Page 1: B15-E~1D
Page 2: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 2 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

DEN YUTURI STANDARD SPECIFICATIONS FOR

WATER INJECTION PUMPS

TABLE OF CONTENTS

1.0 SCOPE

2.0 DEFINITION OF TERMS

3.0 CODES, STANDARD AND COMPANY SPECIFICATIONS

4.0 GENERAL CONTRACTOR INFORMATION

5.0 DESIGN, FABRICATION AND ASSEMBLY REQUIREMENTS

6.0 ELECTRICAL / INSTRUMENTATION REQUIREMENTS

7.0 PROTECTIVE COATINGS

8.0 EQUIPMENT TAGGING AND NAMEPLATES

9.0 INSPECTION AND TESTING

10.0 PREPARATION FOR SHIPMENT

11.0 SPECIAL TOOLS

12.0 SPARES

13.0 DOCUMENTATION REQUIREMENTS

14.0 WEIGHT CONTROL

15.0 SAFETY

ATTACHMENTS:

A. EQUIPMENT DATA SHEET INDEX AND DATA SHEETS B. CONTRACTOR DOCUMENTATION REQUIREMENTS C. INSPECTION MATRIX D. WEIGHT/CENTER OF GRAVITY CONTROL SHEET E. PIPING AND INSTRUMENTATION DRAWINGS F. APPROVED VENDOR LIST FOR INSTRUMENTATION G. COMPANY SPECIFICATIONS

Page 3: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 3 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

1.0 SCOPE

This specification defines the minimum requirements for the design, materials, fabrication, assembly, inspection, testing, painting, preparation for shipment and supply of base plate mounted centrifugal pump unit (pump/motor/controls) suitable for installation on an onshore facility in Eastern Ecuador. The pump unit is to meet the requirements of this specification and the referenced documents.

The following equipment items are included in the scope of supply:

• P- 305 – Water Injection Pumps Package

2.0 DEFINITION OF TERMS

COMPANY - UAOT BLOQUE 15

ENGINEER – Engineering Company

CONTRACTOR - Centrifugal Pump Unit manufacturer

3.0 CODES, STANDARDS AND COMPANY SPECIFICATIONS

3.1 Applicable Standards, Codes and Regulations (Latest Edition)

The latest editions of the following National Codes, Standards and Regulations form a part of this specification except as modified herein. All applicable portions of these documents are to be used in the design and fabrication of the equipment.

• API 610 (latest edition) - Centrifugal Pumps for General Refinery Services

• API 670 (latest edition) - Vibration, Axial Position, and Bearing Temperature Monitoring System

• API 54I - Form-Wound Squirrel Cage Induction Motors - 250 Horsepower and larger

3.2 COMPANY Specifications

B15-EPF-70-SP-001 Electrical Wiring Methods & Materials

B15-EPF-70-SP-011 Medium Voltage Motors

B15-EPF-60-SP-002 Instrument Design

B15-EPF-60-SP-001 Instrument Installation

B15-EPF-20-SP-003 Pipes, Valves & Fittings

B15-EPF-20-SP-001 Above Ground External Painting/Galvanizing Structural

B15-EPF-20-SP-009 Structural Steel Skid Mounted Assemblies

3.3 Equipment Data Sheets and Data Requirements:

See Attachment A, Equipment Data Sheet Index and Data Sheets which are attached to this specification.

Page 4: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 4 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

4.0 GENERAL CONTRACTOR INFORMATION

4.1 The COMPANY may choose not to select the lowest bid nor any equipment which is technically acceptable. Size, weight, ease of operation, efficiency, ease of maintenance, previous experience will all be considered in the overall evaluation.

4.2 Prototype or unproven equipment not having a well established operation record will not be considered. Only standard designs that are in regular and current production and manufactured for the service and site conditions specified, shall be offered. Equipment, piping and valves shall meet or exceed the design pressures and temperatures shown on the drawings and specifications. Per Section 11, CONTRACTOR shall offer, as a Company purchased options a list with cost; of all special tools for maintenance.

4.3 When specified in Section 7, CONTRACTOR will also be required to supply completed data sheet(s) for all equipment in his scope of supply. Completed ISA data sheets or detailed Bill of Material descriptions are required for each CONTRACTOR furnished instrument. These data sheets shall be submitted for COMPANY review and approval during the drawing approval cycle.

4.4 CONTRACTOR shall provide the cost for developing country, operation and maintenance support for 10 days in its proposal to cover on-site alignment check, commissioning and start-up. In addition CONTRACTOR shall provide rate sheets listing the charges for personnel and expenses which would be charged for long term operation and maintenance support after the initial support period has expired. CONTRACTOR shall also provide the location of its maintenance facility nearest COMPANY's Ecuador Operation and the name, address, phone and facsimile number of its customer service representative at that location.

4.5 COMPANY's duly authorized agents and/or representative shall have the following:

4.5.1 Free access to those portions of CONTRACTOR's facilities utilized in any manner for construction of the pump units and components under this specification.

4.5.2 Free access and the right to review all records, logs, reports, and certificates connected or concerned in any manner with construction of the pumps skids and components under this specification.

4.5.3 Right to inspect and/or witness any of CONTRACTOR's activities and/or operations in conjunction with this specification and to reject any work, material or procedure deemed defective or sub-standard.

4.6 CONTRACTOR shall be responsible for all detailed design together with workmanship and performance of the pumps, motors and controls.

4.7 In the absence of any applicable codes and standards, it is the intent of the COMPANY that the CONTRACTOR will adhere to the best engineering practices and that material and workmanship shall be of a high standard.

4.8 CONTRACTOR's extent of supply shall consist of the design, sizing, provision of materials, construction, drawings, data sheets, assembly, painting, testing, delivery and all necessary sub-vendor coordination required.

4.9 Conflicts between the requirements of this specification and the data sheets shall be brought to the COMPANY's attention in writing. The resolution of conflicts will be forwarded, by the COMPANY, to the CONTRACTOR in writing.

Where the CONTRACTOR's bid deviates from the specifications, this fact shall be separately stated in the bid under the heading "Exceptions to the Specifications". Exceptions must address the standards, job specifications and the request for quotation. Failure to identify exceptions shall be deemed to be acceptance by the CONTRACTOR of the specification requirements.

Page 5: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 5 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

Request for substitutions of any kind shall be complete with all pertinent engineering information required for COMPANY's evaluation of the superiority, or equivalence of the substitution. Substitutions may not be made without express approval of COMPANY.

5.0 DESIGN, FABRICATION AND ASSEMBLY REQUIREMENTS

5.1 General Requirements

5.1.1 The completed pumps/motors/control skid assemblies will be designed for a single lift, complete with piping to the skid edge, and valving and controls. The skid shall be designed per Specification B15-EPF-20-SP-009 for “Structural Steel Skid Mounted Assemblies”, and conform Specification B15-EPF-20-SP-003 for “Pipe, Valves and Fittings”.

5.1.2 The CONTRACTOR shall submit to COMPANY for Approval, the detailed design calculations and drawings of the base plate mounted Centrifugal Pump Units including all components and appurtenances; e.g. pipe and nozzle stresses, electric motors, padeye and base plate design, control panel, etc. The CONTRACTOR shall have the design calculations and drawings prepared by an engineer experienced in the design of Centrifugal Pump Units and/or the sub components.

