87
J J u u n n e e 1 1 8 8 , , 2 2 0 0 1 1 8 8 B B o o a a r r d d o o f f D D i i r r e e c c t t o o r r s s 9:15 am F F i i n n a a n n c c e e S S u u b b c c o o m m m m i i t t t t e e e e 8:30 am HR Training Room Munson Road
Transcript
Page 1: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

JJuunnee 1188,, 22001188

BBooaarrdd ooff DDiirreeccttoorrss 9:15 am

FFiinnaannccee SSuubbccoommmmiitttteeee 8:30 am

HR Training Room

Munson Road

Page 2: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Agenda and Materials

June 18, 2018

FINANCE SUBCOMMITTEE

Board of Directors

Time: 8:30 a.m.

Location: HR Training Room, Munson Road Page

1 . Public Comment 1

2 . Chair’s Remarks 2.1 Welcome 2.2 Approval of Minutes 32

2.2.1 May 22, 2018

3 . Financial Reports and Updates

3.1 Results of Operations as of April 30, 2018 - J. Geoghegan 18

4 . Items Needing Approval:

Contracts/PO’s/Amendments $1 million – J. Geoghegan

4.1 Contracts > $1,000,000 [F] 13 4.1.1 CT Natural Gas Corporation 4.1.2 Eversource (CL&P) 4.1.3 Johnson & Johnson 4.1.4 Medtronic USA, Inc. 4.1.5 Owens & Minor 4.1.6 J. Morrissey & Company, Inc. 4.1.7 The Jackson Laboratory 4.1.8 Anthrex, Inc. 4.1.9 Howmedica Osteonics 4.1.10 Medtronic Sofamor Danek 4.1.11 Nuvasive 4.1.12 Connecticut Chilldren’s Medical Center 4.1.13 Hartford Hospital 4.1.14 Saint Francis hospital and Medical Center 4.1.15 The Hospital of Central Connecticut 4.1.16 HealthWide Solutions, LLC 4.1.17 Olympus America, Inc. 4.1.18 GE healthcare 4.1.19 Cardinal Health, 110 LLC 4.1.20 McKesson Corporation 4.1.21 Optum 360, LLC and its affiliate, Optuminsight, Inc.

Page 3: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

FINANCE SUBCOMMITTEE

Agenda and Materials

June 18, 2018

UConn Health

4.2 Leases [F] 14 4.2.1 Instrumentation Laboratory 4.2.2 Universal Hospital Services 4.2.3 Advisory Board 4.2.4 Hartford Healthcare Medical Group

4.3 Project Budgets [F] 15 4.3.1 Project Budget for the UConn Health Main Accumulation Building

(Revised Final: $4,050,000)

5 . Updates and Informational Items:

6. Other Reports6.1 Personnel List 36

Next Regularly Scheduled Meeting:

Monday, September 19, 2018

8:30 a.m.

HR Training Room

Page 4: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

PAGE

1 PUBLIC COMMENT 1

2 CHAIR’S REMARKS

2.1 Welcome 2.1.1 Recognition of R. Lamont MacNeil, D.D.S., M. Dent. Sc. 2 2.1.2 Faculty Recognition Award, Dr. Douglas Peterson 3

2.2 Approvals [vote]

2.2.1 Meeting minutes - March 12, 2018 5 2.2.2 Conflict of Interest Committee Resolution 11

3 CONSENT ITEM

3.1 Contracts > $1,000,000 [F] 13 3.1.1 CT Natural Gas Corporation 3.1.2 Eversource (CL&P) 3.1.3 Johnson & Johnson 3.1.4 Medtronic USA, Inc. 3.1.5 Owens & Minor 3.1.6 J. Morrissey & Company, Inc. 3.1.7 The Jackson Laboratory 3.1.8 Anthrex, Inc. 3.1.9 Howmedica Osteonics 3.1.10 Medtronic Sofamor Danek 3.1.11 Nuvasive 3.1.12 Connecticut Chilldren’s Medical Center 3.1.13 Hartford Hospital 3.1.14 Saint Francis hospital and Medical Center 3.1.15 The Hospital of Central Connecticut 3.1.16 HealthWide Solutions, LLC 3.1.17 Olympus America, Inc. 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight, Inc.

Board of Directors

Agenda and Materials June 18, 2018

8:30 am – Finance Subcommittee

9:15 am – BoD Public Session BoD Executive Session to follow

Munson Road Training Room 16 Munson Road Farmington, CT

Page 5: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

3.2 Leases [F] 14 3.2.1 The Jackson Laboratory 3.2.2 Eagleville Partner, LLC 3.2.3 Eagleville Partner, LLC 3.2.4 Blackthorn Holdings, LLC 3.2.5 Connecticut Children’s Medical Center

3.3 Project Budgets [F] 15

3.3.1 Project Budget for the UConn Health Main Accumulation Building

(Revised Final: $4,050,000)

4 CEO/EVP REPORT – A. Agwunobi

4.1 UConn Foundation Health Sciences Fundraising Report – J. Grey

[A] Academic Affairs Subcmte [C] Clinical Affairs Subcmte [F] Finance Subcmte

5 MAIN BUSINESS

5.1 2019 Consolidated Operating Budget/Spending plan – J. Geoghegan 5.2 Current Services Requests for Fiscal Years 2020 and 2021 – J. Geoghegan (walk in item) 5.3 UConn Health One (EMR) update – B. Metz 5.4 Dean, School of Medicine Update – B. Liang

5.4.1 Health Disparities - Dr. Wizdom Powell, Dir. Health Disparities Institute 5.5 Dean, School of Dental Medicine Update – M. MacNeil 5.6 Clinical Update –

5.6.1 JDH - A. Agwunobi 5.6.2 UMG – A. Horbatuck 30

6 FINANCIAL AFFAIRS COMMITTEE REPORT -T. Holt 6.1 Chair’s Remarks 6.2 Informational Items

6.2.1 Minutes: March 12, 2017 32 6.2.2 Contracts to $999,999 35 6.2.3 Personnel List 36

7 BUILDING AND GROUNDS COMMITTEE REPORT – R. Carbray

7.1 Chair’s Remarks 7.2 Informational items

7.2.1 Minutes – November 28, 2017 43 7.2.2 Bioscience Connecticut Monthly Capital Projects Report 45

8 ACADEMIC AFFAIRS COMMITTEE REPORT - F. Archambault

8.1 Chair’s Remarks 8.2 Informational Items

8.2.1 Minutes: May 21, 2018 70

Page 6: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

9 CLINICAL AFFAIRS COMMITTEE REPORT - C. Chase

9.1 Chair’s Remarks 9.2 Informational Items

9.2.1 Minutes: February 22, 2018 75 9.2.2 Minutes: Peer Review Session – February 22, 2018 80 9.2.3 Summary of Key Indicators 81

10 OTHER REPORTS

10.1 JACC Update – T. Holt

11 EXECUTIVE SESSION

Preliminary notes and drafts that the Health Center has determined that the public interest in withholding such documents and discussions clearly outweighs the public interest in disclosure.

NEXT REGULARLY SCHEDULED MEETING September 17, 2018

Munson Road Training Room 16 Munson Road

Page 7: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Public Participation at UCHC Board of Directors Meetings

University of Connecticut Health Center Board of Directors starts its agenda with Public

Comments. The BOD shall hear brief oral presentations from members of the public who

wish to express their views on issues pending before the BOD or on other issues of

concern to the University of Connecticut Health Center. The agenda for each regular

public meeting of the BOD shall allot up to thirty minutes for this purpose:

a. Requests to address the BOD shall be made to the Chair’s designee at least one day

prior to the meeting and may begin to be made the day following the last BOD meeting.

The actual person who intends to speak must make the request.

b. The Chair of the BOD shall recognize each speaker in the order of signing up, shall

request the speaker identify himself/herself, and shall ensure adherence to time limits as

will permit the orderly progress of the BOD through its agenda. Each speaker will be

allotted a time period of three minutes to speak.

c. At a special meeting of the BOD, comment by members of the public shall be limited

specifically to the subject described in the call of the special meeting.

The BOD would like to give each constituency an opportunity to speak. Therefore,

groups are encouraged to appoint a single spokesperson to present their point of view.

The purpose of Public Participation is to allow the BOD to hear the views of the public.

BOD will neither ask nor answer questions nor make comments during this portion of the

agenda.

The Chair appoints the following person as his designee to receive requests to speak in

the Public Comments portion of BOD meetings:

Scott L. Wetstone, M.D.

Director, Health Affairs Policy Planning

Phone: (860) 679-4440

Fax: (860) 679-1255

Email: [email protected]

University of Connecticut Health Center

263 Farmington Avenue

Farmington, CT 06030-1920

1

Page 8: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

R. Lamont (Monty) MacNeil

2007 - 2018

WHEREAS, R. Lamont MacNeil has served the people of the State of Connecticut and

the University of Connecticut as the Dean of the School of Dental Medicine for the past

eleven years as well as being a UConn Health faculty member for twenty years; and

WHEREAS, During his period of leadership the School of Dental Medicine has excelled

academically in terms of its innovative curriculum, quality of teaching, and number of

students & residents and the research it provides, and clinically in terms of quality of care

and increasing volume of care, especially to underserved populations; and

WHEREAS, Dr. MacNeil’s has navigated the School through very fiscally challenging

times and still achieved success and growth including the planning and implementation of

new clinical facilities under the BioScience Connecticut program; and

WHEREAS, Dr. MacNeil has been an outstanding partner on joint efforts with the

School of Medicine, UConn Health clinical programs, and UConn including but not

limited to the new Biomedical Engineering Department and M-Delta Curriculum; and

WHEREAS, Through his deanship, Dr. MacNeil has been an active and productive

leader in national dental education organizations including service as the Chair of the

Board of the American Dental Education Association; and

WHEREAS, Throughout his tenure, Dr. MacNeil has been a colleague and had an

exemplary working relationship with the members of the Board of Directors; and Dr.

MacNeil leaves his deanship with the gratitude, respect and affection of the members of

the Board of Directors, and their best wishes for the future;

THEREFORE BE IT RESOLVED That the UConn Health Board of Directors records

its deep appreciation to R. Lamont MacNeil for exemplary service to the Board and to the

University.

BE IT FURTHER RESOLVED That this resolution be spread upon the minutes of the

Board of Directors, with copies sent to UConn Board of Trustees and to Dr. MacNeil.

Sanford Cloud, Jr., Chairperson

June 18, 2018

2

Page 9: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

To: Members of the UConn Health Board of Directors

From: Dr. R. Lamont MacNeil, Dean, School of Dental Medicine

Date: June 18, 2018

Subject: Recognition of Dr. Douglas Peterson as the Recipient of the 2018 UCH Board of

Directors Faculty Recognition Award

______________________________________________________________________________

Dr. Douglas Peterson is the recipient of the 2018 Board of Directors Faculty Recognition Award.

This award celebrates and rewards demonstrated academic, administrative and/or excellence of

Health Center faculty. The award was conveyed at the 2018 UCH Commencement Exercises on

May 7, 2018.

Douglas Peterson

Dr. Peterson began his faculty career in 1976 in the Cancer Center and the Dental School of the

University of Maryland, with continuation through 1989. He served as Visiting Scholar at the

Fred Hutchinson Cancer Research Center in 1983, following which time he co-published with Dr.

E. Donnall Thomas, 1990 Nobel Laureate in Physiology or Medicine. Dr. Peterson was

Consultant in Oral Medicine to the National Institutes of Health (NIH) from 1988-1994. Dr.

Peterson was also an Associate Medical Staff member at The Johns Hopkins Hospital and

Oncology Center from 1988-1991. He served as Professor and Head, Department of Oral

Diagnosis, Univ. of Connecticut School of Dental Medicine between 1989-2005, and again as

Interim Department Head 2006-2007. Dr. Peterson served as Chair of the School of Dental

Medicine Faculty Senate from 2009-2015.

Dr. Peterson’s primary academic responsibilities throughout his career have been directed to oral

management of the medically complex patient, with emphasis on oral complications in cancer

patients. He has contributed to development of interprofessional models for patient care,

research, and health professional education in this context for more than 40 years. He has

lectured extensively at the regional, national, and international levels throughout this time.

Dr. Peterson is author of approximately 165 peer-reviewed publications and 150 abstracts, and is

editor of 2 books and co-editor of a Monograph for the Journal of the National Institute. He has

been involved in translational and clinical trial research in the oncology setting throughout his

career, including serving as Principal Investigator on two multi-center, international clinical trials

involving drug development for oral mucositis in cancer patients. He has also served as Principal

Investigator on National Institutes of Health (NIH) grants including R01's and R13's, as well as

primary mentor via the NIH K Award program. Dr. Peterson has also been a reviewer of grant

applications for the NIH on a frequent basis during the past 30 years, including study section

chair for several panels.

Dr. Peterson is a Special Government Employee for the United States Food & Drug

Administration for mucositis clinical trials, having been initially appointed 13 years ago. Dr.

Peterson has also served as lead writer for the NCI’s PDQ® website Oral Complications of

3

Page 10: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Chemotherapy and Head/Neck Radiation for the past 13 years, with strategic updates to be

completed in 2018 via his leadership.

Dr. Peterson chaired the NIH-funded Conference Oral Complications of Emerging Cancer

Therapies in April 2009. He also chaired an American Society of Clinical Oncology (ASCO)

Education Session in June 2012 titled Mucosal Injury in Patients with Cancer: Targeting the

Biology. Dr. Peterson is Co-chair of ASCO’s Supportive Care Guideline Advisory Group, and is

a member of ASCO's Clinical Practice Guidelines Committee as well as its Methodology

Subcommittee. These ASCO committees are responsible for development of high quality,

evidence-based guidelines for the national and international oncology community, including the

role of dental medicine in cancer patient care. He is currently contributing a leadership role in

developing first-in-kind joint oral oncology guidelines in collaboration with ASCO and the

International Society of Oral Oncology. Dr. Peterson has been a frequent contributor to

CancerCare for many years, and received CancerCare’s Physician-of-The-Year award in 2006.

He has also served as lead writer for mucositis guidelines for the European Society of Medical

Oncology from 2007-2016.

Dr. Peterson has contributed to the World Workshop on Oral Medicine series beginning in the

1990’s, with leadership roles from 2004-present. Dr. Peterson is currently Associate Editor for

Dentistry and Medicine for the Journal of the American Dental Association, and is President and

Diplomate of the American Board of Oral Medicine. He is Region 6 Advisor for the European

Association of Oral Medicine, having been elected in 2013. Dr. Peterson also serves as a

reviewer for the Cochrane Oral Health portfolio, based in Univ. of Manchester, U.K.

In recognition of his career contributions, Dr. Peterson received the FDS RCSEd without

Examination from the Royal College of Surgeons/Edinburgh in 2011. He was appointed in

March 2015 to the Faculty of Examiners for the Conjoint FDS Examination in Oral Medicine,

and as Regional Dental Advisor for the Royal College effective April 2015.

Current UConn Health leadership responsibilities include serving as:

Chair of Oral Medicine, Dept. of Oral Health & Diagnostic Sciences

Chair of Scientific Review Committee, UConn Health Institutional Review Board

Co-Chair of UConn Health Conflict of Interest Committee

Vice President/Secretary of Medical Staff, UConn Health (re-elected to 2nd term Nov

2017)

School of Dental Medicine representative to the predoctoral biomedical curriculum

reform committee Vertical Teams Aligned in Learning & Scholarship.

In this role Dr. Peterson is one of two Co-chairs for interprofessional education, in

which Univ. of Connecticut students from multiple health professions, including

dental medicine, medicine, nursing, and pharmacy, are taught management of

medically complex patients via a team-based model.

For these remarkable contributions to education, research, administration and service, Dr.

Peterson is this year’s recipient for the Board of Directors Faculty Recognition Award.

4

Page 11: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Sanford Cloud, Chairman, called the meeting to order at 9:35 a.m.

1. Public CommentRikel Lightner gave public comment on the transition of Correctional Managed Health Carefrom UConn Health to DOC. Stating that many feel, as she does, that there is a highprobability of nonunionized managerial staff will not be selected to crossover to the DOCleaving them without a job; while unionized managerial staff, such as herself, included in thecrossover, may be laid off or put back on the floor at a lower grade level. Combined with this isthe fact that all seniority will be lost and not carried over to the DOC and UConn Health beingthe preferred place of employment may not have suitable positions available for those beingaffected by this change. In closing, Ms. Lightner publically thanked Gail Johnson for hercontinued work through this transitional process.

2. Chair’s Remarks2.1 Mr. Cloud welcomed everyone to the meeting. Chairman Cloud recognized the work of

Mr. Lawrence McHugh and his work with the Board of Directors.

2.1.1 Recognition of Lawrence McHugh

The Board of Directors unanimously approved the resolution honoring the service of Lawrence McHugh.

2.2 Minutes – 2.2.1 December 4, 2017 - Regular meeting

The Board of Directors unanimously approved the minutes of the meetings of the UConn Health Board of Directors held on December 4, 2017.

3. Consent Items (items 3.1 – 3.4 were voted on in the Finance Subcommittee meeting heldearlier in the day)

3.1 Contracts > $1,000,000 [F] 3.1.1 Novo Nordisk, Inc. 3.1.2 Capital Area Health Consortium 3.1.3 Capital Area Health Consortium 3.1.4 Concentra 3.1.5 Edwards Lifescience 3.1.6 GE Healthcare 3.1.7 Jackson & Coker Holdings, LLC, dba Jackson & Coker Locum Tenens, LLC 3.1.8 Locum Tenens Holdings, LLC, dba Locum Tenens.com, LLC 3.1.9 MDA Holdings, Inc., dba Medical Doctor Associates, LLC 3.1.10 Medestar 3.1.11 Quest Healthcare Solutions, LLC 3.1.12 Tusk Enterprises, LLC, dba Rhino Medical and Hospitalists Plus

March 12, 2018 Meeting minutes

Draft

Board of Directors

5

Page 12: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

The Board of Directors unanimously approved agenda item 3.1 described in detail in the board materials on page 9.

3 CEO/EVP Report – A. Agwunobi Dr. Agwunobi briefly highlighted the financial report highlighting the positive margins. At this time we are about $7.5 million ahead of budget. He added some comments regarding the correctional managed health care transition. There are approximately sixteen different groups working collaboratively with the Department of Correction to ensure a smooth transition while the staff is working tirelessly to guarantee that exceptional care continues to be given to all of our prisoners. The UConn Health One, the electronic medical records project is slated to go live on April 28. There will be a go-live readiness time, where we will determine whether the program is ready to go-live. If it is necessary, Dr. Agwunobi will delay the date to go-live. At this time, it appears that we are ready for April 28th. The final item Dr. Agwunobi discussed is the preparation for the Joint Commission. The two recent mock surveys brought to light a few areas that needed attention, manly in the area of Environment of Care. Since then there has been a great deal of focus on these areas in preparation for the Joint Commission’s visit. Jennifer Grey announced that fundraising overall for UConn Health is at $6.5 million, about $2 million over last year at this time and continues to track well. She continued by sharing some initiatives that the Foundation is working on including: - New focuses on naming opportunities for UConn Health. This would include some smaller

areas such as a classroom or hospital room - $25,000, waiting rooms at $100,000, and the Academic Rotunda is $1,000,000.

- A new initiative coming up in April which is #UConn Gives, which a university wide initiative. This will be our first ever school wide giving day.

- In 2015 the Foundation committed to raising $6 million dollars toward the Bioscience CT project. To date they have raised. $4.6 million. Gifts of over $100,000 will get recognized on the donor wall.

5 Main Business

5.1 Fiscal Year 2018 Results of Operations as of January 31, 2018 – J. Geoghegan The full report of the results of operations was reviewed in detail at the Finance Subcommittee meeting earlier and can be found in the board materials beginning on page 11. Mr. Geoghegan reinforced that currently UConn Health has a positive bottom line of $2.9 million, comparable to our budget (loss $4.6 million). All programs are favorable. The driver is overall positive volume, JDH is positive on discharges and outpatient activity; while UMG is positive in RVU production and the providers RVU’s are up year over year. There is additional information in the board materials.

5.2 Optum360 LLC and its affiliate, Optuminsight, Inc. – A. Agwunobi This report was presented in the Finance Subcommittee meeting earlier the same day. We continue to look for more ways to save funds for UConn Health. One of those cost saving approaches would be through revenue cycle. By outsourcing our revenue cycle management. This will improve the finances with additional revenue capture, improve billing function at UConn Health, and improve our readiness for launching the electronic medical records system. An RFP was issued last fall and interviewed 4 out of the 5 that responded. Jeff Geoghegan led the task of interviews and investigating. Dr. Agwunobi did clarify that he did not participate in the interview or selection process. He explained that although he does not have a direct conflict of interest, Dr. Agwunobi sits on the board of a large hospital system in California. That organization owns about 20% of Optum. Once it was determined that Optum was a respondent, Dr. Agwunobi

6

Page 13: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

immediately recused himself from the process. Optum360, a national revenue cycle management firm, with favorable overall costs compared to the other RFP’s; was selected. This firm indicated they serve 4 out of every 5 health care facilities across the US. This firm is part of the same firm that purchased ProHealth Physicians,

Optum did a small assessment prior to the contract stage so we would understand the potential financial benefit of them managing our revenue cycle would be and also to understand the full agreement. Their assessment was that conservatively we have about $8 million of opportunity with best practice being up to $14.5 million over the next twelve months. UConn Health has chosen a target of $10 million.

Dr. Agwunobi discussed the various breakdown costs of the contract and the separate portions of the agreement, including interim staffing and the HealthOne EPIC consulting. The request to the board is net funds of $2.6 million. A resolution was handed out to each board members in a total amount not to exceed $2.6 million.

The Board of Directors unanimously approved agenda item 5.2, The Resolution for a contract with Optum360, LLC and its affiliate, Optuminsight, Inc. in a total amount not to exceed $2.000,000.

5.3 UConn Health One update – Bruce Metz

Mr. Metz reported that considerable progress has been made toward the April 26 go-live

date for the UConn Health EPIC project. Major project areas have been improved and

strengthened including the overall approach to the implementation, project management

governance, testing, training, reporting and an a range of technical activities. The

emphasis of the project team has shifted. The focus now is getting the organization

ready for Health One. To this end a very extensive communication campaign is moving

forward to inform and engage not only our end users but also our patients. In addition

comprehensive clinical, revenue cycle and EPIC directive assessments are being

completed. As a result of these assessments over 100 critical go-lives risks have been

identified with mediation plans developed. A vendor has been selected to serve as

UConn Health’s activation partner and activation planning is well underway.

5.4 Dean, School of Medicine – B. Liang

Dr. Liang reported on the LCME full survey that occurred the week prior to the board

meeting. LCME stands for Liaison Committee on Medical Education, which is the

accrediting board for all United States Medical Schools. Dr. Liang reported that the

survey went well. The survey team reported that although the final LCME report will not

lists strengths of the school, the team recognized that the investment in facilities,

strategy and success of the debt management system, the recently introduced

innovative curriculum, and the wellness concept woven throughout the curriculum are

admirable. There are several areas believed to be mostly compliant but with a need to

monitor; they will need follow ups.

The new curriculum in collaboration with the School of Dental Medicine has successfully

completed Stage 1, the pre-clerkship forum and is now moving to Stage 2 which is the

required clerkship forum.

7

Page 14: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

In addition, Dr. Liang reported that there have two chairs that been recruited and are

now in place. Dr. Riqiang Yan is the new chair of the Neuroscience Department. Dr. Yan

comes to us from the Cleveland Clinic and is the world’s expert on Alzheimer ’s disease.

Also, Dr. Brenton Graveley will now assume the position of permanent chair of the

Department of Genetics and Genome Sciences. Dr. Graveley has recently been

awarded a $9,000,000 grant from the National Institute of Health.

5.4 Dean, School of Dental Medicine update – M. MacNeil

Dr. MacNeil gave an overview of the school’s highlights including the school’s academic

outcomes continue to be very strong reflected in our acceptance rate this year. This year

the school had an unusually high response to the first round of offers which speaks to

the reputation of the school nationally as well as locally. Starting to see Part 1 National

Board results for students who are completing the shared curriculum with medicine and

the results look very good. The match results were very strong this year.

Mr. Geoghegan gave the clinical report earlier. Dr. MacNeil wanted it noted that these

results are being achieved while an onsite clinical renovation and expansion project is

going on. The project should be completed in 12-14 months.

5.5 Clinical update – A. Agwunobi

UConn John Dempsey Hospital has just opened a new state of the art Epilepsy Unit

under the leadership of Dr. John Greenfield. Dr. Ketan Bulsara recently performed JDH’s

first Mechanical Thrombectomy on an advanced stroke patient. The volume at JDH has

been running 70% - 74% occupancy over the last few months. The surgeries are

increasing generally across the board, with several days when the operating rooms were

completely full. The new hybrid operating room will open in May. Overall John Dempsey

is growing.

UMG encounters are 5% ahead of the prior year, and productivity is 7% ahead of last

year. That is due to some great work by Anne Horbatuck and Denis Lafreniere; adding

patients, core physicians, and working with them to ensure they are supported. This has

driven UMG to be favorable to budget, which has not occurred in recent prior years.

Some of the new providers include physicians hired by UMG but who will also benefit the

hospital. In addition Dr. Agwunobi stressed that he and Dr. Liang are working diligently

to retain our current physicians.

As our finances start to improve we must take note that the staff on the front line,

particularly the nursing staff, take the brunt of the increased volume; and we run the

danger of losing nurses. Working with the unions it was decided to pay a stipend to

nurses to enable us to retain and recruit.

6. Financial Affairs – Tim Holt

The Finance Subcommittee met just prior to the full board meeting. The group reviewed and recommended contracts over $1,000,000, which were presented at the board meeting. In additional there was a detailed report on the FY 18 through January and the 2017 audited financial statements. There are informational items beginning on page 26 of the board materials.

8

Page 15: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

7. Building and Grounds – Richard Carbray

The building and grounds committee did not formally meeting this quarter. However, Mr. Carbray and Dr. Archambault attended the joint Building and Grounds committee which met in Storrs on February 14th. At which time Tom Trutter provided an update which highlighted the completion of the Academic building addition as well as the main building and lab renovations. Currently the clinic building renovations are 70% complete.

8. Academic Affairs – Fran Archambault

Academic Affairs met on January 29th and approved recommendations for appointments, sabbatical leaves, and promotions for the medical and dental schools. The group heard a report from the medical oversight committee on department reviews. We are currently in good shape with department reviews which is an improvement over past years. Dr. Steve Angus gave a report on the graduate medical education annual institutional review. Dr. Archambault made a motion that the board approve two recommendations for appointments to endowed chairs. The first was to Dr. Brenton Graveley, for the Health Net, Inc. Chair in Genetics and Developmental Biology. And the second to Dr. David McFadden, for the Murray-Heilig Chair in Surgery.

The Board of Directors unanimously approved the recommendations for appointments to Endowed Chairs for Dr. Brenton Graveley, for the Health Net, Inc. Chair in Genetics and Developmental Biology. And the second to Dr. David McFadden, for the Murray-Heilig Chair in Surgery. 9. Clinical Affairs – A. Agwunobi

Dr. Agwunobi reported for Chair Cheryl Chase. The Clinical Affairs Subcommittee met on February 22nd. Dr. Scott Allen was appointed as Chief Quality Officer for John Dempsey Hospital. The finances were also presented and it was announced that a Vice President of Patient Experience will be hired. This will be someone to lead the effort across the organization to further improve the patient experience in our system and make it more consistent. The nurse stipend (mentioned earlier) was also discussed. The surveys for patient satisfaction were reviewed showing that nurse communication has improved. There is additional work to do in the area of staff responsiveness and doctor communication. Some hospital goals were tentatively approved and an additional goal is being added for central line infections because of the challenges expected with the Leapfrog Safety grade. Our CMS star rating is 3 out of 5 which is where we have been and is equal to or better than most hospitals in the state.

10. Other Reports– Tim Holt

The JACC met twice since the last Board of Directors meeting; once on December 19, 2017 and once on March 12, 2018. Over that period of time the group reviewed six audits, one specific to UConn Health. Action plans are in place to address all recommendations that were a result of the audits. There was an audit of the John Dempsey Hospital Deaf and Hard of Hearing Voluntary Resolution Agreement which was a good report and in compliance with the Department of Justice. There was also a report on the Health One Electronic Medical Records. Two audits were presented on the financial statements for 2017 which were presented earlier in this meeting. Marcum, the outside auditor, issued unqualified opinions and did not identify any deficiencies in internal control. Likewise, the auditors of pubic accounts presented UConn and UConn Health financial statements for 2017 and issued an unqualified opinion and did not identify any issues.

9

Page 16: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Executive Session

At 10:31 a.m. a motion was made and unanimously approved to enter into executive session in order to discuss:

Preliminary notes and drafts that the Health Center has determined that the public interest in withholding such documents and discussions clearly outweighs the public interest in disclosure; and trade secrets that derive independent economic value, actual or potential, from not being generally known, and not being readily ascertainable by proper means by other persons who can obtain economic value from their disclosure of use, and are the subject of efforts that are reasonable under the circumstances to maintain secrecy.

Executive Session Attendees: K. Alleyne, F. Archambault, R. Barry, K. Bragherol, R. Carbray,

S. Cloud, J. Droney, S. Herbst, T. Holt, R. Pino, W. Rawlins (phone), T. Ressel (phone), and K.

Woods

Guests: A. Agwunobi, L. Danville, J. Geoghegan, C. Hyers, A. Keilty, S. Jordan (phone), R. Rubin, J. Teitelbaum (phone), B. White

With no further business the meeting was adjourned at 11:28 am.

Respectfully submitted,

Andrew Agwunobi, MD, MBA Chief Executive Officer, UConn Health Executive Vice President for Health Affairs

Attendees : K. Alleyne, F. Archambault, R. Barry, K. Bragherol, R. Carbray, S. Cloud, J. Droney,

S. Herbst, T. Holt, R. Pino, W. Rawlins (phone), T. Ressel (phone), and K. Woods

10

Page 17: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

TO: Members, Board of Directors

FROM: Andrew Agwunobi, MD, MBA

Executive Vice President for Health Affairs

DATE: June 18, 2018

SUBJECT: Conflict of Interest

RECOMMENDATION

That the Conflict of Interest Subcommittee submit the following advice to Chairman Cloud to support

his decision making regarding instituting Conflict of Interest management plans for selected Board of

Directors members:

BACKGROUND

The committee unanimously approved submitting the following advice to Chairman Cloud to support

his decision making regarding instituting Conflict of Interest management plans for selected Board of

Directors members:

Richard Barry – The chair of each BoD subcommittee should be made aware that Mr. Barry is

the Chief Risk Officer for Key Bank which provides various services to public institutions like

UConn. Mr. Barry should be instructed from voicing his opinions or making comments to other

Board members on any matter that could benefit Key Bank. Mr. Barry should also be recused

from voting on any such matters in his capacity as a Board member.

Andy Bessette – The chair of each BoD subcommittee should be made aware that Mr. Bessette

is an officer at the Travelers. Mr. Bessette should be instructed to refrain from voicing his

opinions or making comments to other Board members on any matter that could benefit the

Travelers, such as rate setting for UCHC contracts with the Travelers. Mr. Bessette should also

be recused from voting on any such matters in his capacity as a Board member.

