Connecticut Department of Energy and Environmental Protection Bashan Lake Dam UPDATE
Transcript

Connecticut Department of Energy and Environmental Protection

Bashan Lake Dam UPDATE

Connecticut Department of Energy and Environmental Protection

Date – June 22, 2015

Connecticut Department of Energy and Environmental Protection

Construction

06/18/2015 Boat Launch Complete←

06/01/2015 Upstream Face of Dam Complete and Weir boards and Trash Rack Partially installed in Front of Closed Gate

Connecticut Department of Energy and Environmental Protection

• 11/05/2014 - Contract approved and Awarded. • 12/05/2014 - NTP issued.• 05/14/2015 - Right side of dam complete.• 05/28/15 - final upstream wall (left side) section complete.• 05/29/15 - trash rack and weir boards installed into gate chamber.• 06/18/15 - Boat Launch complete.• Lake refilling.

Left Wall, Cap and Buttress WorkLeft Section Stripped←

Cap being graded and seeded

Downstream Buttress Forming

Buttress Wall FinishedWall Cap Progress

Connecticut Department of Energy and Environmental Protection

• Lake refilling and channel is equalizing. • Upstream face of dam completed on 05/29/15• Work on buttress wall and downstream cap

has been progressing.• Backfill, grading and seeding of dam cap 50%

complete.• Right maintenance bridge abutment and

training to be formed and poured. Left training wall and spillway to follow.

Look Ahead

Connecticut Department of Energy and Environmental Protection

• Please contact Dan Biron at (860) 424-3892 or [email protected] with any concerns.