5.1.3 All tubing, exposed to injection water, shall be seamless Monel or Duplex stainless steel with Swagelok fittings. All external bolting shall be 316 stainless steel..

5.1.4 The Water Injection Pumps and controls shall be designed to operate in an electrically unclassified area.

5.1.5 All equipment will be suitable for operation in the following environmental conditions:

Atmosphere: Tropical Altitude: 244 meters. Humidity Range: 70%-100% Maximum Ambient Temperature: 114°F Minimum Ambient Temperature: 60°F Maximum Wind Loading: 85 mph Seismic Zone UBC Zone IV

5.2 Design Requirements

5.2.1 Paragraphs below are clarifications and additions to API Standard 610, AND PUMPS SHALL BE DESIGNED EACH FOR 1000 GPM @ 2500 PSIG discharge pressure, Material Class D-1 in accordance the Table H-1 per API 610, 0.97 S.G., 0.33 cP viscosity @ 200 °F maximum p umping temperature.(See attached Existing Pump Curve No. 62197).

5.2.2 For Water Injection Pumps, the casing shall be DUPLEX SS Case.

5.2.3 Pumps shall have a continuously rising Head/Capacity curve characteristic with approximately a 10% head rise from rated point to shut off.

5.2.4 The whole pump casing shall have a pressure rating allowing it to be tested at the hydrostatic test pressure of the discharge side by mounting blinds to the suction and discharge nozzles.

5.2.5 The CONTRACTOR shall provide calculations for shaft displacement at the coupling with forces and moments applied according to API.

0

Page 6: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 6 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

5.2.6 Seal Requirements:

For the Water Injection Pumps, the following seals are required:

John Crane Metastream Coupling, SS Shim Pack One Standard Straight Bore, One long Hub Taper Bore, 7" Spacer, TSCS-0740-0027-1778, Removable Non-Sparking Brass Guard.A non sparking fixed throttle bushing shall be provided in the seal gland.

5.2.7 A lateral critical speed analysis of the whole train, and a damped response to unbalance curve shall be provided to the COMPANY for comment at least 6 weeks prior to construction.

5.2.8 A torsional vibration analysis of the completed couple train shall be provided to COMPANY for comment at least 6 weeks prior to construction.

5.2.9 For pumps over 2500 HP a pressure lubrication system shall be provided to supply oil at a suitable pressure to all bearings. The system shall include an external oil air cooler suitable for the tropical environment sized for 95°F, 100% humidity, etc. A low pressure switch or low lube oil tank level switch shall be provided to monitor lube system for leakage.

5.2.10 Materials for pump parts shall equal to API-610 class D-1 (Modified). See Section 5.3 for a discussion of special process conditions related to material selection for pump components exposed to process fluids.

5.2.11 Full radiographic inspection of suction and discharge nozzle welding shall be provided. Other welds shall be magnetic particle or dye penetrant.

5.2.12 After final balancing of each assembled rotating element has been completed, a residual balance check shall be performed and recorded.

5.2.14 Electric motor shall comply with COMPANY Specification No B15-EPF-70-SP-011, "Medium Voltage Motors".

5.2.15 Couplings shall be flexible disk non-lubricated type with stainless steel hub bolts. Acceptable manufacturers are Thomas and Metastream.

5.2.16 All pumps shall have their Best Efficiency Point between rated point and normal point. The motor will be sized according to this criterion (allowing for testing on water).

5.2.17 For pumps ≥ 2500 HP the pump shall be equipped with non contacting (eddy current) shaft probes. Radial X-Y probes shall be provided at each bearing and axial displacement probes (one active and one inactive) at the thrust bearing. A one event per revolution mark and corresponding phase reference transducer shall be installed at the pump shaft. The probes shall be wired to the control module in the Pump Control Panel supplied by CONTRACTOR. The Analog output (4-20mA) vibration monitoring equipment shall be wired to a terminal box on the skid for monitoring by the plant PLC. Otherwise, for pumps up to 2500 HP, each bearing housing shall have a velocity probe mounted on the horizontal joint with the signal wired to the unit control panel and readable without opening the panel or a panel mounted meter.

5.2.18 The motor will be equipped with casing vibration transducers to measure absolute vibration of the casing in the vertical plane at each bearing housing (one inboard and one outboard). The transducers, accessories and installation will be in accordance with API 670 (latest edition). Both motor and pump shall use the same system and components.

5.2.19 For pump ≥ 2500 HP the pump shall be equipped with 3-wire, 100 ohm, platinum RTDs. Two (2) RTDs are required in each bearing and two (2) in the pump case discharge. RTDs shall be wired to temperature monitoring equipment mounted in pump control panel supplied by pump CONTRACTOR. (One RTD is spare at each bearing and pump discharge flange).

5.2.20 When selected, the Analog output (4-20mA) from temperature monitoring equipment shall be wired to a terminal box for monitoring by the plant PLC.

0

Page 7: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 7 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

5.2.21 For pumps applications using RTDs, the electric motor pump driver shall be equipped with 6 RTDs (2 per phase), 3 wire, 100 ohm, platinum type. One RTD shall be utilized for temperature measurement of each phase of the stator winding, with one spare per phase (3 phases). These RTDs shall be wired to a junction box on the base plate. Wiring from junction box to Motor Protection Relay in MCC will be by others.

5.2.22 Each pump control panel shall be designed to monitor, alarm, and shutdown the pump in the event of any unsafe condition existing with pump or motor. The panel shall have provision for shutdown input from plant ESD panel. The panel shall have one (1) set of dry contacts for COMPANY use for alarm and one (1) set of dry contacts to shut unit down. All contacts wired for COMPANY use shall be wired to a terminal block. 20% spare terminals shall be provided. Panel enclosure shall be NEMA 4X Stainless Steel. All panel electrical components shall be suitable for Class I, Div 2, Group D, for Water Injection Pumps.

5.2.23 The pump case shall be designed with a valved vent & drain arrangement.

5.3 For Water Injection Service, the produced water pumped is a hot (180 °F) and saline (25,000 chlorides) produced water with traces of H2S and oxygen (15 ppb) with substantial dissolved carbon dioxide resulting in a low pH water (about 6 pH). This is a very corrosive fluid. Materials of construction for pump internals include materials such as duplex stainless steel, or super duplex. The pump casing shall be Duplex Stainless Steel.

5.4 The unfiltered and filtered vibration levels defined in the 8th edition of API-610 shall apply to the pump at the design rates.

5.5 Noise levels measured three feet from the pump skid in a free field shall be provided to COMPANY. No enclosure is required.

5.6 CONTRACTOR shall provide Protective shutdowns for each pump including but not limited to main bill of material, Attachment B.

6.0 ELECTRICAL/INSTRUMENTATION REQUIREMENTS

6.1 General

6.1.1 All electrical equipment shall be installed in accordance with requirements of National Electrical Code (NEC-NFPA-70) and per COMPANY Specification B15-EPF-70-SP-001, “Electrical Wiring and Materials”.

6.1.2 Electrical Classification is Class I, Div. 2, Group D, for Water Injection Pumps.

6.1.3 Instrument elements used on skid shall be selected from the attached approved Vendor List found in Attachment F.

6.1.4 Instrumentation design and installation shall be per COMPANY specifications B15-EPF-60-SP-002 and B15-EPF-60-SP-001, “Specification for Instrument Design” and “Specification for Instrument Installation”.