Robert Dakers - The chair of each BoD subcommittee should be made aware that Mr. Dakers

serves as the Executive Financial Officer for the State Office of Policy and Management. Mr.

Dakers should be instructed to refrain from voicing his opinions or making comments to other

Board members on any regulatory matter in which the Department of Policy and Management

11

Page 18: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

is transacting with UCHC. Mr. Dakers should also be recused from voting on any such matters in

his capacity as a Board member.

Joel Freedman - The chair of each BoD subcommittee should be made aware that Mr.

Freedman’s wife, Susan, is a partner in the law firm of Shipman and Goodwin. Mr. Freedman

should be instructed to refrain from voicing his opinions or making comments to other Board

members on any matter that could benefit Shipman and Goodwin. Mr. Freedman should also be

recused from voting on any such matters in his capacity as a Board member.

Wayne Rawlins – The chair of each BoD subcommittee should be made aware that Dr. Rawlins is

the medical director at Connecticare and is a member of the Boards of Trustees for the

Connecticut Science Center. Dr. Rawlins should be instructed to refrain from voicing his

opinions or making comments to other Board members on any matter that could benefit

Connecticare or the Connecticut Science Center. Dr. Rawlins should also be recused from voting

on any such matters in his capacity as a Board member.

12

Page 19: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

No

.C

on

tra

cto

rP

R,

PO

, B

id o

r

Co

ntr

ac

t N

um

be

rC

on

tra

ct

Typ

e

Pre

vio

us C

on

tra

ct

Am

ou

nt

(if

ap

pli

ca

ble

)A

pp

rova

l A

mo

un

tT

erm

Fu

nd

So

urc

eD

ep

t./In

div

idu

al S

po

nso

r (B

usin

ess

Ow

ne

r)

Ex

pe

nse

(E)

Re

ve

nu

e

(R)

De

sc

rip

tio

nS

ou

rcin

g

1C

T N

atu

ral G

as C

orp

ora

tio

n

Mu

ltip

le P

urc

ha

se

Ord

ers

Mu

ltip

le P

Os

$2

,90

0,0

00

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

17

fo

r

FY

18

sp

en

d)

$2

,90

0,0

00

7/1

/18

- 6

/30

/19

Mu

ltip

le S

ou

rce

sC

liff

Ash

ton

, A

sso

cia

te V

ice

Pre

sid

en

t

Fa

cili

tie

s M

an

ag

em

en

t A

dm

inis

tra

tio

nE

Pu

rch

ase

of

na

tura

l g

as f

or

he

at

for

all

bu

ildin

gs o

n t

he

Fa

rmin

gto

n c

am

pu

s f

or

FY

19

. A

ctu

al

sp

en

d d

urin

g F

Y1

8 (

ye

ar

to d

ate

) is

ap

pro

xim

ate

ly $

1,5

70

,00

0.

No

n-c

om

pe

titive

(Utilit

y)

2E

ve

rso

urc

e (

CL

&P

)M

ultip

le P

urc

ha

se

Ord

ers

Mu

ltip

le P

Os

$1

2,6

00

,00

0

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

17

fo

r

FY

18

sp

en

d)

$1

2,6

00

,00

07

/1/1

8 -

6/3

0/1

9O

pe

ratin

g F

un

ds

Clif

f A

sh

ton

, A

sso

cia

te V

ice

Pre

sid

en

t

Fa

cili

tie

s M

an

ag

em

en

t A

dm

inis

tra

tio

nE

Ele

ctr

icity c

osts

fo

r th

e F

arm

ing

ton

ca

mp

us f

or

FY

19

. A

ctu

al sp

en

d d

urin

g F

Y1

8 (

ye

ar

to

da

te)

is a

pp

roxim

ate

ly $

8,7

00

,00

0.

No

n-c

om

pe

titive

(Utilit

y)

3Jo

hn

so

n &

Jo

hn

so

nM

ultip

le P

urc

ha

se

Ord

ers

Mu

ltip

le P

Os

$1

,90

0,0

00

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

17

fo

r

FY

18

sp

en

d)

$1

,90

0,0

00

7/1

/18

- 6

/30

/19

Op

era

tin

g F

un

ds-

Clin

ica

l

Lin

da

Ma

nze

lli,

Dire

cto

r

Ca

lho

un

Ca

rdio

log

y C

en

ter

E

Pu

rch

ase

of

me

dic

al d

evic

es a

nd

ca

rdio

va

scu

lar

pro

du

cts

fo

r F

Y1

9,

so

me

of

wh

ich

are

acce

sse

d t

hro

ug

h G

PO

ag

ree

me

nts

. A

ctu

al sp

en

d d

urin

g F

Y1

8 (

ye

ar

to d

ate

) is

ap

pro

xim

ate

ly $

81

5,0

00

.

So

le S

ou

rce

4M

ed

tro

nic

US

A,

Inc

Mu

ltip

le P

urc

ha

se

Ord

ers

Mu

ltip

le P

Os

$2

,00

0,0

00

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

17

fo

r

FY

18

sp

en

d)

$2

,00

0,0

00

7/1

/18

- 6

/30

/19

Op

era

tin

g F

un

ds-

Clin

ica

l

Au

gu

stu

s M

azzo

cca

, M

D,

Dire

cto

r,

Ort

ho

pa

ed

ic S

urg

ery

E

Pu

rch

ase

of

sp

ina

l m

ed

ica

l su

pp

lies f

or

FY

19

, so

me

of

wh

ich

are

acce

sse

d t

hro

ug

h G

PO

ag

ree

me

nts

. A

ctu

al sp

en

d d

urin

g

FY

18

(ye

ar

to d

ate

) is

ap

pro

xim

ate

ly $

1,2

00

,00

0.

GP

O/C

on

so

rtiu

m

5O

we

ns &

Min

or

Mu

ltip

le P

urc

ha

se

Ord

ers

Mu

ltip

le P

Os

$1

3,0

00

,00

0

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

17

fo

r

FY

18

sp

en

d)

$1

3,0

00

,00

07

/1/1

8 -

6/3

0/1

9O

pe

ratin

g F

un

ds-

Clin

ica

l

Lo

ri A

co

mb

, D

ire

cto

r

Pro

cu

rem

en

t &

Su

pp

ly C

ha

in O

pe

ratio

ns

EM

ed

ica

l a

nd

su

rgic

al su

pp

lies f

or

FY

19

fro

m o

ur

prim

ary

dis

trib

uto

r fo

r th

is c

om

mo

dity.

Actu

al

sp

en

d d

urin

g F

Y1

8 (

ye

ar

to d

ate

) is

ap

pro

xim

ate

ly $

8,4

00

,00

0.

GP

O/C

on

so

rtiu

m

6J M

orr

isse

y &

Co

mp

an

y In

cU

CH

C2

-35

51

90

72

Am

en

dm

en

t

$4

,30

0,0

00

(ap

pro

ve

d b

y B

oa

rd in

Se

pte

mb

er

20

16

)

$5

,00

0,0

00

(in

clu

de

s a

n a

dd

itio

na

l $

70

0,0

00

)3

/1/1

3 -

11

/30

/18

Mu

ltip

le S

ou

rce

sL

ori A

co

mb

, D

ire

cto

r

Pro

cu

rem

en

t &

Su

pp

ly C

ha

in O

pe

ratio

ns

EO

n C

all

Pro

fessio

na

l T

em

po

rary

Se

rvic

es

Bid

7T

he

Ja

ckso

n L

ab

ora

tory

UC

HC

2-6

95

81

40

8A

me

nd

me

nt

$9

00

,00

0$

5,0

40

,00

0

(in

clu

de

s a

n a

dd

itio

na

l $

4,1

40

,00

0)

3/8

/16

- 2

/2/2

2O

pe

ratin

g F

un

ds-

Re

se

arc

h

Ju

lie S

ch

wa

ge

r, A

ssis

tan

t V

ice

Pre

sid

en

t

Re

se

arc

h F

ina

nce

E

Co

llab

ora

tive

re

se

arc

h a

gre

em

en

t w

he

re U

Co

nn

He

alth

will

pro

vid

e f

un

din

g t

o J

AX

to

su

pp

ort

the

eq

uiv

ale

nt

of

10

fu

ll-tim

e f

acu

lty p

ositio

ns.

Jo

int

facu

lty w

ill b

e e

mp

loye

es o

f U

Co

nn

He

alth

with

de

dic

ate

d r

ese

arc

h s

pa

ce

at

JA

X.

So

le S

ou

rce

8A

rth

rex,

Inc.

UC

HC

FC

1-1

02

67

18

15

Ne

w

$1

,50

0,0

00

(ap

pro

ve

d b

y B

oa

rd in

Se

pte

mb

er

20

12

fo

r 8

/1/1

3 -

7/3

0/1

8)

$1

,50

0,0

00

8/1

/18

- 7

/31

/23

Op

era

tin

g F

un

ds-

Clin

ica

l

Ro

be

rt A

rcie

ro,

M.D

., P

rofe

sso

r/C

linic

al

Ort

ho

pe

dic

Su

rge

ryE

Re

pla

ce

me

nt/

up

gra

de

of

cu

rre

nt

su

rgic

al vid

eo

art

hro

sco

py e

qu

ipm

en

t. C

on

tra

ct

va

lue

inclu

de

s c

ost

of

lea

se

d e

qu

ipm

en

t a

nd

re

pa

ir/r

ep

lace

me

nt

se

rvic

e a

gre

em

en

t.S

ole

So

urc

e

9H

ow

me

dic

a O

ste

on

ics

UC

HC

FC

1-8

54

08

75

3A

me

nd

me

nt

$9

00

,00

0$

1,8

00

,00

0

(in

clu

de

s a

n a

dd

itio

na

l $

90

0,0

00

)4

/1/1

7 -

3/3

1/1

9O

pe

ratin

g F

un

ds-

Clin

ica

l

Ka

ren

Cu

rle

y,

Dire

cto

r

Nu

rsin

g A

dm

inis

tra

tio

nE

Sp

ine

Im

pla

nts

S

ole

So

urc

e

10

Me

dtr

on

ic S

ofa

mo

r D

an

ek

UC

HC

FC

1-8

54

15

23

8A

me

nd

me

nt

$7

00

,00

0$

1,0

50

,00

0

(in

clu

de

s a

n a

dd

itio

na

l $

35

0,0

00

)4

/1/1

7 -

3/3

1/1

9O

pe

ratin

g F

un

ds-

Clin

ica

l

Ka

ren

Cu

rle

y,

Dire

cto

r

Nu

rsin

g A

dm

inis

tra

tio

nE

Sp

ine

Im

pla

nts

S

ole

So

urc

e

11

Nu

va

siv

eU

CH

CF

C1

-85

40

62

09

Am

en

dm

en

t$

95

0,0

00

$1

,90

0,0

00

(in

clu

de

s a

n a

dd

itio

na

l $

95

0,0

00

)4

/1/1

7 -

3/3

1/1

9O

pe

ratin

g F

un

ds-

Clin

ica

l

Ka

ren

Cu

rle

y,

Dire

cto

r

Nu

rsin

g A

dm

inis

tra

tio

nE

Sp

ine

Im

pla

nts

S

ole

So

urc

e

12

Co

nn

ecticu

t C

hild

ren

's M

ed

ica

l

Ce

nte

rU

CH

CF

C-9

98

32

59

6N

ew

$3

1,6

16

,76

6

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

15

fo

r

7/1

/15

- 6

/30

/18

)

$3

5,8

75

,72

97

/1/1

8 -

6/3

0/2

1R

eve

nu

e

Ge

ne

ratin

g

Ma

rk S

ira

co

, D

ire

cto

r

Fin

an

ce

-Gra

du

ate

Me

dic

al E

du

ca

tio

nR

CC

MC

ag

ree

s t

o r

eim

bu

rse

UC

on

n H

ea

lth

fo

r th

e s

ala

rie

s a

nd

frin

ge

be

ne

fits

of

all

UC

on

n

He

alth

re

sid

en

ts a

ssig

ne

d b

y t

he

Sch

oo

l o

f M

ed

icin

e t

o t

he

CC

MC

's s

ite

fo

r ro

tatio

ns.

In

ad

ditio

n,

CC

MC

sh

all

pa

y its

pro

po

rtio

na

l sh

are

of

UC

on

n H

ea

lth

’s a

dm

inis

tra

tive

exp

en

se

s in

su

pp

ort

of

Gra

du

ate

Me

dic

al E

du

ca

tio

n.

N/A

- R

eve

nu

e

13

Ha

rtfo

rd H

osp

ita

lU

CH

CF

C-9

98

32

88

9N

ew

$8

1,4

75

,80

8

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

15

fo

r

7/1

/15

- 6

/30

/18

)

$9

3,4

99

,07

87

/1/1

8 -

6/3

0/2

1R

eve

nu

e

Ge

ne

ratin

g

Ma

rk S

ira

co

, D

ire

cto

r

Fin

an

ce

-Gra

du

ate

Me

dic

al E

du

ca

tio

nR

HH

ag

ree

s t

o r

eim

bu

rse

UC

on

n H

ea

lth

fo

r th

e s

ala

rie

s a

nd

frin

ge

be

ne

fits

of

all

UC

on

n

He

alth

re

sid

en

ts a

ssig

ne

d b

y t

he

Sch

oo

l o

f M

ed

icin

e t

o H

art

ford

Ho

sp

ita

l's s

ite

fo

r ro

tatio

ns.

In a

dd

itio

n,

HH

sh

all

pa

y its

pro

po

rtio

na

l sh

are

of

UC

on

n H

ea

lth

’s a

dm

inis

tra

tive

exp

en

se

s in

su

pp

ort

of

Gra

du

ate

Me

dic

al E

du

ca

tio

n.

N/A

- R

eve

nu

e

14

Sa

int

Fra

ncis

Ho

sp

ita

l a

nd

Me

dic

al C

en

ter

UC

HC

FC

-10

03

35

71

3N

ew

$5

2,7

75

,92

2

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

15

fo

r

7/1

/15

- 6

/30

/18

)

$6

0,6

80

,03

47

/1/1

8 -

6/3

0/2

1R

eve

nu

e

Ge

ne

ratin

g

Ma

rk S

ira

co

, D

ire

cto

r

Fin

an

ce

-Gra

du

ate

Me

dic

al E

du

ca

tio

nR

Sa

int

Fra

ncis

ag

ree

s t

o r

eim

bu

rse

UC

on

n H

ea

lth

fo

r th

e s

ala

rie

s a

nd

frin

ge

be

ne

fits

of

all

UC

on

n H

ea

lth

re

sid

en

ts a

ssig

ne

d b

y t

he

Sch

oo

l o

f M

ed

icin

e t

o S

ain

t F

ran

cis

's s

ite

fo

r

rota

tio

ns.

In a

dd

itio

n,

Sa

int

Fra

ncis

sh

all

pa

y its

pro

po

rtio

na

l sh

are

of

UC

on

n H

ea

lth

’s

ad

min

istr

ative

exp

en

se

s in

su

pp

ort

of

Gra

du

ate

Me

dic

al E

du

ca

tio

n.

N/A

- R

eve

nu

e

15

Th

e H

osp

ita

l o

f C

en

tra

l

Co

nn

ecticu

tU

CH

CF

C-9

98

32

90

1N

ew

$1

9,9

33

,43

3

(ap

pro

ve

d b

y B

oa

rd in

Ju

ne

20

15

fo

r

7/1

/15

- 6

/30

/18

)

$2

0,9

15

,36

97

/1/1

8 -

6/3

0/2

1R

eve

nu

e

Ge

ne

ratin

g

Ma

rk S

ira

co

, D

ire

cto

r

Fin

an

ce

-Gra

du

ate

Me

dic

al E

du

ca

tio

nR

TH

OC

C a

gre

es t

o r

eim

bu

rse

UC

on

n H

ea

lth

fo

r th

e s

ala

rie

s a

nd

frin

ge

be

ne

fits

of

all

UC

on

n

He

alth

re

sid

en

ts a

ssig

ne

d b

y t

he

Sch

oo

l o

f M

ed

icin

e t

o T

HO

CC

's s

ite

fo

r ro

tatio

ns.

In

ad

ditio

n,

TH

OC

C s

ha

ll p

ay its

pro

po

rtio

na

l sh

are

of

UC

on

n H

ea

lth

’s a

dm

inis

tra

tive

exp

en

se

s

in s

up

po

rt o

f G

rad

ua

te M

ed

ica

l E

du

ca

tio

n.

N/A

- R

eve

nu

e

16

He

alth

Wid

e S

olu

tio

ns,

LL

CU

CH

CF

C1

-90

86

41

89

A

me

nd

me

nt

$1

,50

0,0

00

(ap

pro

ve

d b

y B

oa

rd in

De

ce

mb

er

20

17

)

$2

,00

0,0

00

(in

clu

de

s a

n a

dd

itio

na

l $

50

0,0

00

)7

/31

/17

- 1

2/3

1/1

8O

pe

ratin

g F

un

ds-

Clin

ica

l

Je

ffre

y G

eo

gh

eg

an

,

Ch

ief

Fin

an

cia

l O

ffic

er

EC

on

tin

ua

tio

n o

f re

ve

nu

e c

ycle

ma

na

ge

me

nt

co

nsu

ltin

g s

erv

ice

s f

or

bo

th t

he

Ep

ic

imp

lem

en

tatio

n p

roje

ct

an

d in

terim

re

ve

nu

e c

ycle

le

ad

ers

hip

.E

me

rge

ncy

17

Oly

mp

us A

me

rica

, In

c.

UC

HC

FC

1-1

00

31

18

13

&

UC

HC

FC

4-1

00

33

00

68

Ne

w$

97

5,0

00

(fo

r 1

/18

/15

- 1

/17

/18

)$

1,5

00

,00

06

/25

/18

- 6

/24

/21

Op

era

tin

g F

un

ds-

Clin

ica

l

Ka

ren

Cu

rle

y,

Dire

cto

r

Nu

rsin

g A

dm

inis

tra

tio

nE

En

do

sco

py e

qu

ipm

en

t (s

co

pe

s,

ca

me

ra,

mo

nito

rs a

nd

re

late

d a

cce

sso

rie

s)

an

d s

erv

ice

ag

ree

me

nt

for

UC

on

n H

ea

lth

Ga

str

oe

nte

rolo

gy D

ep

art

me

nt.

So

le S

ou

rce

18

GE

He

alth

ca

reM

ultip

le,

inclu

din

g P

R

10

33

95

59

3N

ew

/ M

ultip

le P

Os

N/A

$2

,50

0,0

00

7/1

/18

- 6

/30

/19

Mu

ltip

le S

ou

rce

sM

org

an

Hill

s,

Se

nio

r D

ire

cto

r

Ho

sp

ita

l O

pe

ratio

ns

EP

urc

ha

se

of

fou

r x-r

ay m

ach

ine

s,

fou

r u

ltra

so

un

d m

ach

ine

s a

nd

on

e C

-arm

, p

lus

co

nstr

uctio

n/r

en

ova

tio

n o

f ro

om

s f

or

the

pla

ce

me

nt

of

the

ne

w e

qu

ipm

en

t.

So

le S

ou

rce

19

Ca

rdin

al H

ea

lth

11

0 L

LC

Mu

ltip

le,

inclu

din

g

UC

HC

FC

1-7

24

35

57

6M

ultip

le C

on

tra

cts

/ P

Os

$3

,00

0,0

00

(ap

pro

xim

ate

FY

18

sp

en

d w

ith

bo

th

Ca

rdin

al H

ea

lth

11

0 L

LC

an

d

McK

esso

n C

orp

ora

tio

n f

or

34

0b

rep

len

ish

me

nts

)

$5

,00

0,0

00

7/1

/18

- 6

/30

/19

Op

era

tin

g F

un

ds-

Clin

ica

l

Kim

be

rly M

etc

alf,

Se

nio

r D

ire

cto

r

Ho

sp

ita

l O

pe

ratio

ns

EP

urc

ha

se

of

ph

arm

ace

utica

ls t

o r

ep

len

ish

sto

ck o

f re

tail

ph

arm

acie

s t

ha

t a

re p

art

icip

atin

g in

the

Jo

hn

De

mp

se

y H

osp

ita

l P

ha

rma

cy's

34

0b

pro

gra

m.

So

le S

ou

rce

20

McK

esso

n C

orp

ora

tio

nM

ultip

le,

inclu

din

g

UC

HC

FC

1-5

34

93

44

3M

ultip

le C

on

tra

cts

/ P

Os

$3

,00

0,0

00

(ap

pro

xim

ate

FY

18

sp

en

d w

ith

bo

th

Ca

rdin

al H

ea

lth

11

0 L

LC

an

d

McK

esso

n C

orp

ora

tio

n f

or

34

0b

rep

len

ish

me

nts

)

$5

,00

0,0

00

7/1

/18

- 6

/30

/19

Op

era

tin

g F

un

ds-

Clin

ica

l

Kim

be

rly M

etc

alf,

Se

nio

r D

ire

cto

r

Ho

sp

ita

l O

pe

ratio

ns

EP

urc

ha

se

of

ph

arm

ace

utica

ls t

o r

ep

len

ish

sto

ck o

f re

tail

ph

arm

acie

s t

ha

t a

re p

art

icip

atin

g in

the

Jo

hn

De

mp

se

y H

osp

ita

l P

ha

rma

cy's

34

0b

pro

gra

m.

So

le S

ou

rce

21

Op

tum

36

0,

LL

C a

nd

its

aff

ilia

te,

Op

tum

Insig

ht,

In

c.

UC

HC

FC

-5-2

08

7A

me

nd

me

nt

$2

,00

0,0

00

$

2,3

00

,00

0

(in

clu

de

s a

n a

dd

itio

na

l $

30

0,0

00

)4

/1/1

8 -

6/3

0/1

9O

pe

ratin

g F

un

ds-

Clin

ica

l

Je

ffre

y G

eo

gh

eg

an

,

Ch

ief

Fin

an

cia

l O

ffic

er

E

Clin

ica

l re

ve

nu

e c

ycle

ma

na

ge

me

nt

se

rvic

es in

su

pp

ort

of

UC

on

n H

ea

lth

's c

linic

al e

nte

rprise

.

Th

e a

me

nd

me

nt

co

ve

r a

dd

itio

na

l se

rvic

es r

ela

ted

to

th

e im

ple

me

nta

tio

n o

f H

ea

lth

On

e a

nd

He

alth

In

form

atio

n M

an

ag

em

en

t re

vie

ws.

Bid

Fin

an

ce

Su

bco

mm

itte

e J

un

e 1

8, 2018

CO

NT

RA

CT

S (

OT

HE

R T

HA

N R

EA

L E

ST

AT

E L

EA

SE

S)

AN

D P

UR

CH

AS

E O

RD

ER

S O

F $

1,0

00,0

00 O

R M

OR

EF

OR

UC

ON

N H

EA

LT

H B

OA

RD

OF

DIR

EC

TO

RS

AP

PR

OV

AL

ON

JU

NE

18, 2018

Fin

an

ce

Co

rpo

rati

on

Page 1

of

1

13

Page 20: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

No

.L

es

se

eA

nn

ua

l A

mo

un

t

Re

ce

iva

ble

Pri

ce

Pe

r S

q. F

t.T

erm

Ye

arl

y In

cre

as

e

Typ

e o

f L

ea

se

:

Tri

ple

Ne

t o

r

Gro

ss

Le

as

e

If a

ny C

AM

, ta

xe

s,

Ins

ura

nc

e f

or

1s

t ye

ar

Fu

nd

So

urc

eP

rog

ram

Dir

ec

tor

Pu

rpo

se

1T

he

Ja

ckso

n L

ab

ora

tory

$2

20

,25

0/y

ea

r$

25

.32

7/1

/18

- 6

/30

/29

2.5

%G

ross

N/A

Re

ve

nu

e G

en

era

tin

g

Th

om

as T

rutte

r, A

sso

cia

te V

ice

Pre

sid

en

t

Ca

mp

us P

lan

nin

g

UC

on

n H

ea

lth

will

le

ase

8,7

00

sq

ua

re f

ee

t o

f o

ffic

e s

pa

ce

lo

ca

ted

on

the

th

ird

flo

or

of

the

Ad

min

istr

ative

Se

rvic

es B

uild

ing

(A

SB

) to

Th

e

Ja

ckso

n L

ab

ora

tory

,

No

.L

es

so

rA

nn

ua

l A

mo

un

t

Pa

ya

ble

Pri

ce

Pe

r S

q. F

t.T

erm

Ye

arl

y In

cre

as

e

Typ

e o

f L

ea

se

:

Tri

ple

Ne

t o

r

Gro

ss

Le

as

e

If a

ny C

AM

, ta

xe

s,

Ins

ura

nc

e f

or

1s

t ye

ar

Fu

nd

So

urc

eP

rog

ram

Dir

ec

tor

Pu

rpo

se

1E

ag

levill

e P

art

ne

r, L

LC

$2

1,6

00

/ye

ar

$1

.64

7/1

/18

- 6

/30

/19

No

ne

Gro

ss

N/A

Op

era

tin

g F

un

ds-C

linic

al

Do

nn

a M

cK

en

ty, S

en

ior

Dir

ecto

r

De

an

's O

ffic

e M

ed

ica

l

Re

sid

en

tia

l le

ase

of

pro

pe

rty a

t 6

6 In

dia

n S

pri

ng

Ro

ad

, W

oo

dsto

ck, C

T.

Th

e p

rop

ert

y w

ill h

ou

se

up

to

th

ree

3rd

-ye

ar

me

dic

al stu

de

nts

at a

tim

e

wh

ile th

ey a

re c

om

ple

tin

g th

eir

6-w

ee

k c

linic

al ro

tatio

ns in

th

e to

wn

s o

f

Pu

tna

m, T

ho

mp

so

n a

nd

Na

tch

au

g, C

T.

2E

ag

levill

e P

art

ne

r, L

LC

$2

1,6

00

/ye

ar

$1

.95

7/1

/19

- 6

/30

/19

No

ne

Gro

ss

N/A

Op

era

tin

g F

un

ds-C

linic

al

Do

nn

a M

cK

en

ty, S

en

ior

Dir

ecto

r

De

an

's O

ffic

e M

ed

ica

l

Re

sid

en

tia

l le

ase

of

pro

pe

rty a

t 3

3 H

iaw

ath

a H

eig

hts

, W

oo

dsto

ck

Va

lley, C

T. T

he

pro

pe

rty w

ill h

ou

se

up

to

th

ree

3rd

-ye

ar

me

dic

al

stu

de

nts

at a

tim

e w

hile

th

ey a

re c

om

ple

tin

g th

eir

6-w

ee

k c

linic

al

rota

tio

ns in

th

e to

wn

s o

f P

utn

am

, T

ho

mp

so

n a

nd

Na

tch

au

g, C

T.

3B

lackth

orn

Ho

ldin

gs L

LC

$4

68

,41

6/y

ea

r$

13

.00

9/1

/18

- 8

/31

/23

$0

.50

psf

incre

ase

in

ye

ars

2 a

nd

4

Tri

ple

Ne

tT

en

an

t is

re

sp

on

sib

le f

or

CA

M, ta

xe

s &

in

su

ran

ce

Op

era

tin

g F

un

ds-C

linic

al

An

ne

Ho

rba

tuck, V

ice

Pre

sid

en

t

UM

G A

dm

inis

tra

tio

n

5-y

ea

r le

ase

re

ne

wa

l fo

r U

MG

of

36

,03

2 s

qu

are

fe

et lo

ca

ted

at 6

5 K

an

e

Str

ee

t, W

est H

art

ford

.

4C

on

ne

cticu

t C

hild

ren

's M

ed

ica

l

Ce

nte

r $

84

,81

0/y

ea

r$

28

.27

7/1

/18

- 6

/30

/19

n/a

Gro

ss

N/A

Op

era

tin

g F

un

ds-C

linic

al

Jo

hn

Bri

ga

da

, D

ire

cto

r

De

an

's O

ffic

e D

en

tal

Th

e D

en

tal C

linic

s o

f th

e S

ch

oo

l o

f D

en

tal M

ed

icin

e p

rovid

e s

erv

ice

s o

n-

site

at C

on

ne

cticu

t C

hild

ren

’s M

ed

ica

l C

en

ter.

UC

on

n H

ea

lth

pu

rch

ase

s

facili

tie

s, se

rvic

es, a

nd

sta

ff tim

e in

su

pp

ort

of

the

De

nta

l C

linic

's

pe

dia

tric

de

ntistr

y p

ractice

s. T

his

re

qu

est is

fo

r th

e c

ost o

f th

e f

acili

tie

s

on

ly (

3,0

00

sq

ft.).

UN

IVE

RS

ITY

AS

LE

SS

OR

            P

RO

PE

RT

Y L

EA

SE

AG

RE

EM

EN

TS

UN

IVE

RS

ITY

AS

LE

SS

EE

Fin

an

ce S

ub

co

mm

itte

e J

un

e 1

8, 2018

RE

AL

ES

TA

TE

/SP

AC

E L

EA

SE

SF

OR

UC

ON

N H

EA

LT

H B

OA

RD

OF

DIR

EC

TO

RS

AN

D U

CO

NN

BO

AR

D O

F T

RU

ST

EE

S A

PP

RO

VA

L

            P

RO

PE

RT

Y L

EA

SE

AG

RE

EM

EN

TS

14

Page 21: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

TO: Members, UConn Health Board of Directors

FROM: Carolle T. Andrews

Chief Administrative Officer

Thomas P. Trutter, AIA

Associate Vice President, Campus Planning Design & Construction

DATE: June 18, 2018

SUBJECT: Project Budget for the UConn Health Main Accumulation Building (Revised Final:

$4,050,000)

RECOMMENDATION:

That the Board of Directors approve the Revised Final Budget in the amount of $4,050,000 for

the UConn Health (UCH) Main Accumulation Building project

BACKGROUND:

UConn Health’s building for the collection, consolidation, and shipping of hazardous waste

materials from research and clinical activities was demolished in late 2012 as part of the site

preparation for the Jackson Laboratory for Genomic Medicine. Since that time the waste materials

have been handled in temporary areas in the Main Building lab area. The temporary area is

undersized and does not provide sufficient storage areas, resulting in less than optimal operating

conditions including more frequent shipping and thus increased operating expenses. This project

will construct a new 2,500 sf building to establish a new permanent location for the waste

handling and shipping activities.

The Revised Final budget is based upon the estimated cost to complete the project. The proposed

increase of $200,000 is due to complications with the underground water line relocation and

winter weather impacts.

With your approval, the budget will be presented to the Board of Trustees at their June 27, 2018

meeting for their approval.

