7/31/2019 Ballpark Hotel at 1st and N
1/24
washington, dc zc submission 09.11st & n streets s
7/31/2019 Ballpark Hotel at 1st and N
2/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012CONTexT DIAGrAm
SCALe NTS
SITE
ANACOSTIA RIVER
CAPITOL
PARKSTADIUM
MALL
I295
I395
DRAWINGS IND
COVER
CONTEXT DIAGRAM & INDEX
VEHICULAR APPROACH
VIEWS
SITE PICTURES
EXISTING SITE CONDITIONS
PLAT
SITE PLAN
BASEMENT FLOOR PLAN
GROUND FLOOR PLAN
SECOND FLOOR PLAN
TYPICAL FLOOR PLAN
MAIN ROOF
EAST ELEVATION
SOUTH ELEVATION
WEST ELEVATION
NORTH ELEVATION
MATERIALS
PERSPECTIVE 1
PERSPECTIVE 2
BUILDING SECTION EAST-WEST
BUILDING SECTION NORTH-SOUTH
PROJECT DATALEED SCORE CARD
pG 2
7/31/2019 Ballpark Hotel at 1st and N
3/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012VeHICuLAr ApprOACH
SCALe NTS pG 3
7/31/2019 Ballpark Hotel at 1st and N
4/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012VIeWS
SCALe NTS pG 4
7/31/2019 Ballpark Hotel at 1st and N
5/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012SITe pICTureS
2) Looing wst on N stt S.e.1) Looing at th sit o th sothwst
4) On 1st Stt S.e. looing soth towad th sit3) Viw on Cshing pl., looing soth towad th sit
pG 5
7/31/2019 Ballpark Hotel at 1st and N
6/24
7/31/2019 Ballpark Hotel at 1st and N
7/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012pLAT
SCALe AS SHOWN pG 7
7/31/2019 Ballpark Hotel at 1st and N
8/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012SITe pLAN
SCALe 1-0=1/32
DN
DROPOFF
26' ALLEY TO
CUSHING PLACE
1STSTREETS.E.
110'R.O.W.
N STREET S.E.90' R.O.W.
STADIUM PARKING
STRUCTURE AND TICKET
STANDS
LOT 155
3618 S.F.
40' HIGH MERCANTILE
BUILDING PROPOSED BY
OTHERS
YARDS
PAVILLION AY CORNER,
SURFACE PARKING
ENCLOSED IN BRICK PIERED
FENCE
SURFACE PARKING
ENCLOSED BY BRICK-
PIERED FENCE
LOADING AND
SERVICE
PRIMARYENTRANCE
SECONDARYENTRANCE
LOT 157
21440 S.F.
11 STOREY RESIDENTIAL
BUILDING PROPOSED BY
OTHERS
COMBINED LOTS
130' HIGH RESIDENTIAL
BUILDING PROPOSED BY
OTHERS
AUTOMOTIVE TRAFFIC
AUTOMOTIVE TRAFFIC
AUTOMOTIVETRAFFIC
AUTOMOTIVETRAFFIC
PEDESTRIAN
TRAFFIC
PEDESTRIAN
TRAFFIC
SITE-CAST CONCRETE
PAVEMENT
GRANITE PAVERS WITH HONED FINISH,
1' X4' UNITS
28' - 0" 63' - 6" 28' - 0"
24'-5"
56'-0"
24
'-5"
DN
DROP
OFF
26' ALLEY TO
CUSHING PLACE
1STSTREETS.E.
110'R.O.W.
N STREET S.E.
90' R.O.W.
