____________________For Contractor(ITD Cementation India Ltd)
Page -1 of 32 ____________________
For Client(Reliance Infrastructure Limited)
BAR BENDING SCHEDULE OF FOOTING P1 and P8 to P14Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
1 1
32 2
14.955 1 2.765 17.720 68 1204.960 6.321@
18
68
18
68
200
C/C 11328
2 2
32 2
17.019 1 2.765 19.784 96 1899.264 6.321@
19
00
19
00
120C/C 13328
3 3
20
50
0
2
12.272 1 1.728 14.000 68 952.000 2.469@
50
0
200 11340C/C
4 4
20
50
0
50
0
2
14.272 1 1.728 16.000 58 928.000 2.469@200
13340C/C
5 5
20
13380
11380
13380
4
49.584 4 1.728 51.312 14 718.368 2.469100
11380 ###
8 8
25
18
36
18
36
2
16.794 1 2.160 18.954 96 1819.584 3.858@
120
C/C 13207
9 Chair
32 1000 4
5.260 0.000 5.260 90 473.436 6.321
17
39
17
39
500 500
Total::::
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
____________________For Contractor(ITD Cementation India Ltd)
Page -2 of 32 ____________________
For Client(Reliance Infrastructure Limited)
BAR BENDING SCHEDULE OF FOOTING P1 and P8 to P14
MAYAR RIVER BRIDGE
Remarks
7.62
12.01
2.35
2.29
1.77
7.02
2.99
36.05 MT
Total weight (MT)
Footing-Raft Main Bottom 2nd Layer
Footing-Raft Main Bottom 1st Layer
Footing-Raft Main TopInner Layer
Footing-Raft Main TopSurface Layer
Footing-Raft Binder/Outer Ring
Footing-Raft Main Bottom 3rd Layer
Footing-Chairs
For Contractor(ITD Cementation India Limited)
Page -3 of 32 For Client(Reliance Infrastructure Limited)
BAR BENDING SCHEDULE OF FOOTING P2 to P7Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
1 16
32 2
16.255 1 2.765 19.020 73 1388.460 6.321 8.78@
20
18
20
18
200
C/C 12328
2 17
32 2
18.319 1 2.765 21.084 96 2024.064 6.321 12.79@
20
50
20
50
130C/C 14328
3 18
205
00
213.272 1 1.728 15.000 58 870.000 2.469 2.15@
50
0
250C/C 12340
4 19
20
50
0
50
0
2
15.272 1 1.728 17.000 50 850.000 2.469 2.10@250C/C 14340
5 20
20
12380
14380
12380
4
53.584 4 1.728 55.312 14 774.368 2.469 1.91100
14380 ###
7 22
25
19
86
19
86
2
18.094 1 2.160 20.254 96 1944.384 3.858 7.50@
130
C/C 14207
9 Chair
32 1000 4
5.560 0.000 5.560 100 556.040 6.321 3.52
18
89
18
89
500 500
Total:::: 38.746
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
Total weight (MT)
For Contractor(ITD Cementation India Limited)
Page -4 of 32 For Client(Reliance Infrastructure Limited)
BAR BENDING SCHEDULE OF FOOTING P2 to P7
MAYAR RIVER BRIDGE
Remarks
MT
Footing-Raft Main Bottom 2nd Layer
Footing-Raft Main Bottom 1st Layer
Footing-Raft Main TopInner Layer
Footing-Raft Main TopSurface Layer
Footing-Raft Binder/Outer Ring
Footing-Raft Main Bottom 3rd Layer
Footing-Chairs
____________________For Contractor(ITD Cementation India Ltd)
Page -5 of 32 ____________________
For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P1 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6
32 500 2
13.042 1 2.765 15.807 70 1106.490 6.3211
21
51
500
7 7
10
11.797 0.000 11.797 41 483.683 0.617@
11
59
7.1
42
85
71
42
9
10
0
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
____________________For Contractor(ITD Cementation India Ltd)
Page -6 of 32 ____________________
For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P1 FOOTING
MAYAR RIVER BRIDGE
Remarks
6.99
0.30
7.293 MT
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -7 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITEDProject Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P2 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 21
32 500 215.614 1 2.765 18.379 105 1929.795 6.321 12.20
14
72
3
500
8 23
10
11.797 0.000 11.797 50 589.857 0.617 0.36@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total:::: 12.562
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
Total weight (MT)
For Contractor(ITD Cementation India Limited)
Page -8 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
BAR BENDING SCHEDULE OF P2 FOOTING
MAYAR RIVER BRIDGE
Remarks
MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -9 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITEDProject Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P3 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 21
32 500 216.892 1 2.765 19.657 105 2063.985 6.321 13.05
16
00
1
500
8 23
10
11.797 0.000 11.797 54 637.046 0.617 0.39@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total:::: 13.44
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
Total weight (MT)
100
For Contractor(ITD Cementation India Limited)
Page -10 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
BAR BENDING SCHEDULE OF P3 FOOTING
MAYAR RIVER BRIDGE
Remarks
MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Footing-Vertical (Outer Face)
Footing & shaftStirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -11 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITEDProject Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P4 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 21
32 500 2
15.919 1 2.765 18.684 105 1961.820 6.321
15
02
8
500
8 23
10
11.797 0.000 11.797 51 601.654 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -12 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P4 FOOTING
MAYAR RIVER BRIDGE
Remarks
12.40
0.37
12.772 MT
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Shaft Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor (ITD Cementation India Limited)
