Help us plan for the future of Baker Park Reserve!Baker Park Reserve Master PlanProject Information
Project Purpose + Goals » Create a new Master Plan to meet Metropolitan Council Thrive 2040 Regional Park requirements
» Master Plan Components
Project Schedule
Baker Timeline
Public Input
Task June July August sePtember OctOber nOvember December JAnuAry FebruAry mArcH APrIl
Project Organization
Analysis and Research
ConceptsPlan Development & Approvals
Public Open HouseOct. 29th
Online + Stakeholder Engagement
1956 – Resort is donated to Hennepin County Park Reserve District
1960’s – Additional Land acquisition
1972 - Golf Course acquired
2018 - Current Baker Park Reserve Master Plan process
1965 – Baker is the place to
be; popular camground
and beach
1958 – First System of Parks was created
1998 - System of Parks update,
included a master plan for Baker Park
Reserve
1955 – Morris T. Baker buys Maple Hill Farm Resort
1950 1960 1970 1980 1990 2000 2010 2020
1999 – Near Wilderness Settlement opens
1970’s – Major Improvements
1969 - Long Range Improvement Plan
5 Long term actions and goals (10-20 years)
5 Existing conditions – maps and inventory
5 Boundaries and acquisitions
5 Cost estimates for future investments
5 Natural resources recommendations & Stewardship Plan
5 Visitor Demand Forecast
5 Operations and Maintenance practices
5 Public Engagement
5 Accessibility
» Engage the public + park users 5 Learn about issues and opportunities for the park reserve from general public
5 Meet with affected agencies (cities, watershed districts)
5 Meet with unique stakeholders
5 Reach out to underrepresented groups
METhOD EvEnT / LOCATIOn / TARGET GROuP DATEstakeholder meeting Agencies + municipalities July 18, 2018Pop up engagement south beach/recreation Area July 21, 2018Display board / Postcards Campground Office July-August 2018Display board / Postcards golf course clubhouse August 2018Press release general Public August 2018Online engagement survey monkey + social Pinpoint August-October 2018Pop up engagement night to unite, northside Park, maple Plain Aug. 7, 2018stakeholder meeting lIcA Aug. 7, 2018Pop up engagement night to unite, Independence beach neighborhood Aug. 7, 2018Pop up engagement ringer roll ski race Aug. 10, 2018Pop up engagement lIcA summer Picnic, baker Picnic Area Aug. 11, 2018Pop up engagement baker Park Play Area and north beach Aug. 11, 2018Pop up engagement corn Days – st. george’s church, long lake Aug. 12, 2018Phone call/email local cycle group Aug. 15, 2018Phone call/email gear West Aug. 16, 2018Pop up engagement medina celebration Day sept. 15, 2018email/Phone call mobile Hope sept. 17, 2018stakeholder meeting maple Plain Park commission sept. 17, 2018stakeholder meeting medina Park commission sept. 19, 2018
5 Local residents love the open space, trails, and natural area that Baker provides
5 The campground and rec area (beach, play area, picnic area) are both very popular amenities
5 Generally people think TRPD does a great job maintaining and providing high quality facilities
5 Important summer activities: Swimming, Quiet/Solitude in the Park, Observing Nature, Bicycling, Picnicking, Playing on the Playground, Hiking
5 Important winter activities: Observing Nature, Sledding, Winter Walking
5 Most desired improvements: Improvements to campground office for year-round use with information and interpretation exhibits, More electric campsites, Lighted ski trails, More paved trails, Off-leash dog area, Wifi in the campground
5 Most desired natural resource improvement: Improved water quality for wildlife and recreation
5 Other common ideas include: mountain bike trails, more trail loops, playground in campground, keep the zipline!, trail connections to other TRPD parks, trails, and surrounding neighborhoods
highlights of Input
Help us plan for the future of Baker Park Reserve!Baker Park Reserve Master PlanProject Ideas + Precedent Images
Picnic SheltersFishing Piers
nature Play
Winter Camping
Camper Cabins
vista Overlooks
Rv/Electric
Sites
Outdoor Education
Shore Fishing
Interpretive Signage
Shoreland Restoration / Stabilization
Winter Recreation
N 0 1,000 2,000500FeetN 0 1,000 2,000500Feet
Park Boundary
Inholdings
Natural Surface TrailPaved Trail
Regional Trail
24
2419
19
Main Street
Independence Street
Perkinsville Rd
Hamel Rd
Homestead Trail
Park
view
Driv
e
Hamel Rd
Spurzem Lake
Baker National Golf Course
Sledding Hill
Winter ski trails
Half Moon Lake
Lake Katrina
Marshview Group Camp
Half Moon Group Camp
Boat Launch
Oak Knoll Group Camp
Katrina 1 + 2 Group Camps
Public Safety +
We Can Ride
Near Wilderness Settlement
Horse Trailhead
Recreation Area
+ Campground
Operations Center
Maple Plain
Independence
Independence
Orono
Medina
Medina
Lake Independence
12
12
Expand the existing parking lot for Public Safety and We Can Ride.
