Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. PUBLIC INFORMATION Bausch & Lomb Leverages PlantPAx to “See Better, Live Better” on Its Journey to The Connected Enterprise Steve Schneebeli Manager – Director of Engineering / IT Malisko Engineering Matthew Roberts Business Development Manager Malisko Engineering
Transcript
Page 1: Bausch  lomb leverages plant p ax_rev1

Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved.

PUBLIC INFORMATION

Bausch & Lomb Leverages PlantPAx to “See Better, Live Better” on Its Journey to The Connected Enterprise

Steve Schneebeli Manager – Director of Engineering / ITMalisko Engineering

Matthew Roberts Business Development ManagerMalisko Engineering

Page 2: Bausch  lomb leverages plant p ax_rev1

AGENDA• Introduction

• Project Goals

• Selecting a PlantPAx® Solution

• System Overview

• Results

• Lessons Learned and Recommendations

• Next Steps

• Questions

Page 3: Bausch  lomb leverages plant p ax_rev1

INTRODUCING BAUSCH + LOMB AND

MALISKO ENGINEERING, INC.

Page 4: Bausch  lomb leverages plant p ax_rev1

WHO IS BAUSCH + LOMB?• Founded in 1853 in Rochester, NY

• Three Core Business Units:• Vision Care: Contact Lenses and Eye-Care products• Pharmaceuticals: Rx and OTC Medicines for various Eye Diseases and Irritations• Surgical: Medical Devices, Instruments

• Global company with key US Manufacturing sites:• Rochester, NY• Clearwater and Tampa, FL• St. Louis, MO• Greenville, SC

• Acquired by Valeant Pharmaceuticals Aug. 2013 (VRX)

Page 5: Bausch  lomb leverages plant p ax_rev1

B+L LENS CARE SOLUTIONS FACILITY – GREENVILLE, SC

• Aseptic Lens Care Solutions Manufacturing Facility• Pharmacy, Compounding, Mixing, Filling, Packaging and

Palletizing• Plant and Process Utilities• Warehouse / DC off-site

• Originally built early 1980’s

• Volume growth of approx. 9.5% per year

• Products: Biotrue, Renu, PeroxiClear, Sensitive Eyes….• ~ 25 Package formats and ~8 Package sizes

• 2012 Master Plan – identified DCS replacement for Risk Mitigation – controls Process Utilities and Bulk Manufacturing

Page 6: Bausch  lomb leverages plant p ax_rev1

WHO IS MALISKO ENGINEERING?• Experts in manufacturing automation and validation

• Founded in 1994

• Headquartered in St. Louis, Missouri USA

• Regional Offices in Denver, Colorado USA and Eau Claire, Wisconsin USA

• Rockwell Automation® Solution Partner for Control, Process, Information, Industrial IT and Power Quality & Energy Management.

• CSIA Certified Member

Historic Laclede’s LandingSt. Louis, MO

Malisko Western Regional Office Denver, CO

Phoenix Park AreaEau Claire, WI

Control | Process | InformationIndustrial IT | Power Quality &

Energy Management

Page 7: Bausch  lomb leverages plant p ax_rev1

MALISKO’S PAST PRESENTATIONS

Page 8: Bausch  lomb leverages plant p ax_rev1

PROJECT GOALS

Page 9: Bausch  lomb leverages plant p ax_rev1

PROJECT GOALS• Legacy DCS Migration / Risk Mitigation

– Main goal of new Process Control System (PCS) was to provide functionality similar to the existing DCS system– Two Fisher Porter System Six DCS systems - Utilities and Mixing– System cut-over done on a tank-by-tank, system-by-system basis – not ‘rip and replace’

• Provide an interface in the new PCS for future plant-level MES system– Production Schedule Interface– Electronic Batch Records

• Expose process (continuous) and batch data outside of the process network– Existing DCS was an ‘island of automation’ – No direct ties to the corporate network– All existing reports and historian data had to be printed out– No visibility of the process outside of the DCS network

Page 10: Bausch  lomb leverages plant p ax_rev1

CHOOSING A PLANTPAX SOLUTION

Page 11: Bausch  lomb leverages plant p ax_rev1

“TRADITIONAL” DCS VS. PLANTPAX

Criteria Traditional DCS

Local Support Single Local Solutions Provider

Local Eco-System consisting of dozens of local

Integrators and Solution Partners

ScalabilityHardware + Additional

License required for additional I/O

No additional licensing required

TopologyDedicated Servers.