6.1.5 All electrical equipment shall be functionally tested by CONTRACTOR as required to assemble complete functional package. COMPANY reserves the right to witness any and all tests carried out by CONTRACTOR.

6.1.6 Motor starters will be provided by COMPANY and located off-skid in the MCC. Power and control wiring to motors from the MCC will be by others.

6.1.7 COMPANY will supply 4160 VAC / 3 Ph / 60 Hz and 120 / VAC/ 1 Ph / 60 Hz power to each pump base plate (if required).

6.1.8 Control, instrumentation, and power wiring (including RTDs, vibration leads), within the limits of the baseplate shall be installed in rigid conduits and fittings, properly bracketed to minimize vibration and isolated or shielded to prevent

0

Page 8: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 8 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

interference between voltage levels. All wiring for interconnection to COMPANY equipment shall be pulled to stainless steel junction boxes. Junction boxes shall be segregated internally by signal type with a minimum of 20% spares in each section. All terminals and wiring shall be identified and appear on CONTRACTOR’s drawings. The motor power junction box shall be adequately sized for termination of a 3/c, 5 KV cable with ground wire. On-skid junction boxes & conduit layout shall be approved by Company prior to fabrication.

6.1.9 All control instrument wires shall be twisted, shielded, copper pairs or triads #16 AWG minimum. All other power and control wiring shall by type THHN, 600V copper with #14 AWG minimum for control and power.

6.1.10 Conduit Box shall be oversized for stress cones and oversized with insulated standoffs and buss bars. Conduit Box shall be routable 360° in 90° steps and should be removed for transportation.

7.0 PROTECTIVE COATINGS

7.1 CONTRACTOR's shall apply the coating system per the attached specification B15-EPF-20-SP-001, “Above Ground External Painting/Galvanizing”.

8.0 EQUIPMENT TAGGING AND NAMEPLATES

8.1 A 316 stainless steel equipment nameplate shall be securely attached to the pump in a prominent position. Stainless steel rivets or screws shall be used to secure the equipment nameplate. Adhesives or welding as methods of attachment are not permitted. The equipment nameplate shall not be fixed to a part of the pump unit that is removed to provide access for maintenance. An outboard main skid member is the preferred location for nameplates attached to skid packages.

8.2 Each equipment nameplate shall carry the name of the CONTRACTOR and the tag number(s) of the equipment engraved in 1/2" high letters and numerals. The tag numbers for the equipment shall be as indicated on the Reference Drawings and Data Sheets. In addition to the tag number, the equipment nameplate shall also contain:

• Project Name: • Equipment Type: • Model Number: • Serial Number: • Purchase Order Number: • Functional Title: • Year Manufactured: • Rating [HP, Q, TDH (Pumps) ] [HP, Bearing P/N (Motors)]

8.3 CONTRACTOR shall submit a panel front facsimile with a panel nameplate schedule for approval. Schedule shall show nameplate wording, size and color of letters/background.

9.0 INSPECTION AND TESTING

This section describes the minimum requirements for inspection and testing and does not relieve the CONTRACTOR of his obligation to carry out other inspection and testing as required by the codes and standards.

Page 9: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 9 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

9.1 All equipment supplied by the CONTRACTOR shall be subject to inspection by the COMPANY, his authorized agents and other certifying authority if required. All test certificates for materials used during fabrication must be available prior to final inspection.

9.2 Requirements for inspection, testing and related documentation shall be in accordance with the attached Inspection Matrix.

9.3 All instruments and controls shall be operationally tested by CONTRACTOR and witnessed by COMPANY or its representative.

9.4 Hydrostatic test per ANSI B31.3 @ 1.5 x working pressure, using shop water and air pressure; NDT butt weld piping, NDT structural skid: 100% (UT) of main beam members and all welds associated with lifting lugs. 9.5.1 Entire fabricated package will receive shop function test pump not connected –

no water pumped. 9.5.2 NPSHR testing shall be performed on one unit only at the rated conditions. The

CONTRACTOR shall at least 6 weeks before first scheduled test, submit to COMPANY for approval, detailed procedures for all running tests, including criteria for all monitored parameters

9.5 As an option to be quoted, witnessed performance test at rated speed, flow and pressure. Test at vendor shop, using engine generator for power W/ converter, water pumped will be fresh at ambient temperature.

9.6 After completion of all tests, the COMPANY may request an inspection of the pump bearings and seals and if so, this shall not be considered an additional requirement.

10.0 PREPARATION FOR SHIPMENT

10.1 After the completion of assembly, tests and coating the pump packages shall be dried and thoroughly cleaned of all grease and loose debris. All openings, machined surfaces, flanges, and threaded connections shall be protected by coating with rust preventative and installing gasketed metal flange covers. All completely sealed components shall have desiccant or equivalent inside prior to sealing. Additional requirements for shipment preparation shall be in accordance with COMPANY's General Specification No. B15-EPF-20-SP-009, “Structural Steel Skid Mounted Assemblies”.

10.2 CONTRACTOR shall be responsible for providing any bracing, clips and/or brackets necessary for temporary support during transportation. CONTRACTOR shall also provide the magnitude of all temporary loads at the support points. Final details of temporary bracing, clips and brackets shall be subject to approval by COMPANY.

10.3 CONTRACTOR will be responsible for load out, tie down and securing for shipment of the completed packages and equipment on CONTRACTOR furnished transport. CONTRACTOR shall be responsible for supplying any required spreader bars or frames and all required rigging for the loadout and tie down at the CONTRACTOR's facility.

CONTRACTOR shall be responsible for transport to the COMPANY designated receiving location on U.S. Gulf Coast (for bid purposes quote delivery to the port of Houston). Removal from conveyance upon arrival at designated receiving location shall be by COMPANY.

10.4 Completed units shall not ship until released by COMPANY.

11.0 SPECIAL TOOLS

CONTRACTOR shall provide one set of special tools, if required, for the erection and/or maintenance of the pump unit. These items shall be priced separately. Prior to shipment each special tool shall be tagged with a stainless steel tag.

0

0

Page 10: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 10 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

12.0 SPARES

12.1 Within 14 days after receipt of order, CONTRACTOR shall provide two (2) priced recommended spare parts lists for each pump unit specified herein. One (1) list shall cover commissioning. The second list shall cover the first year of operation. CONTRACTOR shall provide both commissioning and operation spare parts as specified on the lists subject to review and confirmation by COMPANY. The proposed equipment price shall not include the cost of recom mended spare parts . COMPANY will place future orders for spare parts based on CONTRACTOR’s submittals and recommendations.

12.2 All spare parts furnished by CONTRACTOR shall be wrapped and packaged to preserve an original as-new condition under site conditions of storage. The spare parts shall be properly tagged with stainless steel tags and coded so that later identification as to their intended equipment usage will be clear. The tags may be of the inexpensive stainless steel (Dymo Tape) imprinted tape variety, provided that they are wired with stainless steel wire or permanently taped to the component or box. All items supplied shall be packaged separately and clearly marked as "Spare Parts" and shipped with the equipment in accordance with the instructions from the COMPANY. Packing lists shall be furnished complete and in detail so that parts can be handled without uncrating, if desired.

13.0 DOCUMENTATION REQUIREMENTS

13.1 Documentation for quotation, approval and record shall be supplied to the COMPANY by CONTRACTOR in accordance with the CONTRACTOR Documentation Requirements form attached to this specification.

