+ All Categories
Home > Environment > Bc model summary

Bc model summary

Date post: 11-Feb-2017
Category:
Upload: alston-loper
View: 199 times
Download: 0 times
Share this document with a friend
4
gital Elevation Models (DEMs) Entire Black Creek Watershed = 2,100 acres thwoods Watershed cludes elementary school) 8 acres Belhaven Watershed (include Harvest Church site) = 257
Transcript
Page 1: Bc model summary

Digital Elevation Models (DEMs)

Entire Black Creek Watershed= 2,100 acres

Northwoods Watershed(includes elementary school)= 58 acres

Belhaven Watershed (includes Harvest Church site) = 257 acres

Page 2: Bc model summary

Land Cover Data LayersBELHAVEN LANDCOVER

Page 3: Bc model summary

Soils Data Layers

Page 4: Bc model summary

0.1 0.25 0.5 1-0.10.00.10.20.30.40.50.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

0.1 0.25 0.5 1-0.10.00.10.20.30.40.50.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

0.1 0.25 0.5 10.0

0.1

0.2

0.3

0.4

0.5

0.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

0.1 0.25 0.5 10.0

0.1

0.2

0.3

0.4

0.5

0.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

5% Impervious Area

25% Impervious Area 50% Impervious Area

10% Impervious Area

Northwoods Elementary School Watershed (58 acres)


Recommended