Software and Hardware Upgrades Expensive

Virtualization Fully Supported – Decoupling Hardware from Software

Page 12: Bausch  lomb leverages plant p ax_rev1

BASIS OF DESIGN PHASE• Basis of Design (BOD) was performed to provide enough technical and financial detail to

determine the best course toward implementation.

• BOD deliverables included:– Proposed System Architecture and Bill of Material with options for redundancy– Preliminary Design Drawings, including preliminary CAD drawings for Network, I/O and Power Distribution– Detailed Analysis against current URS– Initial design engineering (FRS 30% – 50% complete, initial DDS draft)– Technical options or considerations (i.e. Simulation System, FactoryTalk® AssetCentre)– Preliminary schedule– Validation Strategy– Cost Estimate

Page 13: Bausch  lomb leverages plant p ax_rev1

SYSTEM OVERVIEW

Page 14: Bausch  lomb leverages plant p ax_rev1

DOCUMENT EXISTING SYSTEM FUNCTIONALITY

• No formal Functional Requirement Specification (FRS) or Detailed Design Specification (DDS) existed for the Fisher Porter DCS.

• Malisko Engineers generated the FRS and DDS using DCS code exports and interviews with B&L production and engineering groups.

• S-88 Modeling - Define Control Modules, Equipment Modules, Phases and Units.

• Optimized Existing Sterilization Procedure. DCS had multiple phases. PCS has a single Sterilization phase with multiple steps.

• Several review meetings with key B&L production and engineering resources to finalize system design.

Page 15: Bausch  lomb leverages plant p ax_rev1

PLAN FOR STAGED CUT-OVER

• Production scheduling eliminated the idea of ‘rip and replace’

• Malisko had to devise a plan to stage cut over of tanks and Utilities systems

• IFM modules were placed over the DCS termination boards, prior to tank cutover. This allowed for a tank-by-tank cutover when a tank came available, thus minimizing the downtime occurred by the tank.

• Tank cutover time – 2.5 days.

Page 16: Bausch  lomb leverages plant p ax_rev1

STAGED CUTOVER I/O PANEL PICTURES

Page 17: Bausch  lomb leverages plant p ax_rev1

PLANTPAX SYSTEM CHARACTERIZATIONCharacterization verifies that the system provides the required performance.

Page 18: Bausch  lomb leverages plant p ax_rev1

SYSTEM ARCHITECTURE• Three Physical Servers with eight virtualized images

– FactoryTalk® View Servers (Primary and Secondary)– ACP ThinManager Remote Desktop Services (RDS) Servers (Primary and Secondary)– FactoryTalk® Batch Servers (Primary and Warm Backup)– FactoryTalk® Historian – Microsoft SQL Server– Seven FactoryTalk® View SE Thin Clients

• Two Engineering Workstations

• Cisco Stackwise Switches between Data Center and DCS I/O Room

• Device-level Ethernet Ring– Utilized for all I/O Chassis

• Separate network cards for connection to B&L business network for domain authentication.– Controlled by access rules on B&L corporate switches

• VPN Connection into system for Remote Support

Page 19: Bausch  lomb leverages plant p ax_rev1
Page 20: Bausch  lomb leverages plant p ax_rev1

LIBRARY OF PROCESS OBJECTS• V3.0 process objects • “Out of the Box” PlantPAx AOIs • “Enhanced” Global Objects (Valves, Pumps, etc)

Page 21: Bausch  lomb leverages plant p ax_rev1

HMI SCREEN SAMPLE (EXISTING DCS)

• 19” 4:3 Monitors• 1024 x 768 resolution• Ability to move main process screens

utilizing Windows pop-up functionality

Page 22: Bausch  lomb leverages plant p ax_rev1

HMI SCREEN LAYOUT (PLANTPAX)• 24” 16:9 Monitors

• 1920 x 1080 resolution

• Ability to move main process screensutilizing Windowspop-up functionality

Page 23: Bausch  lomb leverages plant p ax_rev1

FACTORYTALK BATCH• Primary and Warm Backup Servers• 30 Unit License – 19 units used• 33 Phases across two processors• Validated default recipes• Using ‘off the shelf’ Rockwell Batch Overview

screen for viewing and controlling batches• Developed custom screen for starting orders read in

from future B&L MES system

Page 24: Bausch  lomb leverages plant p ax_rev1

REPORTING• Reporting done through SQL Server

Reporting Services allowing Web-based access to reports

• Data taken from SQL tables and FactoryTalk® Historian SE

Confidential

Page 25: Bausch  lomb leverages plant p ax_rev1

DATA HISTORIAN AND SQL SERVER• 1,000 tag FactoryTalk® Historian SE server with

redundant FactoryTalk® Live Data interface nodes

• Historian data gathered from both PCS ControlLogix® processors and stand-alone skids