Attachment

15

Page 22: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

MAIN ACCUMULATION BUILDING RENDERING

CONSTRUCTION PROGRESS: 5-17-2018

16

Page 23: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

TYPE BUDGET:

PROJECT NAME:

APPROVED APPROVED APPROVED PROPOSED PROPOSED

PLANNING DESIGN FINAL REVISED FINAL REVISED FINAL

BUDGETED EXPENDITURES 12/7/2016 3/29/2017 6/28/2017 9/27/2017 6/27/2018

CONSTRUCTION 2,080,000$ 3,600,000$ 3,600,000$ 3,070,000$ 3,280,000$

DESIGN SERVICES 305,000 305,000 305,000 352,000 406,000

TELECOMMUNICATIONS 25,000 25,000 25,000 25,000 25,000

FURNITURE, FIXTURES AND EQUIPMENT 35,000 35,000 35,000 35,000 35,000

CONSTRUCTION ADMINISTRATION - - - - -

OTHER AE SERVICES (including Project Management) 45,000 45,000 45,000 28,000 15,000

ART - - - - -

RELOCATION 5,000 5,000 5,000 5,000 5,000

ENVIRONMENTAL 10,000 10,000 10,000 - -

INSURANCE AND LEGAL 10,000 10,000 10,000 - -

MISCELLANEOUS 10,000 10,000 10,000 10,000 10,000

SUBTOTAL 2,525,000$ 4,045,000$ 4,045,000$ 3,525,000$ 3,776,000$

PROJECT CONTINGENCY 255,000 355,000 355,000 325,000 274,000

TOTAL BUDGETED EXPENDITURES 2,780,000$ 4,400,000$ 4,400,000$ 3,850,000$ 4,050,000$

SOURCE(S) OF FUNDING

UCONN HEALTH FUNDS 2,780,000$ 4,400,000$ 4,400,000$ 1,850,000$ 2,050,000$

UCONN 2000 FUNDS - - - 2,000,000 2,000,000

TOTAL BUDGETED FUNDING 2,780,000$ 4,400,000$ 4,400,000$ 3,850,000$ 4,050,000$

BOT 6.27.18

CAPITAL PROJECT BUDGET REPORTING FORM

REVISED FINAL

UCONN HEALTH - MAIN ACCUMULATION BUILDING

17-007

17

Page 24: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

       

 

  

Fisc

al Y

ear

2018

R

esul

ts o

f Ope

ratio

ns

As o

f Apr

il 30

, 201

8

18

Page 25: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Con

solid

ated

Fin

anci

al R

epor

ts

Fina

ncia

l Upd

ate

& H

ighl

ight

s TO

:Mem

bers, B

oard of D

irectors 

FROM:  

Jeffrey P. G

eoghegan, Chief Financial Officer 

DAT

E:  

May 16, 201

8 SU

BJEC

T:  

Una

udite

d FY

 201

8 Fina

ncial R

esults fo

r the

 ten mon

ths en

ded Ap

ril 30, 201

8.  

Intr

oduc

tion:

Th

e fo

llow

ing

prov

ides

hig

hlig

hts f

or th

e ye

ar to

dat

e re

sults

thro

ugh

Apr

il 30

, 201

8:

The

YTD

loss

for t

he p

erio

d en

ding

Apr

il 30

, 201

8, w

as $

3.1

mill

ion

as c

ompa

red

to a

bud

gete

d lo

ss o

f $11

.3 m

illio

n fo

r a fa

vora

ble

varia

nce

of $

8.2

mill

ion.

K

ey d

river

s of b

udge

t var

ianc

es a

re o

utlin

ed b

elow

.

Edu

catio

n, R

esea

rch

& In

stitu

tiona

l Sup

port

Th

e re

sult

of o

pera

tions

for E

duca

tion,

Res

earc

h &

Inst

itutio

nal S

uppo

rt is

favo

rabl

e to

the

budg

et b

y $3

.1 m

illio

n. T

he v

aria

nce

is a

ttrib

uted

to th

e fa

vora

ble

varia

nces

in th

e Sc

hool

of M

edic

ine,

Sch

ool o

f Den

tal M

edic

ine,

Res

earc

h an

d In

stitu

tiona

l Sup

port.

Yea

r to

date

sign

ifica

nt h

ighl

ight

s inc

lude

:

Sc

hool

of M

e dic

ine

resu

lts o

f ope

ratio

ns w

ere

favo

rabl

e to

bud

get b

y $1

.1 m

illio

n. T

here

wer

e fa

vora

ble

varia

nces

in P

erso

nnel

Ser

vice

s, Fr

inge

Ben

efits

and

Out

side

and

Oth

er P

urch

ase

Serv

ices

.

Scho

ol o

f Den

tal M

edic

ine

resu

lts o

f ope

ratio

ns w

ere

favo

rabl

e to

bud

get b

y $2

.0 m

illio

n. T

here

wer

e fa

vora

ble

varia

nces

in P

erso

nnel

Ser

vice

s and

Frin

ge B

enef

its.

R

esea

rch

resu

lts o

f ope

ratio

ns w

ere

favo

rabl

e to

bud

get $

1.1

mill

ion.

Unf

avor

able

var

ianc

es in

Fed

eral

Gra

nt R

even

ue w

ere

offs

et b

y fa

vora

ble

varia

nces

in F

eder

al e

xpen

ditu

res.

Aux

iliar

y an

d In

vest

men

t rev

enue

s wer

e bo

th fa

vora

ble

to b

udge

t.

Clin

ical

Th

e cl

inic

al o

pera

tions

had

a c

o mbi

ned

loss

of $

31.7

mill

ion

com

pare

d to

a b

udge

t los

s of $

36.8

mill

ion.

Sum

mar

y an

alys

is o

f rev

enue

s and

exp

ense

s is p

rese

nted

in

the

follo

win

g pa

ges.

19

Page 26: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

  

Key

Fin

anci

al R

esul

tsFo

r th

e pe

riod

end

ing

Apr

il 30

, 201

8

Y

ear

- to

- Dat

eC

ateg

ory

Act

ual

Bud

get

Var

ianc

ePe

rcen

tPr

ior

Yea

rV

aria

nce

Perc

ent

Tota

l UC

HC

Exc

ess/

(Def

icie

ncy)

($3,

053)

($11

,316

)$8

,263

73.0

%($

18,1

44)

$15,

091

83.2

%

Educ

atio

n, R

esea

rch

& In

stitu

tiona

l Sup

port-

Exce

ss/(D

efic

ienc

y)($

150,

004)

($15

3,11

9)$3

,115

2.0%

($14

9,42

8)($

576)

-0.4

%

Tota

l Clin

ical

(JD

H/U

MG

)($

31,6

90)

($36

,838

)$5

,148

14.0

%($

52,8

53)

$21,

163

40.0

%

CM

HC

- Ex

cess

/(Def

icie

ncy)

$0$0

$0

$0$0

Stat

e A

ppro

pria

tion-

Blo

ck G

rant

$90,

620

$90,

620

$00.

0%$1

01,2

52($

10,6

32)

-10.

5%Fr

inge

Ben

efits

& O

ther

Adj

ustm

ents

$88,

021

$88,

021

$00.

0%$8

2,88

5$5

,136

6.2%

Tota

l Sta

te S

uppo

rt$1

78,6

41$1

78,6

41$0

0.0%

$184

,137

($5,

496)

-3.0

%

To

tal R

even

ues (

000'

s)$7

64,0

92$7

54,3

19$9

,773

1.3%

$726

,460

$37,

632

5.2%

Tota

l Exp

ense

s (00

0's)

$945

,786

$944

,276

$1,5

100.

2%$9

28,7

41$1

7,04

51.

8%

Res

earc

h R

even

ue R

ecog

nitio

n in

Fin

anci

al S

tate

men

ts$6

5,38

9$7

0,37

3($

4,98

4)-7

.1%

$71,

895

($6,

506)

-9.0

%

1,05

4 2,02

1,11

(1,076

)

5,14

‐‐

8,26

Scho

ol of M

edicine

Scho

ol of D

ental M

edicine

Research

Institu

tiona

l Sup

port

Clinical

Correctio

nal M

anaged

 Health

 Care

State Supp

ort

Total U

CHC

Budget Variance by

 Program

 ‐Year To

 Date 

(in 000's)

20

Page 27: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

  

Con

solid

ated

Sta

tem

ent o

f Rev

enue

s and

Exp

ense

s (w

ithou

t Elim

inat

ions

)

Perc

ent

Perc

ent

Act

ual

Bud

get

Var

ianc

eV

aria

nce

Act

ual

Var

ianc

eV

aria

nce

Rev

enue

s:Tu

ition

20,1

22,4

10$

20

,357

,438

$

(235

,028

)$

-1

.2%

19,2

87,4

99$

83

4,91

1$

4.

3%R

esea

rch

Gra

nts a

nd C

ontra

cts

65,3

88,6

8270

,373

,316

(4,9

84,6

33)

-7.1

%71

,894

,779

(6,5

06,0

97)

-9.0

%A

uxili

ary

Ente

rpris

es15

,267

,114

14,2

58,5

051,

008,

608

7.1%

14,2

62,4

201,

004,

694

7.0%

Inte

rnal

Inco

me

81,1

14,2

3881

,539

,085

(424

,847

)-0

.5%

89,8

04,6

39(8

,690

,401

)-9

.7%

Inte

rns a

nd R

esid

ents

55,7

52,0

2256

,189

,424

(437

,402

)-0

.8%

52,0

29,2

683,

722,

754

7.2%

Net

Pat

ient

Car

e41

0,80

0,17

039

9,09

7,34

311

,702

,827

2.9%

375,

414,

769

35,3

85,4

029.

4%C

orre

ctio

nal M

anag

ed H

ealth

Car

e68

,548

,539

67,2

75,9

371,

272,

601

1.9%

69,6

92,9

41(1

,144

,402

)-1

.6%

Gift

s & E

ndow

men

t Inc

ome

4,29

6,71

65,

121,

942

(825

,226

)-1

6.1%

4,62

3,28

4(3

26,5

68)

-7.1

%In

vest

men

t Inc

ome

479,

811

130,

300

349,

511

268.

2%10

0,53

337

9,27

837

7.3%

Oth

er In

com

e42

,322

,718

39,9

75,6

292,

347,

089

5.9%

29,3

49,7

3712

,972

,980

44.2

%

Tot

al R

even

ues

764,

092,

418

$

754,

318,

919

$

9,

773,

499

$

1.3%

726,

459,

868

$

37

,632

,550

$

5.

2%

Exp

ense

s:

Pers

onne

l Ser

vice

s32

2,34

6,23

6$

32

2,37

4,62

8$

(28,

392)

$

0.

0%32

0,19

1,62

9$

2,15

4,60

7$

0.7%

Frin

ge B

enef

its17

7,82

8,07

218

0,01

2,45

2(2

,184

,380

)-1

.2%

171,

451,

048

6,37

7,02

43.

7%M

edic

al C

ontra

ctua

l Sup

port

13,7

79,6

2713

,943

,370

(163

,743

)-1

.2%

12,9

29,9

4384

9,68

46.

6%In

tern

al C

ontra

ctua

l Sup

port

80,6

17,3

8481

,131

,305

(513

,921

)-0

.6%

89,0

87,2

59(8

,469

,875

)-9

.5%

Med

ical

/Den

tal H

ouse

Sta

ff44

,409

,936

44,9

36,5

88(5

26,6

52)

-1.2

%43

,845

,799

564,

137

1.3%

Cor

rect

iona

l Man

aged

Hea

lthca

re68

,548

,539

67,2

75,9

37

1,

272,

601

1.9%

69,6

92,9

41

(1

,144

,402

)-1

.6%

Out

side

Age

ncy

Per D

iem

s3,

154,

672

2,99

8,21

815

6,45

45.

2%2,

546,

960

607,

712

23.9

%D

rugs

32,5

81,8

8931

,909

,892

671,

998

2.1%

27,1

98,0

015,

383,

889

19.8

%M

edic

al S

uppl

ies

44,3

21,3

1842

,948

,353

1,37

2,96

43.

2%41

,587

,881

2,73

3,43

66.

6%U

tiliti

es10

,695

,950

11,2

56,1

17(5

60,1

68)

-5.0

%10

,950

,711

(254

,762

)-2

.3%

Out

side

& O

ther

Pur

chas

ed S

ervi

ces

68,2

13,1

0368

,499

,132

(286

,028

)-0

.4%

61,1

78,8

337,

034,

271

11.5

%In

sura

nce

4,18

1,80

22,

946,

939

1,23

4,86

341

.9%

3,76

4,90

041

6,90

311

.1%

Rep

airs

& M

aint

enan

ce12

,369

,064

12,1

00,1

5826

8,90

62.

2%11

,021

,646

1,34

7,41

812

.2%

Deb

t Ser

vice

8,29

9,08

88,

305,

571

(6,4

83)

-0.1

%8,

541,

748

(242

,661

)-2

.8%

Oth

er E

xpen

ses

24,3

23,0

7523

,785

,409

537,

667

2.3%

22,7

45,8

181,

577,

257

6.9%

Dep

reci

atio

n30

,116

,018

29,8

51,9

4326

4,07

60.

9%32

,005

,783

(1,8

89,7

65)

-5.9

%

Tot

al E

xpen

ses

945,

785,

774

$

944,

276,

011

$

1,

509,

763

$

0.2%

928,

740,

901

$

17

,044

,873

$

1.

8%

Exc

ess/

(Def

icie

ncy)

of R

even

ues

ove

r E

xpen

ses P

rior

to S

tate

App

ropr

iatio

ns(1

81,6

93,3

56)

$

(1

89,9

57,0

92)

$

8,

263,

736

$

4.4%

(202

,281

,033

)$

20,5

87,6

77$

10.2

%

Stat

e A

ppro

pria

tion-

Blo

ck G

rant

90,6

19,9

81$

90

,619

,981

$

(0)

$

0.0%

101,

252,

152

$

(1

0,63

2,17

1)$

-1

0.5%

Wor

kers

Com

pens

atio

n N

et o

f App

ropr

iatio

ns0

(721

,350

)(1

,049

,521

)St

ate

Supp

orte

d Fr

inge

Ben

efits

and

Oth

er

Adj

ustm

ents

88,0

20,7

6388

,020

,763

(0)

0.0%

83,6

06,2

624,

414,

501

5.3%

Exc

ess/

(Def

icie

ncy)

(3

,052

,612

)$

(11,

316,

347)

$

8,26

3,73

5$

73

.0%

(18,

143,

969)

$

15,0

91,3

57$

83.2

%

YT

D A

pril

2017

Con

solid

ated

UC

onn

Hea

lth

YT

D A

pril

2018

Con

solid

ated

UC

onn

Hea

lth

 

21

Page 28: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

  

Perc

ent

Act

ual '

18B

udge

t '18

Var

ianc

eV

aria

nce

Act

ual '

17

Rev

enue

s:

Net

Pat

ient

Car

e32

7,37

1,55

7$

31

7,69

5,12

8$

9,

676,

429

$

3.

0%30

1,10

3,68

8$

O

ther

Inco

me

34,1

27,4

01

31

,932

,036

2,19

5,36

5

6.9%

23,9

51,3

93

Tot

al R

even

ues

361,

498,

958

$

349,

627,

164

$

11,8

71,7

94$

3.

4%32

5,05

5,08

1$

Exp

ense

s:

Pers

onne

l Ser

vice

s11

4,57

7,18

7$

11

3,08

8,23

9$

1,

488,

948

$

1.

3%99

,045

,664

$

Frin

ge B

enef

its72

,324

,788

71,9

92,7

24

33

2,06

4

0.

5%58

,725

,224

Med

ical

Con

tract

ual S

uppo

rt20

5,33

2

19

8,30

2

7,

030

3.

5%16

7,20

4

In

tern

al C

ontra

ctua

l Sup

port

41,5

62,1

05

41

,364

,565

197,

540

0.5%

61,4

11,5

68

M

edic

al/D

enta

l Hou

se S

taff

1,86

8,64

5

2,30

8,33

3

(439

,688

)

-19.

0%2,

596,

170

O

utsi

de A

genc

y Pe

r Die

ms

2,77

5,79

8

2,63

8,61

2

137,

186

5.2%

2,26

6,66

0

Dru

gs28

,889

,012

28,4

05,2

33

48

3,77

9

1.

7%23

,750

,788

Med

ical

Sup

plie

s34

,807

,275

32,8

39,3

24

1,

967,

951

6.

0%31

,607

,778

Util

ities

2,78

3,19

8

2,79

3,89

9

(10,

701)

-0.4

%2,

886,

566

O

utsi

de &

Oth

er P

urch

ased

Ser

vice

s26

,224

,623

24,6

85,4

15

1,

539,

208

6.

2%24

,951

,497

Insu

ranc

e2,

602,

227

2,

117,

165

48

5,06

2

22

.9%

2,83

3,19

0

Rep

airs

& M

aint

enan

ce6,

484,

970

6,

179,

673

30

5,29

7

4.

9%5,

675,

173

O

ther

Exp

ense

s1,

813,

588

1,

586,

433

22

7,15

5

14

.3%

1,57

4,37

1

Inte

rest

Exp

ense

31,9

73

38,4

57

(6,4

84)

-1

6.9%

22,3

11

Dep

reci

atio

n6,

526,

332

6,

145,

609

38

0,72

3

6.

2%7,

384,

728

Tot

al E

xpen

ses

343,

477,

053

$

336,

381,

983

$

7,09

5,07

0$

2.1%

324,

898,

892

$

Exce

ss/(D

efic

ienc

y) o

f Rev

enue

s ov

er E

xpen

ses P

rior t

o St

ate

App

ropr

iatio

ns18

,021

,905

$

13,2

45,1

81$

4,

776,

724

$

36

.1%

156,

189

$

Yea

r-to

-Dat

e A

pril

John

Dem

psey

Hos

pita

lC

onso

lidat

ed S

tate

men

t of R

even

ues a

nd E

xpen

ses

Apr

il 30

, 201

8

                                                              

22

Page 29: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

  John

 Dem

psey

 Hospital  

  Res

ults

of O

pera

tions

  Th

e Y

TD g

ain

for t

he p

erio

d en

ding

Apr

il 30

, 201

8, w

as $

18.0

mill

ion

com

pare

d to

a b

udge

ted

gain

of $

13.2

mill

ion,

for a

favo

rabl

e va

rianc

e of

$4.

8 m

illio

n.

Tota

l rev

enue

s wer

e fa

vora

ble

by $

11.9

mill

ion.

R

even

ue v

aria

nces

wer

e dr

iven

by

favo

rabl

e ne

t pat

ient

reve

nue

of $

9.7

mill

ion,

alo

ng w

ith o

ther

ope

ratin

g in

com

e. T

otal

exp

ense

s wer

e un

favo

rabl

e $7

.1 m

illio

n an

d w

ere

driv

en b

y in

crea

sed

patie

nt c

are

expe

nses

in D

rugs

and

Med

ical

Sup

plie

s as w

ell a

s Out

side

and

ot

her p

urch

ase

serv

ices

. Th

e ga

in fo

r the

sam

e pe

riod

in th

e pr

ior y

ear w

as $

156,

000

for a

favo

rabl

e va

rianc

e of

$17

.9 m

illio

n.

Yea

r - t

o - D

ate

Cat

egor

yA

ctua

lB

udge

tV

aria

nce

Perc

ent

Prio

r Y

ear

Var

ianc

ePe

rcen

tJo

hn D

emps

ey H

ospi

tal (

in th

ousa

nds)

JDH

Exc

ess/

(Def

icie

ncy)

of R

even

ues o

ver E

xpen

ses

$18,

022

$13,

245

$4,7

7736

.1%

$156

$17,

866

1145

2.6%

JDH

Ope

ratin

g M

argi

n5.

0%3.

8%1.

2%31

.6%

0.0%

4.9%

1027

5.3%

Inpa

tient

Dis

char

ges

8,35

87,

947

411

5.2%

7,66

469

49.

1%O

utpa

tient

Equ

ival

ents

14,9

0414

,946

(42)

-0.3

%14

,191

713

5.0%

Ave

rage

Len

gth

of S

tay

4.2

4.2

0.0

0.0%

4.2

0.0

0.0%

Net

Rev

enue

per

Adj

uste

d D

isch

arge

$14,

073

$13,

877

$196

1.4%

$13,

777

$296

2.1%

Cos

t per

Adj

uste

d D

isch

arge

$14,

766

$14,

694

$72

0.5%

$14,

866

($10

0)-0

.7%

Day

s Rev

enue

in A

ccou

nts R

ecei

vabl

e46

415

12.2

%45

12.

2%C

ase

Mix

Inde

x 1.

5670

1.53

840.

0286

1.9%

1.52

96

0.03

742.

4% 

    Net

Rev

enue

: Yea

r to

Dat

e   To

tal n

et p

atie

nt re

venu

e w

as fa

vora

ble

to th

e bu

dget

pla

n by

$9.

7 m

illio

n (3

.0%

) and

favo

rabl

e to

prio

r yea

r by

$26.

3 m

illio

n (8

.7%

). In

patie

nt d

isch

arge

s of

8,35

8 ar

e ab

ove

budg

et b

y 41

1 (5

.2%

) and

repr

esen

t an

9.1%

incr

ease

from

prio

r yea

r. O

utpa

tient

vol

ume,

repr

esen

ted

by O

utpa

tient

Equ

ival

ents

of 1

4,90

4, w

as

unfa

vora

ble

to b

udge

t by

42 (.

3%) a

nd a

bove

prio

r yea

r by

713

(5.0

%).

The

key

driv

ers f

or n

et re

venu

e ar

e:

Com

pare

d to

Bud

get J

DH

had

the

follo

win

g Pr

ice/

Vol

ume

varia

nces

on

Adj

uste

d D

isch

arge

s

o V

olum

e va

rianc

e: A

djus

ted

disc

harg

es w

ere

favo

rabl

e to

bud

get b

y 36

9 a

varia

nce

valu

ed a

t $5.

1 m

illio

n.

o P

rice

varia

nce:

Net

Rev

enue

per

adj

uste

d di

scha

rge

was

$19

6 ab

ove

budg

et, a

favo

rabl

e va

rianc

e va

lued

at $

4.6

mill

ion.

Cas

e m

ix in

dex

is 1

.567

0 co

mpa

red

to a

bud

get o

f 1.5

384

and

a pr

ior y

ear a

ctua

l of 1

.529

6.

23

Page 30: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

   E

xpen

ses

Ex

pens

es w

ere

unfa

vora

ble

to th

e bu

dget

by

$7.1

mill

ion.

Si

gnifi

cant

unf

avor

able

var

ianc

es in

clud

ed O

utsi

de a

nd O

ther

Pur

chas

e Se

rvic

es a

nd In

sura

nce

Expe

nses

. D

rug

expe

nses

, whi

ch e

xcee

d bu

dget

, are

off

set b

y hi

gher

pha

rmac

y re

venu

e. M

edic

al S

uppl

ies,

whi

ch w

as a

lso

over

bud

get,

is th

e re

sult

of

high

er su

rgic

al v

olum

e.

Tot

al c

ost p

er a

djus

ted

disc

harg

e w

as $

14,7

66 c

ompa

red

to a

bud

get o

f $14

,694

for a

n un

favo

rabl

e va

rianc

e of

$72

(.5%

). T

otal

cos

t per

adj

uste

d di

scha

rge

was

unf

avor

able

to p

rior y

ear b

y $1

00 (.

7%).

           

 

24

Page 31: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

  

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Prio

r Yea

r1,

236

1,42

91,

496

1,37

61,

286

1,40

31,

481

1,40

31,

525

1,55

51,

545

1,70

9Bu

dget

1,47

71,

507

1,47

81,

593

1,37

61,

605

1,47

31,

398

1,51

61,

523

1,42

51,

577

FY 2

018

1,37

21,

682

1,49

81,

552

1,61

91,

417

1,49

41,

367

1,36

11,

542

1,0

00

1,1

00

1,2

00

1,3

00

1,4

00

1,5

00

1,6

00

1,7

00

1,8

00

OP Equivilants

JDH Ou

tpatient Equ

ivilants

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Prio

r Yea

r38

042

742

141

845

043

346

336

551

047

749

145

8Bu

dget

412

440

443

440

463

446

476

376

510

491

480

455

Act

ual

371

548

449

550

544

478

514

506

460

486

325

375

425

475

525

575

Cases

Outpatie

nt Surgery Cen

ter C

ases

 

   

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Prio

r Yea

r74

979

273

274

775

079

382

472

078

077

778

679

0B

udge

t82

081

176

779

077

581

683

375

279

678

7FY

201

879

487

282

978

984

781

285

579

587

489

1

600

650

700

750

800

850

900

950

Discharges

JDH Discharges by

 Mon

th

 

   

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Prio

r Yea

r10

6.110

4.610

2.310

4.010

6.810

5.911

6.610

5.910

2.010

1.610

5.099

.3Bu

dget

108.9

108.4

108.3

108.3

109.5

108.4

111.1

107.8

108.7

108.6

FY 20

1810

8.310

9.010

9.510

8.811

1.610

9.512

2.212

0.513

1.111

6.6

90.0

95.0

100.0

105.0

110.0

115.0

120.0

125.0

130.0

135.0

Census

JDH Av

erage D

aily C

ensus B

y Mon

th

 

25

Page 32: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

  

Yea

r-to

-Dat

e A

pril

Perc

ent

Act

ual '

18B

udge

t '18

Var

ianc

eV

aria

nce

Act

ual '

17

Rev

enue

s:

Net

Pat

ient

Car

e74

,253

,295

$

72

,564

,198

$

1,

689,

097

$

2.

3%66

,310

,630

$

Oth

er In

com

e18

,193

,115

18

,497

,588

(3

04,4

73)

-1

.6%

17,5

74,3

49

Tot

al R

even

ues

92,4

46,4

10$

91,0

61,7

86$

1,38

4,62

4$

1.5%

83,8

84,9

79$

Exp

ense

s:

Pers

onne

l Ser

vice

s71

,303

,311

$

70

,685

,783

$

61

7,52

8$

0.

9%69

,634

,369

$

Frin

ge B

enef

its34

,518

,722

34

,400

,207

11

8,51

5

0.

3%31

,996

,451

Med

ical

Con

tract

ual S

uppo

rt5,

731,

724

5,84

2,28

7

(110

,563

)

-1.9

%5,

443,

019

In

tern

al C

ontra

ctua

l Sup

port

11,9

98,9

62

12,0

90,8

04

(91,

842)

-0.8

%12

,015

,096

Out

side

Age

ncy

Per D

iem

s35

0,66

9

308,

469

42,2

00

13.7

%22

4,29

6

D

rugs

3,63

3,57

7

3,

461,

498

17

2,07

9

5.

0%3,

414,

403

M

edic

al S

uppl

ies

1,49

6,59

3

1,

391,

560

10

5,03

3

7.

5%1,

303,

486

U

tiliti

es20

3,98

9

206,

649

(2,6

60)

-1

.3%

174,

029

Out

side

& O

ther

Pur

chas

ed S

ervi

ces

6,91

1,81

4

6,

694,

024

21

7,79

0

3.

3%6,

552,

230

In

sura

nce

195,

666

19

7,23

1

(1

,565

)

-0.8

%24

3,72

7

R

epai

rs &

Mai

nten

ance

753,

379

77

5,18

4

(2

1,80

5)

-2

.8%

617,

054

Oth

er E

xpen

ses

373,

763

40

2,94

5

(2

9,18

2)

-7

.2%

420,

671

Dep

reci

atio

n4,

686,

682

4,68

8,35

8

(1,6

76)

0.

0%4,

855,

206

Tot

al E

xpen

ses

142,

158,

851

$

141,

144,

999

$

1,01

3,85

2$

0.7%

136,

894,

037

$

Exce

ss/(D

efic

ienc

y) o

f Rev

enue

s ov

er E

xpen

ses P

rior t

o St

ate

App

ropr

iatio

ns(4

9,71

2,44

1)$

(5

0,08

3,21

3)$

37

0,77

2$

0.

7%(5

3,00

9,05

8)$

UC

onn

Med

ical

Gro

upC

onso

lidat

ed S

tate

men

t of R

even

ues a

nd E

xpen

ses

Apr

il 30

, 201

8

26

Page 33: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

 

  

UCo

nn M

edical Group

 R

esul

ts o

f Ope

ratio

ns

  The

YTD

def

icit

for t

he p

erio

d en

ding

Apr

il 30

, 201

8, is

$49

.7 m

illio

n co

mpa

red

to a

bud

gete

d de

ficit

of $

50.1

mill

ion,

for a

favo

rabl

e va

rianc

e of

$37

1,00

0. T

he

defic

it in

the

prio

r yea

r was

$53

.0 m

illio

n fo

r a fa

vora

ble

varia

nce

of $

3.3

mill

ion.

Oth

er si

gnifi

cant

hig

hlig

hts i

nclu

de:

Y

ear

- to

- Dat

eC

ateg

ory

Act

ual

Bud

get

Var

ianc

ePe

rcen

tPr

ior

Yea

rV

aria

nce

Perc

ent

Uni

vers

ity M

edic

al G

roup

(in

thou

sand

s)(D

efic

ienc

y)/E

xces

s of R

even

ues o

ver E

xpen

ses

($49

,712

)($

50,0

83)

$371

0.7%

($53

,009

)$3

,297

6.2%

Ope

ratin

g M

argi

n-5

3.8%

-55.

0%1.

2%2.

2%-6

3.2%

9.42

%14

.9%

RV

U's

948,

672

940,

061

8,61

10.

9%86

1,24

287

,430

10.2

%N

et R

even

ue P

er R

VU

$78.

27$7

7.19

$1.0

81.

4%$7

6.99

$1.2

81.

7%C

ost p

er R

VU

(w.o

. Ane

sthe

sia)

$138

.96

$139

.39

($0.

43)

-0.3

%$1

47.6

0($

8.64

)-5

.9%

Ave

rage

Pro

vide

r FTE

190

188

10.

8%19

0(1

)

-0.3

%A

vera

ge M

onth

ly R

VU

Per

Pro

vide

r50

050

01

0.1%

453

48

10.5

%D

ays R

even

ue in

Acc

ount

s Rec

eiva

ble

4442

24.

8%43

1

2.3%

  

    Net

Rev

enue

: Yea

r to

Dat

e   N

et p

atie

nt re

venu

e is

favo

rabl

e to

the

budg

et p

lan

by $

1.7

mill

ion

and

is fa

vora

ble

to p

rior

year

by

$7.9

mill

ion

(12.

0%).

The

key

driv

ers f

or n

et re

venu

e ar

e:

R

VU

’s a

re a

head

of b

udge

t 8,6

11 u

nits

(.9%

) – a

favo

rabl

e vo

lum

e va

rianc

e of

$6

65,0

00.

C

ompa

red

to B

udge

t –Th

e ne

t rev

enue

per

uni

t was

$1.

08 fa

vora

ble

to b

udge

t – a

fa

vora

ble

pric

e va

rianc

e of

$1.

0 m

illio

n.

Exp

ense

s: Y

ear-

to-d

ate

To

tal e

xpen

ses a

re u

nfav

orab

le to

the

budg

et b

y $1

.0 m

illio

n or

.7%

. N

otab

le

favo

rabl

e va

rianc

es w

ere

in P

erso

nnel

Ser

vice

s and

Out

side

and

oth

er p

urch

ase

serv

ices

.