13.2 Documentation for programmable logic controllers (PLCs) shall include an I/O wiring connection diagram showing input and output end devices connected to the PLC I/O cards, I/O address assignments, register assignments, and a printout of the logic program with comments and labels for all PLC functions. The I/O and register addresses shall be cross referenced with the logic program.

13.3 CONTRACTOR shall provide a complete document package for unit components. Other suppliers shall forward certified data to be compiled into a single dossier by the CONTRACTOR. An operation and preventative maintenance manual for the pump package shall be provided by the CONTRACTOR in an indexed and assembled loose-leaf binder in the quantity specified on the attached CONTRACTOR Documentation Matrix form.

13.4 CONTRACTOR shall completely fill out the attached data sheets and return with the quotation.

14.0 WEIGHT CONTROL

14.1 The transportation, installation, and operation of this equipment requires the consideration of weight and center of gravity for this project. Accurate estimates of weight and center of gravity location are required and must be provided by the CONTRACTOR at the earliest possible date. A "Weight/Center of Gravity Control Sheet" is attached for this purpose and must be completely filled out by the CONTRACTOR, at the bid (preliminary estimate), submittal of approval drawings (detailed design estimate) and at shipment (weighed).

Page 11: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 11 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

14.2 Approval drawings shall include the C.G. and weight for the motor/pump assembly.

14.3 CONTRACTOR shall provide "as-built" measured weight of the pump unit with a complete description of what is included in the weight.

14.4 The "as-built" weight shall be painted on base plates or equipment supports (on a "sign board" if required) in clearly visible letters at least four inches (4") high. If different, the shipping weight, including export packing, shall be shown on a similar board, using the same lettering, also shown in Pounds.

15.0 SAFETY

It is the intent of the COMPANY that operational hazards be reduced to a minimum. CONTRACTOR shall use sound engineering judgment in the design, fabrication/assembly of the pump package to ensure that it will perform the required process function without compromising this aim. If so equipped, piping, valves, electrical conduit/cable and instrument tubing shall be arranged in such a manner as to avoid tripping and overhead hazards, yet still be operational. Piping, tubing and conduit of insufficient mechanical strength for standing, shall be protected from personnel traffic.

ATTACHMENTS

The following documents are attached to and are a part of this Specification:

A) Equipment Data Sheet Index and Data Sheets

B) Main Bill of Materials for Water Disposal Pump

C) Contractor Documentation Requirements

D) Inspection Matrix

E) Weight / Center of Gravity Control Sheet

F) Piping and Instrumentation Drawings

G) Approved Vendor List for Instrumentation

H) Company Specifications

0

Page 12: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 12 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

ATTACHMENT “A”

EQUIPMENT DATA SHEET INDEX

NUMBER REV. DATA SHEET TITLE

A0115-003D B Centrifugal Pump P-305

Page 13: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 13 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

FACILITY: EDEN YUTURI DEVELOPMENT PROJECT

ITEM NO. P-305

1 APPLICABLE TO: ESTIMATE PURCHASE AS BUILT ITEM NO.

2 SERVICE WATER INJECTION PUMPS MANUFACTURER

3 LOCATION EASTERN ECUADOR NO. REQUIRED 1 (ONE)

4 MOTOR DRIVE AC MOTOR TURBINE

5 PUMP IS TO BE MANUFACTURED IN ACCORDANCE WITH THE FOLLOWING STDS: API 610 ANSI B73.1 ANSI B73.2

6 PUMP SIZE TYPE : HORIZONTAL SPLIT CASE NO. STAGES 6 x 8 x 12ª MSD 12 STAGES

GE

NE

RA

L

7 LIQUID PRODUCED WATER NPSH AVAILABLE (ft) 100' +

8 PUMPING TEMPERATURE (°F): NORM. 180 MAX. 200

CAPACITY @ PT (US gpm): NORM. 1000 RATED 1000

9 SPECIFIC GRAVITY @ PT 0.97 DISCHARGE PRESSURE (psig) 2500

10 VAPOR PRESSURE @ PT (psia) 8 psia @ 180 °°°°F SUCTION PRESSURE (psig): MAX 0 RATED 0 psig

11 VISCOSITY @ PT: 0.33 cp

12 DIFFERENTIAL PRESSURE (psi) 2500

13 SITE AMBIENT TEMPERATURE (°F): MAX. 100 MIN 70 DIFFERENTIAL HEAD (ft) 5954

14 HYDRAULIC

15 UNUSUAL CONDITIONS 100% R.H. LOCATION: INDOOR HEATED WITH ROOF

16 SALT SPRAY ENVIRONMENT OUTDOOR UNHEATED w/o ROOF

17 CORROSION/EROSION CAUSED EXTERNALLY BY SALT

18

19

20

OP

ER

AT

ING

CO

ND

ITIO

NS

21

22 PROPOSAL CURVE NO. MD – 145.1

MINIMUM CONTINUOUS FLOW (US gpm)

23 SPEED (rpm) 3560 THERMAL STABLE 500

24 NPSH REQUIRED (WATER)(ft) 21 ROTATION (VIEWED FROM COUPLING END) CW CCW

25 RATED bhp 1870 SUCTION SPECIFIC SPEED 10700

26 MAXIMUM bhp WITH RATED IMPELLER 2321 EFFICIENCY (%) (AT NORMAL CAP. AND RATED SUCT. PRESS.) 78 %

27 MAXIMUM HEAD WITH RATED IMPELLER (ft) 6600

28 REMARKS: Duplex stainless steel impellers, shaft and casing

29

30

QUOTATION MAY NOT BE CONSIDERED IF MANUFACTURER DOES NOT COMPLETE FORM

SPEC NO. AO115-003D REV. _B

BY FURNISHING INFORMATION FOR BLANK SPACES. SHEET 1 OF 4

Page 14: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 14 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

FACILITY: EDEN YUTURI DEVELOPMENT PROJECT

ITEM NO. P-305

31 CASING MOUNT: NOZZLES SIZE RATING FACING LOCATION

32 CENTERLINE NEAR CENTERLINE FOOT SUCTION 8” � RTJ SIDE

33 VERTICAL IN LINE BRACKET DISCHARGE �” � RTJ SIDE

34 VERTICAL BARREL SUMP PUMP OTHER 8”

35 CASING SPLIT: AXIAL RADIAL BEARINGS (TYPE/NO.):

36 CASING TYPE: VOLUTE SINGLE STAGGERED RADIAL SLEEVE THRUST BALL

37 DIFFUSER DOUBLE LUBRICATION TYPE: RING OIL OIL MIST PRESSURE

38 MAXIMUM ALLOWABLE PRESSURE: psig @ °F FLOOD FLINGER

39 3000 psig @ PT COUPLING:

