21
© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com Battery Maintenance Should be done EVERY 2 Years
Transcript

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Battery Maintenance

Should be done EVERY 2 Years

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Battery Box Located Outside on S.S.

Enclosure and Inside Enclosure Poly Fiber

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Note Indicator Light

Location

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Power Off The N-300

w/Toggle Switch

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove the Four Screws

That Hold The Cover on.

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Disconnect The Battery Cable From

The Charger Module

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Inspect All Connections for Corrosion

and Good Connections

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

If Any Corrosion is Found, All Corroded

Components Must Be Replaced

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove all (8) Screws that Secure

the Batteries in the Enclosure

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Remove Both Sets of

Cells Together

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Prepare new Components, Attach Cable

Assy. To Battery Terminals (red +, black -)

Battery to

Charger

Module

Cable P/N

G2-0030

Battery P/N E3-1006

Includes Fusible Link

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Place Battery Assembly Into The

Battery Enclosure

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Reinstall ALL (8) Screws

That Secure The Battery

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

The Battery Fusible Link Must Be

Connected to The Battery Terminals on

One Side of The Battery

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Connect the Battery Charger Module to The

Battery Cable attached to The Other Side of

the Battery

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Push The Battery Fusible Link

Connected to The Battery into the Void

Around The Battery Cells

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Re-Install Battery Cover Making Sure the

Charge Indicator Lens is Aligned with the

Indicator Lamp.

© 2014 YZ Systems for use by YZ’s distribution network and end-users. www.yzsystems.com

Power On The N-300

w/Toggle Switch


Recommended