Baroda Electrical SEZ© Abhay Developers Pvt Ltd
© Dr Rajesh Khajuria
TEAMPro Limited
UK – IndiaElectrifying Future ©
Dr R Khajuria TEAM 2
Promoters
• Abhay Developers Pvt Ltd, Baroda (SPV)– BRG Group: Mr Bakulesh R Gupta, Chairman
– Mr Sargam Gupta, MBA (UK), Director
– IT SEZ, Schools and Real Estate business
– Rs 100 Crore Net worth
– Rs 200 Crore Baroda Knowledge City: IT / ITES SEZ approved by Government of Gujarat.
• Dr Rajesh Khajuria, Director, TEAMPro Limited, London UK / Baroda India.
Dr R Khajuria TEAM 3
Presentation Scheme• 1. India’s Electrical Industry in World: 4• 2. Electrical Industry in India: Slide 5-9
– Hydro, Ultra Mega Power, Transmission, Rural.
• Future Power Scenario: 10-13• Power Capacity Addition: 14-15• FDI and Exports in Electrical Industry:16-23• Baroda’s Potential in Elec. Industry: 24-27• Project Details: 28-35• Why TEAM? Knowledge Partners: 36-37
Dr R Khajuria TEAM 4
Electrical Industry
• India has in the world the…
• 5th largest electricity generation capacity.
• 5th largest telecom services market - US$ 17.8 billion revenues in FY 2005.
• 2nd largest road network - 3.3 million km.
Dr R Khajuria TEAM 5
Hydro-Power Unexploited
• There are still 1.6 billion people in the world with no access to electricity, almost all of them living in developing countries.
• 23% of total technically feasible hydropower potential is exploited in China, 82% in USA, 65% in Canada, 73% in Germany, but only 5% in Africa and 13% in Asia as a whole.
» Source: UNIDO
Dr R Khajuria TEAM 6
Hydro-Power 150,000 MW
Dr R Khajuria TEAM 7
Ultra Mega: 20,000 MW
Source: Economic Survey, Government of India
Dr R Khajuria TEAM 8
Transmission: 60,000 KM
Dr R Khajuria TEAM 9
Rural: 56% Yet to Elec.
Dr R Khajuria TEAM 10
Future Power Scenario 1
• Interactive Session on Current and Future Power Scenario held on 25th May 2006 in New Delhi. Present:– Hon’ble Minister of Power Shri Sushil Kumar
Shinde– Shri R.V. Shahi, Secretary Power– Shri Anil K. Agarwal, President, ASSOCHAM, – Shri Rakesh Bakshi, Managing Director, Vestas
RRB, – Dr. V.K. Garg, CMD, Power Finance corporation
Dr R Khajuria TEAM 11
Future Power Scenario 2
• Need for huge capacity addition in the power sector since only 34,000 MW expected during the 10th Plan (2002-2007). – 100,000 MW required by India.
• For 50,000 MW hydro initiatives already launched, progress needs to be stepped up. – State Governments need to expedite procedures for
land acquisition and other approvals and the Centre needs to ensure effective coordination, so as to have matching transmission capacity coming up.
Dr R Khajuria TEAM 12
Future Power Scenario 3
• To Privatise 50% of New Power Capacity.
• To ensure contribution of renewable energy in the overall energy scenario of the country…– 2% to 20% by Y 2020 in India.– 5% to 20% in USA and Europe.
» Sources: ASSOCHAM, TEAM Research.
Dr R Khajuria TEAM 13
SEZs Need Electricals
• 150 SEZs approved by BOA, Ministry of Commerce, Government of India shall need Power and Electrical equipments on a massive scale – Worth Rs 25,000 Crore over Y 2006-2011
approx.
Dr R Khajuria TEAM 14
Power Capacity Addition 1
Result: Massive Demand for Electrical Equipments
Dr R Khajuria TEAM 15
Power Capacity Addition 2
Result: Massive Demand from Thermal-Hydro Sectors
Dr R Khajuria TEAM 16
Foreign Investment
• India's foreign exchange reserves stand at US$ 165 billion (12.08.2006).
• India has become the second-most attractive destination for foreign direct investment (FDI) among manufacturing investors…
» Source: as per A T Kearney's latest FDI Confidence Index rankings.
Dr R Khajuria TEAM 17
FDI in India
Dr R Khajuria TEAM 18
FDI Rise Due to Elec.
• “FDI flows to India rose by 36% in 2003-04, mainly due to Electrical Equipments, Computer Software, Electronics and Services sectors.”
» Source: India Budget, Ministry of Finance, Government of India
Dr R Khajuria TEAM 19
Electrical Export Share• India's …• Total Exports account for less than 1% of Global
Trade.• Power Generating Machinery & Equipment
Exports account for only 0.2% of Global Market.• Electrical machinery, apparatus and appliance
also account for 0.2% of Global Trade.– Result: Tremendous Scope to increase Export of
Electrical & Power Equipment, Apparatus, and Appliances
Dr R Khajuria TEAM 20
Engineers Strength:India
Dr R Khajuria TEAM 21
Electrical Machinery
• Electrical Machinery industry’s share in India’s ‘Value Added Registered Manufacturing’ has increased from 5.82% in 1970s to 8% by 2004.– Result: It is one of the very few sectors with
33% rise in overall share.– Value Added Registered Manufacturing’s share
is 66% in total Manufacturing sector.