40 HYDROSTATIC TEST PRESSURE 4500 psig MANUFACTURER METASTREAM

41 IMPELLER DIAMETER (in.): TYPE

42 RATED MAXIMUM MINIMUM MODEL

43 IMPELLER MOUNT: BETWEEN OVERHUNG DRIVER HALF-COUPLING MANUFACTURED BY:

44 PACKING: PUMP MANUFACTURER DRIVER MANUFACTURER PURCHASER

45 MANUFACTURER GLAND PLATE TAPS REQUIRED:

46 TYPE QUENCH FLUSH DRAIN VENT

47 SIZE / NO. OF RINGS REMARKS:

48 MECHANICAL SEAL:

49 MFR. John Crane, as per Bill of Materials

50 MODEL SH/105 – E1 WEIGHT OF PUMP AND BASEPLATE (lbs)

51 MFR. CODE WEIGHT OF MOTOR (lbs)

52 API CLASS CODE BSTFX WEIGHT OF TURBINE (lbs)

53 GLAND TYPE/MATERIAL 316 SS

54 REMARKS:

55

1 SEAL FLUSH PIPING PLAN 41/62 MAT’L 316 SS

COOLING-WATER PIPING PLAN N/A MAT’L

2 AUXILIARY FLUSH PLAN MAT’L TOTAL COOLING WATER REQUIRED (US gpm)

3 SEAL FLUSH PIPING: THREADED SOCKET WELDED FLANGED Tubing

SIGHT FLOW INDICATORS REQUIRED

4 EXTERNAL SEAL FLUSH FLUID REQUIRED N/A PACKING COOLING INJECTION REQUIRED

5 US gpm / psig US gpm / psig

6 REMARKS: PLAN 62 INCLUDES MOTOR DRIVEN EXCHANGER

7

AU

XIL

IAR

Y P

IPIN

G

8

QUOTATION WILL NOT BE CONSIDERED IF MANUFACTURER DOES NOT COMPLETE FORM SPEC NO. AO115-003D REV. B

BY FURNISHING INFORMATION FOR BLANK SPACES. SHEET 2 OF 4

Page 15: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 15 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

FACILITY: EDEN YUTURI DEVELOPMENT PROJECT

ITEM NO. P-305

9 TABLE H-1 CLASS (PER API 610) D-1 (MODIFIED) SHAFT/SLEEVE 500 K MONEL / 316SS

10 BARREL CASE DUPLEX BASEPLATE (MATERIAL/TYPE)

11 INNER CASE PARTS API STANDARD 610 STANDARD BASEPLATE NO.

12 IMPELLER DUPLEX ANSI B73.1 STANDARD BASEPLATE NO.

13 CASE/IMPELLER WEAR RINGS DUPLEX

14 REMARKS:

15

16

TEST NONWITNESSED WITNESSED OBSERVED

INSPECTION REQUIRED FOR NOZZLE WELDS:

17 PERFORMANCE MAGNETIC PARTICLE DYE PENETRANT

18 HYDROSTATIC INSPECTION REQUIRED FOR CASTINGS:

19 NPSH (ONE PUMP) RADIOGRAPHIC ULTRASONIC

20 SHOP INSPECTION MATERIAL CERTIFICATION

INSPECTION REQUIRED FOR

21 DISMANTLE AND INSPECT AFTER TEST MAGNETIC PARTICLE DYE PENETRANT

22 CASTING REPAIR PROCEDURE APPROVAL RADIOGRAPHIC ULTRASONIC

23 REMARKS:

24

25

26 MOTOR DRIVER BY: SUPPLIER TURBINE DRIVER BY

27 ITEM NO. MTD BY SUPPLIER ITEM NO. MTD BY

28 HP 2000 RPM 3600 FRAME L9500 HP RPM MAT’L

29 MFR. RELIANCE TYPE

30 INLET STEAM psig TEMP F

31 TYPE INDUCTION INSUL: F EXHAUST psig

32 ENC TEAAC-XT TEMP RISE: 8 °F

STEAM RATE FL lb/BHP/HR

33 VOLTS/PHASE/HERTZ 4160 / 3PH / 60 Hz BEARINGS LUBE

34 BEARINGS SLEEVE LUBE OIL RING NOZZLES SIZE ANSI RATING FACING POSITION

35 0 FULL LOAD AMPS INLET

36 EXHAUST

37 REMARKS:

38

QUOTATION WILL NOT BE CONSIDERED IF MANUFACTURER DOES NOT COMPLETE FORM SPEC NO. AO115-003D REV. B

BY FURNISHING INFORMATION FOR BLANK SPACES. SHEET 3 OF 4

Page 16: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 16 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

FACILITY: EDEN YUTURI DEVELOPMENT PROJECT

ITEM NO. P-305

39 PIT OR SUMP DEPTH (in.) N/A FLOAT AND ROD N/A

40 MINIMUM SUBMERGENCE REQUIRED (in.) CARBON STEEL STAINLESS STEEL BRONZE NONE

41 COLUMN PIPE FLANGED THREADED FLOAT SWITCH

42 LINE SHAFT OPEN / ENCLOSED PUMP THRUST (lbs):

43 GUIDE BUSHINGS AT MINIMUM FLOW AT DESIGN FLOW

44 BOWL LINE SHAFT AT RUNOUT: DOWN

45 GUIDE BUSHING LUBE WATER OIL GREASE

46 REMARKS:

47

48 DELIVERY, WEEKS

49 PUMP PRICE

50 DRIVER PRICE

51 EST. FREIGHT

52 TOTAL PRICE

53 THE SOUND LEVELS GENERATED BY THE PUMP AND DRIVER SHALL BE WITHIN THE LIMITS OF THE ATTACHED SPECIFICATION

54

55

56

QUOTATION WILL NOT BE CONSIDERED IF MANUFACTURER DOES NOT COMPLETE FORM SPEC NO. AO115-003D REV. B

BY FURNISHING INFORMATION FOR BLANK SPACES. SHEET 4 OF 4

Page 17: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 17 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

ATTACHMENT “B”

MAIN BILL OF MATERIALS FOR WATER DISPOSAL PUMP

ITEM ITEM DESCRIPTION

1 SKID-MOUNTED ELECTRIC MOTOR DRIVEN MULTISTAGE CENTRIFUGAL WATER INJECTION PUMPS AND RELATED EQUIPMENT PER THE SCOPE OF SUPPLY AS DETAILED ON THE ATTACHED BILL OF MATERIALS.

2

SULZER MULTI-STAGE CENTRIFUGAL PUMP: RATED 1000 GPM @ 2500 PSIG DISCHARGE PRESSURE, MD# MSD 6X8X12A - 12 STAGES, MATERIAL CLASS D1, DUPLEX STAINLESS STEEL CASE, IMPELLER WITH WEAR RINGS, K-MONEL SHAFT WITH 316 SS SLEEVE, SLEEVE / BALL BEARINGS, JC 1648-RS MECHANICAL SEAL, PLAN 41 SEAL FLUSH, PLAN 62 AUXILIARY FLUSH, NON WITNESSED HYDROTEST, NON WITNESSED PERFORMANCE/NPSH TEST, MATERIAL TEST REPORTS: CASE, IMPELLERS, SHAFT. NOTE 1

3

ELECTRIC MOTOR, RELIANCE SQUIRREL CAGE INDUCTION MOTOR, HORIZONTAL FOOT MOUNTED, 2000 HORSEPOWER, 3600 RPM, 4160 VOLT, TEAAC CLASS F INSULATION, 1.15 SF, FRAME 9500, API THIRD EDITION PER SPEC. 5011, ENDURASEAL SEALED STATOR INSULATION, FOOT PLANE PER API 541, VERTICAL JACKING PROVISIONS, DUAL INSULATING BEARINGS WITH GROUND STRAP, API CONSTANT LEVEL OILERS, PREMIUM BALANCE PER API, COAST TO REST SEALS, SLEEVE BEARINGS, COOPER BAR ROTOR, SPANISH NAME PLATE, 85 DBA @ 1 METER, SS HARDWARE, 2 PIECE SOLE PLATE, BEARINGS RTD'S - 2 PER PHASE, SPACE HEATER, OVERSIZED MAIN BOX W/SPACE HEATER & ATANDOFF INSULATORS / QUICK DISCONNECT, UNWITHNESSED ROUTINE TEST PER NEMA. NOTE 2

4 JOHN CRANE METASTREAM COUPLING, SS SHIM PACK ONE STANDARD STRAIGHT BORE, ONE LONG HUB TAPER BORE, 7" SPACER, TSCS-0740-0027-1778, REMOVABLE NON-SPARKING BRASS GUARD.

