+ All Categories
Home > Documents > Bauer Equipment and Systems on Projects around the World.

Bauer Equipment and Systems on Projects around the World.

Date post: 29-Dec-2015
Category:
Upload: mercy-harmon
View: 216 times
Download: 4 times
Share this document with a friend
Popular Tags:
56
Bauer Equipment and Systems on Projects around the World
Transcript

Bauer Equipment and Systems

on Projects around the World

Is there risk in foundation ?

...our ancestors built safely in rock...

“almost for eternity”

.......or later on rock

...and the longest wall on earth

...in the middle ages on dense river sediments like gravel or sand

except the following case...

...a total foundation disaster but a famous tourist attraction as well

... being under investigation and repair

since 800 years

equipment evolution from 1950 - now

piled foundation with BG and Kelly- bar

foundation pile installation

BG fleet in congested Bangkok

BG 42 in TFC in Taiwan

post grouted pile

skin grouting base grouting

test result of grouted piles

pile load test using tiebacks

steel plant Jubail, Saudi Arabia

extension of Zurich Airport

BG 18/30, secant pile wall

secant piles as retaining wall by BG

Meyer´s Centre Adelaide, Australia

quality control system Medef

BG 12 on rail tracks in New Jersey, USA

river and offshore piles

BG 50, Huang Shi Jangtze bridge, China

BG 30 on jack- up platform in Oman

BA 2000 at Porto do Pecem jetty, Brazil

top down method for traffic tunnels

Inter City Express

BG piles under limited headroom

BG 30 low head room, Japan

high speed flight auger piles

front of wall secant piles

BG 42 DKS for bored piles

mixed in place piles or pile walls

full displacement pile,

highest performance !

diaphragm walls with DHG- grab

diaphragm walls with BC- cutter

Louvre, Paris Royal Diwan, Jeddah

BC 30 at Louvre in Paris

BC- cutter with slurry circle

diaphragm wall with BC 40- cutter

Al Suknah, Oman

low headroom cutter CBC 25

MBC ( Mini Bauer Cutter )

MRT Taipei Boston Artery

temporary tiebacks installed by UBW

excavated tieback

permanent tiebacks for Olympic Games area in Munich, 1972

H- beam or soldier pile wall

soil nailing

large scale load test

jet grouting for underpinning

monastery Trzebnia, Poland

Academy of arts, Dresden

jet grouting with result

dry excavation pit

desalination plant Jeddah 3 Airport Munich Terminal 2

vibrocompaction with TR- vibrators

power plant Algeciras, Spain

vibrocompaction

vibrodisplacement or stone columns

Formosa Mai- Liao Plant, Taiwan

B- wall as flood defence

B- wall or slim vib- wall

steel profile shoe with jet

drains and dynamic compaction

special foundation techniques in Berlin


Recommended