14
Baudrand Sylvest re Physics Research Commite e 1 Status of the Status of the Longitudinal and Longitudinal and Transverse Polarimeters Transverse Polarimeters Working polarimeters HERA polarization status 2005 Efficiency of the polarimeters TPOL & LPOL Cavity LPOL Energy spectrum with locked or unlocked cavity Bremsstralung spectra Present Status New calorimeter
Transcript
Page 1: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 1

Status of the Longitudinal and Status of the Longitudinal and Transverse PolarimetersTransverse Polarimeters

•Working polarimeters

•HERA polarization status 2005

•Efficiency of the polarimeters

•TPOL & LPOL

•Cavity LPOL

•Energy spectrum with locked or unlocked cavity

•Bremsstralung spectra

•Present Status

•New calorimeter

Page 2: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 2

WORKING POLARIMETERSWORKING POLARIMETERS

Page 3: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 3

Polarization Delivered in 2005Polarization Delivered in 2005

•Polarisation is rather low (less than 30%) compared to the previous year.

•Polarization do not show a clear tendency.

•Polarization level is not enough for experiments. For ex.HERMES predictions are based on 50%.

Experiments wait that the Polarization level increase

Helicity change

Page 4: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 4

Efficiency of the PolarimetersEfficiency of the Polarimeters

TPOL ~94% LPOL ~91% Both ~98.25%

• LPOL: Machine studies (begin of 2005) + Time for syst. studies and Cavity studies

• TPOL: TPOL vacuum window + Hardware electronics.

Page 5: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 5

LPOL & TPOLLPOL & TPOL

Page 6: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 6

LPOLLPOL

Good agrement TPOL-LPOL even at online level

2% errors between CR and SW. Detailed systematic studies are planned to decrease this number.

Data from 1st Jan to 20th May show a clear agreement at online level (no LPOL data quality corrections)

CR=Crystal calo. SW= Sandwich calo.

Page 7: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 7

TPOLTPOL

Detailed syst. Studies shows beam spot to Polarization correlations.

Monte Carlo simulation confirmed the observation.

Focus correction now applied online to data:

There were some changes in 2005 in hardware:

•Stepping motor controler changed.

•Si detector damaged 2 month ago- Debugging in progress.

•Function generator for depol.

Current TPOL syst. 3.5%

Applied on line

Page 8: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 8

NEW CAVITY LPOLNEW CAVITY LPOL

Page 9: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 9

The new Cavity LPOL is recording Comptons event now

•Histograms show a clear signal of compton photons above the Bremsstrahlung spectrum.

•Estimation gives a rate of 0.1 photons per bunch crossing

Energy spectrum with locked or Energy spectrum with locked or unlocked cavityunlocked cavity

10/03/05

Page 10: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 10

BremsBremssstratrahhlung Spectralung Spectra

• Synchrotron radiation shift has been reduced by putting a one X0 tungsten plate in front of the calo

• Problems with electronics readout induced a « shoulder », now removed

Brems Spectra is now understood

Ibunch =83,7A

PM Voltage: 850V

PM Voltage: 850V

Ibunch=170A

« shoulder »

Page 11: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 11

Present statusPresent status

• Locking STABLE under any accelerator conditions.

• Locking STABLE / switch laser pol.

• DAQ problems, under study

• Polarisation estimation almost there.

Cavity LPOL is on the way to deliver polarisation

06/05/05 BREMS

COMPTONS

Page 12: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 12

New CalorimeterNew Calorimeter

•Neither of the 2 LPOL calo are suitable for cavity operations.

•Tungsten- Quartz fiber sampling calorimeter.

•Signal produced from Č radiation in the quartz fiber.

•50 layers of tungsten plate interleaved with layers of quartz fiber

Page 13: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 13

New CalorimeterNew Calorimeter

Will be finished by end of June, take into operation as soon as possible

•Design and complete simulation of Č light done

•Energy resolution within the requirements

•To do: Cut the fibers & bundle them.

Page 14: Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.

Baudrand Sylvestre

Physics Research Commitee 14

ConclusionsConclusions•Working polarimeters:

•In 2005 Efficiency for the LPOL is ~ 91% and TPOL ~ 94%, combined 98.3%

•TPOL & LPOL:

•Polarimeters in agreement within systematics

•Cavity LPOL:

•Procedure for Laser/e-beam interaction now established

•Brems. spectrum is understood. DAQ problems are under studies.

•New calorimeter will be built by the end of June and put in operation immediately after.