5 VALVES:

6 ONE 8" G2JF, BALL VALVE - 1500# RTJ FLANGED ENDS, CS BALL/STEM INTERNALLY COATED - FIRESAFE.

7 ONE 6" G2J BALL VALVE, 1500# RTJ FLANGED ENDS, REDUCED PORT NICKEL PLATED CS BALL/STEM, INTERNALLY COATED CS BODY, GEAR OPERATED FIRESAFE.

8 ONE 6" G5J SWING CHECK VALVE, 1500# RTJ FLANGED ENDS, CS BODY/COVER, 316 SS DISC, INTERNALLY COATED.

9 ONE 4" G5J SWING CHECK VALVE, 1500# RTJ FLANGED ENDS, CS BODY/COVER, 316 SS DISC, INTERNALLY COATED.

10 ONE 2" G2J BALL VALVE, 1500# RTJ FLANGED ENDS, REDUCED PORT, NICKEL PLATED CS BALL/STEM, INTERNALLY COATED CS BODY, GEAR OPERATED FIRESAFE.

11 ONE EACH 1/2" NEEDLE VALVE - 6000 PSIG, NPT CONNECTIONS 316 SS BODY AND STEM, METAL, METAL SEAT.

12 TWO EACH 3/4" GAUGE VALVE, 6000 PSIG, NPT CONNECTIPONS316 CONNECTIONS SS BODY AND STEM,METAL, METAL SEAT, MULTIPORT W/BLEED

13 ONE 3" CHOKE VALVE, 1500# RTJ FLANGED ENDS, CS BODY WITH SUITABLE ORIFICE, COR_VAL OR EQUAL.

14 ONE 4" G2J BALL VALVE, 1500# RTJ FLANGED ENDS, REDUCED PORT, NICKEL PLATED CS BALL/STEM, INTERNALLY COATED CS BODY, GEAR OPERATED FIRESAFE.

0

Page 18: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 18 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

15 INSTRUMENTS:

16 THREE PUMP RTD'S: 3-WIRE, 100 OHM, PLATINUM 385 WITH XP HEAD- MINCO. ONE SLEEVE BEARING RTD INBOARD, ONE SLEEVE BEARING RTD OUTBOARD AND ONE PUMP CASING RTD.

17 FOUR, PROXIMITY PROBES: NON-CONTACT TYPE FOR X AND Y POSITION ON INBOARD/OUTBOARD (4 EA. PER MOTOR) PUMP BEARING HOUSING WIRED TO JUNCTION BOX OR CONTROL PANEL ON SKID, 1/4" - 28 MALE MOUNTING CONNECTION, 0.5 METER LENGTH WITH CONNECTOR AND SS ARMOR

18 FOUR PROXIMITY TRANSMITTERS: LOCATED IN PANEL TO CONVERT PROXIMITY PROBE SIGNAL TO 4-20 MA. TO OFF SKID PLC.

19 ONE PRESSURE INDICATOR: 4" DIAL FACE, PHENOLIC CASE, SOLID FRONT, BLOWOUT BACK, 316 SS WETTED PARTS, 1/2" NPT CONNECTION, LIQUID FILLED , ASHCROFT.

20 ONE PRESSURE INDICATOR: 4" DIAL FACE, PHENOLIC CASE, SOLID FRONT, BLOWOUT BACK, 316 SS WETTED PARTS, 1/2" NPT CONNECTION, LIQUID FILLED , ASHCROFT.

21 ONE LOW SUCTION PRESSURE SWITCH: 1/2" NPT CONNECTION, STAINLESS STEEL CONSTRUCTION, 120 VAC, NEMA 4X- BARSDALE OR EQUAL.

22 ONE, FLOW SWITCH : 3/4" NPT CONNECTION, STAINLESS STEEL CONSTRUCTION, FIELD CONFIGURABLE DUAL SWITCH POINT(SPDT) RELAYS FOR FLOW OR SINGLE SWITCH POINT (DPDT), 24 VDC INPUT, NEMA 4X, SET AT 525 GPM/550 GPM.

23 ONE LOW DISCHARGE PRESSURE SWITCH: 1/2" NPT CONNECTION, SS CONSTRUCTION, 24 VDC, NEMA 4X, SPDT, SET AT 2349# FALLING.

24 ONE FISHER RECIRCULATION FLOW CONTROL VALVE: 2" 1500# RTJ CONNECTION , CS/SS CONSTRUCTION, SIZE 46 PNEUMATIC ACTUATOR, 4-20 MA POSITIONER , NEMA 4X.

25 ELECTRICAL:

26 ONE RELIANCE ELECTRIC MOTOR: 2000 HP, 3600 RPM, 4160 VOLTS, TEAAC CLASS F INSULATION, 1.15 SF, FRAME 9500, BEARINGS RTD`S - ONE PER BEARING, STATOR RTD'S - 2 PER PHASE, 85 DBA @ 1 METER.

27 SPACE HEATER

28 COMPLETE ASSEMBLY OF ALL ON SKID COMPONENTS

29 NEMA 4 SS JUNCTION BOX FOR TERMINATION OF VIBRATION AND TEMPERATURE OUTPUTS TO THE PLC ,\.

30 RELAY BASED PANEL PACKAGED IN 316 SS NEMA 4X, ENCLOSURE, PANEL TO ACCOMMODATE THE PSI, PSH AND VSH SHUTDOWN FUNCTIONS, START/STOP AND E-STOP.

31 FABRICATED STEEL, SINGLE LIFT SKID, A-36 CARBON STEEL, 1/4" CHECKERED FLOOR PLATE W/4" CURB AND (2) 2" DRAIN COUPLINGS, FOUR LIFTING LUGS, COMPLETE ASSEMBLY OF ALL ON SKID COMPONENTS.

Page 19: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 19 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

32 MISCELLANEOUS:

33 ONE TEMPORARY STRAINER CONE, 8 IN., 600# SS CONSTRUCTION WITH 1/8 INCH PERFORATIONS

34 ALL INTERCONNECTING PIPING AS SHOWN WITHIN THE SKID AREA ON THE P&ID THAT ACCOMPANIED THE INQUIRY IS SUPPLIED

35 ONE 3/4", 1500# THREADED BALL VALVE, STD. PORT. ANSI 316 SS BALL/ ANSI 316 STEM, DURAFIL SEAT

36 PAINT/PREPARATION FOR SHIPMENT: PAINT PER SPECIFICATION B15-EPF-20-SP-001 TO INCLUDE PAINT OVER OF PUMP AND MOTOR.

NOTES:

1. Only Sulzer Pump according to "Item Description" is accepted as a valid option. It is not

accepted other manufacturer brand. The Materials of the pump shall be in accordance with "Item

Description", It is not accepted the option of an internally coated C.S. case. * Seal to be John

Crane according to Sulzer recommendation.