‐0.75%

‐1.36%

2.59%

‐0.35%‐0.16%

‐0.09%

‐2.00%

‐1.50%

‐1.00%

‐0.50%

0.00%

0.50%

1.00%

1.50%

2.00%

2.50%

3.00%M

EDICAID

MED

ICAR

E

MED

ICAR

E MC

HMO

WORKER

'S COMP

SELFPA

Y

UMG Payer Shifts: 201

8 vs. 201

7

27

Page 34: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

July

Aug

Sept

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

June

Prio

r Yea

r RV

U's

79,2

9989

,168

85,6

3785

,847

89,8

8785

,753

90,0

3379

,668

91,7

9884

,152

98,0

2695

,263

FY 2

018

budg

eted

RV

U's

90,9

4086

,795

90,1

8198

,185

97,1

0891

,555

95,4

6887

,429

101,

599

100,

801

83,2

9497

,879

FY 2

018

RV

U's

83,5

2895

,085

86,5

3197

,664

96,6

2591

,280

100,

012

96,5

7997

,892

103,

476

FY 2

018

Tot

al M

onth

ly R

even

ue$8

,300

,395

$8,7

77,8

60$8

,870

,600

$9,5

61,8

61$9

,288

,733

$8,7

13,6

47$9

,291

,485

$8,8

88,4

30$9

,895

,081

$10,

858,

319

Prio

r Yea

r Tot

al M

onth

ly R

even

ue$7

,611

,808

$8,6

16,2

30$8

,217

,392

$8,4

23,6

27$8

,501

,024

$8,4

27,5

07$8

,972

,253

$7,7

34,0

13$8

,928

,076

$8,4

53,0

49$9

,260

,295

$9,6

53,1

66

$-

$2,0

00

,00

0

$4,0

00

,00

0

$6,0

00

,00

0

$8,0

00

,00

0

$10

,00

0,0

00

$12

,00

0,0

00

45,0

00

55,0

00

65,0

00

75,0

00

85,0

00

95,0

00

105

,00

0

115

,00

0

Revenue

RVU's

Un

ive

rsit

y M

ed

ica

l G

rou

pC

om

pa

ris

on

of

Ac

tua

l, B

ud

ge

ted

, an

d P

rio

r Y

ea

r R

VU

's A

ga

ins

t M

on

thly

To

tal R

ev

en

ue

s

28

Page 35: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

FROM: Jeffrey P. Geoghegan

Chief Financial Officer

DATE: June 18, 2018

RE: Proposed Spending Plan for Fiscal Year 2019 for UConn Health

RECOMMENDATION:

The UCH Board of Directors endorse and recommend to the University Board of Trustees

approval of the spending plan for Fiscal Year 2018 of $1,047.6 million for UConn Health.

BACKGROUND:

The Fiscal Year 2019 Spending Plan includes $1,047.6 million of revenue, including state

funding of $238.8 million, to cover $1,047.6 million in expenses.

29

Page 36: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

TO: UCONN Health Board of Directors

FROM: Anne Horbatuck, RN, BSN, MBA

Vice President, Ambulatory Operations

Denis Lafreniere, MD, FACS

Medical Director, UConn Medical Group, Professor and Chief, Division of Otolaryngology,

Head and Neck Surgery, Associate Dean of Clinical Affairs

DATE: June 18, 2018

SUBJECT: UConn Medical Group (UMG) Operations Report

PROGRESS ON AMBULATORY ORGANIZATIONAL GOALS and INITIATIVES

Brief highlights for the third quarter of FY18 include:

Service

Substantial work to prepare for the HealthOne go-live continued in Q3, efforts this quarter focused on

Workflow planning; Provider preferences; Provider scheduling and productivity standards; Scheduling

set-up; along with coordination and the completion of Epic certified trainer and user trainings

In addition, 199 Medical Assistants were certified or registered in preparation for HealthOne

Quality

YTD UMG collected $442,000 in MU incentive payments, $136,000 received in Q3 for providers

meeting MU.

Population Health efforts have continued with the expansion of the Chronic Care Management Program.

Finance

As of April, encounters are 5% ahead of prior year actual, with RVU's are 10% ahead of prior year actual.

YTD Encounters are 1.54% ahead of budget with RVU's are slightly ahead budget by just under 1%

30

Page 37: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

In Q3, UMG received $60,000 from United Medicare Advantage for work done to close gaps in care for

attributed lives under this contract.

Providers meeting or exceeding the 55th percentile: As of the end of the third quarter, 161 providers

(40.0%) are meeting or exceeding the 55th percentile. This quarter, UMG has experienced a slight

decrease compared to the baseline, where in March 2017, 130 of 315 providers had met the 55th

percentile, which equated to 41.4% of all providers meeting or exceeding the target.

Distribution of providers based on percentage of the 55th percentile target

As of March (YTD) Less than

59.9%

60 to

69.9%

70 to

79.9%

80 to

89.9%

90 to

99.9%

>99.9% Grand

Total

Count of Provider Name 79 28 39 43 52 161 402

% of Providers 19.7% 7.0% 9.7% 10.7% 12.9% 40.0% 100%

Provider Productivity Summary (compared to Budget wRVUs): As of the end of the third quarter, 170

providers (42.5%) are meeting or exceeding budgeted wRVUs.

Distribution of providers based on percentage of the budget (wRVUs)

As of March (YTD) Less than

59.9%

60 to

69.9%

70 to

79.9%

80 to

89.9%

90 to

99.9%

>99.9% Grand

Total

Count of Provider Name 51 23 31 59 66 170 400

% of Providers 12.8% 5.8% 7.8% 14.8% 16.5% 42.5% 100.0%

31

Page 38: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Meeting Minutes

March 12, 2018

DRAFT

FINANCE SUBCOMMITTEE

Board of Directors

Location: HR Training Room, Munson Road

Present (Voting): R. Carbray; R. Dakers; T. Holt; K. Woods

Chairman Tim Holt called the meeting to order at 8:32 am

1. Public CommentThere was no public comment.

2. Chair’s Remarks

2.1 Chair Tim Holt welcomed the group.2.2 Approval of Minutes

2.2.1 December 4, 2017

In a motion duly made and seconded, the Committee approved the minutes of December 4, 2017

3. Fiscal Reports and Updates

Mr. Geoghegan reported that at the end of January, 2018 UConn Health had a favorable varianceto budget of $7.4 million. The forecast for the rest of the year is for the next five months there are anumber of items that are coming up against the budget including a reduction in our Medicarepayments and a reduction in our payments for pharmaceuticals related to 340b which will result inless revenue. Mr. Geoghegan reminded the board that we are still budgeted for the implementationof the EPIC project for May and June.

Mr. Geoghegan showed a slide of the budget variance to the group depicting all business unitswere favorable to the overall budget. Clinical is about $5 million favorable, Institutional Support,Research, both the School of Medicine and the School of Dental Medicine are also favorable.Overall salaries and fringe benefits are under as we still continue to monitor all of the hiring throughthe entity. In the School of Dental Medicine, as they are still ramping up and utilizing their newdental clinics, they continue to be favorable to budget.

John Dempsey Hospital has seen excellent volume overall. Hospital discharges are about 3.3%greater than expectations; which is 7.7% greater than the prior year. Outpatient equivalents are1.1% greater than budget, and 9.3% greater than the prior year. Showing the hospital is makinggreat strides overall. Another main driver for our overall hospital progress is our surgeries. Themain OR in University Tower as well as the Outpatient Surgery Center both continue to befavorable to budget with significant growth. Another area for this year for volume is our emergencyroom which continues to track over budget. This year we have seen double the number of flupatients over past years.

UMG: The Physician RVU’s have been tracking about 1% greater than budgeted. The averageprovider FTE’s is currently over budget about 3 indicating we have highered about 3 providers morethan the number of providers that have left. The average monthly RVU’s is almost exactly right onthe budged target which is 39 RVU’s over last year’s productivity. The Medicare managed careplans are resulting in a slight increase in the revenue over prior year.

32

Page 39: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

FINANCE SUBCOMMITTEE

March 12, 2018

The question was asked about new hire physicians for specialties. Dr. Agwunobi answered our increase in faculty in one of the drivers our recent volume, especially in the area of specialties such neurosurgery and neurology. The State of Connecticut budget: The Governor did release a proposed budget for next year (fiscal 2019). That budget basically rolls forward our state appropriations from this year into next year. There was a slight increase which has been reduced due to cuts made by the state which were rolled to 2019. This was an expected occurrence. Otherwise there is not significant change in the budget to date. In May Mr. Geoghegan expects to have a special meeting of the Finance Subcommittee to discuss where we feel the proposed budget will land and to prepare a 2019 budget plan. There were estimated retirement contribution rates released from the Comptroller’s office. All of the rates regardless of the plan have an increase. The state retirement plan increased 11%. The contribution for this is now a 67.6% proposal. This is not an increase or a change in the employees’ contributions, those changes were made last year. This is the amount charged to UConn Health for the plan. Overall for all the plans it is expected we will see a $13.1 million increase with the new rates. Approximately $5.6 million of that could be covered by the block grant, but the remaining $7.5 million will need to be covered by additional revenues. The question was asked how our fringe rate costs compare with other Connecticut Hospitals. Mr. Geoghegan answered: Connecticut Hospital Association does an analysis of fringe costs state wide. That has been tracking an overall rate around 28-30% rate. UConn does have an alternate plan here that is at about 15%. When we do our combination our overall rate is in the mid 60’s. Mr. Geoghegan noted that there were handouts of the state auditors’ report distributed to each board member. That information can be found with the Board of Directors meeting materials at https://health.uconn.edu/finance/accounting/overview/financial-reports/

4. Items Needing Approval

In preparation of the approval of the contracts, Dr. Agwunobi reviewed the Optum360 revenue cycle

management RFP. The decision was made to outsource our revenue cycle management which will

cause additional financial capture. The selection process ran from September to December, 2017.

Mr. Geoghegan led the selection committee process to choose a firm. Dr. Agwunobi pointed out

that because he is on the board of a large hospital group in California which owns 20% of one of the

firms that applied he recused himself from the selection process. The firm that was selected is

Optum360, which is a national revenue cycle firm that had favorable overall costs. Optum states

that it serves 4 out of every five hospital centers across the United States with revenue cycle

solutions and has over 7,700 revenue cycle experts. This company is part of the same firm that has

purchased ProHealth, however a different arm of the same corporation. Optum was asked to do a

thirty day assessment of UConn Health to evaluate the opportunities and help us determine what

the contract would look like. The results showed a low opportunity of $8 million and the aggressive

opportunity of $13 million. The actual revenue cycle improvement cost will be $1.8 million. In

addition Optum will be supplying us with some short term staffing, and some EPIC consulting help

(EPIC work will be offset by EPIC budgeted funds). The total contract is $2.6 million, however

$730,000 is being offset by vacant position salaries. The total requested operating funds is $2.3

million.

33

Page 40: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

FINANCE SUBCOMMITTEE

March 12, 2018

4.1 Contracts/PO’s/Amendments $1million+

4.1.1 Novo Nordisk, Inc.

4.1.2 Capital Area Health Consortium

4.1.3 Capital Area Health Consortium

4.1.4 Concentra

4.1.5 Edwards Lifescience

4.1.6 GE Healthcare

4.1.7 Optum360, LLC and its affiliate, Optuminsight, Inc

4.1.8 Jackson & Coker Holdings, LLC, dba Jackson & Coker Locum Tenens, LLC

4.1.9 Locum Tenens Holdings, LLC, dba Locum Tenens.com, LLC

4.1.10 MDA Holdings, Inc., dba Medical Doctor Associates, LLC

4.1.11 Medestar

4.1.12 Quest Healthcare Solutions, LLC

4.1.13 Tusk Enterprises, LLC, dba Rhino Medical and Hospitalists Plus

4.2 Leases

There were no leases presented to the group

4.4 Project Budgets There were no project budgets presented to the group

In a motion duly made and seconded, the Committee approved agenda item 4.1 as described in detail in the board materials on pages 9.

5. Updates and Informational Items 5.1 Contracts to $999,999

5.1.1 Health Sciences North Research Institute 5.1.2 Institute for Community Research 5.1.3 Khmer Health Advocates, Inc. 5.1.4 Regents of the University of California, Davis 5.1.5 Yale University 5.1.6 Agilent Technologies 5.1.7 Edge pharmacy Services, LLC 5.1.8 Tomotherapy, Inc.

6. Other Reports

6.1 Personnel List

With no further business, the Finance Subcommittee meeting was adjourned at 9:22 am

Respectfully submitted,

Jeffrey Geoghegan

Chief Financial Officer

The Next Regularly Scheduled Meeting

Monday, June 18, 2018 at 8:30 am

34

Page 41: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

No

.C

on

tracto

rP

O/C

on

tract

Nu

mb

er

Co

ntr

act

Typ

e

To

tal A

mo

un

tT

erm

Fu

nd

So

urc

eD

ep

t./In

div

idu

al S

po

nso

r (B

usin

ess

Ow

ner)

Exp

en

se (

E)

Reven

ue (

R)

Descri

pti

on

So

urc

ing

1In

str

um

enta

tion L

abora

tory

UC

HC

FC

1-3

4769263

Am

endm

ent

$950,0

00

7/9

/13 -

7/8

/18

Opera

ting F

unds-

Clin

ical

Kim

berl

y M

etc

alf, S

enio

r D

irecto

r

Hospital O

pera

tions

E

JD

H u

ses Instr

um

enta

tion L

abora

tory

for

all

coagula

tion testing

inclu

din

g f

acto

rs &

specia

lty

coagula

tion a

ssays

. T

his

agre

em

ent

for

equip

ment, s

erv

ice a

nd c

onsum

able

s f

or

coagula

tion testing

inclu

des tra

nsitio

n to n

ew

er

equip

ment, s

erv

ice inclu

din

g labor,

travel, p

art

s a

nd r

eagents

Sole

Sourc

e

2U

niv

ers

al H

ospital S

erv

ices

UC

HC

FC

4-9

9096293

New

$750,0

00

4/2

/18 -

4/1

/21

Opera

ting F

unds-

Clin

ical

Kim

berl

y M

etc

alf, S

enio

r D

irecto

r

Hospital O

pera

tions

EU

niv

ers

ity

Hospital S

erv

ices (

UH

S)

pro

vid

es a

n A

sset3

60

medic

al equip

ment m

anagem

ent pro

gra

m.

Sole

Sourc

e

3A

dvis

ory

Board

U

CH

CF

C2-6

0164960-C

CC

Am

endm

ent

$580,0

00

3/3

1/1

5 -

3/3

0/2

0O

pera

ting F

unds-

Clin

ical

Jam

es T

hib

eault, D

irecto

r

Str

ate

gic

Pla

nnin

gE

Annual m

em

bers

hip

to C

rim

son C

ontinuum

of

Care

, a p

ropri

eta

ry

soft

ware

pro

duct th

at allo

ws u

s to a

naly

ze p

hys

icia

n e

conom

ic

and q

ualit

y perf

orm

ance a

nd c

om

pare

perf

orm

ance m

etr

ics to

cohort

data

bases.

Sole

Sourc

e

4H

art

ford

Healthcare

Medic

al G

roup

UC

HC

FC

1-F

usco 2

018

New

$560,0

00

7/1

/18 -

6/3

0/1

9O

pera

ting F

unds-

Clin

ical

Lin

da M

anzelli

, D

irecto

r

Calh

oun C

ard

iolo

gy

Cente

rE

HH

CM

G p

rovid

es the s

erv

ices o

f D

r. D

anie

l F

usco f

or

clin

ical,

call

covera

ge a

nd h

ospital ro

undin

g. U

Conn H

ealth b

ills a

nd

colle

cts

for

serv

ices.

Sole

Sourc

e

Fin

an

ce

Su

bc

om

mit

tee

Ju

ne

18

, 2

01

8C

ON

TR

AC

TS

(O

TH

ER

TH

AN

RE

AL

ES

TA

TE

LE

AS

ES

) A

ND

PU

RC

HA

SE

OR

DE

RS

OF

$5

00

K T

O $

99

9,9

99

INF

OR

MA

TIO

NA

L IT

EM

S

Pa

ge

1 o

f 1

35

Page 42: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

UNIVERSITY OF CONNECTICUT HEALTH

PERSONNEL LIST

JUNE 2018

ACTIONS FOR INFORMATION

What follows is a list of actions taken by the Executive Vice-President for Health Affairs

under the authority delegated to him by the Board for the period January 20, 2018 through

May 10, 2018. This list is presented to the Members of the UCH Board of Directors FOR

INFORMATION at the meeting of June 18, 2018.

Leaves of Absence

1. Aguila, Hector L., Associate Professor/Basic Sciences, Department of Immunology,

medical leave with pay for the period April 6, 2018 through May 18, 2018.

2. Appleby, Lesley, Physical Therapist 2 - UHP, Rehabilitation Services - Outpatient,

medical leave with pay for the period February 23, 2018 through May 6, 2018,

medical leave without pay for the period May 7, 2018 through May 17, 2018,

maternity leave without pay for the period May 18 through May 30 and family

leave without pay for the period May 31, 2018 through August 30, 2018.

3. Bartos, Megan E., Occupational Therapist 2 - UHP, Rehabilitation Services -

Inpatient, medical leave with pay for the period March 26, 2018 through April 12,

2018 and medical leave with pay for the period April 14, 2018 through April 15,

2018.

4. Bath, Roopjeet K., Assistant Professor/Clinical, Gastroenterology, maternity leave

with pay for the period February 2, 2018 through March 29, 2018 and family leave

with pay for the period March 30, 2018 through April 29, 2018.

5. Brennan, Lauren E., Nurse Practitioner, UMG-Surgery - Urology, maternity leave

with pay for the period February 25, 2018 through April 6, 2018, family leave with

pay for the period April 7, 2018 through May 9, 2018 and family leave without pay

for the period May 10, 2018 through June 3, 2018.

6. Carreiro, Irene D., Application Analyst 1, UConn HealthONE, medical leave with

pay for the period February 16, 2018 through May 10, 2018.

7. Champeau, Corey A., Lead Physician Assistant, N.N.I.C.U. Unit, medical leave

with pay for the period March 12, 2018 through March 25, 2018

8. Cirullo, Lisanne M., Nurse Practitioner, UMG-Rheumatology, family leave with

pay for the period February 5, 2018 through February 25, 2018.

36

Page 43: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

UNIVERSITY OF CONNECTICUT HEALTH

PERSONNEL LIST

ACTIONS FOR INFORMATION

JUNE 2018

Leaves of Absence continued

9. Cleaveland, Karen S., Nurse Practitioner, N.N.I.C.U. Unit, medical leave with pay

for the period November 7, 2017 through November 13, 2017 and medical leave

without pay for the period November 14, 2017 through March 20, 2018.

10. Constantine, Cheryl, Clinical Research Assistant 3, Psychiatry, medical leave with

pay for the period February 23, 2018 through March 25, 2018.

11. Craven, Nancy A., Physical Therapist 2 - UHP, Rehabilitation Services -

Outpatient, medical leave with pay for the period April 9, 2018 through April 22,

2018.

12. Crosson, John, Physical Therapist 2 - UHP, Rehabilitation Services - Outpatient,

medical leave with pay for the period February 6, 2018 through May 6, 2018.

13. Desousa, Marcia T., Clinical Research Assistant 2, Calhoun Cardiology Center,

medical leave with pay for the period March 19, 2018 through April 29, 2018 and

maternity leave with pay for the period April 30, 2018 through July 8, 2018.

14. Dias, Feliciano, Clinical Lab Supervisor, Microbiology and Serology, medical leave

with pay for the period April 5, 2018 through April 15, 2018.

15. Forgue, Ken F., Technical Analyst 2, Customer Support Services, medical leave

with pay for the period February 26, 2018 through March 6, 2018.

16. Giove, Kimberly S., Administrative Program Coordinator, Oral and Maxillofacial

Surgery, medical leave with pay for the period May 3, 2018 through May 7, 2018

and medical leave without pay for the period May 8, 2018 through June 27, 2018.

17. Gomlinski, Gregg, Rehabilitation Services Supervisor, Rehabilitation Services -

Outpatient, medical leave with pay for the period February 23, 2018 through

March 5, 2018.

18. Goodwin, Kerri A., Executive Assistant, Neag Cancer Center, medical leave with

pay for the period April 5, 2018 through April 22, 2018.

19. Grala, Elizabeth M., Nurse Manager, Psychiatry 1 Unit, medical leave with pay for

the period March 5, 2018 through April 24, 2018.

20. Guarino, Carolyn A., Quality Assurance Specialist, Clinical Effectiveness

Administration, medical leave with pay for the period March 7, 2018 through

April 8, 2018.

37

Page 44: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

UNIVERSITY OF CONNECTICUT HEALTH

PERSONNEL LIST

ACTIONS FOR INFORMATION

JUNE 2018

Leaves of Absence continued

21. Hepner, Aubrey A., Nurse Practitioner, Intensive Care Unit, maternity leave with

pay for the period February 1, 2018 through April 25, 2018, family leave with pay

for the period April 26, 2018 through June 25, 2018 and family leave without pay

for the period June 26, 2018 through July 12, 2018.

22. Hong, Mi Y., Nurse Practitioner, Intermediate Unit, medical leave with pay for the

period April 4, 2018 through May 2, 2018.

23. Ives, Alissa J., Medical Technologist 2, Blood Bank – Lab Medicine, medical leave

with pay for the period February 17, 2018 through March 11, 2018

24. Johnson, Debra V., Nurse Practitioner, Psychiatric Clinic, medical leave with pay

for the period February 13, 2018 through March 13, 2018.

25. Knapik, Ursula K., Administrative Officer, Academic Affairs and Education,

medical leave with pay for the period February 13, 2018 through February 19, 2018.

26. Laborde-Lilley, Carmen, Medical Technologist 2, Core Lab, family leave with pay

for the period March 25, 2018 through March 29, 2018.

27. Leblanc, Laura B., Administrative Officer, Medicine Administration, maternity

leave with pay for the period April 10, 2018 through May 21, 2018 and family leave

with pay for the period May 22, 2018 through July 11, 2018.

28. Lepowsky, Steven M., Senior Associate Dean of Education and Patient Care,

General Dentistry, medical leave with pay for the period March 5, 2018 through

March 18, 2018.

29. Levine, Nadia, Supervisor, Clinical Case Manager, Case Management, medical

leave with pay for the period April 25, 2018 through May 16, 2018.

30. Longo, Lynn D., Radiation Therapy Technologist, Radiation Therapy, medical

leave with pay for the period May 3, 2018 through May 16, 2018.

31. Lotko, John, Application Developer 3, Enterprise Systems, medical leave with pay

for the period January 26, 2018 through April 19, 2018.

32. Manion, Jody L., Occupational Therapist 2 - UHP, Rehabilitation Services -

Outpatient, maternity leave with pay for the period March 29, 2018 through May 9,

2018 and family leave with pay for the period May 10, 2018 through July 15, 2018.

38

Page 45: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

UNIVERSITY OF CONNECTICUT HEALTH

PERSONNEL LIST

ACTIONS FOR INFORMATION

JUNE 2018

Leaves of Absence continued

33. Marshall, Kristin R., Cardio Sonographer, Cardiology, medical leave with pay for

the period February 12, 2018 through March 4, 2018 and medical leave with pay for

the period April 5, 2018 through April 17, 2018.

34. McNally, Christine E., Academic Curriculum Coordinator, Curricular Affairs,

medical leave with pay for the period February 8, 2018 through February 19, 2018

and medical leave with pay for the period February 22, 2018 through March 4,

2018.

35. Mills-Miller, Racine M., Administrative Program Coordinator, Endocrinology,

medical leave with pay for the period January 19, 2018 through January 22, 2018

and medical leave without pay for the period January 23, 2018 through February 4,

2018.

36. Morin, Arlene M., Clinical Nurse Specialist, JDH – Organization and Staff

Development, medical leave with pay for the period February 5, 2018 through

February 18, 2018.

37. Neff, Lynne D., Clinical Case Manager, Case Management, medical leave with pay

for the period April 19, 2018 through May 6, 2018.

38. Nelson, Susan M., Clinical Case Manager, Case Management, medical leave with

pay for the period February 19, 2018 through February 20, 2018 and medical leave

without pay for the period February 21, 2018 through March 4, 2018.

39. Oguro, Mayu, Assistant Professor/Basic Sciences, Cell Biology, medical leave with

pay for the period March 14, 2018 through May 7, 2018.

40. Poetzsch, Robert E., Application Developer 3, Enterprise Systems, medical leave

with pay for the period March 22, 2018 through April 8, 2018.

41. Porter, Martha A., Clinical Research Associate 1, University of Connecticut Center

on Aging, medical leave with pay for the period May 1, 2018 through June 13,

2018.

42. Schwenn, Janet H., Neonatal Specialist, Respiratory Care, N.N.I.C.U. Unit, medical

leave with pay for the period March 8, 2018 through April 8, 2018.

39

Page 46: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

UNIVERSITY OF CONNECTICUT HEALTH

PERSONNEL LIST

ACTIONS FOR INFORMATION

JUNE 2018

43. Spyros, Patricia A., Assistant Nursing Manager, UConn Health Surgery Center,

medical leave with pay for the period February 22, 2018 through March 11, 2018.

44. Sun, Lei, Application Architect, Strategic Projects and Clinical Systems, family

leave with pay for the period March 19, 2018 through March 27, 2018.

45. Urciuoli, Wendy S., Librarian 2, Library, medical leave with pay for the period

February 23, 2018 through March 28, 2018.

46. Vera-Licona, Martha, Assistant Professor/Basic Sciences, Center for Quantitative

Medicine, maternity leave with pay for the period February 28, 2018 through

April 24, 2018.

47. Vieira, Tammy L., Executive Assistant, General Surgery, medical leave with pay

for the period March 8, 2018 through March 29, 2018.

48. Weinstock, Clara G., Assistant Professor/Clinical, Internal Medicine Associates,

medical leave with pay for the period March 12, 2018 through April 1, 2018.

49. White, Bruce A., Professor/Basic Sciences, Cell Biology, medical leave with pay

for the period April 12, 2018 through May 13, 2018.

Resignations

1. Bansal, Ridhi, Assistant Professor/Clinical, Internal Medicine Associates, effective

March 1, 2018.

2. Burdick, Erica L., Clinical Case Manager, Case Management, effective March 1,

2018.

3. DeMeo, Margaret O., Associate Compliance Officer, Healthcare and Regulatory

Compliance, effective, March 2, 2018.

4. Farrell, Kimberly A., Assistant Professor/Clinical, Prosthodontics and Operative

Dentistry, effective April 30, 2018.

5. Huey, Leighton Y., Professor/Clinical, Psychiatry, effective February 28, 2018.

6. Larsen, Kevin W., Associate Vice President of Business and Ancillary Services,

Operating Room Unit, effective February 16, 2018.

40

Page 47: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

UNIVERSITY OF CONNECTICUT HEALTH

PERSONNEL LIST

ACTIONS FOR INFORMATION

JUNE 2018

Resignations continued

7. Rose, Suzanne, Senior Associate Dean, Academic Affairs and Education, effective

February 5, 2018.

8. Sylvain, Jonathan M., Rehabilitation Services Supervisor, Rehabilitation Services -

Outpatient, effective April 25, 2018.

9. Tremblay, Matthew A., Assistant Professor/Clinical, Neurology, effective April 12,

2018.

10. Trudel, Crystal L., Reimbursement Analyst 1, UMG-University Physician Patient

Accounts, effective May 1, 2018.

11. Worshoufsky, Ann M., Clinical Nurse Specialist, JDH - Organization and Staff

Development, effective April 5, 2018.

12. Zanotti, Stefano, Assistant Professor/Basic Sciences, Orthopaedic Surgery,

effective April 6, 2018.

Retirements

1. Bruinsma, Patricia E., Histotechnologist, UMG – General Dermatology, effective

February 28, 2018.

2. Collins, Roxanne, Clinical Lab Supervisor, Core Lab, effective March 31, 2018.

3. Granger, Margo C., Compensation and Classification Officer, Human Resources

Administration, effective March 31, 2018.

4. Guynn, Robert S., Pharmacist - UHP, CMHC - Pharmacy, effective February 28,

2018.

5. Haar, Maria M., Nurse Practitioner, N.N.I.C.U. Unit, effective March 31, 2018.

6. Hanlon, Mary P., Histotechnologist, UMG - General Dermatology, effective

February 28, 2018.

7. Kalagher, Nancy Anne, Nurse Practitioner, UMG – General Obstetrics, effective

March 31, 2018.

8. Kelly, Martin J., Clinical Practice Manager, Psychiatric Clinic, effective March 31,

2018.

41

Page 48: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

UNIVERSITY OF CONNECTICUT HEALTH

PERSONNEL LIST

ACTIONS FOR INFORMATION

JUNE 2018

Retirements continued

9. Kels, Barry D., Associate Professor/Clinical, Opthalmology Surgery, effective

April 30, 2018.

10. Olson, Marianne, Administrative Program Coordinator, Curricular Affairs,

effective April 30, 2018.

11. Spracklin, Kathy D., Medical Technologist 2, Microbiology and Serology, effective

February 28, 2018.

Deceased

1. Jani-Acsadi, Agnes A., Associate Professor/Clinical, Neurology, effective May 9,

2018.

42

Page 49: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

BOARD OF DIRECTORS

BUILDING & GROUNDS COMMITTEE NOVEMBER 28, 2017

MUNSON TRAINING ROOM

MINUTES

The meeting was convened by R. Carbray at 8:30 am. I. Public Comment:

o No public comment.

II. Chair’s Remarks: o Approval of Minutes: In a motion duly made, seconded and unanimously carried the

UCHC Building & Grounds Subcommittee approved the meeting minutes from September 7, 2017.

III. Discussion Items: o Bioscience Connecticut Capital Project Status: Mr. Trutter provided an overview

of the April 2018 Bioscience Monthly Program Report to the committee, and provided an overview of budget, scope and other issues of each of the planned construction projects. Slides were presented to provide a visual reference to the overall program update.

o Construction Updates o Academic Building: This project will move into the completed projects by our next

meeting. A tour of the completed Wellness Center was provided.

o C Building: Phase 1 is completed. Phase II is underway. Budget increase will be brought to the BOD. A group that advocates for equal access for all toured our facilities and were pleased with the improvements made to accommodate individuals with disabilities. The Jacobs group is scaling back to minimal staff through 2018.

Planning Updates

o Main Accumulation Building: Started site work. Currently, a couple of weeks behind due to water main issue with MDC having to re-route a 12: water/fire line. Once completed excavation for the foundation will begin.

o C Building Roof Replacement: Majority of work is completed.

o Parking Garage Fencing: Eagle Fence awarded fencing contract.

Presentations o George Karsanow, Director of Construction Services, provided an update on the

Capital Projects unrelated to Bioscience Connecticut. This update focused on capital renewal and infrastructure improvements projects completed in and progress, including Fire Code Deficiency Corrections which are ongoing, Elevator upgrades, H Building Sealant Replacement.

43

Page 50: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

BOARD OF DIRECTORS

BUILDING & GROUNDS COMMITTEE NOVEMBER 28, 2017

MUNSON TRAINING ROOM

o Environment of Care (EOC) Update: Joint Commission Survey expected in 2018,

which has Dr. Agwunobi’s attention and he has implemented an action plan and appointed Kevin Higgins, Director Environment of Care. Mock Survey results suggest a conditional accreditation could occur if issue are not resolved.