• Ability to import Historian data into Excel using DataLink add-in

• SQL database used to store FactoryTalk® Batch data, FactoryTalk® Alarms and Events, and FactoryTalk® Diagnostics data utilized for reporting

• Future connectivity of SQL and FactoryTalk® Historian to upcoming FactoryTalk® VantagePoint® installation

Page 26: Bausch  lomb leverages plant p ax_rev1

BIOMETRICS FOR USER AUTHENTICATION• DigitalPersona U.are.U 4500 Readers• Utilizes U.are.U Software Development Kit• VB .Net application used to detect and log-in users into FactoryTalk View SE• Users can enroll up to two fingerprints• Challenge of getting reader to work with ACP ThinManger Thin Clients

VB.Net App Interprets data

from Reader and sends FT Login

Credentials

Fingerprint Read from Reader

FT User is Logged into

System

Page 27: Bausch  lomb leverages plant p ax_rev1

RESULTS

Page 28: Bausch  lomb leverages plant p ax_rev1

IMMEDIATE RESULTS

• Robust, redundant system including servers, PLCs, application software, and networking (I/O Ring and Server to Client utilizing Stackwise switches)

• Local Rockwell support and readily available replacement parts

• Remote access for troubleshooting support if needed

• Built on a standardized set of process objects (PlantPAx)

• Easier for maintenance and engineering to learn and troubleshoot the system

Page 29: Bausch  lomb leverages plant p ax_rev1

LONG TERM BENEFITS• PCS system provides the framework to get data exposed to the corporate level

• Roll-out of VantagePoint to display and analyze data on the desktop (process users or engineers)

• Provide standardized programming environment following site standards

• S-88 model utilizing Phase Manager opens up options for further automation of the Mixing System

• Ability to interface with future B+L MES system to pass production orders down to the batching system, and feed critical production data for Electronic Batch Records

Page 30: Bausch  lomb leverages plant p ax_rev1

LESSONS LEARNEDAND

RECOMMENDATIONS

Page 31: Bausch  lomb leverages plant p ax_rev1

LESSONS LEARNED AND RECOMMENDATIONS• DCS replacements require planning and communications if not ‘rip and replace’

• At the mercy of Production, so scheduling needs to be flexible

• During initial design, factor-in framework for new enhancements, even if replacing with similar functionality.

• While laying your framework for the Connected Enterprise, have early and often conversations with plant IT groups. Make them part of the design process.

• Spend time with operators on the existing system. Don’t just ‘reverse engineer’ the old DCS code.

Page 32: Bausch  lomb leverages plant p ax_rev1

B&L LESSONS LEARNED AND RECOMMENDATIONS• Create a comprehensive URS – approved by key stakeholders; incorporate inputs from SME’s

• Include and fund a BOD phase if appropriate

• Follow a formal vendor selection process; evaluate proposals against critical criteria

• Align vendor capabilities with business needs

• Create and follow a detailed Project Plan in partnership with your vendor(s)

• Include SME’s in Design Reviews

• Understand Change Order process

• Include Contingency Plans

Page 33: Bausch  lomb leverages plant p ax_rev1

NEXT STEPS• Work towards bringing other isolated systems into the new Process Control Network

• Determine data to be collected via Historian (continuous) and SQL (events)

• Roll-out ‘Data to the Desktop’ initiative. Utilize FactoryTalk® VantagePoint and Historian DataLink.

• Look for ways to automate existing manual processes

Page 34: Bausch  lomb leverages plant p ax_rev1

Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved.

PUBLIC INFORMATION

THANK YOU

Steve SchneebeliMalisko Engineering Inc.Director of Engineering / IT – St. Louis, [email protected]

Matthew RobertsMalisko Engineering Inc.Business Development [email protected]