Page -13 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITEDProject Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P5 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 21
32 500 217.056 1 2.765 19.821 105 2081.205 6.321
16
16
5
500
8 23
10
11.797 0.000 11.797 54 636.928 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor (ITD Cementation India Limited)
Page -14 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P5 FOOTING
MAYAR RIVER BRIDGE
Remarks
13.16
0.39
13.548 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor (ITD Cementation India Limited)
Page -15 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITEDProject Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P6 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 21
32 500 215.852 1 2.765 18.617 105 1954.785 6.321
14
96
1
500
8 23
10
11.797 0.000 11.797 50 589.582 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor (ITD Cementation India Limited)
Page -16 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P6 FOOTING
MAYAR RIVER BRIDGE
Remarks
12.36
0.36
12.72 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -17 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITEDProject Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P7 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 21
32 500 2
14.919 1 2.765 17.684 105 1856.820 6.321
14
02
8
500
8 23
10
11.797 0.000 11.797 47 554.466 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -18 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P7 FOOTING
MAYAR RIVER BRIDGE
Remarks
11.74
0.34
12.079 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor (ITD Cementation India Limited)
Page -19 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P8 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6a
32 500 2
12.132 1 2.765 14.897 60 893.820 6.321
11
24
1
500
7 7
10
11.797 0.000 11.797 38 448.291 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor (ITD Cementation India Limited)
Page -20 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P8 FOOTING
MAYAR RIVER BRIDGE
Remarks
5.65
0.28
5.927 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -21 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P9 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6a
32 500 2
11.280 1 2.765 14.045 60 842.700 6.321
10
38
9
500
7 7
10
11.797 0.000 11.797 35 412.900 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -22 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P9 FOOTING
MAYAR RIVER BRIDGE
Remarks
5.33
0.26
5.582 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -23 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P10 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6a
32 500 2
10.573 1 2.765 13.338 60 800.280 6.321
96
82
500
7 7
10
11.797 0.000 11.797 33 389.306 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -24 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P10 FOOTING
MAYAR RIVER BRIDGE
Remarks
5.06
0.24
5.299 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -25 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P11 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6a
32 500 2
9.941 1 2.765 12.706 60 762.360 6.321
90
50
500
7 7
10
11.797 0.000 11.797 31 365.711 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -26 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P11 FOOTING
MAYAR RIVER BRIDGE
Remarks
4.82
0.23
5.045 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -27 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P12 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6a
32 5002
10.972 1 2.765 13.737 60 824.220 6.321
10
08
1
500
7 7
10
11.797 1 0.864 12.661 34 430.479 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -28 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P12 FOOTING
MAYAR RIVER BRIDGE
Remarks
5.21
0.27
5.476 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -29 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P13 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6
32 500 2
12.654 1 2.765 15.419 70 1079.330 6.321
11
76
3
500
7 7
10
11.797 0.000 11.797 40 471.886 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm
)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -30 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P13 FOOTING
MAYAR RIVER BRIDGE
Remarks
6.82
0.29
7.114 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem
For Contractor(ITD Cementation India Limited)
Page -31 of 32 For Client(Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name
Contractor ITD Cementation India Limited
BAR BENDING SCHEDULE OF P14 FOOTINGStructure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Bar mark Shape of bar
6 6
32 500 2
13.023 1 2.765 15.788 70 1105.160 6.321
12
13
2
500
7 7
10
11.797 0.000 11.797 41 483.683 0.617@
11
59
7.1
42
85
71
42
9
300
C/C ###
Total::::
6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Sl.
no.
Dia of
bar (mm)
No Of Bent
Cutting Length
(m)
No. of Lap
Reqrd
Length per Lap (m)
Total Cut Length (m)
No of bars
Total Length (m)
Unit Weight (kg/m)
100
For Contractor(ITD Cementation India Limited)
Page -32 of 32 For Client(Reliance Infrastructure Limited)
RELIANCE INFRASTRUCTURE LIMITED
ITD Cementation India Limited
BAR BENDING SCHEDULE OF P14 FOOTING
MAYAR RIVER BRIDGE
Remarks
6.99
0.30
7.284 MT
CONSTRUCTION of CONVEYOR cum ROAD BRIDGE. (CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)
Total weight (MT)
Footing-Vertical (Outer Face)
Footing & shaft-Stirrups
Cem