At 9:48 am The Committee unanimously voted to adjourn. In attendance: F. Archambault, R. Carbray

Respectfully submitted,

Carolle Andrews Administrative Liaison to the Board

44

Page 51: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Data

Date

:04/2

3/1

8

Re

po

rt D

ate

:05/0

1/1

8

B

ioscie

nce C

on

necti

cu

t C

ap

ital P

roje

cts

Rep

ort

No

. 72 -

Ap

ril 2018

Pre

pa

red

by

UC

ON

N H

ealth

Ja

co

bs a

nd

Ca

mp

us P

lan

nin

g,

Desig

n a

nd C

onstr

uction

45

Page 52: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce

Co

nn

ecticu

t C

ap

ita

l P

roje

cts

Re

po

rt N

o. 7

2 -

Ap

ril 2

01

8

Ta

ble

of C

on

ten

ts

Pro

gra

m O

ve

rvie

w -

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

1

Ex

ec

uti

ve

Su

mm

ary

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

--3

Pro

gra

m S

tatu

s -

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-7

Pro

gra

m M

etr

ics

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

--8

Ja

co

bs

Pro

jec

t M

an

ag

em

en

t O

ve

rsig

ht

Ac

tivit

ies

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-9

Pro

gra

m B

ud

ge

t &

Fu

nd

ing

Su

mm

ary

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-11

Pro

jec

t R

ep

ort

sJD

H N

ew

Co

nstr

uctio

n &

Re

no

va

tio

ns (

Roll-

Up)

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

---13

Ph

ase

I -

S

ite

& E

ast

Pa

rkin

g G

ara

ge

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

---14

Ph

ase

II -

Ne

w H

osp

ita

l T

ow

er

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

15

Ph

ase

III -

H B

ldg

Re

no

va

tio

ns--

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

--- 1

6

Aca

de

mic

Bu

ildin

g A

dd

itio

ns &

Re

no

va

tions--

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

---17

Clin

ica

l R

en

ova

tions -

C B

ldg -

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

---18

Ma

in B

uild

ing

La

b (

L)

Re

no

vations -

Pro

ject

1 -

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-19

Ma

in B

uild

ing

La

b (

L)

Re

no

vations -

Pro

ject

2 -

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-20

Ou

tpa

tie

nt

Pa

vili

on

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-21

Incu

ba

tor

La

b A

dd

itio

n -

CG

SB

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

--- 2

2

Ma

ste

r P

roje

cts

Sc

he

du

leS

um

ma

ry S

ch

ed

ule

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-23

De

taile

d S

ch

ed

ule

---

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

----

-22

46

Page 53: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Pa

ge

1

Bio

scie

nce

Co

nn

ecticu

t P

rog

ram

Re

po

rt N

o.

71

– J

an

ua

ry 2

01

8

Prog

ram

Ove

rvie

w

Prog

ram

Des

crip

tion

Bios

cien

ce C

onne

ctic

ut is

inte

nded

to h

elp

Con

nect

icut

’s e

cono

my

by c

reat

ing

cons

truct

ion-

rela

ted

jobs

imm

edia

tely

and

gen

erat

ing

long

term

, sus

tain

able

eco

nom

ic

grow

th b

ased

on

bios

cien

ce re

sear

ch, i

nnov

atio

n, e

ntre

pren

eurs

hip

and

com

mer

cial

izat

ion.

The

Con

stru

ctio

n Pr

ogra

m a

t UC

onn

Hea

th in

clud

es a

ll as

pect

s of

pla

nnin

g,

cons

truct

ing,

and

act

ivat

ing

the

follo

win

g pr

ojec

ts:

N

ew H

ospi

tal t

ower

, Site

& P

arki

ng (C

ompl

ete)

: Con

stru

ctio

n of

a n

ew

384,

000

SF, 1

69 b

ed, e

leve

n flo

or h

ospi

tal t

ower

hou

sing

key

pat

ient

are

as

incl

udin

g th

e em

erge

ncy

depa

rtmen

t, su

rger

y su

ite, M

RI s

uite

, ren

al d

ialy

sis,

re

spira

tory

ther

apy,

inpa

tient

reha

b (o

rthop

edic

s, re

hab

gym

and

wor

kspa

ce),

clin

ical

sup

port,

and

pat

ient

edu

catio

n sp

ace.

The

pro

ject

incl

udes

a n

ew 4

03

spac

e pu

blic

gar

age

and

a ne

w 3

97 s

pace

sta

ff ga

rage

.

Exis

ting

Hos

pita

l Ren

ovat

ions

(On

Hol

d): R

enov

atio

n to

sev

eral

dep

artm

ents

an

d up

grad

es to

util

ity a

nd e

lect

rical

sys

tem

s.

Ac

adem

ic B

uild

ing

Addi

tion

& R

enov

atio

ns (C

ompl

ete)

: A 1

9,15

3 SF

cl

assr

oom

add

ition

and

reno

vatio

n of

exi

stin

g cl

assr

oom

s, o

ffice

, and

lab

spac

e. R

enov

atio

ns w

ill in

clud

e th

e up

grad

e of

the

mec

hani

cal,

elec

trica

l and

pl

umbi

ng in

frast

ruct

ure

and

prog

ram

exp

ansi

ons.

Clin

ical

Bui

ldin

g R

enov

atio

ns (I

n Pr

ogre

ss):

Ren

ovat

ions

will

incl

ude

the

upgr

ade

or re

plac

emen

t of t

he m

echa

nica

l, el

ectri

cal a

nd p

lum

bing

in

frast

ruct

ure

and

prog

ram

exp

ansi

ons

for t

he P

at a

nd J

im C

alho

un

Car

diol

ogy

Cen

ter a

nd th

e Sc

hool

of D

enta

l Med

icin

e.

M

ain

Build

ing

Lab

(L) R

enov

atio

ns (C

ompl

ete)

: Tw

o M

ulti-

Phas

ed re

nova

tion

proj

ects

will

reno

vate

200

,000

of t

he 2

83,0

00 s

quar

e fe

et o

f exi

stin

g re

sear

ch

lab

faci

litie

s an

d bu

ildin

g in

frast

ruct

ure.

U

Con

n H

ealth

Out

patie

nt P

avilio

n (C

ompl

ete)

: Con

stru

ctio

n of

a n

ew $

203

milli

on, 3

06,8

80 s

q. ft

. am

bula

tory

car

e fa

cilit

y w

ill be

occ

upie

d by

the

Car

ole

and

Ray

Nea

g C

ompr

ehen

sive

Can

cer C

ente

r and

oth

er o

utpa

tient

ser

vice

s.

This

pro

ject

incl

udes

a n

ew p

arki

ng g

arag

e of

app

roxi

mat

ely

1,40

0 sp

aces

.

Incu

bato

r Lab

Add

ition

(Com

plet

e): N

ew b

uild

ing

addi

tion

to th

e ex

istin

g C

ell

and

Gen

ome

Scie

nce

Build

ing

(CG

SB) t

o cr

eate

an

addi

tiona

l 28,

000

squa

re

feet

of n

ew in

cuba

tor s

pace

to fo

ster

new

bus

ines

s st

art-u

ps.

 

47

Page 54: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Page 2

Bio

scie

nce C

onnecticut

Pro

gra

m R

eport

No.

71 –

January

2018

Prog

ram

Tea

m

Ow

ner:

UC

onn

Hea

lth C

ampu

s Pl

anni

ng, D

esig

n, a

nd C

onst

ruct

ion

Proj

ect M

anag

emen

t Ove

rsig

ht:

Jaco

bs P

roje

ct M

anag

emen

t Co.

Fund

ing

The

New

Con

stru

ctio

n &

Ren

ovat

ions

for U

Con

n H

ealth

are

fund

ed in

the

amou

nt o

f $79

6 m

illion

with

$57

8 m

illion

from

UC

21. T

he b

alan

ce w

ill be

fro

m p

rivat

e fin

anci

ng a

nd U

Con

n H

ealth

fund

s (in

clud

ing

phila

nthr

opy)

.

Sche

dule

and

Bud

get

Plan

ning

& D

esig

n w

as in

itiat

ed in

Jun

e of

201

0. T

he p

rogr

am is

pla

nned

for

com

plet

ion

in e

arly

201

9. C

urre

ntly

, no

maj

or is

sues

hav

e be

en id

entif

ied

whi

ch

put t

he c

ompl

etio

n at

risk

. A

sum

mar

y sc

hedu

le is

loca

ted

on th

e la

st p

age

of

this

repo

rt.

Sum

mar

y Sc

hedu

le &

Cas

h flo

w

48

Page 55: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Pa

ge

3

Bio

scie

nce

Co

nn

ecticu

t P

rog

ram

Re

po

rt N

o.

71

– J

an

ua

ry 2

01

8

Exec

utiv

e Su

mm

ary:

Mile

ston

es, C

urre

nt /

Upc

omin

g C

onst

ruct

ion

Activ

ities

C

linic

Bui

ldin

g R

enov

atio

n M

ilest

ones

: o

Ph

ase

2 co

nstru

ctio

n is

com

plet

e.

o

Phas

e 3

cons

truct

ion

is u

nder

way

. o

$6

7.7M

(72%

) of f

unds

exp

ende

d. 

Cur

rent

/ U

pcom

ing

Activ

ities

: o

Fr

amin

g is

und

erw

ay in

Pha

se 3

Den

tal S

urge

ry a

rea.

o

D

emol

ition

is u

nder

way

in P

hase

3 D

enta

l Exa

m a

reas

.

Hos

pita

l Tow

er –

Hyb

rid O

.R.

Mile

ston

es:

o

Hyb

rid O

.R. P

roje

ct is

com

plet

e!

o

$317

.2M

(98%

) of f

unds

exp

ende

d (e

ntire

pro

ject

)

Cur

rent

/ U

pcom

ing

Activ

ities

: o

Sc

affo

ldin

g is

bei

ng in

stal

led

in th

e pe

ntho

use.

o

Fi

nal C

O fo

r the

bui

ldin

g w

ill be

issu

ed a

fter p

erm

anen

t sca

ffold

ing

is in

stal

led

in p

enth

ouse

.

49

Page 56: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Pa

ge

4

Bio

scie

nce

Co

nn

ecticu

t P

rog

ram

Re

po

rt N

o.

71

– J

an

ua

ry 2

01

8

Ac

adem

ic B

uild

ing

Addi

tion

and

Ren

ovat

ion 

M

ilest

ones

: o

Al

l con

tract

wor

k is

com

plet

e.

o

$35.

4M (9

6%) o

f fun

ds e

xpen

ded.

Cur

rent

/ U

pcom

ing

Activ

ities

:

o

Res

olve

min

or is

sues

to o

btai

n Fi

nal C

ertif

icat

e of

Occ

upan

cy

o

Fina

ncia

l Clo

seou

t is

unde

rway

.

M

ain

Build

ing

Lab

(L) R

enov

atio

ns –

Pro

ject

2

Mile

ston

es:

o

Fina

l Cer

tific

ate

of O

ccup

ancy

rece

ived

. o

$3

8.6M

(97%

) of f

unds

exp

ende

d.

Cur

rent

/ U

pcom

ing

Activ

ities

: o

Fi

nanc

ial c

lose

out i

s un

derw

ay.

50

Page 57: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Pa

ge

5

Bio

scie

nce

Co

nn

ecticu

t P

rog

ram

Re

po

rt N

o.

71

– J

an

ua

ry 2

01

8

Safe

ty

(Sta

tistic

s- c

umul

ativ

e th

roug

h M

arch

of 2

018)

Proj

ect

Wor

kers

O

rient

ed

Inci

dent

s H

ours

W

orke

d O

SHA

Inci

dent

Rat

es *

Activ

ities

& T

rain

ing

Com

plet

ed T

his

Mon

th

Firs

t Aid

R

ecor

dabl

e Lo

st T

ime

Rec

orda

ble

Lost

Tim

e

Pre-

OC

IP P

roje

cts

164

7 5

3 93

,804

10

.7

6.4

C

ompl

ete

(Wor

k pr

ior t

o O

CIP

sta

rt)

OC

IP P

roje

cts

Out

patie

nt P

avilio

n C

&S

943

12

7 1

394,

251

3.6

0.5

Com

plet

e

Out

patie

nt P

avilio

n Fi

t Out

81

0 13

5

2 29

3,37

6 3.

4 1.

4

Com

plet

e

Out

patie

nt P

avilio

n –

8 Ea

st

81

0 0

0 17

,295

0.

0 0.

0

Com

plet

e

Mai

n La

b R

enov

atio

n 66

0 19

3

3 42

8,06

7 1.

4 1.

4

Com

plet

e

Mai

n La

b –

Phas

e II

410

3 1

0 19

2,25

7 1.

0 0.

0

Com

plet

e

New

Hos

pita

l Tow

er

2,08

4 72

29

10

1,

336,

546

4.3

1.5

Com

plet

e

Incu

bato

r Lab

Add

ition

31

6 4

3 0

34,4

29

17.4

0.

0

Com

plet

e

Acad

emic

Add

ition

37

3 1

0 0

99,4

40

0.0

0.0

Com

plet

e

Clin

ic B

uild

ing

Ren

ovat

ion

360

5 4

1 25

2,93

2 3.

2 0.

8

Rei

nfor

cing

Infe

ctio

n Pr

even

tion

OC

IP T

otal

s:

6,03

7 12

9 52

17

3,

048,

593

3.4

1.1

Prog

ram

Tot

als:

6,

201

136

57

20

3,14

2,39

7 3.

6 1.

3

Prog

ram

Wid

e Ac

tiviti

es T

his

Mon

th:

Ove

rall

cont

ract

or s

afet

y pe

rform

ance

co

ntin

ues

to b

e ve

ry g

ood.

The

re h

ave

been

no

firs

t-aid

or r

ecor

dabl

e in

jurie

s fo

r the

pas

t th

ree

mon

ths.

As

the

only

rem

aini

ng w

ork

for t

he p

rogr

am is

re

nova

tion

of e

xist

ing

clin

ical

faci

litie

s, fo

cus

has

prim

arily

shi

fted

to in

fect

ion

prev

entio

n.

*Incid

ent R

ate

= (#

Inju

ry/Il

lnes

s Ca

ses

x 20

0,00

0) /

Tota

l Hou

rs w

orke

d.

3.9

2.6

3.4

1.1

012345678

Aug‐13Sep‐13Oct‐13Nov‐13Dec‐13Jan‐14Feb‐14Mar‐14Apr‐14May‐14Jun‐14Jul‐14Aug‐14Sep‐14Oct‐14Nov‐14Dec‐14Jan‐15Feb‐15Mar‐15Apr‐15May‐15Jun‐15Jul‐15Aug‐15Sep‐15Oct‐15Nov‐15Dec‐15Jan‐16Feb‐16Mar‐16Apr‐16May‐16Jun‐16Jul‐16Aug‐16Sep‐16Oct‐16Nov‐16Dec‐16Jan‐17Feb‐17Mar‐17Apr‐17May‐17Jun‐17Jul‐17Aug‐17Sep‐17Oct‐17Nov‐17Dec‐17Jan‐18Feb‐18Mar‐18

Incident Rate

UCH

 Incide

nt Rate Tren

ding

 (OCIP Projects Only)

Conn

ecticut Average RIR

Conn

ecticut Average LTIR

UCH

C OCIP RIR

UCH

C OCIP LTRIR

51

Page 58: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Pa

ge

6

Bio

scie

nce

Co

nn

ecticu

t P

rog

ram

Re

po

rt N

o.

71

– J

an

ua

ry 2

01

8

Issu

es /

Con

cern

s

C B

uild

ing:

o

Pr

evio

us R

epor

ted

Ope

n Ite

ms:

Fund

s fro

m th

e fo

unda

tion

are

requ

ired

to c

ompl

ete

the

proj

ect.

Oth

er fu

nd s

ourc

es w

ill be

requ

ired

if th

e fo

unda

tion

fund

s ar

e no

t ava

ilabl

e.

52

Page 59: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Page

7

Bio

scie

nce C

onnecticut

Pro

gra

m R

eport

No.

71 –

January

2018

Prog

ram

Sta

tus

No Activity

 or N

A No curren

t issue

s/de

cisio

ns re

quire

dIssues need attention or re

solutio

nUnresolved issue

s are im

pacting the 

project. 

Proj

ect

Sco

pe

Sche

dule

Bu

dget

Ph

ase I ‐ Site

 & Parking

 

No scop

e issue

s. 

Completed

 on sche

dule. 

Project C

ompleted

 on bu

dget. 

Phase II ‐ N

ew Hospital 

No Scop

e Issues. 

Complete 

Remaining

 fund

s will be used

 for H

ybrid

 O.R. design 

and constructio

n. 

Phase III ‐ H Building Re

novatio

Scop

e de

pend

ent o

n future fu

nding. 

Desig

n is on

 hold pe

nding fund

ing. 

TBD  

Main Bu

ilding Lab (L) R

enovations – Project 1 

No scop

e issue

s.  

Project com

pleted

 a fe

w weeks beh

ind sche

dule 

Project com

pleted

 und

er bud

get. 

Main Bu

ilding Lab (L) R

enovations – Project 2  

No scop

e issue

s.  

Actual su

bstantial com

pletion date was M

ay 3, 2017 

and moves are com

plete 

Project com

pleted

 und

er bud

get.  

Outpa

tient Pavilion

 (Including

 8th floo

r East) 

All add

ition

al sc

ope and changes w

ere completed

 with

in 

the project b

udget. 

Final CO re

ceived

 4/19/2017

 Project com

pleted

 und

er bud

get. 

Acad

emic Building Ad

ditio

n & Ren

ovations 

No ne

w sc

ope issue

s.  

All w

ork is complete 

Additio

nal Skanska staff costs were resolved

 with

in 

project b

udget 

Clinical Building Re

novatio

ns (C

 Building) 

No ne

w sc

ope issue

s.  

Phase II work proceeding

 on sche

dule.  

Curren

t projection is on

 bud

get. 

Incuba

tor Lab

 Add

ition

 (CGSB

No scop

e issue

s. 

Final Certificate of Occup

ancy re

ceived

.  Project com

pleted

 und

er bud

get.  

(+) o

r (‐) de

notes c

hange in status from

 last m

onth 

53

Page 60: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Page 8

Bio

scie

nce C

onnecticut

Pro

gra

m R

eport

No.

71 –

January

2018

 

54

Page 61: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

  

Pa

ge

9

Bio

scie

nce

Co

nn

ecticu

t P

rog

ram

Re

po

rt N

o.

71

– J

an

ua

ry 2

01

8

Jaco

bs P

roje

ct M

anag

emen

t Ove

rsig

ht A

ctiv

ities

In

trodu

ctio

n Ja

cobs

is p

rovi

ding

Pro

gram

Man

agem

ent O

vers

ight

sup

port

and

staf

f aug

men

tatio

n se

rvic

es to

the

UC

onn

Hea

lth fo

r the

Bio

scie

nce

CT

cons

truct

ion

proj

ects

at t

he

Farm

ingt

on c

ampu

s. T

his

supp

ort b

egan

in e

arly

Jan

uary

201

2 an

d th

is re

port

is a

con

tract

del

iver

able

inte

nded

to p

rovi

de m

anag

emen

t inf

orm

atio

n to

sup

port

the

sign

ifica

nt p

lann

ing,

sch

edul

ing,

des

ign,

dem

oliti

on, s

ite p

repa

ratio

n, c

onst

ruct

ion

and

finan

cial

act

iviti

es.

Sum

mar

y of

Wor

k Pe

rform

ed T

his

Perio

d

Plan

ning

an

d Pr

ogra

mm

ing:

Jaco

bs

cont

inue

s to

w

ork

with

C

PDC

an

d co

nstru

ctio

n m

anag

ers

on C

onst

ruct

ion

phas

ing

and

sche

dulin

g fo

r th

e C

linic

bu

ildin

g an

d Ac

adem

ic b

uild

ing

reno

vatio

ns.

Cur

rent

focu

s is

on

plan

ning

for

C

build

ing

site

logi

stic

s an

d m

ove

plan

ning

.

Te

chno

logy

Pla

nnin

g:

Jaco

bs c

ontin

ues

to c

oord

inat

e w

ith p

roje

ct t

eam

s fo

r IT

an

d AV

des

ign

in th

e C

linic

and

Aca

dem

ic B

uild

ings

.

FF&E

: J

acob

s co

ntin

ues

to c

oord

inat

e pr

ocur

emen

t, de

liver

y an

d se

tup

of t

he

furn

iture

for t

he C

bui

ldin

g pr

ojec

t.

M

ove

and

Activ

atio

n M

anag

emen

t:

Jaco

bs is

wor

king

with

the

Clin

ic B

uild

ing

team

on

mov

e pl

anni

ng e

fforts

.

Budg

et P

lann

ing:

D

etai

led

revi

ews

of b

udge

ts a

nd r

epor

ts fo

r ea

ch B

SC p

roje

ct

with

UC

onn

Hea

lth m

gt.,

CPD

C m

gt.

& PM

s co

ntin

ue.

C

ost T

rack

ing:

R

evie

win

g co

ntra

ctor

cha

nge

orde

r req

uest

s, s

ched

ule

of v

alue

s,

and

paym

ent

appl

icat

ions

. J

acob

s co

ntin

ues

to a

ssis

t in

miti

gatio

n of

pot

entia

l cl

aim

s an

d ne

gotia

tion

of c

hang

e re

ques

ts.

Sa

fety

Ove

rsig

ht S

ervi

ces:

Ja

cobs

con

tinue

s co

ordi

natin

g ob

serv

atio

ns w

ith th

e C

onst

ruct

ion

Man

ager

s an

d ve

rifyi

ng th

eir

com

plia

nce

with

UC

onn

Hea

lth s

afet

y re

gula

tions

. Th

ey c

ontin

ue to

revi

ew S

PAs,

JH

As, c

rane

lift

plan

s, e

tc.

Pr

ojec

t Man

agem

ent C

ontro

l Sys

tem

(Del

con/

Uni

fier):

Pro

ject

con

trols

hav

e be

en

trans

ition

ed fr

om D

elco

n to

Uni

fier.

Jac

obs

cont

inue

s to

ass

ist w

ith re

conc

iliatio

n of

fina

ncia

l dat

a.

M

aste

r Pr

ogra

m S

ched

ule:

Ja

cobs

con

tinue

s to

wor

k w

ith t

he c

ontra

ctor

s to

as

sist

with

sch

edul

e m

anag

emen

t and

lead

ersh

ip.

C

omm

unic

atio

n an

d C

oord

inat

ion

of E

fforts

: At

tend

ing

OAC

mee

tings

and

BSC

O

vers

ight

com

mitt

ee,

and

othe

r m

eetin

gs a

s re

quire

d to

dis

cuss

pro

ject

and

pr

ogra

m is

sues

. P

rovi

de q

uarte

rly re

ports

.

O

CIP

: Jac

obs

cont

inue

s to

atte

nd q

uarte

rly O

CIP

adm

inis

tratio

n m

eetin

gs w

ith th

e O

CIP

adm

inis

trato

r (W

illis)

, und

erw

riter

(The

Har

tford

), an

d C

M (F

usco

)

55

Page 62: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Pa

ge

10

Bio

scie

nce

Co

nn

ecticu

t P

rog

ram

Re

po

rt N

o.

71

– J

an

ua

ry 2

01

8

Pr

ojec

t M

anag

emen

t:

The

Clin

ic

Build

ing

proj

ect

has

been

su

cces

sful

lytra

nsiti

oned

to U

Con

n H

ealth

PM

. Ja

cobs

con

tinue

s to

sup

port

the

proj

ect w

ith fu

lltim

e Pr

ojec

t Eng

inee

ring

sta f

f and

Par

t tim

e Ex

ecut

ive

Ove

rsig

ht.

Pr

ogra

m M

anag

emen

t: J

acob

s co

ntin

ues

to p

rovi

de c

ounc

il an

d ex

ampl

es o

f bes

tpr

actic

es fo

r la

rge

scal

e pr

ogra

m a

nd c

onst

ruct

ion

man

agem

ent t

o th

e C

ampu

sPl

anni

ng, D

esig

n, a

nd C

onst

r uct

ion

depa

rtmen

t.

Va

lue

Plus

: J

acob

s tra

cks

the

valu

e w

e br

ing

to o

ur c

lient

s in

a s

yste

m c

alle

d

Valu

e +.

Ite

ms

track

ed c

an b

e in

nova

te m

etho

ds o

r pr

oces

ses

that

red

uce

cons

truct

ion

or o

pera

ting

cost

s, v

alue

eng

inee

ring,

pro

cure

men

t im

prov

emen

ts,

nego

tiate

d re

duct

ions

in c

hang

e co

sts,

etc

. T

hese

idea

s ar

e ap

prov

ed b

y th

ecl

ient

bef

ore

they

are

logg

ed in

to th

e sy

stem

. S

ince

we

are

imbe

dded

with

the

UC

onn

Hea

lth C

ampu

s Pl

anni

ng,

Des

ign,

and

Con

stru

ctio

n de

partm

ent,

we

are

also

trac

king

thes

e ite

ms

for t

he p

roje

ct te

am.

To d

ate

UC

H h

as a

ppro

ved

Valu

ePl

us it

ems

tota

ling

$73,

295,

355.

56

Page 63: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Bio

scie

nce

Co

nn

ecticu

t C

ap

ita

l P

roje

cts

Re

po

rt N

o.

72

- A

pri

l 2

01

8

Pro

gra

m B

ud

ge

t &

Fu

nd

ing

Su

mm

ary

- A

nticip

ate

d C

ash

flo

w

FY

11

FY

12

FY

13

FY

14

FY

15

FY

16

FY

17

FY

18

FY

19

Fu

nd

ing

To

tal

Cu

rre

nt

Fu

nd

ing

UC

21 B

ond F

unds

35,1

42,5

13

68,7

00,0

00

83,4

60,3

29

127,2

00,0

00

96,2

65,0

00

103,0

63,8

75

57,9

90,9

06

5,5

80,0

00

-

577,4

02,6

23

OutP

atient

Pavili

on F

unds

-

-

48,2

79,2

03

125,9

20,0

90

27,9

80,7

07

-

-

-

-

202,1

80,0

00

UC

H F

unds (

inclu

din

g p

hila

nth

ropy)

-

-

-

8,5

02

1,6

20,2

68

3,8

82,7

44

3,1

78,0

45

2,9

43,8

24

3,2

87,1

20

14,9

20,5

03

TO

TA

L F

UN

DS

35,1

42,5

13

68,7

00,0

00

131,7

39,5

32

253,1

28,5

93

125,8

65,9

75

106,9

46,6

19

61,1

68,9

51

8,5

23,8

24

3,2

87,1

20

794,5

03,1

26

Pla

nn

ed

Ex

pe

nd

itu

res

JD

H N

ew

Constr

uction &

Renovations

2,5

99,7

16

13,2

99,3

23

18,0

16,8

49

48,5

83,4

26

101,0

25,0

55

102,4

58,4

48

26,8

04,1

07

12,2

29,0

77

-

325,0

16,0

00

Academ

ic B

uild

ing A

dditio

ns &

Renovations

-

-

315,0

85

1,2

36,0

19

2,0

48,4

75

14,5

38,8

71

11,6

97,8

90

6,9

58,6

60

-

36,7

95,0

00

Clin

ical R

enovations -

C B

ldg

-

-

407,3

46

2,0

68,1

62

3,0

06,5

47

4,9

20,7

03

38,4

78,6

71

24,1

60,4

19

20,3

22,7

56

93,3

64,6

04

Main

Build

ing L

ab (

L)

Renovations -

Pro

ject

1

2,3

33,6

10

741,8

53

6,4

04,4

86

32,0

44,3

65

21,2

80,4

68

10,1

23,2

21

3,8

34,9

87

582,5

13

-

77,3

45,5

03

Main

Build

ing L

ab (

L)

Renovations -

Sw

ing S

pace

-

-

476,1

12

17,7

62

98,4

74

-

-

-

-

592,3

48

Main

Build

ing L

ab (

L)

Renovations -

Pro

ject

2-

-

-

331,5

73

660,7

40

8,0

20,6

77

24,9

24,6

26

5,9

52,0

55

-

39,8

89,6

71

Outp

atient

Pavili

on

-

1,0

49,7

35

32,3

56,8

08

78,6

15,2

37

76,2

38,4

93

9,9

68,0

44

3,6

39,6

18

312,0

65

-

202,1

80,0

00

Incubato

r Lab A

dditio

n -

CG

SB

-

-

62,0

49

812,1

69

6,6

32,4

92

10,8

53,9

57

265,1

58

694,1

75

-

19,3

20,0

00

AN

NU

AL

PR

OG

RA

M E

XP

EN

DIT

UR

ES

4,9

33,3

26

15,0

90,9

11

58,0

38,7

35

163,7

08,7

13

210,9

90,7

44

160,8

83,9

21

109,6

45,0

57

50,8

88,9

64

20,3

22,7

56

794,5

03,1

26

CU

RR

ENT

PRO

JEC

TIO

N (C

UM

ULA

TIVE

)4,

933,

326

20,0

24,2

37

78,0

62,9

71

24

1,77

1,68

4

45

2,76

2,42

8

61

3,64

6,34

9

72

3,29

1,40

6

774,

180,

370

79

4,50

3,12

6

TO

TA

L U

NE

XP

EN

DE

D30,2

09,1

87

83,8

18,2

76

157,5

19,0

74

246,9

38,9

53

161,8

14,1

84

107,8

76,8

82

59,4

00,7

76

17,0

35,6

36

-

-

* Fi

nanc

ial D

ata

Subj

ect t

o Pl

ant A

ccou

ntin

g Ve

rific

atio

nP

age 1

1

FY 11

FY 12

FY 13

FY 14

FY 15

FY 16

FY 17

FY 18

FY19

UCH

 FUNDS

 (INCLUDING PHILANTH

ROPY)

00

08,50

21,62

0,26

83,88

2,74

43,17

8,04

52,94

3,82

43,28

7,12

0AC

C FU

NDS

01,04

9,73

532

,356

,808

78,615

,237

76,238

,493

9,96

8,04

43,63

9,61

831

2,06

50

UC2

1 FU

NDS

4,93

3,32

614

,041

,176

25,681

,927

85,084

,973

133,13

1,98

314

7,03

3,13

310

2,82

7,39

447

,633

,075

17,035

,636

ORIGINAL

 PRO

JECT

ION (C

UMULATIVE

)4,75

4,01

027

,569

,603

117,57

2,46

933

8,62

2,25

858

0,60

1,57

375

2,96

2,99

281

7,87

7,71

883

9,80

4,00

083

9,80

4,00

0CU

RREN

T PR

OJECT

ION (C

UMULATIVE

)4,93

3,32

620

,024

,237

78,062

,971

241,77

1,68

445

2,76

2,42

861

3,64

6,34

972

3,29

1,40

677

4,18

0,37

079

4,50

3,12

6

 ‐ 100,000

,000

 200,000

,000

 300,000

,000

 400,000

,000

 500,000

,000

 600,000

,000

 700,000

,000

 800,000

,000

 900,000

,000

0

50,000

,000

100,00

0,00

0

150,00

0,00

0

200,00

0,00

0

250,00

0,00

0

Cumulative Expenditures

Expenditures

Plan

ned Project E

xpen

ditures by

 Sou

rce

57

Page 64: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Bio

scie

nce C

onnecticut

Capital P

roje

cts

Report

No.