STADIUM PARKING
STRUCTURE AND TICKET
STANDS
LOT 155
3618 S.F.
40' HIGH MERCANTILE
BUILDING PROPOSED BY
OTHERS
YARDS
PAVILLION AY CORNER,
SURFACE PARKING
ENCLOSED IN BRICK PIERED
FENCE
SURFACE PARKING
ENCLOSED BY BRICK-
PIERED FENCE
LOADING AND
SERVICE
PRIMARYENTRANCE
SECONDARYENTRANCE
LOT 157
21440 S.F.
11 STOREY RESIDENTIAL
BUILDING PROPOSED BY
OTHERS
COMBINED LOTS
130' HIGH RESIDENTIAL
BUILDING PROPOSED BY
OTHERS
AUTOMOTIVE TRAFFIC
AUTOMOTIVE TRAFFIC
AUTOMOTIVETRAFFIC
AUTOMOTIVETRAFFIC
PEDESTRIAN
TRAFFIC
PEDESTRIAN
TRAFFIC
SITE-CAST CONCRETE
PAVEMENT
GRANITE PAVERS WITH HONED FINISH,
1' X4' UNITS
28' - 0" 63' - 6" 28' - 0"
24'-5"
56'-0"
24
'-5"
pG 8
7/31/2019 Ballpark Hotel at 1st and N
9/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012bASemeNT fLOOr pLAN
SCALe 1-0=1/16
1
2
5
A b f HG
004
005
001
T5
003A
003b
maintenance/storage
001
it r
002
LaundrY
003
emPLoYee area
004
eLectricaL sVc.room
005
C D Ie
6
7
9
13b
13b
13e
13e
13e
13e
13b
13e
13e
13e
13e
13b
13b
13e
13A
13e
13e
13b corridor
006
stair 2
007
8
3
4
TrANSfOrmerVAuLT
buSVAuLT
TrANSfOrmerVAuLT
STOrmWATerVAuLT
17'-3"
2'-10"
13'-3"
4'-10"
7' - 11" 1' - 4" 11' - 9" 3' - 6" 19' - 0" 4' - 8"
1'-1"
14'-11"
1'-1"
1'-0"
15'-9"
20' -0"
1' -0"
6' -11"
8' -4"
2' -8"
17'-3"
6'-0"
2'-8"
1' -10"
uNexCAVATeD
96'-0"
50' -2"
12'-8"
2' - 0" 10' - 0"
008
ey el. r.
009
w r
010
010 002
6' -8"
15' -4"
prOjeCT SITe:8,964 SQuAre feeT
Not: Intio laot is oillstativ oss onl,
and is sct toodiication ding thpit ocss.
ns
treets.e.
1st street s.e.
pG 9
7/31/2019 Ballpark Hotel at 1st and N
10/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012GrOuND fLOOr pLAN
SCALe 1-0=1/16
1
2
5
A b f HG
110
120
118
117
116
103A
103b
114b115
meeting rm.
115
mens' rm.
116
womens' rm.
117
Luggage
110
PreP
103
F.c.r.
105
VestibuLe
107
administration
101
suite shoP
102
PantrY
104
business ctr.
106
LobbY &breaKFast area
108
recePtion
109
Fitness
111
PreFunction
113
corridor
112
corridor
114
eXit PassagewaY
118
stair 1
119
stair 2
120
C D Ie
6
7
9
3DS
2C
2C
2C
10C
10C
10C
10C
4A
4A
4A
4A
4A
4A
2C
2C
2C
2C
5A
8D
8D
8D
8D
8D
8D
8D
8D
8D8D
3CS
3CS
3CS
3CS
3DS
4A
4A
4A
4A
4A
4A
4A
4A
4A
4A
4A
3D
3D
3D
3D
6D 6D
4A
4A
2C
2C
4A
3D
3DS
3DS
9CS
9CS
9CS
9CS
4A
4A
114A
105
107A107b
111
TOprOperTyLINe
80' -4"
TOp.L.
12' -0"
TOp.L.
8' -1"
9'-0"
ALLeyWIDTH
26'-0"
TOprOperTy
LINe
96'-0"
TO
prOperTyLINe
59'-0"
TOprOperTyLINe
71'-11"
TOprOperTyLINe
50' -2"
TOprOperTyLINe
50' -2"
8
3
4
21' - 9" 11' - 7" 4' - 0" 5' - 7" 6' - 9" 8' - 8" 20' - 4" 20' - 8"
17'-5"
21'-0"
18'-0"
15'-5"
6'-4"
16'-9"
8'-5"
26'-7"
TrANSfOrmerVAuLT
TrANSfOrmerVAuLT
buSVAuLT
STOrmWATerVAuLT
21'-0"
8'-7"
8'-9"
0'-7"
2'-10"
15'-0"
7' - 11" 13' - 9" 3' - 0" 15' - 4" 3' -8"
5' -2"3' -6"
1'-0"
0' -3"
8'-0"
3'-0"
3' -6"
1'-0"
0' -4"
3' -3"4'-10"
0'-7"
0' -10"
1'-7"
e.j.
e.j.
fACe OfWALL AbOVe
2' -4"
8' - 10" 10' - 5"
2' -7"
2' -6"2' -4"6'-9"
8'-2"
2' -4"
2'-4"
7' -8"15'-2"
5'-4"
10' - 0" 3' - 11"
1'-6"
1'-1"
3' -2"
2'-10"
5'-2"
3 ' - 10 " 4 ' - 5"1' -3"
3'-0"
8' -10"
2'-2"
5' - 0" 5' - 0"
0' -6"7' -4"
6'-0"
15'-9"
9' -2"
90 t. r.O.W.
110ftr.O.W.
SerVICe/ DeLIVery
10' x 20'
LOADING
12' x 30'
LIfT
up
10b
59'-0"
72'-0"
+19.50
+26.66
+19.50
LOADINGpLATfOrm100 Sf
ALLey+26.00
meASurINGpOINT+21.25
LOWerSLAb+21.75+21.67LOWerSLAb
GrADe+19.50
-T.O.C.
Not: Intio laot is oillstativ oss onl,and is sct toodiication ding thpit ocss.
n
streets.e.
1st street s.e.
pG 10
7/31/2019 Ballpark Hotel at 1st and N
11/24
7/31/2019 Ballpark Hotel at 1st and N
12/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012TypICAL fLOOr
SCALe 1-0=1/16
1
2
5
A b f HGC D Ie
6
7
9
8
3
4
K301
Ks
302
303
K
304
305
K
306
hKPg
316
i
317
s
320
el.
315
c
319
K
307
Ks
308
K
309
K
310
311
K
312
313
K
314
8CS
8CS
6DS
6DS
6DS
6DS
9b
9b
9b
8CS
6DS
6CS
6DS
6CS
6CS
10AS
10AS
10AS
8CS
6CS
6DS6DS
6CS
6CS
6DS
6DS
6CS
6CS
6CS
8CS
8CS
9b
6DS
3b
5bS
5bS
4A
4A
4A
10AS
10AS
10AS
10AS
9AS
9AS
9AS
9AS
6CS
2CS
2CS
2CS2CS
4A
4A
4A
4A 4A
4A4A
4A
4A
4A
4A
4A
4A
4A
4A
4A4A
4A
4A
10AS
6DS
10AS10AS
6DS
4A
4A
4A
3C
4A
4A
4A
4A
4A
6DS
6CS
6CS
3bS
11CS
3b
10AS
10AS
10AS
3bS
3bS
5b
5b
3bS
3b
10AS
3bS
3bS
5b
19'-8"
12'-10"
12'-10"
12'-9"
3'-5"
2'-9"
15'-1"
13'-11"
13'-8"
12'-5"
12'-7"
5'-6"
12' - 1" 4' - 10"
4' -0"
5'-6"
21' - 3" 14' - 0" 14' - 5"
3'-2"
15'-1"
8' -6"
12' - 11" 12' - 5" 12' - 1" 6' - 10" 5' - 6"
50' -2"
4' - 0" 4' - 2" 8' - 1" 1' - 1"11' -9"4' -11"4' -2"7' -11"4' -2"
4'-1"
4'-1"
8'-0"
4'-3"
9'-11"
4'-2"
10'-1"
4'-2"
14'-1"
9'-2"
72'-0"
57'-6"
33' -7"
4' - 1" 4' - 2" 9' - 3" 4' - 2" 6' - 9" 4' - 2"
1' -0"
4'-1"
6'-1"
7'-7"
4'-2"
8'-1"
4'-2"
7'-11"
4'-2"
4'-9"
72'-0"
59'-0"
3'-6"
63' -0"
5' -6"
16'-2"
29'-6"
27'-10"
4'-4"
4'-2"
8'-0"
4'-2"
7'-1"
3'-3"
4'-2
"
9'-8"
4'-2"
8'-3"
4' -0"12' -9"4' -11"4' -2"8' -1"4' -2"7' -11"4' -2"
4' -0"
Not: Intio laot is oillstativ oss onl,and is sct toodiication ding thpit ocss.
pG 12
7/31/2019 Ballpark Hotel at 1st and N
13/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012mAIN rOOf
SCALe 1-0=1/16
1
2
5
A b f HG
rooFtoPembeLLishment
1405
mechanicaL
1406
Fan encLosure
1403
rooFtoP decK
1404
rooFtoPembeLLishment
1402
C D Ie
6
7
9
8
3
4
exIT
pASSAGeWAy
stair
1407
stair
1408
bAr
tl
1409
tl
1410
oPen mech.encLosure
10AS10AS
27'-10"
29'-6"
22'-4"
3'-5"
37'-11"
10'
-0"
57'-6"
50' -2"
0' -6"12' -6"27' -10"9' -4"
72'-0"
5
9'-0"
0'-6"
5
8'-3"
0'-4"
0' -5"
12' -7"
26' -0"
29'-6"
37' -3"
0' -7"
8' -8"
0' -8"
6' -9"
0'-6"
34'-0"
37
'-7"
10'-0"
37'-6"
10'
-0"
73'-6"
5' -6"
0' -5"12' -8"
26' -0"
8' - 11" 17' - 1" 18'-6"
7'-4"
3'-8"
49' -10"
100' -5"
4' -0"
rooF beLow @ 2ndFLoor
19' -0"
Not: Intio laot is oillstativ oss onland is sct toodiication ding thpit ocss.
pG 13
7/31/2019 Ballpark Hotel at 1st and N
14/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012eAST eLeVATION
SCALe : 1/16 = 1-0
1GROUND
19.50'
2ND FLOOR
37.25'
3RD FLOOR
46.42'
4TH FLOOR
55.58'
5TH FLOOR
64.75'
6TH FLOOR
73.92'
7TH FLOOR
83.08'
8TH FLOOR
92.25'
9TH FLOOR
101.42'
10THFLOO110.58'
11THFLOO
119.75'
12THFLOO
128.92'
13THFLOO
138.08'
TOPOF EMBELLISHMENT
165.25'
ROOF149.25'
16'-0"
11'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-
2"
9'-2"
9'-2"
9'-2"
9'-2"
17'-9"
125679 8 34
T.O.P.
151.25'
14'-0"
130'-0"
PORCELAINTILEPANELS,
24"x48"TYP.
DECORATIVEGRILLEAT
PTACUNIT,TYP.
PORCELAINRIBBED
ACCENT PANELS
OPENINGFORMEDFROM
STOREFRONT/WINDOW
WALLSYSTEM
ROOFMOUNTED
EMBELLISHMENT
FORMEDFROM
CUIRTAINWALL
PROFILESAND GLASS
M.P.
21.25'
SIDEWALK
19.12'
TOPOFPE159.25'
BALL PARK HOTEL
pG 14
7/31/2019 Ballpark Hotel at 1st and N
15/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012SOuTH eLeVATION
SCALe : 1/16 = 1-0
1GROUND FLOOR19.50'
2ND FLOOR
37.25'
3RD FLOOR
46.42'
4TH FLOOR55.58'
5TH FLOOR
64.75'
6TH FLOOR
73.92'
7TH FLOOR
83.08'
8TH FLOOR
92.25'
9TH FLOOR
101.42'
10THFLOOR
110.58'
11THFLOOR
119.75'
12THFLOOR
128.92'
13THFLOOR
138.08'
TOPOF EMBELLISHMENT165.25'
ROOF
149.25'
6'-0"
10'-0"
11'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-
2"
9'-2"
9'-2"
9'-2"
9'-2"
16'-0"
A B F HGC D IE
T.O.P.
151.25'
14'-0"
130'-0"
ROOFMOUNTED
EMBELLISHMENT
FORMEDFROM
CUIRTAINWALL
PROFILESAND GLASS
PORCELAINTILEPANELS,
24"x48"TYP.
OPENINGFORMEDFROM
STOREFRONT/WINDOW
WALLSYSTEM
DECORATIVEGRILLEAT
PTACUNIT,TYP.
PORCELAINRIBBED
ACCENT PANELS
PRODEMAWOODPANELS
METALPANELS
M.P.
21.25'
TOPOF PENTHOUSE
159.25'
CLEARGLASSHANDRAIL
BALL PARK HOTEL
pG 15
7/31/2019 Ballpark Hotel at 1st and N
16/24
7/31/2019 Ballpark Hotel at 1st and N
17/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012NOrTH eLeVATION
SCALe : 1/16 = 1-0
1GROUND FLOOR
19.50'
1GROUND FLOOR
19.50'
2ND FLOOR37.25'
3RD FLOOR
46.42'
4TH FLOOR
55.58'
5TH FLOOR
64.75'
6TH FLOOR73.92'
7TH FLOOR
83.08'
8TH FLOOR
92.25'
9TH FLOOR
101.42'
10THFLOOR
110.58'
11THFLOOR
119.75'
12THFLOOR
128.92'
13THFLOOR
138.08'
TOPOF EMBELLISHMENT
165.25'
ROOF
149.25'
6'-0"
10'-0"
11'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-
2"
9'-2"
9'-2"
9'-2"
9'-2"
17'-9"
ABFH G CDI E
MECHANICALENCLOSURESTAIR AND FAN
ENCLOSURE
T.O.P.151.25'
130'-0"
14'-0"
PORCELAINTILEPANELS,
24"x48"TYP.
DECORATIVEGRILLEAT
PTACUNIT,TYP.
OPENINGFORMEDFROM
STOREFRONT/WINDOW
WALLSYSTEM
ROOFMOUNTED
EMBELLISHMENT
FORMEDFROM
CUIRTAINWALL
PROFILESAND GLASS
METALPANELS
METALPANELS
PORCELAINRIBBED
ACCENT PANELS
PRODEMAWOODPANELS
M.P.
21.25'
M.P.
21.25'
TOPOFPENTHOUSE
159.25'
CLEARGLASSHANDRAIL
BRICK
PARTY
WALL
pG 17
7/31/2019 Ballpark Hotel at 1st and N
18/24
7/31/2019 Ballpark Hotel at 1st and N
19/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012perSpeCTIVe 1
SCALe : NTS pG 19
7/31/2019 Ballpark Hotel at 1st and N
20/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012perSpeCTIVe 2
SCALe : NTS pG 20
7/31/2019 Ballpark Hotel at 1st and N
21/24
toPoFembeLLishment
7/31/2019 Ballpark Hotel at 1st and N
22/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012buILDING SeCTION NOrTH-SOuTH
SCAL: 1-0=1/16
1ground FLoor19.50'
2ndFLoor37.25'
3rdFLoor46.42'
4thFLoor55.58'
5thFLoor64.75'
6thFLoor73.92'
7thFLoor83.08'
8thFLoor92.25'
9thFLoor101.42'
10thFLoor110.58'
11thFLoor119.75'
12thFLoor128.92'
13thFLoor138.08'
toPoF embeLLishment165.25'
rooF149.25'
6'-0"
10'-0"
11'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
9'-2"
16'-0"
t.o.P.151.25'
m.P.21.25'
toPoFPenthouse159.25'
N Stt S.e.
14'-0"
130'-0"
pG 22
7/31/2019 Ballpark Hotel at 1st and N
23/24
LEED 2009 for New Construction and Major Renovations Capitol Gateway Hotel 1st & N streets S E
7/31/2019 Ballpark Hotel at 1st and N
24/24
1st & n street s.e
WASHINGTON DC 1825 k STreeT, NW SuITe 300 WASHINGTON DC 20006
09.14.2012LeeD SCOre CArD
LEED 2009 for New Construction and Major Renovations Capitol Gateway Hotel, 1st & N streets, S.E.