2. Only Reliance Motor according item description is accepted as valid option. It is not accepted

other motor’s brand. Service Factor Shall be 1.15.

3. This Main Bill of material will be used for Bid evaluation purposes.

Page 20: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 20 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

ATTACHMENT “C”

CONTRACTOR DOCUMENTATION REQUIREMENTS

NOTES:

1. The CONTRACTOR shall furnish the specified documentation with the original and each copy of their quotation as tabulated on pages 2 and 3 (Contractor Documentation Requirements) as well as any other technical information which they deem necessary and appropriate.

2. CONTRACTOR shall furnish for approval and record the specified documentation in the number of copies indicated and within the number of calendar days indicated following receipt of Purchase Order.

3. All CONTRACTOR documentation shall be submitted in original form on clear and legible copies. Prints with white lines and dark background are not acceptable. Maximum drawing size shall be 24” x 36” unless approved by COMPANY. Preferred sizes for final documentation are 8-1/2x11 or 11x17.

4. CONTRACTOR shall furnish all requested documentation in proper form and quantity in accordance with the specified requirements. Each document must be properly identified by name of manufacturer, purchase order number, project identification, plant name and location, complete equipment name, and tag number located on the cover sheet or first page of said document or, in the case of drawings, on each drawing.

5. All documentation transmitted must specify its intended use such as “for approval”, “for fabrication”, “for construction”, “as-built drawings”, “certified prints”, “spare parts list”, type of manual, etc.

6. CONTRACTOR shall furnish final documentation as printed matter on 8 ½” x 11” or 11” x 17” size. Where original drawings must be reduced in size to meet these requirements, a full-size, certified, reproducible transparency of each drawing shall be supplied in addition to the reduced-size copy.

7. Documentation or drawings “for approval” shall be accurate. Preliminary documentation is not acceptable. Any part of work subject to approval must have a signed release, dated and issued, before any fabrication begins.

8. Final CONTRACTOR documentation must be accompanied by the CONTRACTOR Documentation Receipt Form.

Page 21: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 21 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

WITH

PROP’LS.

FOR COMPANY APPROVAL CERTIFIED PRINTS

ITEM DOCUMENT PRINTS ELECTRONIC

PRINTS DAYS ARO

ELECTRONIC

PRINTS

1 Descriptive Literature 1 ea

2 Completed Instrument Data Sheets

3 General Arrangement Drawings 1 3 14 4

4 Shop Details & Assembly Drawings 1 3 28 4

5 Dimensional Drawings 1 3 28 4

6 Component Cross-Section Drawings 1 3 28 4

7 Component Outline Drawings 1 3 28 4

8 Component Details 1 3 28 4

9 Sub-CONTRACTOR Drawing & Data Index 1 3 28 4

10 Piping & Instrument Schematics 1 3 28

11 Piping Drawings

12 Burner Control Logic Drawings

13 Mill Test Reports (Case, Impeller

Shaft, Wheels) 4

14 Radiograph Records 4

15 Hydrostatic Test 4

16 Stress Relief Charts 4

17 Record Showing Location of Heat Jobs 4

18 Welding Procedures 3 14 4

19 Structural Drawings & Design Data 3 14 4

20 Wiring Diagrams 1 3 28 4

21 Control Schematic 1 3 28 4

22 Cable & Conduit Layout Drawings 3 28 4

23 Performance Curve or Data 1 ea 4

Page 22: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 22 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

WITH

PROP’LS.

FOR COMPANY APPROVAL CERTIFIED PRINTS

ITEM DOCUMENT PRINTS ELECTRONIC

PRINTS DAYS ARO

ELECTRONIC

PRINTS

24 Performance Test Data 1 3 180 4

25 Bill of Materials and/or Components 1 3 28 4

26 Manufacturer’s Data Sheets 4

27 Recommended Spare Parts for One Year Operation

1 3 14 4

28 Recommended Spare Parts for Start-up

1 3 14 4

29 Installation Instructions

4

30 Operating Instructions 3 28

4

31 Maintenance Instructions 3 28

4

32 Other Inspection Records/Reports

4

33 Nameplate Rubbing

34 Users Reference List 1 ea

35 Detailed Manufacturing Schedules 1 ea *

36 List of Special Tools Required 1 ea

4

37 Recommended Start-up & Commissioning Procedures

1 ea 3 60 4

38 ASME Code Calculations 3 28 4

39 Structural Calculations 3 28 4

40 Insurance Certificate 1 ea

41 Material Status Report 1 ea *

42 Fabrication Status Report 1 ea *

43 Unpriced Purchase Orders

44 Weight / Center of Gravity Control Sheet

1 ea 1 3 28 4

Page 23: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 23 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

ATTACHMENT “D” INSPECTION MATRIX

ITEM NO

ACTIVITY DESCRIPTION

WITNESS/ VERIFY

REVIEW OF DOCUMENTS

OBTAIN CERT.

AND/OR TEST

RECORDS

COMMENTS

1 MATERIAL TEST REPORTS √ Case, Impeller Shaft, Wheels

2 HEAT TREATMENT CHARTS

3 WELDING PROCEDURES √

4 WELDER QUALIFICATION RECORDS

5 WORKMANSHIP, DIMENSIONS √

6 MATERIALS / BOM √

7 COMPLIANCE WITH PURCHASE ORDER

8 COMPLIANCE WITH SPECIFICATIONS

9 RADIOGRAPHS √ See NTD Below

10 ULTRASONIC TESTING √

11 HYDROSTATIC TESTING √ √

12 RUN TESTING √ √ Same as Performance Test

13 PERFORMANCE TESTING √ √ √

14 AUXILIARY EQUIPMENT TESTING

15 NON-DESTRUCTIVE TESTING √

16 COMPLETE UNIT TESTING √ √ √ Same as Performance Test

17 TRIAL FIT SUB-ASSEMBLIES

18 SOUND LEVEL √ √

19 PROTECTIVE COATING √

20 PREPARATION FOR SHIPMENT √

21 NAMEPLATE / TAGGING √

22 TORSIONAL/LATERAL ROTOR ANALYSIS

√ √

23

24

25

Page 24: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 24 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

Plan

Elevation

“B”

“C”

“Z”

“Y”

“X”

“A”

C.G.