72 -

Apri

l 2018

Pro

gra

m B

udg

et

& F

undin

g S

um

mary

- A

nticip

ate

d C

ost

Co

st

Su

mm

ary

by P

roje

ct

Cu

rre

nt

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pe

nd

ing

Co

mm

itm

en

ts

Pro

jec

ted

Co

sts

Pro

jec

ted

Ove

r/U

nd

er

Ex

pe

nd

itu

re t

o

Da

te%

Ex

pe

nd

ed

AB

CD

E=

B+

C+

DF

=A

-E

Ph

ase

I -

Site

& P

ark

ing

13

,96

9,7

95

13

,96

9,7

95

-

-

13

,96

9,7

95

-

13

,96

9,7

94

10

0%

Ph

ase

II -

Ne

w H

osp

ita

l T

ow

er

(& H

yb

rid

OR

)3

11

,04

6,2

05

31

0,0

79

,09

0

66

9,5

44

29

7,5

71

31

1,0

46

,20

5

-

30

3,2

64

,28

0

97

%

Ph

ase

III -

H B

ldg

Re

no

va

tio

ns -

Sco

pe

Elim

ina

ted

-

-

-

-

-

-

-

0%

To

tal -

Ne

w H

os

pit

al T

ow

er,

Sit

e &

Pa

rkin

g3

25

,01

6,0

00

32

4,0

48

,88

5

66

9,5

44

29

7,5

71

32

5,0

16

,00

0

-

31

7,2

34

,07

5

98

%

Aca

de

mic

Bu

ildin

g A

dd

itio

ns &

Re

no

va

tio

ns

36

,79

5,0

00

36

,52

8,6

71

23

1,3

29

35

,00

0

36

,79

5,0

00

-

35

,40

0,3

34

96

%

Clin

ica

l R

en

ova

tio

ns -

C B

ldg

93

,36

4,6

04

92

,53

8,8

07

46

5,8

37

35

9,9

60

93

,36

4,6

04

-

67

,65

8,9

75

72

%

Ma

in B

uild

ing

La

b (

L)

Re

no

va

tio

ns -

Pro

ject 1

7

7,3

45

,50

3

77

,34

3,5

98

1,9

05

-

77

,34

5,5

03

-

77

,34

3,5

98

10

0%

Ma

in B

uild

ing

La

b (

L)

Re

no

va

tio

ns -

Sw

ing

Sp

ace

59

2,3

48

59

2,3

48

-

-

59

2,3

48

-

59

2,3

48

10

0%

Ma

in B

uild

ing

La

b (

L)

Re

no

va

tio

ns -

Pro

ject 2

39

,88

9,6

71

39

,39

0,0

47

49

9,6

24

-

39

,88

9,6

71

-

38

,56

5,2

50

97

%

Ou

tpa

tie

nt P

avili

on

20

2,1

80

,00

0

20

2,1

50

,05

3

29

,94

7

-

20

2,1

80

,00

0

-

20

2,0

74

,52

9

10

0%

Incu

ba

tor

La

b A

dd

itio

n -

CG

SB

19

,32

0,0

00

18

,89

0,1

03

42

9,8

97

-

19

,32

0,0

00

-

18

,79

6,7

38

97

%

TO

TA

L P

RO

JE

CT

S E

XP

EN

DIT

UR

ES

79

4,5

03

,12

6

79

1,4

82

,51

3

2,3

28

,08

2

69

2,5

31

79

4,5

03

,12

6

-

75

7,6

65

,84

7

95

%

Co

st

Su

mm

ary

by C

ate

go

ry

Cu

rre

nt

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pe

nd

ing

Co

mm

itm

en

ts

Pro

jec

ted

Co

sts

Pro

jec

ted

Ove

r/U

nd

er

Ex

pe

nd

itu

re t

o

Da

te%

Ex

pe

nd

ed

AB

CD

E=

B+

C+

DF

=A

-E

Co

nstr

uctio

n6

12

,11

8,9

13

61

1,3

36

,38

2

90

,00

0

69

2,5

31

61

2,1

18

,91

3

-

58

4,6

16

,71

6

96

%

De

sig

n S

erv

ice

s5

2,4

64

,20

6

52

,40

4,0

06

60

,20

0

-

52

,46

4,2

06

-

50

,76

6,3

14

97

%

Te

leco

mm

15

,33

3,1

94

15

,27

2,9

04

60

,28

9

-

15

,33

3,1

94

-

15

,21

5,7

02

99

%

Fu

rnis

hin

g, F

ixtu

res &

Eq

uip

me

nt

48

,61

1,6

78

48

,37

1,9

90

23

9,6

88

-

48

,61

1,6

78

-

44

,90

7,6

98

92

%

Co

nstr

uctio

n A

dm

inis

tra

tio

n5

,53

0,6

23

5,3

31

,93

0

19

8,6

93

-

5,5

30

,62

3

-

4,9

26

,91

4

89

%

Oth

er

A/E

& C

on

su

ltin

g S

erv

ice

s2

3,6

75

,91

2

23

,64

5,0

32

30

,88

0

-

23

,67

5,9

12

-

23

,06

7,0

98

97

%

Art

wo

rk4

49

,38

7

44

9,3

87

-

-

44

9,3

87

-

44

9,3

87

10

0%

Re

loca

tio

n1

,59

3,1

84

1,5

93

,18

4

-

-

1,5

93

,18

4

-

1,3

42

,05

1

84

%

En

vir

on

me

nta

l1

,09

8,1

43

1,0

98

,14

3

-

-

1,0

98

,14

3

-

1,0

84

,05

1

99

%

Insu

ran

ce

& L

eg

al

12

,72

0,6

04

12

,29

8,0

92

42

2,5

12

-

12

,72

0,6

04

-

11

,81

2,5

38

93

%

Oth

er

Mis

ce

llan

eo

us

19

,74

6,3

77

19

,68

1,4

63

64

,91

5

-

19

,74

6,3

77

-

19

,47

7,3

77

99

%

Su

bto

tal

79

3,3

42

,22

1

79

1,4

82

,51

3

1,1

67

,17

7

69

2,5

31

79

3,3

42

,22

1

-

75

7,6

65

,84

7

96

%

Co

nti

ng

en

cy

1,1

60

,90

5

-

1,1

60

,90

5

-

1,1

60

,90

5

-

-

0%

TO

TA

L7

94

,50

3,1

26

79

1,4

82

,51

3

2,3

28

,08

2

69

2,5

31

79

4,5

03

,12

6

-

75

7,6

65

,84

7

95

%

* Fi

nanc

ial D

ata

Subj

ect t

o Pl

an A

ccou

ntin

g Ve

rific

atio

nP

ag

e 1

2

58

Page 65: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anagem

ent

Sta

tus:

Com

ple

te

(Hybrid O

R In C

onstr

uction)

Desig

ner:

SB

A / H

KS

Constr

ucto

r:T

urn

er

Constr

uction

Pro

ject M

anager:

Kevin

Nort

on

Pro

ject N

um

ber:

901590

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m A

ppro

val

6/3

0/2

010

6/3

0/2

010

0.0

UC

21

317,4

38,0

00

$

310,9

21,3

68

$

98%

Desig

n S

tart

(N

TP

)9/2

/2010

9/2

/2010

0.0

UC

H F

unds

7,5

78,0

00

$

6,3

12,7

07

$

83%

Schem

atic D

esig

n R

eceiv

ed

8/1

9/2

011

8/1

9/2

011

0.0

Schem

atic D

esig

n A

ppro

ved

9/3

0/2

011

9/3

0/2

011

0.0

Desig

n D

ev. / P

hase I C

D's

Receiv

ed

2/1

7/2

012

2/1

0/2

012

0.2

To

tal

325,0

16,0

00

$

317,2

34,0

75

$

98%

Desig

n D

evelo

pm

ent A

ppro

ved

3/3

0/2

012

4/2

4/2

012

(0.8

)

Phase II C

onstr

uction D

ocs R

eceiv

ed

11/2

1/2

012

11/3

0/2

012

(0.3

)

Phase I C

onstr

uction S

tart

(N

TP

)6/1

1/2

012

6/4

/2012

0.2

Metr

icT

arg

et

(To

Date

)C

urr

en

t

Phase I C

onstr

uction C

om

ple

te3/2

9/2

013

3/2

9/2

013

0.0

SB

E P

art

icip

ation

30%

39%

Phase II C

onstr

uction S

tart

(N

TP

)4/1

0/2

013

5/1

3/2

013

(1.1

)M

BE

/WB

E/D

BE

Part

icip

ation

10%

24%

Phase II C

onstr

uction C

om

ple

te1/7

/2016

5/2

/2016

(3.8

)

Ph

ase II F

F&

E / M

ove-I

n C

om

ple

te3/1

7/2

016

5/1

3/2

016

(1.9

)C

ontr

acts

Aw

ard

ed to D

ate

100%

100%

Phase III C

onstr

uction S

tart

(N

TP

)5/5

/2016

TB

DE

arn

ed V

alu

e to D

ate

100%

99%

Phase III C

onstr

uction C

om

ple

te2/1

2/2

017

TB

DE

xpenditure

s to D

ate

100%

97%

Phase III F

F&

E / M

ove-I

n C

om

ple

te3/4

/2017

TB

DC

onstr

uction C

hange O

rders

5%

10%

Pro

ject

Co

mp

leti

on

3/4

/2017

TB

DC

ontingency / R

em

ain

ing C

osts

5%

5%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$248,8

72,6

08

$248,4

85,0

37

$90,0

00

$297,5

71

$248,8

72,6

08

$0

$243,8

19,9

06

Desig

n S

erv

ices

$23,9

25,5

45

$23,9

25,5

45

$0

$0

$23,9

25,5

45

$0

$22,7

54,3

92

Tele

com

m$7,5

14,2

93

$7,5

06,8

47

$7,4

46

$0

$7,5

14,2

93

$0

$7,4

74,6

89

Furn

ishin

g, F

ixtu

res &

Equip

ment

$25,0

59,3

90

$24,9

86,4

47

$72,9

43

$0

$25,0

59,3

90

$0

$24,2

74,3

21

Constr

uction A

dm

inis

tration

$2,8

78,5

31

$2,8

78,5

31

$0

$0

$2,8

78,5

31

$0

$2,8

78,5

30

Oth

er

A/E

& C

onsultin

g S

erv

ices

$8,8

64,4

41

$8,8

64,4

41

$0

$0

$8,8

64,4

41

$0

$8,7

05,3

02

Art

work

$201,0

80

$201,0

80

$0

$0

$201,0

80

$0

$201,0

80

Relo

cation

$491,2

12

$491,2

12

$0

$0

$491,2

12

$0

$460,0

35

Environm

enta

l$241,2

82

$241,2

82

$0

$0

$241,2

82

$0

$241,2

82

Insura

nce &

Legal

$5,2

11,1

41

$5,0

99,7

51

$111,3

90

$0

$5,2

11,1

41

$0

$5,0

95,4

82

Oth

er

Mis

cella

neous

$1,3

87,9

63

$1,3

68,7

12

$19,2

51

$0

$1,3

87,9

63

$0

$1,3

29,0

55

Su

bto

tal

$324,6

47,4

86

$324,0

48,8

85

$301,0

30

$297,5

71

$324,6

47,4

86

$0

$317,2

34,0

75

Co

nti

ng

en

cy

$368,5

14

$368,5

14

$0

$368,5

14

$0

$0

TO

TA

L$325,0

16,0

00

$324,0

48,8

85

$669,5

44

$297,5

71

$325,0

16,0

00

$0

$317,2

34,0

75

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 1

3

JD

H N

ew

Co

nstr

ucti

on

&

CO

ST

/ F

OR

EC

AS

T *

NO

TE

S

Ren

ovati

on

s (

Ro

ll u

p)

(1)

The p

endin

g c

om

mitm

ent am

ount in

clu

des a

ll pote

ntial costs

for

Turn

er

and their

subcontr

acto

rs.

Ph

ase I -

Park

ing

& S

ite:

Constr

uction o

f a n

ew

403 s

pace p

ublic

gara

ge in t

he e

xis

ting I

lot.

In

additio

n t

o the n

orm

al site w

ork

for

constr

uction, exis

ting s

ite u

tilit

ies inclu

din

g s

anitary

, sto

rm,

wate

r, a

nd

ele

ctr

ical w

ill b

e r

elo

cate

d d

uring t

he initia

l constr

uction p

hase t

o

accom

modate

the c

onstr

uction o

f th

e n

ew

tow

er.

Ph

ase II

-T

he N

ew

Ho

sp

ital

To

wer:

Will

inclu

de e

leven levels

and w

ill

house k

ey p

atient

are

as inclu

din

g t

he e

merg

ency d

epart

ment,

surg

ery

suite,

MR

I suite,

renal dia

lysis

, re

spirato

ry t

hera

py,

inpatient

rehab

(ort

hopedic

s,

rehab g

ym

and w

ork

space),

clin

ical support

, and p

atient

education s

pace. S

upport

serv

ices locate

d in t

he n

ew

tow

er

will

inclu

de

centr

al ste

rile

pro

cessin

g a

nd a

new

main

lobby.

Phase

II a

lso inclu

des a

new

397 s

pace s

taff

gara

ge.

Ph

ase

III

-H

Bu

ild

ing

Ren

ovati

on

: R

epla

cem

ents

and u

pgra

des t

o

syste

ms inclu

din

g h

eating,

air c

onditio

nin

g,

ventila

tion,

plu

mbin

g a

nd

ele

ctr

ical syste

ms.

Renovation

of th

e e

xis

ting J

ohn D

em

psey H

ospital

floors

is n

ot

curr

ently

funded.

SC

OP

E

$0

$50,000,00

0

$100

,000,000

$150

,000,000

$200

,000,000

$250

,000,000

$300

,000,000

$350

,000,000

$400

,000,000

Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Curren

t Plan

Actual Expen

ditures

Projected Expe

nditu

res

DE

SC

RIP

TIO

N /

TE

AM

SC

HE

DU

LE

FU

ND

ING

*

A A A A A A AM

ET

RIC

S

A A A AA

(1)

59

Page 66: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anagem

ent

Sta

tus:

Clo

se O

ut

Desig

ner:

SB

A / H

KS

Constr

ucto

r:T

urn

er

Constr

uction

Pro

ject M

anager:

Kevin

Nort

on

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m A

ppro

val

6/3

0/2

010

6/3

0/2

010

0.0

UC

21

13,9

69,7

95

$

13,9

69,7

94

$

100%

Desig

n S

tart

(N

TP

)9/2

/2010

9/2

/2010

0.0

Schem

atic D

esig

n R

eceiv

ed

8/1

9/2

011

8/1

9/2

011

0.0

Schem

atic D

esig

n A

ppro

ved

9/3

0/2

011

9/3

0/2

011

0.0

Enablin

g C

D's

Receiv

ed

2/1

7/2

012

2/1

0/2

012

0.2

To

tal

13,9

69,7

95

$

13,9

69,7

94

$

100%

Site &

Park

ing G

MP

5/2

2/2

012

5/2

2/2

012

0.0

Site &

Park

ing C

onstr

uction S

tart

(N

TP

)6/1

1/2

012

6/4

/2012

0.2

Constr

uction S

ubsta

ntial C

om

ple

te3/2

9/2

013

3/2

9/2

013

0.0

Metr

icT

arg

et

(To

Date

)C

urr

en

t

Pro

ject C

om

ple

te6/2

6/2

013

4/3

0/2

013

1.9

SB

E P

art

icip

ation

30%

37%

MB

E/W

BE

/DB

E P

art

icip

ation

10%

13%

Contr

acts

Aw

ard

ed to D

ate

100%

100%

Earn

ed V

alu

e to D

ate

100%

100%

Expenditure

s to D

ate

100%

100%

Constr

uction C

hange O

rders

(1

)6%

0%

Pro

ject

Co

mp

leti

on

6/2

6/2

013

4/3

0/2

013

1.9

Contingency / R

em

ain

ing C

osts

0%

0%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

(1)

Fin

al constr

uction c

ost w

as 2

% less than initia

l constr

uction c

ontr

act

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$13,4

35,9

07

$13,4

35,9

07

$0

$0

$13,4

35,9

07

$0

$13,4

35,9

06

Desig

n S

erv

ices

$0

$0

$0

$0

$0

$0

$0

Tele

com

m$0

$0

$0

$0

$0

$0

$0

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$0

$0

$0

$0

$0

$0

$0

Constr

uction A

dm

inis

tration

$0

$0

$0

$0

$0

$0

$0

Oth

er

A/E

& C

onsultin

g S

erv

ices

$437,7

10

$437,7

10

$0

$0

$437,7

10

$0

$437,7

10

Art

work

$0

$0

$0

$0

$0

$0

$0

Relo

cation

$0

$0

$0

$0

$0

$0

$0

Environm

enta

l$8,0

00

$8,0

00

$0

$0

$8,0

00

$0

$8,0

00

Insura

nce &

Legal

$25,0

00

$25,0

00

$0

$0

$25,0

00

$0

$25,0

00

Oth

er

Mis

cella

neous

$63,1

78

$63,1

78

$0

$0

$63,1

78

$0

$63,1

78

Su

bto

tal

$13,9

69,7

95

$13,9

69,7

95

$0

$0

$13,9

69,7

95

$0

$13,9

69,7

94

Co

nti

ng

en

cy

$0

$0

$0

$0

$0

$0

$0

TO

TA

L$13,9

69,7

95

$13,9

69,7

95

$0

$0

$13,9

69,7

95

$0

$13,9

69,7

94

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 1

4

Gara

ge

Ph

ase I -

Sit

e &

East

Park

ing

CO

ST

/ F

OR

EC

AS

T *

Sit

e:

In a

dditio

n t

o t

he n

orm

al site w

ork

for

constr

uction, exis

ting s

ite

utilit

ies inclu

din

g s

anitary

, sto

rm,

wate

r, a

nd e

lectr

ical w

ill b

e r

elo

cate

d

during t

he initia

l constr

uction p

hase t

o a

ccom

modate

the c

onstr

uction o

f th

e n

ew

tow

er

and p

ark

ing f

acili

ties.

Park

ing

: C

onstr

uction o

f a n

ew

403 s

pace p

ublic

gara

ge in t

he e

xis

ting I

lo

t

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

FU

ND

ING

*

A A A A A a A AA AM

ET

RIC

S

$0

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,00

0

$12,000,00

0

$14,000,00

0

$16,000,00

0 Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Actual Expen

ditures

Projected Expe

nditu

res

A

60

Page 67: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anagem

ent

Sta

tus:

Com

ple

te

(Hybrid O

R In C

onstr

uction)

Desig

ner:

SB

A / H

KS

Constr

ucto

r:T

urn

er

Constr

uction

Pro

ject M

anager:

Kevin

Nort

on

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m A

ppro

val

6/3

0/2

010

6/3

0/2

010

0.0

UC

21

303,4

68,2

05

$

296,9

51,5

73

$

98%

Desig

n S

tart

(N

TP

)9/2

/2010

9/2

/2010

0.0

UC

H F

unds

7,5

78,0

00

$

6,3

12,7

07

$

83%

Schem

atic D

esig

n R

eceiv

ed

8/1

9/2

011

8/1

9/2

011

0.0

Schem

atic D

esig

n A

ppro

ved

9/3

0/2

011

9/3

0/2

011

0.0

Desig

n D

ev. / E

nablin

g C

D's

Receiv

ed

2/1

7/2

012

2/1

0/2

012

0.2

To

tal

311,0

46,2

05

$

303,2

64,2

80

$

97%

Desig

n D

evelo

pm

ent A

ppro

ved

3/3

0/2

012

3/3

0/2

012

0.0

Constr

uction D

ocum

ents

Receiv

ed

11/9

/2012

11/3

0/2

012

(0.7

)

New

Tow

er

GM

P3/2

9/2

013

5/2

/2013

(1.1

)M

etr

icT

arg

et

(To

Date

)C

urr

en

t

New

Tow

er

Constr

uction S

tart

(N

TP

)4/1

0/2

013

5/1

3/2

013

(1.1

)S

BE

Part

icip

ation

30%

39%

Com

mis

sio

nin

g C

om

ple

te11/1

3/2

015

5/1

1/2

016

(5.9

)M

BE

/WB

E/D

BE

Part

icip

ation

10%

24%

Su

bsta

nti

al C

om

ple

tio

n1/7

/2016

5/2

/2016

(3.8

)

FF

&E

Com

ple

te3/3

/2016

5/1

1/2

016

(2.3

)C

ontr

acts

Aw

ard

ed to D

ate

100%

100%

New

Tow

er

Move-I

n C

om

ple

te3/1

7/2

016

5/1

3/2

016

(1.9

)E

arn

ed V

alu

e to D

ate

100%

99%

Phase 2

b S

itew

ork

Com

ple

te6/1

7/2

016

10/2

5/2

016

(4.3

)E

xpenditure

s to D

ate

100%

97%

Pro

ject C

loseout

8/5

/2016

12/3

1/2

016

(4.9

)C

onstr

uction C

hange O

rders

5%

11%

Pro

ject

Co

mp

leti

on

8/5

/2016

12/3

1/2

016

(4.9

)C

ontingency / R

em

ain

ing C

osts

5%

5%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$235,4

36,7

01

$235,0

49,1

30

$90,0

00

$297,5

71

$235,4

36,7

01

$0

$230,3

84,0

00

Desig

n S

erv

ices

$23,9

25,5

45

$23,9

25,5

45

$0

$0

$23,9

25,5

45

$0

$22,7

54,3

92

Tele

com

m$7,5

14,2

93

$7,5

06,8

47

$7,4

46

$0

$7,5

14,2

93

$0

$7,4

74,6

89

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$25,0

59,3

90

$24,9

86,4

47

$72,9

43

$0

$25,0

59,3

90

$0

$24,2

74,3

21

Constr

uction A

dm

inis

tration

$2,8

78,5

31

$2,8

78,5

31

$0

$0

$2,8

78,5

31

$0

$2,8

78,5

30

Oth

er

A/E

& C

onsultin

g S

erv

ices

$8,4

26,7

31

$8,4

26,7

31

$0

$0

$8,4

26,7

31

$0

$8,2

67,5

92

Art

work

$201,0

80

$201,0

80

$0

$0

$201,0

80

$0

$201,0

80

Relo

cation

$491,2

12

$491,2

12

$0

$0

$491,2

12

$0

$460,0

35

Environm

enta

l$233,2

82

$233,2

82

$0

$0

$233,2

82

$0

$233,2

82

Insura

nce &

Legal

$5,1

86,1

41

$5,0

74,7

51

$111,3

90

$0

$5,1

86,1

41

$0

$5,0

70,4

82

Oth

er

Mis

cella

neous

$1,3

24,7

85

$1,3

05,5

34

$19,2

51

$0

$1,3

24,7

85

$0

$1,2

65,8

77

Su

bto

tal

$310,6

77,6

91

$310,0

79,0

90

$301,0

30

$297,5

71

$310,6

77,6

91

$0

$303,2

64,2

80

Co

nti

ng

en

cy

$368,5

14

$0

$368,5

14

$0

$368,5

14

$0

$0

TO

TA

L$311,0

46,2

05

$310,0

79,0

90

$669,5

44

$297,5

71

$311,0

46,2

05

$0

$303,2

64,2

80

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 1

5

Ph

ase II -

New

Ho

sp

ital T

ow

er

CO

ST

/ F

OR

EC

AS

T *

& S

taff

Park

ing

Gara

ge

*Phase II: Is s

how

ing a

Pro

ject C

om

ple

tion d

ate

of 8/1

6/1

6. T

his

late

r date

is d

ue to the

Phase 2

b P

ost E

D w

ork

schedule

d to o

ccur

3/2

3/1

6-6

/28/1

6.

Th

e N

ew

Ho

sp

ital

To

wer:

Constr

uction o

f a n

ew

384,0

00 s

quare

foot,

169 b

ed,

ele

ven f

loor

hospital to

wer.

N

ew

Sp

ace:

-E

merg

ency D

epart

ment

-S

urg

ery

Suite

-M

RI S

uite

-R

enal D

ialy

sis

-R

espirato

ry T

hera

py

-In

patient

Rehabili

tation

-C

linic

al

Support

-P

atient

Education

Park

ing

:397 s

pace s

taff

gara

ge.SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

FU

ND

ING

*

A A A A A A A A

ME

TR

ICS

$0

$50,000,00

0

$100

,000,000

$150

,000,000

$200

,000,000

$250

,000,000

$300

,000,000

$350

,000,000

Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Actual Expen

ditures

Projected Expe

nditu

res

AA A AA A

61

Page 68: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anagem

ent

Sta

tus:

On H

old

Desig

ner:

SB

A / H

KS

Constr

ucto

r:T

urn

er

Constr

uction

Pro

ject M

anager:

Kevin

Nort

on

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m A

ppro

val

6/3

0/2

010

6/3

0/2

010

0.0

UC

21

-$

-$

#D

IV/0

!

Desig

n S

tart

(N

TP

)9/2

/2010

9/2

/2010

0.0

UC

H F

unds

-$

Schem

atic D

esig

n R

eceiv

ed

8/1

9/2

011

8/1

9/2

011

0.0

Schem

atic D

esig

n A

ppro

ved

9/3

0/2

011

9/3

0/2

011

0.0

Desig

n D

evelo

pm

ent R

eceiv

ed

2/1

7/2

012

2/1

0/2

012

0.2

To

tal

-$

-$

#D

IV/0

!

Desig

n D

evelo

pm

ent A

ppro

ved

3/3

0/2

012

3/3

0/2

012

0.0

Constr

uction D

ocum

ents

Receiv

ed

11/9

/2012

11/3

0/2

012

(0.7

)

Constr

uction G

MP

1/3

1/2

016

TB

DM

etr

icT

arg

et

(To

Date

)C

urr

en

t

Constr

uction S

tart

(N

TP

)5/5

/2016

TB

DS

BE

Part

icip

ation

30%

N/A

Constr

uction C

om

ple

te2/1

2/2

017

TB

DM

BE

/WB

E/D

BE

Part

icip

ation

10%

N/A

Com

mis

sio

nin

g C

om

ple

te2/1

2/2

017

TB

D

FF

&E

Com

ple

te3/4

/2017

TB

DC

ontr

acts

Aw

ard

ed to D

ate

N/A

N/A

Move-I

n C

om

ple

te3/4

/2017

TB

DE

arn

ed V

alu

e to D

ate

100%

100%

Expenditure

s to D

ate

100%

100%

Constr

uction C

hange O

rders

N/A

0%

Pro

ject

Co

mp

leti

on

3/4

/2017

TB

DC

ontingency / R

em

ain

ing C

osts

10%

N/A

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

Costs

for

Phase III D

esig

n S

erv

ices a

re inclu

ded in P

hase II R

eport

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$0

$0

$0

$0

$0

$0

$0

Desig

n S

erv

ices

$0

$0

$0

$0

$0

$0

$0

Tele

com

m$0

$0

$0

$0

$0

$0

$0

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$0

$0

$0

$0

$0

$0

$0

Constr

uction A

dm

inis

tration

$0

$0

$0

$0

$0

$0

$0

Oth

er

A/E

& C

onsultin

g S

erv

ices

$0

$0

$0

$0

$0

$0

$0

Art

work

$0

$0

$0

$0

$0

$0

$0

Relo

cation

$0

$0

$0

$0

$0

$0

$0

Environm

enta

l$0

$0

$0

$0

$0

$0

$0

Insura

nce &

Legal

$0

$0

$0

$0

$0

$0

$0

Oth

er

Mis

cella

neous

$0

$0

$0

$0

$0

$0

$0

Su

bto

tal

$0

$0

$0

$0

$0

$0

$0

Co

nti

ng

en

cy

$0

$0

$0

$0

$0

$0

$0

TO

TA

L$0

$0

$0

$0

$0

$0

$0

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 1

6

H B

uil

din

g R

en

ova

tio

n CO

ST

/ F

OR

EC

AS

T *

Infr

astr

uctu

re:

Repla

cem

ents

and u

pgra

des t

o s

yste

ms inclu

din

g

heating,

air c

onditio

nin

g,

ventila

tion,

plu

mbin

g a

nd e

lectr

ical syste

ms

Ren

ovati

on

:of

the e

xis

ting J

ohn D

em

psey H

ospital to

allo

w s

evera

l depart

ments

to e

xpand inclu

din

g:

-Clin

ical P

ath

olo

gy L

abs

-Clin

ical P

harm

acy

Th

is S

co

pe

IS N

OT

FU

ND

ED

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

A A A A A A A

$0

$5,000,000

$10,000,00

0

$15,000,00

0

$20,000,00

0

$25,000,00

0

$30,000,00

0

$35,000,00

0

$40,000,00

0

$45,000,00

0 Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Actual Expen

ditures

Projected Expe

nditu

res

FU

ND

ING

*

ME

TR

ICS

62

Page 69: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anager

Sta

tus:

Com

ple

te

Desig

ner:

Cente

rbro

ok A

rchitects

& P

lanners

Constr

ucto

r:S

kanska

Pro

ject M

anager:

David

Sem

noski

Pro

ject N

um

ber:

901729

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m S

tart

1/2

3/2

013

1/2

3/2

013

0.0

UC

21

36,0

95,0

00

$

35,1

24,1

87

$

97%

Pro

gra

m A

ppro

val

6/2

4/2

013

7/1

5/2

013

(0.7

)U

CH

Funds

700,0

00

$

276,1

47

$

39%

Schem

atic D

esig

n S

tart

7/1

5/2

013

7/1

5/2

013

0.0

Schem

atic D

esig

n R

eceiv

ed

10/1

7/2

013

10/1

7/2

013

0.0

Schem

atic D

esig

n A

ppro

ved

11/4

/2013

11/2

6/2

013

(0.7

)T

ota

l36,7

95,0

00

$

35,4

00,3

34

$

96%

Desig

n D

evelo

pm

ent R

eceiv

ed

2/2

8/2

014

2/2

6/2

014

0.1

Desig

n D

evelo

pm

ent A

ppro

ved

4/4

/2014

3/2

1/2

014

0.5

Constr

uction D

ocum

ents

Receiv

ed

8/1

4/2

014

11/2

1/2

014

(3.3

)M

etr

icT

arg

et

(To

Date

)C

urr

en

t

Constr

uction G

MP

11/6

/2014

3/1

7/2

015

(4.3

)S

BE

Part

icip

ation

30%

45%

Constr

uction S

tart

11/2

1/2

014

4/2

0/2

015

(4.9

)M

BE

/WB

E/D

BE

Part

icip

ation

10%

21%

Constr

uction C

om

ple

te9/2

8/2

016

9/1

9/2

017

(11.7

)

FF

&E

Com

ple

te11/8

/2016

9/2

5/2

017

(10.6

)C

ontr

acts

Aw

ard

ed to D

ate

100%

99%

Com

mis

sio

nin

g C

om

ple

te11/8

/2016

9/2

5/2

017

(10.6

)E

arn

ed V

alu

e to D

ate

100%

99%

Move-I

n C

om

ple

te11/8

/2016

10/2

/2017

(10.8

)E

xpenditure

s to D

ate

95%

92%

Constr

uction C

hange O

rders

5%

9%

Pro

ject

Co

mp

leti

on

11/8

/2016

10/2

/2017

(10.8

)C

ontingency / R

em

ain

ing C

osts

5%

13%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$28,4

75,3

45

$28,4

40,3

45

$0

$35,0

00

$28,4

75,3

45

$0

$27,9

09,5

13

Desig

n S

erv

ices

$3,4

94,2

69

$3,4

64,2

69

$30,0

00

$0

$3,4

94,2

69

$0

$3,4

60,9

40

Tele

com

m$567,5

84

$567,5

84

$0

$0

$567,5

84

$0

$560,8

33

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$1,2

49,0

73

$1,2

49,0

73

$0

$0

$1,2

49,0

73

$0

$1,1

85,1

53

Constr

uction A

dm

inis

tration

$205,3

72

$205,3

72

$0

$0

$205,3

72

$0

$125,3

57

Oth

er

A/E

& C

onsultin

g S

erv

ices

$1,4

70,0

78

$1,4

60,0

78

$10,0

00

$0

$1,4

70,0

78

$0

$1,4

53,6

87

Art

work

$0

$0

$0

$0

$0

$0

$0

Relo

cation

$40,0

00

$40,0

00

$0

$0

$40,0

00

$0

$30,9

58

Environm

enta

l$35,0

00

$35,0

00

$0

$0

$35,0

00

$0

$33,0

29

Insura

nce &

Legal

$942,6

28

$919,7

99

$22,8

29

$0

$942,6

28

$0

$566,1

33

Oth

er

Mis

cella

neous

$156,6

45

$147,1

51

$9,4

94

$0

$156,6

45

$0

$74,7

31

Su

bto

tal

$36,6

35,9

94

$36,5

28,6

71

$72,3

23

$35,0

00

$36,6

35,9

94

$0

$35,4

00,3

34

Co

nti

ng

en

cy

$159,0

06

$0

$159,0

06

$0

$159,0

06

$0

$0

TO

TA

L$36,7

95,0

00

$36,5

28,6

71

$231,3

29

$35,0

00

$36,7

95,0

00

$0

$35,4

00,3

34

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 1

7

Acad

em

ic B

uild

ing

Ad

dit

ion

&

CO

ST

/ F

OR

EC

AS

T *

(1)

The p

endin

g c

om

mitm

ent am

ount in

clu

des a

ll pote

ntial costs

for

Skanska a

nd their

subcontr

acto

rs.

