
4 Premium towards additional 0.33 F.S.I. 325.00 5
5 Contribution from Development Fund 238.22 4
6Grant for Brimstowad/JNNURM/SWM
Project200.00 3
7 Others Receipts 264.33 4
Total 6214.65 100
CAPITAL RECEIPTS - BUDGET ESTIMATES 'A','B' & 'E'
xiv
1
2
3
4
5 6 7
Sr. Budget Share
No. Particulars Estimates in
2013-2014 Rupee
(Rs.in crore)
1 Traffic Operations, Roads & Bridges 2000.06 32
2 Storm Water Drains 1114.62 18
3 Information Technology Department 121.88 2
4 Markets & Deonar Abattoir 83.56 1
5 Health Budget 623.60 10
6 S.W.M.and Transport 309.08 5
7 Fire Brigade Services & Disaster Management 163.56 3
8 Gardens,Zoo,Swimming Pools & Theatres 212.24 3
9 Others (Budget A ) 1051.04 17
10Repairs to Municipal properties & Slum
Improvement (Budget B )107.02 2
11Repairs to Primary School Buildings
(Budget E )356.98 6
12 Excess of Income over Expenditure 71.01 1
Total 6214.65 100
CAPITAL EXPENDITURE - BUDGET ESTIMATES 'A', 'B' & 'E'
xv
1
2 3 4
5
6
7
8
9
10
11 12
Particulars R.E. B.E.
2009-10 2010-11 2011-12 2012-13 2013-14
Revenue
Expenditure 397.49 472.84 670.50 493.01 650.68
Capital
Expenditure 932.90 625.65 438.70 1275.32 2000.06
Total 1330.39 1098.49 1109.20 1768.33 2650.74
(Rs.in crore)
xvi
Actuals
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
2009-10 2010-11 2011-12 2012-13 2013-14
Rs.
in c
rore
Capital Expenditure
Revenue Expenditure
Traffic Operations, Roads & Bridges
Particulars R.E. B.E.
2009-10 2010-11 2011-12 2012-13 2013-14
Revenue
Expenditure 990.94 1212.97 1266.34 1563.12 1966.85
Capital
Expenditure 81.19 103.85 63.88 97.66 309.08
Toal 1072.13 1316.82 1330.22 1660.78 2275.93
(Rs.in crore)
xvii
Actuals
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2009-10 2010-11 2011-12 2012-13 2013-14
Rs.
in c
rore
Capital Expenditure
Revenue Expenditure
Solid Waste Management and
Transport
Particulars R.E. B.E.
2009-10 2010-11 2011-12 2012-13 2013-14
Revenue
Expenditure 919.09 1156.77 1249.61 1505.54 1885.02
Capital
Expenditure 206.04 324.45 243.63 325.13 623.60
Total 1125.13 1481.22 1493.24 1830.67 2508.62
(Rs.in crore)
xviii
Actuals
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
2009-10 2010-11 2011-12 2012-13 2013-14
Rs.
in c
rore
Capital Expenditure
Revenue ExpenditureHealth Budget
Particulars R.E. B.E.
2009-10 2010-11 2011-12 2012-13 2013-14
Revenue
Expenditure 220.88 242.65 362.54 269.89 284.52
Capital
Expenditure 1024.03 969.29 968.11 1027.13 1114.62
Total 1244.91 1211.94 1330.65 1297.02 1399.14
(Rs.in crore)
xix
Actuals
0
200
400
600
800
1000
1200
1400
1600
2009-10 2010-11 2011-12 2012-13 2013-14
Rs.
in
cro
re
Storm Water Drains
Capital Expenditure
Revenue Expenditure
Particulars R.E. B.E.
2009-10 2010-11 2011-12 2012-13 2013-14
Revenue
Expenditure 1036.03 1016.45 1038.50 1679.04 2115.45
Capital
Expenditure 74.48 41.76 120.89 287.01 356.98
Total 1110.51 1058.21 1159.39 1966.05 2472.43
(Rs.in crore)
xx
Actuals
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2009-10 2010-11 2011-12 2012-13 2013-14
Rs.
in c
rore
Primary Education
Capital Expenditure
Revenue Expenditure
xxi
Sr. Budget Share in
No. Sources of Revenue Income Estimates Rupee
2013-2014
(Rs.in crore)
1 Water Charges 842.78 21
2 Water Tax 134.63 3
3 Water Benefit Tax 787.35 19
4 Sewerage Charges 436.71 11
5 Sewerage Tax 272.63 7
6 Sewerage Benefit Tax 486.06 12
7 Other Receipts 1074.37 27
Total 4034.53 100
REVENUE INCOME - BUDGET 'G'
xxii
1
2
3
4
5
6
7
Budget Share in
Sr. Items of Revenue Expenditure Estimates Rupee
No. 2013-2014
(Rs.in crore)
1 Establishment Expenses 1134.25 28
2 Administrative Expenses 390.17 10
3 Operation & Maintenance 659.92 16
4 Interest and Finance Charges 67.58 2
5Revenue Grants,Contributions and Subsidies &
Programme expenses584.16 14
6 Provisions and Write-off 380.19 10
7 Prior period Expenses 2.59 ...
8 Transfer to Capital A/c 815.67 20
Total 4034.53 100
REVENUE EXPENDITURE - BUDGET 'G'
xxiii
1
2
3 4
5
6
7
8
Budget Share in
Sr. Particulars Estimates Rupee
No. 2013-2014
(Rs.in crore)
1 Internal Generation 815.67 25
2 Loan Receipt 993.00 31
3 Contribution/Grant 614.41 19
4 Accumulated Surplus 802.00 25
Total 3225.08 100
CAPITAL RECEIPTS - BUDGET 'G'
xxiv
1
2
3
4
Sr. Division wise Budget Share in
No. Capital Expenditure Estimates Rupee
2013-2014
(Rs.in crore)
1 Common Services 15.86 ...
2 Water Operation 649.31 20
3 Water Supply Project 1894.13 59
4 Sewerage Operation 209.79 7
5 Sewerage Project 181.35 6
6 M S D P 274.46 8
7 Anticipated surplus during the year 0.18 ...
Total 3225.08 100
CAPITAL EXPENDITURE - BUDGET 'G'
xxv
1
2
3
4
5
6 7
ParticularsR.E. B.E.
2009-10 2010-11 2011-12 2012-13 2013-14
Revenue Exp. 1631.72 1518.55 1741.06 2677.88 3218.86
Capital Exp. 1672.26 2233.09 1799.75 2676.12 3224.90
Total 3303.98 3751.64 3540.81 5354.00 6443.76
(Rs. in Crore)
xxvi
Actuals
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
2009-10 2010-11 2011-12 2012-13 2013-14
Rs.
in
Cro
re
Capital Exp.
Revenue Exp.
BUDGET 'G' Revenue & Capital -Water & Sewerage