Background, Development and Background, Development and Contents of the PHC/CHIA Contents of the PHC/CHIA Technical Reference Document Technical Reference Document Deborah Dale, Hydrogeologist Deborah Dale, Hydrogeologist OSM-MCR OSM-MCR Alton, Illinois Alton, Illinois
Transcript
Page 1: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Background, Development and Background, Development and Contents of the PHC/CHIA Contents of the PHC/CHIA

Technical Reference DocumentTechnical Reference Document

Deborah Dale, HydrogeologistDeborah Dale, HydrogeologistOSM-MCR OSM-MCR

Alton, IllinoisAlton, Illinois

Page 2: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Topics:Topics:• What is the PHC/CHIA reference document?•Background into the development of the document

•Contents

Page 3: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

What is the PHC/CHIA reference document?

Page 4: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Hydrologic Considerations for Permitting and Liability Release

Probable Hydrologic Consequences (PHC)

Determination Cumulative Hydrologic Impact Assessment (CHIA)

Post-Mining Hydrologic Assessment (PHA)

Technical reference for the MCRTechnical reference for the MCR

Distributed by the Mid-Continent Distributed by the Mid-Continent Technology Development and Transfer Technology Development and Transfer Team Team

Page 5: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

• To provide a systematic approach within the MCR for the review and development of PHCs & CHIAs

Purpose of the document:

• Insight into the regulatory basis for bond release and post-reclamation hydrologic balance

Authors of the document: Brian Hicks, OSM-MCR

Wayne VanBuren, ADEQ

Timothy Walter, TX RRC

Deborah Dale, OSM-MCR

Page 6: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Background into the development of the guidance document

Page 7: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

• The Determination of Probable Hydrologic Consequences and The Statement of the Resultsof Test Borings or Core Sampling

Milestones in the Development of PHC/CHIA Guidance Documents

May 1980

Page 8: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

• DRAFT Guidelines for Preparation of a Probable Hydrologic Consequences Determination (PHC)

Milestones in the Development of PHC/CHIA Guidance Documents

December 1985

• DRAFT Guidelines for Preparation of a Cumulative Hydrologic Impact Assessment (CHIA)

• DRAFT Appendices to PHC and CHIA Guidelines Documents

Page 9: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

• DRAFT Managing Hydrologic Information: A Resource for Development of Probable Hydrologic Consequences (PHC) and Cumulative Hydrologic Impact Assessment (CHIA)

Milestones in the Development of PHC/CHIA Guidance Documents

January 1997

Page 10: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

• OSM’s Hydrologic Issues Team releases to the states for review and comment a Phase I guidance document for baseline data (draft)

• Hydrologic Issues Team meets with states to review a draft outline for a Phase II guidance document for writing PHCs and CHIAs (Austin)

Milestones in the Development of PHC/CHIA Guidance Documents

August 1999

April 2001

Page 11: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Following the Austin meeting, several states raised concerns through the Interstate Mining Compact Commission (IMCC) about OSM’s proposed approach

A main concern was that the preparation of any guidance document would carry a requirement for mandatory use rather than discretionary use

Milestones in the Development of PHC/CHIA Guidance Documents

Page 12: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

The IMCC and the Western Interstate The IMCC and the Western Interstate Energy Board (WIEB) requested, and Energy Board (WIEB) requested, and OSM agreed, to defer additional work OSM agreed, to defer additional work on Phase II PHC/CHIA guidance until on Phase II PHC/CHIA guidance until a State-Federal workshop on this a State-Federal workshop on this subject could be held and the results subject could be held and the results assessed.assessed.

Milestones in the Development of PHC/CHIA Guidance Documents

March 2002

• Intergovernmental Benchmarking Workshop on PHC/CHIAs (New Orleans)

Page 13: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

(57) topics relating to PHC/CHIA topics relating to PHC/CHIA permitting hydrology (either permitting hydrology (either concerns, issues or merely areas of concerns, issues or merely areas of interest) were identified during the interest) were identified during the course of the workshopcourse of the workshop

Milestones in the Development of PHC/CHIA Guidance Documents

Page 14: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Milestones in the Development of Milestones in the Development of PHC/CHIA PHC/CHIA Guidance DocumentsGuidance Documents

• Draft Methodology for Review and Preparation of PHC Determinations and CHIAs in the Mid-Continent Region

January 2006

Page 15: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Technical Reference for the Mid-ContinentRegion:

Hydrologic Considerations for Permitting andLiability Release

Probable Hydrologic Consequences (PHC) DeterminationCumulative Hydrologic Impact Assessment (CHIA)

Post-Mining Hydrologic Assessment (PHA)

Distributed by the Mid-Continent Technology Development and Transfer Team

September 2006

Draft

Page 16: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Hydrologic Considerations for Permitting and Liability Release

Probable Hydrologic Consequences (PHC)

Determination Cumulative Hydrologic Impact Assessment (CHIA)