C.G.C.G. Co-ordinates

to be clearly shown onGeneral Arangement Drawings

ATTACHMENT “E”

WEIGHT/CENTER OF GRAVITY CONTROL SHEET

EQUIPMENT DESCRIPTION OR SPECIFICATION TITLE:

EQUIPMENT TAG NO SPEC. NO.: 018H

WATER INJECTION PUMP P-305

WEIGHT DATA

(POUNDS)

ESTIMATED WEIGHT

% CONTINGENCY ALLOWANCE

WEIGHT * STATUS (1, 2 or 3)

DRY LIFT OPERATING TEST

SIZE DATA (OVERALL DIMENSIONS ANTICIPED) IN FEET, INCHES

DIM DRY (‘, “)

OPERATING (‘, “)

“A” =

“B” =

“C” =

DIM DRY OPERATING

“X” =

“Y” =

“Z” =

WEIGHT CHECK LIST WEIGHT STATUS *

ITEM APPLICABLE INCLUDED IN WEIGHT DATA

ESTIMATED WEIGHT (IF NOT INCLUDED)

1 = PRELIMINARY ESTIMATE

1.0 SKID STEELWORK YES / NO YES / NO

2.0 FIRE PROOFING YES / NO YES / NO 2 = DETAILED

DESIGN ESTIMATE

3.0 THERMAL INSULATION YES / NO YES / NO

4.0 SKID INSTRUMENTS YES / NO YES / NO 3 = WEIGHED INFORMATION

5.0 SKID ELECTRICAL YES / NO YES / NO

6.0 SKID PIPEWORK YES / NO YES / NO

BY REMARKS REV. BY REMARKS

Page 25: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 25 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

ATTACHMENT “F” DRAWINGS

Drawing No. Drawing Title Revision

B15-EPF-01-100 Legends and Symbols 7

B15-EPF-101A Instrument Detail 6

B15-EPF-101B Instrument Details 9

FO3-EPF-01 109E Water Disposal Pumps A

HSP-1011871-41 JOHN CRANE SEAL A

62197 EXISTING PUMP CURVE

Page 26: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 26 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

ATTACHMENT F

APPROVED VENDOR LIST FOR INSTRUMENTATION CATEGORY EQUIPMENT/ FUNCTION MANUFACTURER Electrical 2301 A, sharing load and speed control Woodward Electrical Amp-meters Yokogawa Electrical Amps recorders Bristol Electrical Battery charger La Marche Electrical Central load panels Square D Electrical Conduit and accessories Crouse-Hinds Electrical Current transducers Yokogawa Electrical Electrical motors (high capacity) Reliance,Siemens Electrical Electrical motors (low capacity) Baldor,Marathon,Reliance,Siemens Electrical Ignition transformer Webster Electrical Lamps, explosion proof Crouse-Hinds Electrical Portable electric plants Yanmar Electrical Power supplies Power one Electrical Starters, soft starters Westinghouse – Cutler Hammer Electrical Transformer current/voltage indicators Simpson Electrical Transformers (high capacity) Powell Esco Electrical Transformers (low capacity) General Electric/ Westinghouse Electrical UPS (CPF plant), 90 S series Deltec Electrical UPS (Islands) Ferrups Best Power Electrical Voltage regulator Basler Electrical Voltmeters Yokogawa Electrical Watt-meters Yokogawa Instrument Actuators, crash valves Bettis Controls & Actuators Instrument Actuators, valves Automax Instrument BS&W monitor Invalco Instrument Control devices Allen Bradley Instrument Control valves, regulators, I/P controllers Fisher Instrument Crash valves and process shut-in valves W-K-M Dynacentric Instrument Device Net, Control Net, Ethernet Allen Bradley Instrument Differential pressure switches Mid – West Instrument Differential pressure transmitters Rosemount Instrument ESD push buttons Crouse-Hinds Instrument Fire Detection System (FDS, control panel) Cerberus Pyrotronics Instrument Flame detectors UV/IR (ESD system) General Monitors Instrument Flame detectors, ignitor, pilots Fireeye Instrument Floats Omega Instrument Flow meters, turbine Halliburton Instrument Gas flow transmitters Yokogawa Instrument Pressure vacuum safety valves (PVSVs) Varec Instrument Human Machine Interface (HMI) Wonderware – Intouch Instrument Instrumentation ball & needle valves, SST316 Whitey Instrument Instrumentation tubing connectors and fittings Swagelok Instrument LACT unit Daniel Instrument Level controls (sumps) Magnetrol Instrument Level indicators, liquid K-TEK Instrument Level indicators, tank Major Instrument Level interface transmitters Drexelbrook Instrument Level sight glasses Kenko Instrument Level sight glasses, high pressure Penberthy Instrument Level switches Drexelbrook

Page 27: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 27 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

Instrument Level switches, crude oil (tanks T-101 A/B) Babbit Instrument Level transmitters Rosemount Instrument Modems Microwave Data System MDS Instrument Orifice fittings Daniel Instrument Panel alarm annunciator Ronan Instrument Panels and junction boxes Hoffman Instrument Panelviews Allen Bradley Instrument PD meters Daniel Instrument Pilot gas regulators, burners Noth American Instrument PLCs Allen Bradley Instrument Pressure gauges Ashcroft Instrument Pressure microcontrollers Watlow Controls Instrument Pressure recorders ITT Barton Instrument Pressure Safety Valves (PSVs) Crosby by Anderson Greenwood Instrument Pressure switches SOR Instrument Pressure switches (well heads) Barksdale Instrument Pressure switches, control panels Murphy Instrument Pressure transducers Omega Instrument Pressure transmitters Rosemount Instrument PSVs used with chemical pumps, check valves Nupro Instrument Rupture discs Fike Instrument Scraper passage indicator TDW Pig-Sig Instrument Smoke/heat detectors Fenwall Kidde Instrument Solenoids, DC Asco Instrument Solenoids, crash valves Versa Instrument Temperature microcontrollers Watlow Controls Instrument Temperature switches SOR Instrument Temperature transmitters Rosemount Instrument Thermocouples Omega Instrument Thermometers Ashcroft Instrument Thermowells Ashcroft Mechanical Air conditioners Panasonic Mechanical Automatic drains, condensate Spirax Sarco Mechanical Centrifugal pumps, air compressors (Islands) Ingersoll Rand Mechanical Chemical pumps Hydroflow Mechanical Chemical pumps Texteam Mechanical Chlorine pumps (potable water plant) Pulsatron Mechanical Diesel Topping Plant Petrofac Mechanical Engines and generators (designed to work at an ambient

temperature of 45 degrees C) Caterpillar

Mechanical Explosion proof pumps (used at condensate scrubbers) L-G Agoulds Mechanical Fire system pumps Aurora Mechanical Gas and diesel station pumps, meters Fill-Rite Mechanical Gas compressor Ariel Mechanical Gas cooler Zurn Industries Mechanical Gas membrane system Kvaerner Mechanical Oil diffusers Deltech Mechanical Screw air compressor Gardner Denver Mechanical Sump pumps (used for wastewater), three phases, 460 V. ABS Mechanical Trash Incinerator Pennram ESS Mechanical Vibration switches (engines) Balmac Mechanical Water filters Wemco Mechanical Water trappers Deltech Mechanical Water wells for human consumption, 15 HP Franklin

Page 28: B15-E~1D

Departamento: FIC Código No.: B15-EPF-20-SP-063-0 Revisión : 0

UAOT BLOQUE 15

Water Injection Pumps Página No.: 28 de 28

La información del presente documento es propiedad exclusiva del Bloque 15 y no deberá ser usada para otros propósitos distintos a los especificados.

ATTACHMENT “H” COMPANY SPECIFICATIONS

SPECIFICATION NUMBER

DATE REV SPECIFICATION TITLE

B15-EPF-70-SP-001 01/06 0 Electrical Wiring Methods and Materials for Skid Equipment

B15-EPF-70-SP-011 01/06 0 Medium Voltage Motors

B15-EPF-60-SP-002 01/06 0 Instrument Design

B15-EPF-60-SP-001 01/06 0 Instrument Installation

B15-EPF-20-SP-003 01/06 0 Pipe, Valves, & Fittings

B15-EPF-20-SP-001 01/06 0 Above-Ground External Painting/Galvanizing

B15-EPF-20-SP-009 01/06 0 Structural Steel Skid Mounted Assemblies


Recommended