Constr

uction o

f a

17,6

00 s

.f. additio

n a

nd r

enovations to the

exis

ting A

cadem

ic B

uild

ing t

o p

rovid

e n

ew

cla

ssro

om

space f

or

the m

edic

al and d

enta

l schools

.

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

A A A A A A A A AA

FU

ND

ING

*

$0

$5,000,000

$10,000,00

0

$15,000,00

0

$20,000,00

0

$25,000,00

0

$30,000,00

0

$35,000,00

0

$40,000,00

0 Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Curren

t Plan

Actual Expen

ditures

Projected Expe

nditu

res

ME

TR

ICS

(1)

63

Page 70: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anager

Sta

tus:

In C

onstr

uction

Desig

ner:

Arc

hitectu

ral R

esourc

es C

am

bridge

Constr

ucto

r:F

usco

Pro

ject M

anager:

Kevin

Nort

on

Pro

ject N

um

ber:

901737

Ori

gin

al T

arg

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m S

tart

2/2

5/2

013

2/1

2/2

013

0.4

UC

21

88,5

89,6

04

$

65,7

44,4

72

$

74%

Pro

gra

m A

ppro

val

10/2

4/2

013

10/1

4/2

013

0.3

UC

H F

unds

4,7

75,0

00

$

1,9

14,5

03

$

40%

Schem

atic D

esig

n S

tart

(N

TP

)10/2

5/2

013

10/1

5/2

013

0.3

Schem

atic D

esig

n R

eceiv

ed

1/2

8/2

014

4/2

4/2

014

(2.8

)

Schem

atic D

esig

n A

ppro

ved

2/2

6/2

014

8/1

/2014

(5.1

)T

ota

l93,3

64,6

04

$

67,6

58,9

75

$

72%

Desig

n D

evelo

pm

ent R

eceiv

ed

7/2

3/2

014

1/1

5/2

015

(5.8

)

Desig

n D

evelo

pm

ent A

ppro

ved

8/2

2/2

014

5/8

/2015

(8.5

)

Constr

uction D

ocum

ents

Receiv

ed

1/2

/2015

10/1

5/2

015

(9.4

)M

etr

icT

arg

et

(To

Date

)C

urr

en

t

Constr

uction D

ocum

ents

Revie

wed

1/3

0/2

015

10/1

5/2

015

(8.5

)S

BE

Part

icip

ation

30%

N/A

Constr

uction G

MP

4/1

0/2

015

3/1

8/2

016

(11.3

)M

BE

/WB

E/D

BE

Part

icip

ation

10%

N/A

Constr

uction S

tart

(N

TP

)4/2

4/2

015

5/2

3/2

016

(13.0

)

Constr

uction C

om

ple

te4/2

7/2

018

2/1

8/2

019

(9.8

)C

ontr

acts

Aw

ard

ed to D

ate

98%

99%

FF

&E

Com

ple

te4/2

7/2

018

2/1

8/2

019

(9.8

)E

arn

ed V

alu

e to D

ate

88%

83%

Com

mis

sio

nin

g C

om

ple

te4/2

7/2

018

2/1

8/2

019

(9.8

)E

xpenditure

s to D

ate

82%

72%

Move-I

n C

om

ple

te4/2

7/2

018

2/2

5/2

019

(10.0

)C

onstr

uction C

hange O

rders

4%

6%

Pro

ject

Co

mp

leti

on

4/2

7/2

018

2/2

5/2

019

(10.0

)C

ontingency / R

em

ain

ing C

osts

5%

2%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$72,4

71,9

84

$72,1

12,0

24

$0

$359,9

60

$72,4

71,9

84

$0

$51,3

88,7

36

Desig

n S

erv

ices

$7,3

99,4

24

$7,3

69,2

24

$30,2

00

$0

$7,3

99,4

24

$0

$6,9

06,0

21

Tele

com

m$986,9

94

$938,4

85

$48,5

08

$0

$986,9

94

$0

$921,4

42

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$5,2

62,9

67

$5,0

96,2

22

$166,7

45

$0

$5,2

62,9

67

$0

$2,4

10,7

23

Constr

uction A

dm

inis

tration

$730,0

94

$730,0

94

$0

$0

$730,0

94

$0

$405,0

94

Oth

er

A/E

& C

onsultin

g S

erv

ices

$4,0

82,9

64

$4,0

82,9

64

$0

$0

$4,0

82,9

64

$0

$3,7

00,8

08

Art

work

$0

$0

$0

$0

$0

$0

$0

Relo

cation

$280,3

47

$280,3

47

$0

$0

$280,3

47

$0

$103,2

18

Environm

enta

l$248,9

90

$248,9

90

$0

$0

$248,9

90

$0

$237,6

68

Insura

nce &

Legal

$1,5

66,0

62

$1,5

66,0

62

$0

$0

$1,5

66,0

62

$0

$1,4

95,8

72

Oth

er

Mis

cella

neous

$114,3

94

$114,3

94

$0

$0

$114,3

94

$0

$89,3

94

Su

bto

tal

$93,1

44,2

21

$92,5

38,8

07

$245,4

53

$359,9

60

$93,1

44,2

21

$0

$67,6

58,9

75

Co

nti

ng

en

cy

$220,3

83

$0

$220,3

83

$0

$220,3

83

$0

$0

TO

TA

L$93,3

64,6

04

$92,5

38,8

07

$465,8

37

$359,9

60

$93,3

64,6

04

$0

$67,6

58,9

75

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 1

8

Clin

ical R

en

ovati

on

s -

C B

ldg

CO

ST

/ F

OR

EC

AS

T *

Infr

astr

uctu

re R

enovations t

o t

he e

xis

ting C

linic

(C

) build

ing i

nclu

din

g

ME

P s

yste

ms

School of

Denta

l/M

edic

ine E

xpansio

n a

nd R

enovations

Pat

and J

im C

alh

oun C

ard

iolo

gy C

ente

r E

xpansio

n a

nd R

enovations

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

FU

ND

ING

*

A A A A AA

ME

TR

ICS

AA

$0

$10,000,00

0

$20,000,00

0

$30,000,00

0

$40,000,00

0

$50,000,00

0

$60,000,00

0

$70,000,00

0

$80,000,00

0

$90,000,00

0

$100

,000,000

Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8Jul‐1

9

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Curren

t Plan

Actual Expen

ditures

Projected Expe

nditu

res

A A A

64

Page 71: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Bio

scie

nce

Co

nn

ecticu

t C

ap

ita

l P

roje

cts

Re

po

rt N

o.

72

- A

pri

l 2

01

8

Pro

ject

Re

po

rt

Pro

ject

Title

:

De

live

ry M

eth

od

:C

on

str

uctio

n M

an

ag

em

en

t

Sta

tus:

Co

mp

lete

De

sig

ne

r:S

tan

tec

Co

nstr

ucto

r:T

urn

er

Co

nstr

uctio

n

Pro

ject

Ma

na

ge

r:R

ich

Alle

n

Pro

ject

Nu

mb

er:

90

11

34

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce i

n

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Com

ple

te S

D (

Pre

-Bio

scie

nce P

lannin

g)

5/1

5/2

011

5/1

5/2

011

0.0

UC

21

76,5

30,0

00

$

76,5

28,0

99

$

100%

Revis

ed M

aste

r P

lan A

ppro

val

11/1

1/2

011

11/1

1/2

011

0.0

UC

H F

unds

815,5

03

$

815,4

99

$

100%

NT

P f

or

Revis

ed D

esig

n12/1

6/2

011

12/1

6/2

011

0.0

Revis

ed P

rog

ram

2/8

/2012

2/8

/2012

0.0

Desig

n D

evelo

pm

ent

Receiv

ed

4/6

/2012

3/3

0/2

012

0.2

To

tal

77,3

45,5

03

$

77,3

43,5

98

$

100%

Desig

n D

evelo

pm

ent

Appro

ved

5/2

2/2

012

6/1

/2012

(0.3

)

50%

Constr

uction D

ocum

ents

Receiv

ed

8/1

7/2

012

8/1

7/2

012

0.0

Dem

olit

ion D

ocum

ents

Receiv

ed

9/1

4/2

012

9/1

4/2

012

0.0

Metr

icT

arg

et

(To

Date

)C

urr

en

t

Constr

uction D

ocum

ents

Receiv

ed

11/9

/2012

11/3

0/2

012

(0.7

)S

BE

Part

icip

ation

30%

48%

Constr

uction G

MP

11/1

6/2

012

12/7

/2012

(0.7

)M

BE

/WB

E/D

BE

Part

icip

ation

10%

29%

Constr

uction S

tart

(N

TP

)11/1

6/2

012

12/7

/2012

(0.7

)

Com

mis

sio

nin

g C

om

ple

te6/1

9/2

015

9/2

1/2

015

(3.1

)C

ontr

acts

Aw

ard

ed t

o D

ate

100%

100%

Constr

uction C

om

ple

te7/1

0/2

015

9/2

1/2

015

(2.4

)E

arn

ed V

alu

e t

o D

ate

100%

100%

FF

&E

Com

ple

te8/7

/2015

10/1

9/2

015

(2.4

)E

xpenditure

s t

o D

ate

100%

100%

Move-I

n C

om

ple

te8/7

/2015

11/3

/2015

(2.9

)C

onstr

uction C

hang

e O

rders

5%

6%

Pro

ject

Co

mp

leti

on

8/7

/2015

11/3

/2015

(2.9

)C

onting

ency /

Rem

ain

ing

Costs

5%

N/A

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$63,3

26,7

01

$63,3

26,7

01

$0

$0

$63,3

26,7

01

$0

$63,3

26,7

01

Desig

n S

erv

ice

$6,7

07,3

62

$6,7

07,3

62

$0

$0

$6,7

07,3

62

$0

$6,7

07,3

63

Tele

com

m$613,9

39

$613,9

39

$0

$0

$613,9

39

$0

$613,9

40

Furn

ishin

g,

Fix

ture

s &

Eq

uip

ment

$1,3

70,2

65

$1,3

70,2

65

$0

$0

$1,3

70,2

65

$0

$1,3

70,2

64

Constr

uction A

dm

inis

tration

$392,3

57

$392,3

57

$0

$0

$392,3

57

$0

$392,3

57

Oth

er

A/E

& C

onsultin

g S

erv

ices

$2,1

37,0

99

$2,1

37,0

99

$0

$0

$2,1

37,0

99

$0

$2,1

37,0

98

Art

work

$0

$0

$0

$0

$0

$0

$0

Relo

cation

$479,9

69

$479,9

69

$0

$0

$479,9

69

$0

$479,9

69

Environm

enta

l$242,0

38

$242,0

38

$0

$0

$242,0

38

$0

$242,0

39

Insura

nce &

Leg

al

$1,2

57,4

03

$1,2

57,4

03

$0

$0

$1,2

57,4

03

$0

$1,2

57,4

02

Oth

er

Mis

cella

neous

$816,4

65

$816,4

65

$0

$0

$816,4

65

$0

$816,4

65

Su

bto

tal

$77,3

43,5

98

$77,3

43,5

98

$0

$0

$77,3

43,5

98

$0

$77,3

43,5

98

Co

nti

ng

en

cy

$1,9

05

$0

$1,9

05

$0

$1,9

05

$0

$0

TO

TA

L$77,3

45,5

03

$77,3

43,5

98

$1,9

05

$0

$77,3

45,5

03

$0

$77,3

43,5

98

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ifica

tion

Pa

ge

19

Ma

in B

uil

din

g L

ab

(L

) R

en

ova

tio

ns

-

Pro

jec

t 1

CO

ST

/ F

OR

EC

AS

T *

Maste

r P

lan f

or

the c

om

ple

te r

enovation o

f 283,0

00 G

SF

of

space o

n

floors

1-7

of

the L

ab (

L)

build

ing

Renovatio

ns t

o a

ppro

xim

ate

ly 5

0%

of

the 2

83,0

00 G

SF

of

researc

h

and a

dm

in s

pace o

n f

loors

1 –

7 o

f th

e M

ain

Build

ing

Repla

cem

ent

of

the M

EP

infr

astr

uctu

re f

or

the r

enovate

d a

reas

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

FU

ND

ING

*

A A A A A AA A A A AA A

$0

$10,00

0,00

0

$20,00

0,00

0

$30,00

0,00

0

$40,00

0,00

0

$50,00

0,00

0

$60,00

0,00

0

$70,00

0,00

0

$80,00

0,00

0

$90,00

0,00

0 Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Curren

t Plan

Actual Expen

ditures

Projected Expe

nditu

res

ME

TR

ICS

A A A

65

Page 72: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anagem

ent

Sta

tus:

Com

ple

te

Desig

ner:

Sta

nte

c

Constr

ucto

r:W

hitin

g T

urn

er

Pro

ject M

anager:

Ric

h A

llen

Pro

ject N

um

ber:

901772

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m A

ppro

val

0.0

UC

21

39,3

87,6

71

$

38,0

63,2

50

$

97%

Desig

n S

tart

(N

TP

)5/1

/2014

9/1

6/2

014

(4.5

)U

CH

Funds

502,0

00

$

502,0

00

$

100%

Schem

atic D

esig

n R

eceiv

ed

9/1

6/2

014

12/1

2/2

015

(14.9

)

Schem

atic D

esig

n A

ppro

ved

10/3

/2014

2/1

3/2

015

(4.4

)

Desig

n D

evelo

pm

ent R

eceiv

ed

12/3

0/2

014

7/2

/2015

(6.0

)T

ota

l39,8

89,6

71

$

38,5

65,2

50

$

97%

Desig

n D

evelo

pm

ent A

ppro

ved

1/2

7/2

015

7/2

/2015

(5.1

)

Constr

uction D

ocum

ents

Receiv

ed

3/2

4/2

015

10/1

6/2

015

(6.8

)

Constr

uction G

MP

5/1

9/2

015

1/2

7/2

016

(8.3

)M

etr

icT

arg

et

(To

Date

)C

urr

en

t

Constr

uction S

tart

8/1

9/2

015

12/1

4/2

015

(3.8

)S

BE

Part

icip

ation

30%

25%

Constr

uction C

om

ple

te11/2

4/2

017

3/2

9/2

017

7.9

MB

E/W

BE

/DB

E P

art

icip

ation

10%

19%

FF

&E

Com

ple

te12/2

5/2

017

4/1

3/2

017

8.4

Com

mis

sio

nin

g C

om

ple

te12/2

5/2

017

4/1

3/2

017

8.4

Contr

acts

Aw

ard

ed to D

ate

100%

99%

Move-I

n C

om

ple

te12/2

5/2

017

5/1

1/2

017

7.5

Earn

ed V

alu

e to D

ate

100%

99%

Expenditure

s to D

ate

91%

92%

Constr

uction C

hange O

rders

5%

6%

Pro

ject

Co

mp

leti

on

12/2

5/2

017

5/1

1/2

017

7.5

Contingency / R

em

ain

ing C

osts

10%

44%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$33,2

64,5

66

$33,2

64,5

66

$0

$0

$33,2

64,5

66

$0

$32,5

03,0

24

Desig

n S

erv

ices

$2,9

18,1

68

$2,9

18,1

68

$0

$0

$2,9

18,1

68

$0

$2,9

18,1

68

Tele

com

m$416,8

48

$416,8

48

$0

$0

$416,8

48

$0

$415,5

97

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$353,4

63

$353,4

63

$0

$0

$353,4

63

$0

$353,4

63

Constr

uction A

dm

inis

tration

$328,7

93

$328,7

93

$0

$0

$328,7

93

$0

$328,7

93

Oth

er

A/E

& C

onsultin

g S

erv

ices

$1,1

32,1

25

$1,1

32,1

25

$0

$0

$1,1

32,1

25

$0

$1,1

31,8

78

Art

work

$0

$0

$0

$0

$0

$0

$0

Relo

cation

$55,5

48

$55,5

48

$0

$0

$55,5

48

$0

$21,7

63

Environm

enta

l$37,5

80

$37,5

80

$0

$0

$37,5

80

$0

$36,7

80

Insura

nce &

Legal

$765,6

59

$695,5

20

$70,1

39

$0

$765,6

59

$0

$692,5

84

Oth

er

Mis

cella

neous

$210,1

51

$187,4

36

$22,7

15

$0

$210,1

51

$0

$163,1

99

Su

bto

tal

$39,4

82,9

01

$39,3

90,0

47

$92,8

54

$0

$39,4

82,9

01

$0

$38,5

65,2

50

Co

nti

ng

en

cy

$406,7

70

$0

$406,7

70

$0

$406,7

70

$0

$0

TO

TA

L$39,8

89,6

71

$39,3

90,0

47

$499,6

24

$0

$39,8

89,6

71

$0

$38,5

65,2

50

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 2

0

Main

Bu

ild

ing

Lab

(L

) R

en

ovati

on

s -

Pro

ject

2

CO

ST

/ F

OR

EC

AS

T *

Renovations

to a

ppro

xim

ate

ly 5

0%

of

the 2

83,0

00 G

SF

of

researc

h

and a

dm

in s

pace o

n f

loors

1 –

7 o

f th

e M

ain

Build

ing

Repla

cem

ent

of

the M

EP

infr

astr

uctu

re f

or

the r

enovate

d a

reas

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

FU

ND

ING

*

A A A A A A A A

ME

TR

ICS

$0

$10,000,00

0

$20,000,00

0

$30,000,00

0

$40,000,00

0

$50,000,00

0

$60,000,00

0

$70,000,00

0

$80,000,00

0 Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Curren

t Plan

Actual Expen

ditures

Projected Expe

nditu

res

66

Page 73: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Desig

n/B

uild

(C

ore

& S

hell)

Constr

uction M

anagem

ent (F

it-O

ut)

Sta

tus:

Com

ple

te

D/B

Cri

teri

a A

rchitect:

Fle

tcher

Thom

pson/T

soi K

obus A

ssoc.

Fit-O

ut A

rchitect:

Perk

ins E

astm

an A

rchitects

Desig

n/B

uild

er:

Fusco / C

lark

, A

Join

t V

entu

re

Fit-O

ut C

onstr

uction M

anager:

Dim

eo C

onstr

uction C

om

pany

Pro

ject M

anager:

Robert

Palo

ma

Pro

ject N

um

ber:

11-0

42

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

FO

Constr

uction D

ocum

ents

Receiv

ed

6/3

0/2

013

8/2

8/2

013

(1.9

)C

TL F

unds

203,0

00,0

00

$

202,0

74,5

29

$

100%

FO

GM

P9/5

/2013

11/1

2/2

013

(2.2

)

FO

Constr

uction S

tart

1/6

/2014

1/6

/2014

0.0

Core

&S

hell

Constr

uction C

om

ple

te10/1

5/2

014

10/1

5/2

014

0.0

FO

Constr

uction C

om

ple

te12/3

/2014

4/1

0/2

015

(4.2

)T

ota

l202,1

80,0

00

$

202,0

74,5

29

$

100%

FF

&E

, C

x, M

ove-I

n C

om

ple

te1/2

1/2

015

6/1

5/2

015

(4.8

)

Pro

ject

Co

mp

lete

(N

et

of

8th

Flo

or

East)

1/2

1/2

015

6/1

5/2

015

(4.8

)

Metr

icT

arg

et

(To

Date

)C

urr

en

t

SB

E P

art

icip

ation

30%

36%

MB

E/W

BE

/DB

E P

art

icip

ation

10%

22%

8 E

ast C

onstr

uction D

ocum

ents

Rec

5/2

9/2

015

6/1

/2015

(0.1

)

8 E

ast G

C C

ontr

act E

xecute

d1/2

8/2

016

1/2

8/2

016

0.0

Contr

acts

Aw

ard

ed to D

ate

100%

100%

8 E

ast C

onstr

uction S

tart

1/2

9/2

016

1/2

9/2

016

0.0

Earn

ed V

alu

e to D

ate

100%

100%

8 E

ast C

onstr

uction C

om

ple

te7/1

/2016

7/2

2/2

016

(0.7

)E

xpenditure

s to D

ate

100%

100%

FF

&E

, C

x, M

ove-I

n C

om

ple

te7/8

/2016

7/2

2/2

016

(0.5

)C

onstr

uction C

hange O

rders

5%

7%

8th

Flo

or

East

Pro

ject

Co

mp

lete

7/8

/2016

7/2

5/2

016

(0.6

)C

ontingency / R

em

ain

ing C

osts

5%

0%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$149,3

78,7

92

$149,3

78,7

92

$0

$0

$149,3

78,7

92

$0

$149,3

78,7

92

Desig

n S

erv

ices

$6,4

09,1

08

$6,4

09,1

08

$0

$0

$6,4

09,1

08

$0

$6,4

09,1

00

Tele

com

m$5,0

15,9

26

$5,0

11,5

91

$4,3

35

$0

$5,0

15,9

26

$0

$5,0

11,5

91

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$14,9

26,1

42

$14,9

26,1

42

$0

$0

$14,9

26,1

42

$0

$14,9

23,3

96

Constr

uction A

dm

inis

tration

$745,4

76

$745,4

76

$0

$0

$745,4

76

$0

$745,4

76

Oth

er

A/E

& C

onsultin

g S

erv

ices

$5,5

33,3

61

$5,5

16,2

10

$17,1

51

$0

$5,5

33,3

61

$0

$5,4

86,2

10

Art

work

$248,3

07

$248,3

07

$0

$0

$248,3

07

$0

$248,3

07

Relo

cation

$246,1

08

$246,1

08

$0

$0

$246,1

08

$0

$246,1

08

Environm

enta

l$293,2

53

$293,2

53

$0

$0

$293,2

53

$0

$293,2

53

Insura

nce &

Legal

$2,4

13,5

80

$2,4

13,5

80

$0

$0

$2,4

13,5

80

$0

$2,4

13,5

80

Oth

er

Mis

cella

neous

$16,9

69,9

47

$16,9

61,4

86

$8,4

61

$0

$16,9

69,9

47

$0

$16,9

18,7

16

Su

bto

tal

$202,1

80,0

00

$202,1

50,0

53

$29,9

47

$0

$202,1

80,0

00

$0

$202,0

74,5

29

Co

nti

ng

en

cy

$0

$0

$0

$0

$0

$0

$0

TO

TA

L$202,1

80,0

00

$202,1

50,0

53

$29,9

47

$0

$202,1

80,0

00

$0

$202,0

74,5

29

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 2

1

Ou

tpati

en

t P

avilio

n

CO

ST

/ F

OR

EC

AS

T *

New

 Parking

 Garage:

1,44

0 spaces

which includ

e 82

 handicap spaces.

New

 306

,880

 squa

re fo

ot Outpa

tient Pavilion

to In

clud

e: 

Relocatio

n of m

edical offices th

at are currently hou

sed inou

tdated

 and

 inadeq

uate m

edical office space in Dow

ling South(85,00

0 square fe

et) a

nd 

a po

rtion of Dow

ling North (1

3,50

0square fe

et). 

Relocatio

n of th

e Carole and

 Ray Neag Co

mpreh

ensive Cancer C

enter

and Ra

diationOncology from

 the existin

gmain bu

ilding to th

e Outpatie

nt 

Pavilion. 

Patie

nt‐cen

tered services such as a café, re

tail space for a

 com

mercial 

pharmacy and an

 optical sho

p. 

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

FU

ND

ING

*

A

ME

TR

ICS

A A A A A A

$0

$50,000,00

0

$100

,000,000

$150

,000,000

$200

,000,000

$250

,000,000

Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Curren

t Plan

Actual Expen

ditures

Projected Expe

nditu

res

AA AA A AA A A A A A A

67

Page 74: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

B

ioscie

nce C

onnecticut C

apital P

roje

cts

Report

No. 72 -

Apri

l 2018

Pro

ject R

eport

Pro

ject T

itle

:

Deliv

ery

Meth

od:

Constr

uction M

anagem

ent

Sta

tus:

Com

ple

te

Desig

ner:

Goody C

lancy

Constr

ucto

r:S

tandard

Build

ers

Pro

ject M

anager:

Janic

e H

ill

Pro

ject N

um

ber:

901750

Targ

et

Actu

al/

Pro

jecte

d

Vari

an

ce in

Mo

nth

sS

ou

rce

Bu

dg

et

Co

st

to D

ate

% E

xp

en

ded

Pro

gra

m A

ppro

val

6/2

8/2

013

9/1

2/2

013

(2.5

)U

C21

18,7

70,0

00

$

18,6

62,7

93

$

99%

Schem

atic D

esig

n S

tart

(N

TP

)7/1

/2013

9/1

3/2

013

(2.4

)U

CH

Funds

550,0

00

$

133,9

45

$

24%

Schem

atic D

esig

n R

eceiv

ed

8/1

5/2

013

11/2

1/2

013

(3.2

)

Schem

atic D

esig

n A

ppro

ved

9/1

3/2

013

11/2

1/2

013

(2.3

)

Desig

n D

evelo

pm

ent R

eceiv

ed

12/1

8/2

013

1/3

0/2

014

(1.4

)T

ota

l19,3

20,0

00

$

18,7

96,7

38

$

97%

Desig

n D

evelo

pm

ent A

ppro

ved

1/1

6/2

014

4/1

/2014

(2.5

)

Constr

uction D

ocum

ents

Receiv

ed

6/2

/2014

7/2

4/2

014

(1.7

)

Constr

uction G

MP

& m

obili

zation

8/1

5/2

014

10/6

/2014

(1.7

)M

etr

icT

arg

et

(To

Date

)C

urr

en

t

Constr

uction S

tart

(N

TP

)9/1

/2014

10/6

/2014

(1.2

)S

BE

Part

icip

ation

30%

23%

Constr

uction C

om

ple

te10/9

/2015

10/3

0/2

015

(0.7

)M

BE

/WB

E/D

BE

Part

icip

ation

10%

9%

FF

&E

Com

ple

te10/9

/2015

4/2

9/2

016

(6.7

)

Com

mis

sio

nin

g C

om

ple

te10/9

/2015

5/6

/2016

(6.9

)C

ontr

acts

Aw

ard

ed to D

ate

100%

98%

Move-I

n C

om

ple

te10/9

/2015

4/2

9/2

016

(6.7

)E

arn

ed V

alu

e to D

ate

100%

98%

Expenditure

s to D

ate

100%

96%

Constr

uction C

hange O

rders

6%

4%

Pro

ject

Co

mp

leti

on

10/9

/2015

5/7

/2016

(6.9

)C

ontingency / R

em

ain

ing C

osts

5%

1%

Pro

jecte

d

Bu

dg

et

Co

mm

itte

d

Co

sts

Un

co

mm

itte

d

Co

sts

Pen

din

g

Co

mm

itm

en

tsP

roje

cte

d C

osts

Pro

jecte

d

Over/

Un

der

Co

st

to D

ate

AB

CD

E=

B+

C+

DF

=A

-E

Constr

uction

$15,7

36,5

68

$15,7

36,5

68

$0

$0

$15,7

36,5

68

$0

$15,6

97,6

96

Desig

n S

erv

ices

$1,6

10,3

30

$1,6

10,3

30

$0

$0

$1,6

10,3

30

$0

$1,6

10,3

30

Tele

com

m$217,6

10

$217,6

10

$0

$0

$217,6

10

$0

$217,6

10

Furn

ishin

gs, F

ixtu

res &

Equip

ment

$390,3

78

$390,3

78

$0

$0

$390,3

78

$0

$390,3

78

Constr

uction A

dm

inis

tration

$250,0

00

$51,3

07

$198,6

93

$0

$250,0

00

$0

$51,3

07

Oth

er

A/E

& C

onsultin

g S

erv

ices

$455,8

44

$452,1

15

$3,7

29

$0

$455,8

44

$0

$452,1

15

Art

work

$0

$0

$0

$0

$0

$0

$0

Relo

cation

$0

$0

$0

$0

$0

$0

$0

Environm

enta

l$0

$0

$0

$0

$0

$0

$0

Insura

nce &

Legal

$564,1

31

$345,9

77

$218,1

54

$0

$564,1

31

$0

$291,4

85

Oth

er

Mis

cella

neous

$90,8

12

$85,8

18

$4,9

94

$0

$90,8

12

$0

$85,8

17

Su

bto

tal

$19,3

15,6

73

$18,8

90,1

03

$425,5

70

$0

$19,3

15,6

73

$0

$18,7

96,7

38

Co

nti

ng

en

cy

$4,3

27

$0

$4,3

27

$0

$4,3

27

$0

$0

TO

TA

L$19,3

20,0

00

$18,8

90,1

03

$429,8

97

$0

$19,3

20,0

00

$0

$18,7

96,7

38

* Fi

nanc

ial D

ata

Sub

ject

to P

lant

Acc

ount

ing

Ver

ificat

ion

Page 2

2

Incu

bato

r L

ab

Ad

dit

ion

- C

GS

B

CO

ST

/ F

OR

EC

AS

T *

New

build

ing a

dditio

n t

o t

he e

xis

ting C

ell

and G

enom

e S

cie

nce

Build

ing t

o c

reate

an a

dditio

nal

28,0

00 g

ross s

quare

feet

of

new

in

cubato

r space t

o f

oste

r new

busin

ess s

tart

-ups

and 2

,000 g

ross

square

feet

for

a D

ata

Cente

r D

isaste

r R

ecovery

space.