Post-Mining Hydrologic Assessment (PHA)

Page 17: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

This guidance document has (4) main sections:

Probable Hydrologic Consequence (PHC)

Hydrologic Reclamation Plan (HRP)

Cumulative Hydrologic Impact Assessment (CHIA)

Post-Mining Hydrologic Assessment (PHA)

Page 18: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Probable Hydrologic Consequences (PHC)

DeterminationAddresses the anticipated effects of the

planned mining and reclamation on the quality/quantity of sw and gw systems

Determine if AFM are present

Describe and characterize the subsurface strata

Overburden properties

Page 19: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Disposal/storage operations

• Non-coal waste

• Spoil• Coal processing waste

• Coal combustion byproducts

PHC - -

Page 20: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

PHC - Erosion and sediment control

Page 21: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

PHC - Mining methods

Page 22: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.
Page 23: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.
Page 24: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

PHC - Coal-bed methane recovery

Page 25: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Hydrologic Reclamation Plan (HRP)

Detailed description of how to:1)Minimize impacts to sw & gw systems within

and adjacent to the permit area; and2) Prevent material damage outside the permit area

*HRP must include mitigation plans for hydrologic impacts - BTCA

HRP Elements: AMD generation

• Controlled placement of overburden

• Water management• Mitigation options

Page 26: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

HRP Elements (continued): Non-acidic mine drainage

Recharge capacity

Disposal activities

• High TDS (i.e. sulfates, chlorides)

Increased sediment loading

SW and GW monitoring

Page 27: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

HRP Elements (continued): Water supply replacement

Page 28: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

a.k.a. the Chia Pet

Cumulative Hydrologic Impact Assessment (CHIA)

Page 29: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Cumulative Hydrologic Impact Assessment (CHIA)

An assessment of the probable cumulative impacts of all anticipated mining in an area to assure the operation has been designed to prevent material damage to the hydrologic balance outside the permit area

Page 30: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Cumulative Hydrologic Impact Assessment (CHIA)

An assessment of the probable cumulative impacts of all anticipated mining in an area to assure the operation has been designed to prevent material damage to the hydrologic balance outside the permit area

Hydrologic balance: Relationship between the quality/quantity of water flowing into, stored within, and discharging from a unit (i.e. drainage basin, aquifer, lake, etc.)

Page 31: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Highlights of the CHIA section:

When is a CHIA required? Relationship between PHC and CHIA

• Prospective mining operations + all existing operations

“Anticipated mining”(30 CFR 701.5 “cumulative impact area”)

Page 32: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Highlights of the CHIA section (continued):

Cumulative Impact Area (CIA)• Definition of the CIA• Qualitative delineation of the CIA (sw and

gw)

Page 33: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Highlights of the CHIA section (continued):

Cumulative Impact Area (CIA)• Definition of the CIA• Qualitative delineation of the CIA (sw and

gw)

Baseline conditions

• Quantitative check of the working CIA Criteria for evaluating

Identification of hydrologic concerns• Water quantity issues• Changes in water quality

Page 34: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Highlights of the CHIA section (continued):

Material damage• Definition (from previous draft CHIA

guidelines, OSM 1985, 1997); examples

• Functions of material damage criteria (standards, enforcement)

Methods for analysis of cumulative hydrologic impacts

Statement of findings

Page 35: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Post-Mining Hydrologic Assessment (PHA)

Regulatory basis for release of performance bondsPost-reclamation hydrologic balance

Page 36: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

DOES CURRENT WATER QUALITY MEET APPLICABLE

STATE OR FEDERAL STANDARDS?

DO TREND

ANALYSIS

DO TREND

ANALYSIS

DO TREND

ANALYSIS

RECOMMEND

APPROVAL

RECOMMEND

APPROVAL

RECOMMEND

APPROVAL

RECOMMEND

DENIAL

RECOMMEND

DENIAL

IS CURRENT WATER QUALITY BETTER

THAN BASELINE WATER QUALITY?

CONTINUED

MONITORING MAY

BE REQUIRED

CONTINUED

MONITORING MAY

BE REQUIRED

IS WATER SUITABLE FOR

ITS INTENDED USE?

YES

NO

YESNO

+/0

+/0

+/0

NO

-

YES OR

SAME

-

-

WATER-QUALITY TREND

+ IMPROVING

0 NO CHANGE

- WORSENING

Page 37: Background, Development and Contents of the PHC/CHIA Technical Reference Document Deborah Dale, Hydrogeologist OSM-MCR Alton, Illinois.

Appendices:

Appendix A: Glossary of water-related words, 153 p

Appendix B: Outline of suggested minimum requirements for PHCs

Appendix C: Outline of suggested minimum requirements for HRPs

Appendix D: Outline of suggested minimum requirements for CHIAs

Appendix E: Outline of suggested minimum requirements for PHAs

Appendix F: Resources for processes/tools for determining impacts, 17 p (databases, software, training, etc.)