Dr R Khajuria TEAM 22
Auto Electrical Parts
• Automobile with Auto Parts industry has a – Turnover of Rs 1440 Billion, – Investment of Rs 800 Bn, – Exports of Rs 1000 Bn, – Employment for 45 mn direct, 100 mn
indirect.
• Auto & Parts Industry is growing @ 16% p.a. in Production and 35% p.a. in Exports.
Dr R Khajuria TEAM 23
Select Elect. Production
•Provisional figures.
•Global companies are eying expansions in India.
Dr R Khajuria TEAM 24
Baroda’s Potential 1
• Baroda has India’s three largest and oldest Electrical Companies, all growing fast: – ABB Ltd (Swiss giant) – Locomotives to
Complete Electrical systems on turnkey basis.– Novino Batteries Ltd (Matsushita, Japan) –
Largest in Dry Cell Batteries, Torches etc.– Jyoti Ltd – Mini Hydel Power Stations, Motors,
Switchgears and Rotating Electrical Equipments.
Dr R Khajuria TEAM 25
Baroda’s Potential 2
• 80% of Transformers of Gujarat State are manufactured in Baroda’s 100 SSI Units.
• Over 500 Electrical & Engineering Units.
• Electrical Supplier-industry like CRGO Laminations, Control Panels, PCBs, Lighting, Battery Cell, Switches, Wires & Cables etc have developed locally.
Dr R Khajuria TEAM 26
Baroda’s Potential 3
• Halol 40 KM from Baroda has expanding cluster of General Motors (GM).
• Pune’s thriving Auto industry with 9 major Automobile plants source Auto Parts from Baroda and Halol.
• Baroda is known for Engineering Design (L & T Chiyoda) and Manufacturing industry.
Dr R Khajuria TEAM 27
Government Agencies• Electrical Research And Development Agency
(ERADA), Government of Gujarat/India, Baroda – for testing and certification.
• Gujarat Engineering Research Institute (GERI), Baroda.
• Gujarat Energy Development Agency (GEDA), Baroda – Nodal Agency of Government of Gujarat for Non-conventional Energy (Wind, Solar, etc).
• Gujarat Electricity Board’s Head Quarter, Baroda.
Dr R Khajuria TEAM 28
Electrical SEZ Location• 100 Hectare (250 Acre) Land at GIDC
Savli, Baroda• Airport – Baroda (Domestic) – 15 km
• Ahmedabad (International) -- 115 km
• Railway Station – 20 km• Dry Port (CFS Oppo. GSFC) – 15 km• Ports–Kandla (440 km), Mumbai (440 km)• Manpower: 100,000 Graduates in 200 km.
Dr R Khajuria TEAM 29
SEZ Infrastructure• No Pollution Zone.• Developed Land with Plots of ¼ - 5 acres each.• Direct Road access from Expressway Baroda-
Ahmedabad), only 12 km from Baroda.• 100% Power (GEB/Gas/Wind), Internal Roads.• Water, Engineers and Skilled Manpower.• 100% Security, Regulated Entry, Insurance,
International Banking & Finance, Post Office, Transport, Warehouses, Offices, Parking,
• Garden, Service Apartments.
Dr R Khajuria TEAM 30
SEZ Project Cost (Rs Million approx.)
• Land – 100 Hectares 250• Development 250• Buildings 300• Utilities & Power 550• Equipments 500• P & P Expenses 150• Total 2,000 (200 Cr)
Dr R Khajuria TEAM 31
Sources of Finance
(Rs Million)*
• Equity 500
• FDI 300
• Term Loans 1,200
• Total 2,000 (200 Cr)» * (Approx.)
Dr R Khajuria TEAM 32
Export & Employment
(Y 2006-11) (Rs Million)*• Project Investment in SEZ: 2,000• SEZ 100 Units’ Investment: 8,000• Total Investment in SEZ: 10,000 (1,000 Cr)• Electrical/Power Sector
Investment (10 Years): 2000,000 (2 Lakh Cr)• Exports expected from SEZ: 20,000 (2,000 Cr)• Employment Potential in SEZ: 20,000 Persons
» * (Approx estimates).
Dr R Khajuria TEAM 33
Permissions• Land Acquisition.
• Gujarat SEZ Act, 2003.
• SEZ Act 2005 and SEZ Rules 2006, Ministry of Commerce, Government of India.
• In-principle / Formal Approval.
• Notification in Official Gazette.
Dr R Khajuria TEAM 34
SEZ Project Planning
• Feasibility Study by TEAM
• Applications by TEAM
• Fund-raising Tie-ups by TEAM
• Government Permissions
• Construction Permissions
• Implementation Team
Dr R Khajuria TEAM 35
Implementation Schedule*
• Project Planning 3 Months
• Permissions-SEZ 3 Months– Sub-Total 6 Months
• Implementation 54 Months
• Total 60 Months* (approx.)
Dr R Khajuria TEAM 36
Why TEAM?
• Since 1983 in India, then London UK.• 220 Projects Advised successfully.• Electrical Industry Knowledge & Clients.• Total US$ 10 Billion investment catalysed.• Invited by Governments of India, UK,
Singapore, HK, Thailand, Sudan, Dubai, Abu Dhabi, Oman for development assignments in technology and trade.
Dr R Khajuria TEAM 37
Knowledge Partners
TEAMPro Limited, UKDr Rajesh Khajuria, Director
MBA (Fin), PhD (Management), CMC, FIMC, MIoD
[email protected], www.TeamPro.orgIndia Baroda M: 094260 75402
London T: +44-20-8866 4345 (Sunil Vaghani)
Electrifying Future ©