SC

OP

ED

ES

CR

IPT

ION

/ T

EA

M

SC

HE

DU

LE

FU

ND

ING

*

A A A A A A A A A A

ME

TR

ICS

$0

$5,000,000

$10,000,00

0

$15,000,00

0

$20,000,00

0

$25,000,00

0 Jul‐0

9Jul‐1

0Jul‐1

1Jul‐1

2Jul‐1

3Jul‐1

4Jul‐1

5Jul‐1

6Jul‐1

7Jul‐1

8

Overall Project C

ash Flow

 Plan

 vs. Actua

l

Orig

inal Plan

Curren

t Plan

Actual Expen

ditures

Projected Expe

nditu

res

A A A A

68

Page 75: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

IDT

ask N

am

eD

ura

tio

nS

tart

Fin

ish

1N

ew

Bed

tow

er

& R

en

ovati

on

s76.3

8 m

on

sT

hu

9/2

/10

Tu

e 1

0/2

5/1

6

2D

esig

n S

ite

work

& E

ast

Pa

rkin

g377 d

ays

Thu 9

/2/1

0F

ri 2

/10/1

2

3D

esig

n N

ew

Tow

er

& R

enovations

430 d

ays

Mon 3

/21/1

1F

ri 1

1/9

/12

4S

ite &

East P

ark

ing G

ara

ge C

onstr

uction (

Phase I)

237 d

ays

Mon 6

/4/1

2T

ue 4

/30/1

3

5N

ew

Tow

er

Constr

uction (

Phase II)

790 d

ays

Thu 5

/2/1

3W

ed 5

/11/1

6

6N

ew

Tow

er

FF

&E

84 d

ays

Wed 1

/6/1

6W

ed 5

/11/1

6

7N

ew

Tow

er

Move-I

n2 d

ays

Thu 5

/12/1

6F

ri 5

/13/1

6

8P

hase 2

b -

Post T

urn

over

Work

117 d

ays

Mon 5

/16/1

6T

ue 1

0/2

5/1

6

9A

cad

em

ic A

dd

itio

n &

R

en

ovati

on

58.4

8 m

on

sW

ed

1/2

3/1

3F

ri 1

0/6

/17

10

De

sig

n

468 d

ays

Wed 1

/23/1

3F

ri 1

1/7

/14

11

Site

En

ab

ling

& A

dd

idio

n C

on

str

uctio

n335 d

ays

Mon 4

/20/1

5F

ri 7

/29/1

6

12

A B

uild

ing

Re

no

va

tio

n570 d

ays

Mon 8

/3/1

5F

ri 1

0/6

/17

13

Clin

ical R

en

ovati

on

s75 m

on

sT

ue 2

/12/1

3M

on

2/2

5/1

9

14

De

sig

n C

linic

al R

en

ova

tio

ns

698 d

ays

Tue 2

/12/1

3T

hu 1

0/1

5/1

5

15

Phase 1

Renovation

339 d

ays

Mon 5

/23/1

6F

ri 9

/8/1

7

16

Phase 2

Renovation

142 d

ays

Mon 9

/11/1

7T

ue 3

/27/1

8

17

Phase 3

Renovation

118 d

ays

Wed 3

/28/1

8F

ri 9

/7/1

8

18

Phase 4

Renovation

121 d

ays

Mon 9

/10/1

8M

on 2

/25/1

9

19

Lab

Ren

ovati

on

s P

roje

ct

180.1

mo

ns

Fri

4/1

0/0

9M

on

9/2

1/1

5

20

La

b R

en

ova

tio

n P

lan

nin

g &

De

sig

n936 d

ays

Fri 4

/10/0

9F

ri 1

1/9

/12

21

Ph

ase

1A

Co

nstr

uctio

n340 d

ays

Tue 1

2/1

1/1

2M

on 3

/31/1

4

22

Ph

ase

1B

Co

nstr

uctio

n238 d

ays

Mon 4

/7/1

4W

ed 3

/4/1

5

23

Ph

ase

2A

Co

nstr

uctio

n154 d

ays

Wed 2

/4/1

5M

on 9

/21/1

5

24

Lab

Ren

ovati

on

s P

roje

ct

217.2

4 m

on

sM

on

12/1

4/1

5T

ue 5

/2/1

7

25

Ph

ase

3A

Co

nstr

uctio

n362 d

ays

Mon 1

2/1

4/1

5T

ue 5

/2/1

7

26

Am

bu

lato

ry C

are

Cen

ter

(AC

C)

57.6

2 m

on

sM

on

12/5

/11

Fri

7/2

2/1

6

27

AC

C P

lan

nin

g / C

ore

& S

he

ll D

esig

n460 d

ays

Mon 1

2/5

/11

Fri 9

/6/1

3

28

AC

C P

ark

ing G

ara

ge

210 d

ays

Mon 1

/21/1

3F

ri 1

1/8

/13

29

AC

C C

ore

& S

hell

488 d

ays

Mon 3

/4/1

3W

ed 1

/14/1

5

30

AC

C Inte

riors

- F

it O

ut

310 d

ays

Mon 1

/6/1

4F

ri 3

/13/1

5

31

Do

wlin

g R

elo

ca

tio

ns t

o A

CC

2 d

ays

Fri 1

/30/1

5M

on 2

/2/1

5

32

De

mo

lish

Do

wlin

g N

ort

h &

So

uth

60 d

ays

Mon 3

/2/1

5F

ri 5

/22/1

5

33

8 E

ast C

on

str

uctio

n

126 d

ays

Fri 1

/29/1

6F

ri 7

/22/1

6

34

Ad

dit

ion

to

CG

SB

: In

cu

bato

r L

ab

s28.1

4 m

on

sF

ri 9

/13/1

3F

ri 1

2/1

8/1

5

35

Incubato

r Lab P

lannin

g &

Desig

n207 d

ays

Fri 9

/13/1

3M

on 6

/30/1

4

36

Incubato

r Lab C

onstr

uction

316 d

ays

Fri 1

0/3

/14

Fri 1

2/1

8/1

5

ign

Sit

ew

ork

& E

ast

Park

ing

Desig

n N

ew

To

wer

& R

en

ovati

on

s

Sit

e &

East

Park

ing

Gara

ge C

on

str

ucti

on

(P

hase I)

New

To

wer

Co

nstr

ucti

on

(P

hase II)

New

To

wer

FF

&E

New

To

wer

Mo

ve-I

n

Ph

ase 2

b -

Po

st

Tu

rno

ver

Wo

rk

Desig

n

Sit

e E

nab

lin

g &

Ad

did

ion

Co

nstr

ucti

o

A B

uild

ing

Ren

ovati

on

Desig

n C

lin

ical R

en

ovati

on

s

Ph

ase 1

Ren

ovati

on

Ph

ase 2

Ren

ova

Ph

ase 3

R

Ph

a

Lab

Ren

ovati

on

Pla

nn

ing

& D

esig

n

Ph

ase 1

A C

on

str

ucti

on

Ph

ase 1

B C

on

str

ucti

on

Ph

ase 2

A C

on

str

ucti

on Ph

ase 3

A C

on

str

ucti

on

AC

C P

lan

nin

g / C

ore

& S

hell D

esig

n

AC

C P

ark

ing

Gara

ge

AC

C C

ore

& S

hell

AC

C In

teri

ors

- F

it O

ut

Do

wlin

g R

elo

cati

on

s t

o A

CC

Dem

olish

Do

wlin

g N

ort

h &

So

uth

8 E

ast

Co

nstr

ucti

on

Incu

bato

r L

ab

Pla

nn

ing

& D

esig

n

Incu

bato

r L

ab

Co

nstr

ucti

on

12

2013

2014

2015

2016

2017

2018

201

BIO

SC

IEN

CE

CO

NN

EC

TIC

UT

MA

ST

ER

PL

AN

SC

HE

DU

LE

Tue

5/1/

18

Page 1

of 1

69

Page 76: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Draft Minutes May 21, 2018

ACADEMIC AFFAIRS SUBCOMMITTEE Board of Directors

Time: 10:00 a.m. – 12:00 p.m.

Location: Munson Training Room, 16 Munson Road, Farmington, CT

Present (Voting): Archambault, F; Cloud, S; Duncan, J; Freedman; J; Hansen, M; Hurley, M; Rawlins, W (telephonically); Woods, K Present (Non-Voting): Liang, B; MacNeil, L; Volin, J (telephonically); Henderson, D; Regan, T; Pilbeam, C; Kream, B; Nissen, J; Metz, B; Wetstone, S; Thatcher, C; Hesselbrock, V; Geoghegan, J; Blumenthal, J (telephonically); McKenty, D; Perregaux, R; Andrews, C; Keilty, A; Abu-Hasaballah, K

Excused (Voting): Alleyne, K; Droney, J; Mina, M Excused (Non-Voting): Agwunobi, A; McFadden, D; Lepowsky, S; Nestler, E; Angus, S; Siraco, M; Swiatek, J Meeting commenced at 10:00am

1. Public Comment 2 . Chair’s Remarks

a. Welcome and updatesThe Chair wished Dr. R.L. MacNeil, Dean of the SODM all the best as he moves on from his deanship to teach and work on internationalizing his already national organization.

b. Approval of minutes from January 29, 2018 MeetingMotion to approve the minutes as written. Seconded. Approved 7-0-0.

3. Consent Items a. Approval of School of Medicine Recommendations for Reappointment of

Tenure Track Faculty, Endowed Chair Appointment, Emeritus Appointmentsand Sabbatical Leave (Dr. Bruce T. Liang)

Dr. Bruce Liang, Dean of the SOM, is requesting that the AASBOD approve the faculty being recommended for reappointment of tenure track, as listed on page 10 in the materials. His request includes the recommendation of Dr. David Steffens to be appointment as the Samuel “Sy” Birnbaum/Ida, Louis and Richard Blum Chair in Psychiatry. He is additionally asking that the AASBOD approve the recommendations for emeritus appointments, as listed on page12, as well as Dr. Cato Laurencin’s request for sabbatical leave, as described on page 13. While Dr. Laurencin is on his sabbatical, which will be taken in smaller periods of time, he will stay engaged in both CICATS and the Institute for Regenerative Engineering, as well as appoint a deputy to continue the work being done in these institutes.

Motion to approve the recommendations. Seconded. Approved 6-0-1.

4. Business Items

5 . Informational Items a. School of Medicine Junior Rank Promotions (Dr. Bruce T. Liang)

Dr. Liang presented the names of those receiving junior rank promotion in the SOM, as shown on page 15 in the materials.

70

Page 77: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Draft Minutes May 21, 2018

ACADEMIC AFFAIRS SUBCOMMITTEE Board of Directors

b. Oversight Committee Update – Department and Center Reviews (MarcHansen)

Dr. Mark Hansen reported the status of the department and center reviews. The five reviews scheduled for 2018 are: CT Institute for Clinical and Translational Science, Department of Obstetrics and Gynecology, Department of Pediatrics, Department of Psychiatry, and Institute for Regenerative Engineering. The reviews scheduled for 2019 are: Department of Family Medicine, Departments of Immunology, and Department of Neurology. The completion of these reviews will complete the 7-year cycle of reviews, as mandated by the SOM bylaws.

A type-1 center is a center located within a department and answers to the department. A type-II center is an independent entity and is meant to be outside of the departmental structure. Both are at the discretion of the Dean to appoint, dissolve or consolidate as necessary, in consultation with the Dean’s council.

The board acknowledged this to be Dr. Hansen’s last meeting as a member of the AASBOD, thanked him and his committee for the excellent work done to get the reviews back on track.

c. LCME Exit Report (Dr. David Henderson)The SOM had their LCME site survey on March 4th-7th. A five-person team evaluated the SOM on the basis of 12-standards and 93 constituent elements. The outcome of the review was that five elements were found to be less than outright satisfactory: 1.4 Affiliation Agreements: the agreements have all of the information

that is required but need to be reorganized to meet the LCME’sstandards.

2.4 Sufficiency of Administrative Staff: there were some issues identifiedin the ISA, regarding communication with the students and will requiresome monitoring with the departure of Dr. Rose and the reorganizationof the administrative structure.

3.2 Community Scholars/ Research Opportunities: solutions werealready in place to address the issues noted in scholarship.

3.3 Diversity: the LCME team found issue with the fact that the SOMdoes not have a diversity policy for medical students, separate fromUConn Health. This policy was already written at the time, but had notgone through the approval process. This policy describes how the schooldefines diversity for our students. It was suggested that the policyincorporate verbiage that already exists on the website about the HealthCareer Opportunity Programs (HCOP).

8.8 Monitoring Student Time: a solution was already put into effect with apositive repeat survey, but the LCME felt that additional data collectionwould be appropriate given that it is a new curriculum.

More detail related to the visit can be found on pages19-22 in the materials.

71

Page 78: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Draft Minutes May 21, 2018

ACADEMIC AFFAIRS SUBCOMMITTEE Board of Directors

There is a growing alarm surrounding the decrease in URM students, particularly African American and Latino male students, attending medical school nationally. The issue is rooted in the socioeconomic structure and stems back deep into the educational system early on. Dr. David Henderson has engaged the AAMC consortium and participated in a workshop to develop leadership among minorities; also working with UConn specialties to make an active concerted effort to keep our URM students here after graduation. Maintaining students after graduation would help produce more mentors and create a more inviting environment for incoming students. President Herbst recently signed off on a large proposal submitted to the Dept. of Health and Human Services, which will provide significant resources to improve upon and positon UConn to take a leadership role in addressing this matter.

d. Match Day Statistics (Dr. David Henderson)Dr. Henderson presented the 2018 match day statistics, found on page 23 in the materials. Of note, all 84 students eligible for graduation were placed in residency, not 83/84 as listed in the materials. 25% of the matched students stayed in CT, last year it was 27%, however this number varies from year to year.

e. Admissions Update (Dr. Thomas Regan)Dr. Thomas Regan provided a handout for those in attendance, noting that it was the first time UConn SOM’s acceptance has been overfilled on the day after students were required to make final selections. Of 3,107 applicants, they interviewed 315; 219 of which were CT residents. The LCME has approved the SOM to have a class size of 110, but we are currently at 112. Dr. Regan believes the new curriculum and the learning environment, including new learning areas, are what sold the Medical School to potential applicants. If the school does overenroll, they will need to inform the LCME.

f. MD/PhD Program Update (Dr. Carol Pilbeam)Dr. Carol Pilbeam presented an update on the MD/PhD program, who has a goal of training physician scientists who will devote the majority of their time to research. The information from her presentation can be found on page 24 of the materials. Their program has graduated 79 students, with an 8-year average time of completion, integrating medical and research training. For the 2018 entering class, they received 144 applicants, made 29 offers, and matriculated 7 students; four women, three men. The GPA and MCAT scores of those matriculating are higher than the national average and applications, acceptances, and enrollment have increased with an end goal of 40 students. The Dean has been a great supporter of the program and its collaboration with JAX and new faculty positions only strengthen the program.

72

Page 79: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Draft Minutes May 21, 2018

ACADEMIC AFFAIRS SUBCOMMITTEE Board of Directors

In reviewing applications from URM students, they often do not have enough research experience to make them qualified for admission to the MD/PhD program. The hope is to develop a pipeline where URM students spend time doing research with and getting to know the faculty.

The school does track the graduates to see who indeed devotes their career to biomedical sciences. 45/64 graduates are in an environment where they can do research, but it does not specify whether or not they are in fact doing research. Dr. Pilbeam estimates that approximately 50% of the graduates are indeed engaged in active research.

g. ACGME Update (Dr. Jacqueline “Kiki” Nissen)Dr. Kiki Nissen provided the AASBOD with an ACGME update; her slides are available on pages 25-38 in the materials. The ACGME now has an international accreditation arm since 2010.. There are 128 new international programs and 10,683 US programs accredited by the ACGME. It is the 5th Anniversary of milestones, which are used to enhance the curriculum in each of the residency programs. The ACGME is constantly improving the milestones and using the milestone data to enhance the curriculum.

UConn’s GME has gone through 2-rounds of CLER (Clinical Learning Environment Review), which takes place at the hospitals where the learning happens. The focus of the reviews is on patient safety, healthcare quality/ health disparities, supervision, professionalism, transition in care, and well-being across the clinical care team. A landmark study has shown that the clinical learning environmentin is an important predictor of the quality of care provided long after training. Some overarching themes and findings are listed out on page 29-30 in the materials.

Broad issues affecting GME are the opioid epidemicand, diversity, and physician well-being. Due to the opioid epidemic, the clinical learning environments must use evidence-based medicine in protocols and procedures using opioids; have effective teaching strategies with residents include prevention and recognition of addiction, teach residents how to effectively treatpain syndromesusing non-pharmacological means, and participate in clinical trials of new non-opioid pain relief. The ACGME has convened a taskforce and have new and expanded standards related to diversity and culture. All GME offices will be required to have a diversity statement, mission, and plan for addressing diversity in their own programs. With regard to physician well-being, the ACGME is looking at suicide, clinical depression, and physician burnout. They have sponsored a well-being symposium and since February 2018 there have been ten key papers addressing this topic. The AAMC and National Academy of Medicine are also collaborating to work on this issue. A national suicide hotline has been added to the GME website and a de-identified (by name, not program)

73

Page 80: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Draft Minutes May 21, 2018

ACADEMIC AFFAIRS SUBCOMMITTEE Board of Directors

burnout study is being conducted so that each program will receive this critical data regarding physician burnout.

This however needs to be addressed more broadly and prevention needs to be a greater focus, by improving the workplace environment. Dr. Nissen is working with hospital leadership to develop a wellness committee here at Uconn Health.

Update on the Dean search for the SODM: The search is being coordinated through the Vice Provosts office. There was a robust pool of applicants and is now narrowed down to 4 final candidates:

Sharon M. Gordon, DDS, MPH, PhDo East Carolina University

Michael Glick, DMDo University at Buffalo, SUNY

Russel S. Taichman, DMD, DMSco University of Michigan

Frank A. Scannapieco, DMD, PhDo University of Buffalo

The hope is that a Dean will be named and on site by July 1, 2018.

Motion to adjourn. Approved. 11:54am.

Next Regularly Scheduled Meeting Monday, September 10, 2018 10 a.m. – 12 p.m. Munson Training Room, 16 Munson Road, Farmington, CT

74

Page 81: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

Meeting Minutes

May 24, 2018

CLINICAL AFFAIRS SUBCOMMITTEE

Board of Directors

16 Munson Road

1 Cheryl Chase, Chairman, called the meeting to order at 2:04 pm

1.1 No public comment

2 Chair’s remarks 2.1 The Clinical Affairs Subcommittee unanimously approved the motion to accept

the minutes of the subcommittee meeting held on February 22, 2018

3 Chief Executive Officer Report – Dr. Andrew Agwunobi

Dr. Agwunobi provided the following comments:

UCONN Health Finances: UConn Health will be ending the fiscal year at approximately $9m ahead of budget. Year to date we are ahead of budget by $8.26 million. Over the next couple of months some expenses related to EPIC are expected, including the expected productivity of physicians. The group viewed a slide which reviewed the breakdown of the various categories and variance to budget; including clinical which is at $5.148 ahead of budget, research at $1.115 ahead of budget, and the schools of medicine and dental medicine at $1.054 and $2.022 respectfully. Institutional Support is currently showing a deficit due to expenses relating to the transition of Correctional Managed Health Care which have been temporarily categorized in that fund. Anticipation for next year is expected to be a very tough year financially due to required raises, fringe rate increases determined by the State Comptroller, and ongoing expenses related to the EPIC implementation.

Dr. Agwunobi talked briefly on the EPIC (Health One) implementation. Although the go-live did happen as scheduled, some areas, such as the Cancer Center, Dermatology and Ophthalmology, still have work through some issues. Dr. Agwunobi noted that he is very proud of the work done by the hospital and by UMG leadership for the work they continue to do to make sure that this implementation is successful.

4 Quality Reports 4.1 UConn John Dempsey Hospital (JDH) – Dr. Scott Allen

Dr. Allen reported that the hospital’s Leap Frog score dropped from an A to a B for this past quarter. Dr. Allen felt the reasoning for was most likely centered around the increase in CLABSI (central line associated blood stream infections) numbers for the quarter. A plan has been put in place to ensure the cases of CLABSI will be reduced going forward in addition to all other serious infection incidence.

The Serious Safety Event rate maintained through April with a score of 0.7 only one event. There were no serious safety events during the EPIC implementation.

Dr. Allen reviewed the data collected from the HCAHPS (Hospital Consumer Assessment of Hospitals, Providers, and Systems) surveys that are sent to patients following discharge.

Nurse Communication is now well above the targeted goal of 75%.

75

Page 82: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

CLINICAL AFFAIRS SUBCOMMITTEE

Meeting Minutes

February 22, 2018

UConn Health

A new program called “No Pass Zone” has been initiated in the hospital. The new program in If you are passing a room where someone needs assistance – go in.

The Doctor communication scored did drop just a little. However the responses are still hovering in the 80% range.

Lastly, the QAPI Committee (Quality Assessment Performance Improvement

Committee) which is chaired by Andy is a group that meets monthly and reviews the

performance improvement and quality metrics throughout the hospital. Going forward as

part of the QAPI Program Dr. Allen will present minutes from the meetings at the

quarterly Clinical Affairs Subcommittee meetings.

4.1.2 Environment of Care - Kevin Higgins Mr. Higgins reported that six months ago the Environment of Care Committee reported about 100 action items that needed attention. To date, the number of items is down to 5 items remaining. A tremendous amount of work has been done. The surveyors are expected soon and at this time the work is winding down and the team will be ready. A company called Joint Commission Readiness will be coming to do a mock survey early in June to ensure that the hospital is prepared.

4.1.3 Joint Commission Clinical Readiness – Deb Abromaitis Last survey was in November 2015, we are on a three year cycle. The surveys begin at 8:00 am and are always unannounced. The steps are first we process an application and then they tell us who the surveyors will be. The processing of the application has been completed. We have been told that our compliment will include a behavioral health care survey which will have a dedicated specialist for one day The second survey will be for the hospital which will include a specialist an ambulatory care specialist for two days, engineer for two days, physician for 4 days, nurse for 4 days and administrator for 3 days. We will be notified at 7:30 the morning of their arrival with the bios of those people coming. The biggest change in the management of the survey is that the findings are not only discussed with the leaders, but put into a matrix that is color coded to designate the severity of the findings. Plans have been put in place to aid in preparation of the Joint Commission visit to ensure that all areas are as ready as possible. These plans include chapter champions, chapter meetings, monthly mock surveys, leadership binders, survey folders and Joint Commission Resources coming back in June to review and run a mock survey.

4.2 UConn Medical Group – Anne Horbatuck, Dr. Denis Lafreniere

Ms. Horbatuck reported some of the key accomplishments from the last quarter. The component preparations for Health One included additional work flow planning, provider scheduling, provider preferences (which allows us to get the right patient to the right provider), making sure patients were seen in a good timeframe, extensive training, hired two new faculty and four APRNs. In addition 199 medical assistants had to be registered. The Putnam site was moved into the multi-specialty area, West Hartford had

76

Page 83: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

CLINICAL AFFAIRS SUBCOMMITTEE

Meeting Minutes

February 22, 2018

UConn Health

a lot of physical site improvements done, and ambulatory operations focused on the office assistant and how that person is utilized. Encounters are 5% ahead of prior year and 1.54% ahead budget and the RVU’s are 10’% over last year and just under 1% ahead of budget. There has been an increase in overall doctor rating and also in recommend this provider. Some of the quality updates were:

Population Health – Interviewing for Assistant VP, Nurse Care Manager/Navigator and two Care

Coordinators Chronic Care Management program expansion - New position hired for expansion (grant funded)

• Designed for patients with 2 or more chronic conditions Person Centered Medical Home - Application anticipated to be submitted in July

Quality and Contract Performance - Medicaid Meaningful Use (MU)

• $442,000 total to date in FY18 - Awarded $60,000 from United Medicare Advantage for closing gaps in care for

their members - Anthem – Receiving an additional per member per month (PMPM) payment to

assist with care management for their members • Focus will be on frequent ED users and gaps in care

Dr. Lafreniere reported on the Merit Based Incentive Program (MBIP). The reporting period ended at the end of 2017 and UMG has a score of 100. Anything over 70 indicates the Health Center will receive an increase year in our CMS payment rate over the next fiscal. The amount is not known at this time. The Practice Transformation Network grant is entering its final year. This is a grant to help the Health Center develop a system where we can consistently give patient centered care with increased costs and maximized quality. Part of the mission is to instill this process within UConn Health so it will move forward once the grant is completed. We are working with third party payers (Anthem) to decrease unnecessary ED admissions and working to save money using formulary pharmaceutical costs to ensure what we select is on formulary that will save costs. We are also working with other state agencies in the project, such as the State Comptroller and the new Office of Health Strategy which is helping us to utilize some of the benefits that we can get out of working closer with Medicaid and several other programs within the state

5. EPIC (UConn HealthOne) update – Bruce Metz The HealthOne cut over took place at 5:17 on April 28. Overall the go-live has gone very well. Since the beginning a 24/7 hour support structure has been in place which consisted of a series of command centers, a call center, over 100 EPIC analysts. We brought in about 360 “at the elbow” personnel and we have been depending on a host of after ready clinical ready cycle teams around the clock. The at the elbow personnel work side by side with our end users to help everyone navigate they system and perform the workflows. We have been able to taper down our ATE personnel each week as the end users become more proficient.

77

Page 84: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

CLINICAL AFFAIRS SUBCOMMITTEE

Meeting Minutes

February 22, 2018

UConn Health

Summary of Early Successes include:

– On track to meet milestones and metrics established to monitor progress and determine go-live success

– Hospital and inpatient areas as a whole have adapted quicker than expected – Ambulatory clinics that moved from NextGen are reaching pre go-live productivity

levels – For Revenue Cycle billing, cumulative charges are consistent with Epic benchmarks

for this stage of the go-live – Departments, such as Orthopedics and Pharmacy, that took ownership of

operationalizing Epic during implementation are having a smoother transition – Some providers have commented about the benefits of HealthONE (e.g.,

“HealthONE is way better than NextGen for doing orders/charts for the doctor. Takes me a quarter of the time to chart. Vast improvement!” Dr. Craig Rodner)

Summary of Major Concerns and Outstanding Issues include:

– Enterprise-wide adoption of converged and standardized ways of working represents a dramatic change

– Effective and efficient operation of more complex workflows has been challenging for certain clinical areas (e.g., treatment plans in Cancer Center; ordering of procedures in Radiology)

– Ambulatory clinics that moved from paper are experiencing a range of system and process issues (e.g., Dermatology, Cancer Center, Ophthalmology)

– Registration and check-in process is not being completed from start to finish in all cases

– Advanced Epic tools that increase provider productivity and benefit patient care have not been deployed in all clinical areas (e.g., order sets in specialty practices)

– New hardware and device needs have emerged as a result of end-users experiencing the system

– Focused efforts and SWAT teams have been formed to tackle these and other issues

Summary of Key Next Steps include: – Continue to closely monitor the Go-Live, remediate problems and address

challenges – Develop a roadmap for stabilization and plan for shifting to this phase once the go-

live period is complete – Recognize additional successes and the huge effort from thousands of people who

are making change of this magnitude possible School Reports

5.1 School of Dental Medicine – Dr. Steven Lepowsky Dr. Lepowsky shared with the group about his recent care as he was hospitalized here

at the health center. He remarked that all aspects of his care could not have been better from the doctors and nurses to the housekeepers.

The Dental School recently entered the third phase of the renovations. This phase has

created some unique challenges that have not been faced before in the terms of space and space allocation, treatment areas and accessibility to the treatment areas. They

78

Page 85: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

CLINICAL AFFAIRS SUBCOMMITTEE

Meeting Minutes

February 22, 2018

UConn Health

started o receive feedback from patients, some of which is negative and related to the construction. Dispute the challenges the clinical operations are doing very well. All of the financial measures across all aspects of the school are doing well. Every financial measure is not only ahead of last year, but also ahead of budget. The net revenue as opposed to gross revenue has improved measurably over last year and budget.

Update on CCMC transition: Although we no longer will have a presence at CCMC we

continue to have ongoing discussions with the leadership of CCMC to ensure that we have a meaningful presence although our outpatient practices will no longer be at CCMC. We are doing quite a bit of work maximizing the utilization of the space at Kane Street to accommodate the activity that used to take place at CCMC.

There being no further business, the meeting was adjourned at 3:04 pm. Respectfully submitted,

Andrew Agwunobi, MD, MBA Chief Executive Officer, John Dempsey Hospital Attendees: Mr. Richard Barry (phone), Ms. Cheryl Chase, Dr. David McFadden, Dr. Wayne Rawlins (phone), Ms. Teresa Ressel (phone), Dr. David Shafer, Dr. Susan Tannenbaum

Next Regularly Scheduled Meeting

Thursday, May 24, 2018 2:00 pm – 4:00 pm

Munson Training Room Munson Road Building

79

Page 86: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

CLINICAL AFFAIRS SUBCOMMITTEE PEER REVIEW SESSION

Board of Directors

Location: Munson Training Room, Munson Road Building

The meeting was called to order by Dr. Agwunobi at 3:06 pm

Public Comment There was no public comment

Chairs comments A motion was made, seconded and the minutes of the February 22, 2018 meeting of the Clinical Affairs Peer Review Subcommittee meeting were approved

Executive Session At 3:07 pm, the Committee voted, upon motion made and seconded, to go into Executive Session, pursuant to the General Statutes, to discuss Preliminary notes and drafts that the Health Center has determined that the public interest in withholding such documents and discussions clearly outweighs the public interest in disclosure; and trade secrets that derive independent economic value, actual or potential, from not being generally known, and not being readily ascertainable by proper means by other persons who can obtain economic value from their disclosure of use, and are the subject of efforts that are reasonable under the circumstances to maintain secrecy.

Adjournment At 3:23 pm the Committee went out of Executive Session and upon motion made and seconded, at 3:24 pm voted to adjourn the meeting.

Respectfully submitted,

Andrew Agwunobi, MD, MBA Chief Executive Officer John Dempsey Hospital

Attendance: Mr. Richard Barry (phone), Ms. Cheryl Chase, Dr. David McFadden, Dr. Wayne Rawlins, Dr. David Shafer, Dr. Susan Tannenbaum Guests: Dr. Andrew Agwunobi, Dr. Scott Allen, Dr. Richard Simon, Elizabeth Bjorge, Joanne Boucher, Michelle DeLayo, Anne Niziolek, Caryl Ryan, Jeffrey Blumenthal, Scott Simpson

Meeting Minutes May 24, 2018

80

Page 87: BBooaarrdd ooff DDiirreeccttoorrss - UConn Health · 3.1.18 GE healthcare 3.1.19 Cardinal Health, 110 LLC 3.1.20 McKesson Corporation 3.1.21 Optum 360, LLC and its affiliate, Optuminsight,

John

 Dem

psey Hospital

Summary of Key Inpatie

nt and

 Ancillary Indicators

Mar YTD

 FY 18

Key Inpatie

nt Indicators

Mar YTD

 FY 18

Prior Y

ear to Da

teVa

riance

% Variance

Admissions

7,48

56,89

559

08.6%

Discharges

7,46

76,88

758

08.4%

Patie

nt Days

31,358

29,056

2,30

27.9%

ALOS

4.1

4.2

‐0.1

‐3.1%

Average Da

ily Cen

sus

114.4

106.0

8.4

7.9%

Key An

cillary Services

Mar YTD

 FY 18

Prior Y

ear to Da

teVa

riance

% Variance

ED Visits

26,837

25,166

1,67

16.6%

Surgical Cases (e

xcl pain mgt cases)

7,27

06,80

546

56.8%

UCo

nn M

edical Group

 Encou

nters

514,74

749

9,06

015

,687

3.1%

81


Recommended