Complete the trail connection to separate bikes/peds from road and avoid vehicular gate.
City of Medina proposed trail connection (potential sight line and safety concerns)
Future planned Baker-Carver Regional Trail alignment
Explore potential re-con�guration of the trails and trailhead parking lot along Hwy 19 in coordination with the implementation of the Baker–Carver Regional Trail Master Plan. Consider adding a restroom.
Continue natural resource e�orts at improving the water quality of Lake Independence.
Near Wilderness Settlement-Restroom / Shower Building: Add a shower/restroom building with an in�rmary.-Explore the desire to enhance programming o�erings and capacity at the N.W.S.-ADA Accessible Trails: Modify existing trails to be ADA compliant. -Improve other trails to be more sustainable.
VistasPreserve and potentially enhance existing vistas with overlooks or short trail spurs.
Winter Fat Tire Biking: Consider the addition of winter fat tire bike trails in areas where it does not negatively e�ect current uses or activities. Location TBD.
See Recreation Area Board for speci�c improvements here.
Consider accessibility and parking improvements to group campground.
Lake Indepe n d ence Regional Trail
Park Entrance
Add an accessible �shing pier with benches.
Lake
Inde
pend
ence
Regi
onal
Trai
l
Baker Park Reserve Master PlanOverall concept Plan DRAFT
Instructions: Please use post-it notes to add comments or thoughts on the additional features being considered for inclusion in the master plan.
N 0 1,000 2,000500Feet
Park Boundary
Regional TrailNatural Surface TrailPaved TrailCampsite
Consider additional trail and tunnel under Hwy 19 or signalized intersection for maintenance vehicles.
6 Existing Restroom Buildings to be removed and replaced with 5 New Restroom Buildings
Circulation: Recon�gure campground roads in this area and relocate dump stations to better facilitate tra�c �ow and avoid congestion between campers exiting and entering.
Consider adding a small nature play area in the campground (Location to be determined)
Upgrade campground restroom buildings 3 + 4
Add electricity to Loop F. Upgrade all electric sites from 30 amp to 50 amp.
Add parking spaces along the perimeter drive
Consider an ADA Accessible Fishing Pier
Consider shoreline �shing improvements
Explore options to alleviate boat queuing issues
Add a large picnic shelter
New boat rental building planned in 2019
Shoreline restoration and stablization of rock embankment areas in south beach area
Map
le P
lain
Medina
Inde
pend
ence
Lake Independence
Lake Independence Regional Trail
Operations Center
Outdoor Storage Area
B
D
C
E
A
H
J
G
F
Oak Knoll Group Camp
Recreation Area +
Campground Entrance
Driftwood Shelter
Play Area
24
19
19
Consider additional camper cabins and be open for winter camping
Consider adding winter camping tent sites
Play Area renovation scheduled for 2020. Consider retaining a zipline feature in the new play area design.
PDump
P
P
P
1
2
3
4
5
Consider adding winter recreation opportunities such as snowshoeing and fat tire biking.
Baker Park Reserve Master Planrecreation Area concept PlanDRAFT
Instructions: Please use post-it notes to add comments or thoughts on the additional features being considered for inclusion in the master plan.
Baker Park Reserve Master PlanPotential Improvements
Instructions: Place stickers in the appropriate columns next to recommendations that you think should be considered for inclusion or should not be considered for inclusion in the Baker Park Reserve Master Plan. We are looking to confirm that these suggested improvements reflect community input and if so, we will further evaluate them for potential inclusion in the master plan.
RECOMMEnDATIOn COnSIDER DO nOT COnSIDER
Campground
redesign circulation of campground entry/exit, including relocating dump stations
consider the addition of more camper cabins
explore more options for winter recreation and winter camping
consider the addition of a small nature play area at campground
consider adding electricity to F loop and increasing existing electric loops from 30 to 50 amp service
Consider the addition of wifi in the campground
explore expanding nature-based programming at the campground
Recreation Area / Beach
consider the addition of a picnic shelter at the north beach
consider a small shelter/shade structure for group picnic areas
Consider the addition of an accessible fishing pier near north beach
naturalize and/or stabilize shoreline, replacing rock embankment areas at south beach area
Group Camps
Improve marshview group camp site for ADA accessibility
near Wilderness Settlement
Add a new shower / restroom building with infirmary
explore enhanced programming offerings and capacity at the n.W.s.
Improve trails to cabins for accessibility and other trails to be more sustainable
consider archery range improvements to provide greater seasonality/use
Operations and Maintenance / Public Safety
consider safety improvements to Hwy 19 crossing for maintenance vehicles
expand the existing Public safety parking lot to accommodate existing use
natural Resource Areas
continue efforts to improve water quality in lake Independence
General Recommendations
Preserve and enhance existing vistas with scenic overlooks or short trail spurs off main paved loop trail
explore the addition of historical interpretive signage
complete trail connection at south end of park (Welcome Drive Area)
DRAFT
List other ideas that you think should be considered here: