+ All Categories
Home > Technology > Bank of China - Made with z Systems story

Bank of China - Made with z Systems story

Date post: 17-Aug-2015
Category:
Upload: ibm-cics
View: 200 times
Download: 0 times
Share this document with a friend
Popular Tags:
1
® Made with IBM stability z Systems made with Bank of China has been providing reliable nancial services to their customers for over a century. To ensure the best level of availability, Bank of China uses CICS TS, enhancing the performance and operational ef ciency of the bank. ibm.com/zsystems IN THE BEGINNING Bank of China wanted to maximise their operational ef ciency, through merging data centers and standardizing CICS levels. Prior to the consolidation project, workload peaks were compromising availability and performance in one of their data centers. Given these existing issues, Bank of China were concerned around the impact the project could have on their levels of service. THE BIG IDEA The IBM service team worked with Bank of China to understand and resolve their performance issues so that the project could continue unhindered. The IBM team were also able to use this partnership to highlight application best practices. This ensured that BOC could deliver their services at the level demanded by their customers. TAKING ACTION BOC implemented the IBM teamWs recommendations to adjust coupling facility parameters and rene their application design. This resulted in a more stable platform upon which to begin their consolidation. IBM also suggested to run a comprehensive health check to ensure a trouble-free upgrade. This revealed further areas to rene CICS settings and to adopt OWLM to maximise ef ciencies. RESULT! In a sentence? Upgrade and optimize in condence, with the expertise and support of IBM to help you realize your goals. Improvements in conguration and design allowed BOC to successfully merge data centers - upgrade their CICS systems to a consistent level across the enterprise. This drastically reduced maintenance efforts and resulted in BOC improving their workload management and reducing the response time during peak periods. BOC felt that having a strong relationship with IBM was the key to their successful upgrade, allowing them to modernize with mitigated risk.
Transcript

®

Made with IBM

stability

z Systemsmade with

Bank of China has been providing

reliable financial services to their

customers for over a century. To

ensure the best level of availability,

Bank of China uses CICS TS,

enhancing the performance and

operational efficiency of the bank.

ibm.com/zsystems

IN THE BEGINNING

Bank of China wanted to

maximise their operational

efficiency, through

merging data centers and

standardizing CICS levels.

Prior to the consolidation

project, workload peaks

were compromising

availability and

performance in one of

their data centers. Given

these existing issues,

Bank of China were

concerned around the

impact the project could

have on their levels of

service.

THE BIG IDEA

The IBM service team

worked with Bank of

China to understand and

resolve their performance

issues so that the project

could continue

unhindered.

The IBM team were also

able to use this

partnership to highlight

application best practices.

This ensured that BOC

could deliver their services

at the level demanded by

their customers.

TAKING ACTION

BOC implemented the

IBM teamWs

recommendations to

adjust coupling facility

parameters and refine

their application design.

This resulted in a more

stable platform upon

which to begin their

consolidation.

IBM also suggested to run

a comprehensive health

check to ensure a

trouble-free upgrade. This

revealed further areas to

refine CICS settings and

to adopt OWLM to

maximise efficiencies.

RESULT!

In a sentence? Upgrade and optimize in confidence, with the expertise and

support of IBM to help you realize your goals.

Improvements in

configuration and design

allowed BOC to

successfully merge data

centers - upgrade their

CICS systems to a

consistent level across

the enterprise. This

drastically reduced

maintenance efforts and

resulted in BOC improving

their workload

management and

reducing the response

time during peak periods.

BOC felt that having a

strong relationship with

IBM was the key to their

successful upgrade,

allowing them to

modernize with mitigated

risk.

Recommended