BAB A 100, Spandauer-Damm-Brücke, Berlin, Germany
ClientSenate Department for Urban DevelopmentDepartment Civil EngineeringWürttembergische Straße 6, 10707 Berlin
Contact PersonMr Dipl.- Eng. Detlef Wolber;
Range of activitiesPlanning, Preparation for awarding the contract,Constructive Examination and Equalisation
LocationSpandauer Damm Brücke, Berlin, Germany
Capital expenditure36.000.000 Euro;
Period of realisation2007 - 2010
The Spandauer Damm Bridge is in terms of traffic arather important overpass in Berlin. It crosses the federalmotorway BAB A 100, the main-line railway and therailway of the S-Bahn and needed reconstruction due tomaterial fatigue of the prestressed concretesuperstructure. This superstructure will be replaced by anew construction with two composite steel and concretebridges. The replacement of the complex of slopesleading to the BAB A 100 including slopes Northeast,Northwest and Southeast, the adaptation of slopeSouthwest as well as the construction of two more roadsign bridges is still necessary, due to an altered trafficrouteing in the transportation hub and the existence ofdamage on the structure.
Overview of the range of activities:Demolition concrete: 9,000 m²Reconstruction concrete: 1,200 m²Reconstruction reinforced concrete: 1,900 tonsReconstruction constructional steelwork: 1,300 tonsReconstruction auger piles: 4,400 mReplacement road construction: 15,000 m²
Writing the terms of reference was accompanied with astrict observance of dead lines and a great effort onterms of agreement.
Verification
Planning
Support StructurePlanning Project Management
Energy Efficiency
Building Physics
Fire Protection
Site Management
Expertises
Studies
Competition
HSE
Building Construction
Civil Engineering
Bridge Construction
Special Design
Dynamics