Project Checklist
15 4 7 Possible Points: 26Y ? N Y ? N
Y Prereq 1 2 Credit 4 1 to 2
1 Credit 1 1 2 Credit 5 1 to 2
5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1
1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1
6 Credit 4.1 6
1 Credit 4.2 1 12 3 Possible Points: 153 Credit 4.3 Alternative TransportationLow-Emitting and Fuel-Efficient Vehicles 3
2 Credit 4.4 2 Y Prereq 1
1 Credit 5.1 Site DevelopmentProtect or Restore Habitat 1 Y Prereq 2
1 Credit 5.2 Site DevelopmentMaximize Open Space 1 1 Credit 1 1
1 Credit 6.1 Stormwater DesignQuantity Control 1 1 Credit 2 1
1 Credit 6.2 Stormwater DesignQuality Control 1 1 Credit 3.1 1
1 Credit 7.1 Heat Island EffectNon-roof 1 1 Credit 3.2 1
1 Credit 7.2 1 1 Credit 4.1 1
1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1
1 Credit 4.3 1
6 3 Possible Points: 10 1 Credit 4.4 11 Credit 5 1
Y Prereq 1 1 Credit 6.1 Controllability of SystemsLighting 1
4 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1
2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1
2 1 Credit 3 2 to 4 1 Credit 7.2 Thermal ComfortVerification 1
1 Credit 8.1 1
7 5 7 Possible Points: 35 1 Credit 8.2 1
Y Prereq 1 5 1 Possible Points: 6Y Prereq 2
Y Prereq 3 1 Credit 1.1 1
3 Credit 1 1 to 19 1 Credit 1.2 1
7 Credit 2 1 to 7 1 Credit 1.3 1
2 Credit 3 2 1 Credit 1.4 1
2 Credit 4 2 1 Credit 1.5 1
3 Credit 5 3 1 Credit 2 1
2 Credit 6 2
4 Possible Points: 46 1 7 Possible Points: 14
1 Credit 1.1 1
Y Prereq 1 1 Credit 1.2 1
3 Credit 1.1 1 to 3 1 Credit 1.3 11 Credit 1.2 Building ReuseMaintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1
2 Credit 2 1 to 2
2 Credit 3 1 to 2 51 17 25 Possible Points: 110
Regional Priority: Specific Credit
Regional Priority: Specific Credit
Regional Priority: Specific CreditRegional Priority: Specific Credit
Measurement and Verification
Exemplary performance, Double Transit Ridership
Green Housekeeping
Education Credit
Reduced Mercury in Lamps
Innovation in Design: Specific Title
Materials Reuse
Storage and Collection of Recyclables
Materials and Resources
Fundamental Commissioning of Building Energy Systems
TotalConstruction Waste Management
Enhanced Commissioning
On-Site Renewable Energy
Enhanced Refrigerant Management
Construction IAQ Management PlanBefore Occupancy
Materials and Resources, Continued
Water Efficiency
Building ReuseMaintain Existing Walls, Floors, and Roof
Alternative TransportationParking Capacity
Heat Island EffectRoof
Recycled Content
Regional Materials
Certified Wood
Alternative TransportationBicycle Storage and Changing Rooms
Sustainable Sites
Alternative TransportationPublic Transportation Access
Site Selection
Development Density and Community Connectivity
Construction Activity Pollution Prevention
Low-Emitting MaterialsAdhesives and Sealants
Low-Emitting MaterialsPaints and Coatings
Optimize Energy Performance
Energy and Atmosphere
Water Use Reduction20% Reduction
Low-Emitting MaterialsComposite Wood and Agrifiber Products
Low-Emitting MaterialsFlooring Systems
Indoor Chemical and Pollutant Source Control
Thermal ComfortDesign
Controllability of SystemsThermal Comfort
Green Power
Water Use Reduction
Minimum Energy Performance
Fundamental Refrigerant Management
Daylight and ViewsViews
LEED Accredited Professional
Daylight and ViewsDaylight
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Construction IAQ Management PlanDuring Construction
Outdoor Air Delivery Monitoring
Indoor Environmental Quality
Minimum Indoor Air Quality Performance
Environmental Tobacco Smoke (ETS) Control
Increased Ventilation
Regional Priority Credits
Innovation and Design Process
pG 24