of 17
7/31/2019 BCS Sample Project Proposal
1/17
BCS HIGHER EDUCATION QUALIFICATIONS
PROJECT PROPOSAL
Candidate Name:
Membership No:
Course Provider:
(if applicable)
NOT APLICABLE
7/31/2019 BCS Sample Project Proposal
2/17
Project Level:
(Tick as appropriate)
Diploma Professional GraduateDiploma
Project Title: INFRASTRUCTURE MANAGEMENT SYSTEM - (IMS)
Proposal Submission Date:
Authenticator:
(Tick as appropriate)
BCS Professional Member (i.e. MBCS/FBCS) (CV not required)
7/31/2019 BCS Sample Project Proposal
3/17
Authenticators Membership No.:
IT Professional (e.g. Manager, Supervisor or Tutor) with aminimum of 5 years relevant work experience.
CV enclosed (mandatory)
Planned Project Submission date: October 2011 April 2012
NOTE: Please complete your proposal in the relevant section overleaf.
7/31/2019 BCS Sample Project Proposal
4/17
Background of the Project
< Company> is a semi-government organisation and provide electricity service in Sri
Lanka. < Company> IT branch consist with three main sections. Those are application
development, Infrastructure Management and Clerical Operations.
Proposed project IT-INFRASTRUCTURE MANAGEMENT SYSTEM - (IMS) is
relate to the Infrastructure Management section. It will reduce obstacles in managementactivities and streamline all the processes within the Infrastructure section
Activities of Infrastructure management Section.
7/31/2019 BCS Sample Project Proposal
5/17
Infrastructure Management Section consists with several processes to help day to day
activities of developers, administrators, management and < Company>customers.
Processes are as follow.
1. Administration of Datacenter
Administrate server farms related to Internet, email, databases and
application servers.
Hosting of internally developed new applications and serve them to end
users.
2. Handle IT related purchasing
7/31/2019 BCS Sample Project Proposal
6/17
Handle tenders of IT equipment and software purchasing
Handle hardware maintenance Agreement
Handle Software Licence renewals
Hand WAN Link purchasing and maintenance agreement
3. Workshop
Repair and troubleshoot PCs and Server hardware
Software installations
Establish wired and wireless network
Configure end-user equipment to access < Company> network
4. Network Infrastructure management
7/31/2019 BCS Sample Project Proposal
7/17
Provide Network Solutions related to business requirement
Manage internal IP schemes for all business units of < Company>)
Manage various operator WAN links connections to < Company> (IP
VPN)
Scope of the Project
7/31/2019 BCS Sample Project Proposal
8/17
Scope of the project is decided with considering the immediate requirements of the
management. The network infrastructure management process and work shop
process are given top priority to stream line and automate immediately. However the
software solutions should be capable to extend its functionality to other processes as
well (single interface to manage all activities).
Deliverables of proposed system
System Deliverables relate to the Workshop process
workshop helpdesk will assign a job number to the customer complain
Analyse the nature of the job and assign a person to solve the problem
7/31/2019 BCS Sample Project Proposal
9/17
Provide customer to inquire status of the job
Ability to close successfully completed jobs
Facility to generate various MIS reports regarding workshop activities
Repetitive nature of problems.
Efficiency of the workshop activities etc...
Deliverable related to the Network Process
Following facilities will be accessed by the IT administrators located island wide. By
authenticate with the system, they will be able to manage their resources.
WAN Link management
Keep records regarding WAN Links in the entire Island (ISP details, Bandwidth,
Circuit ID, IP configuration, Cost of link...etc)
7/31/2019 BCS Sample Project Proposal
10/17
Remind service provider agreement expirations.
Generate MIS reports (about agreement expiry, Bandwidth wise, Available links
service provider wise ....etc.)
LAN Management
Facility to keep IP configuration of the LAN (assign IP addresses, Free IP
addresses..etc)
Facility to keep VLAN configuration details
Facility to generate PC labels (to Stick on network devices, PCs, Printers) to
identify network configuration of each device. Provide massaging system to educate end-users regarding maintenance down
times.
Approach of the project
7/31/2019 BCS Sample Project Proposal
11/17
Interview and prototyping will be used to gather the requirement of users.
Incremental development process will be used to develop the system.
Development Tools
VB .NET 2005 or above
PHP and Java Scripts
Confirmation of the fitness of the System
Use Unit testing, White box testing, Black box testing incrementally with
each face.
7/31/2019 BCS Sample Project Proposal
12/17
User feedback with early system experience.
System Requirement
Hardware Requirement
Client Side
Windows 2000 or above
IE 6 or Firefox 3.5 or above browser
512 MB RAM
500 MB Free Disk Space
Server Side Requirement
Windows 2003 or above windows server
7/31/2019 BCS Sample Project Proposal
13/17
IIS or Apache web server, My SQL Database
1 GB RAM
2 GB Free Disk Space
Milestones
7/31/2019 BCS Sample Project Proposal
14/17
7/31/2019 BCS Sample Project Proposal
15/17
See separate attachment as a JPG file
7/31/2019 BCS Sample Project Proposal
16/17
Examiners Comments (to be completed by the Examiner)
From the elements provided, the Examiners believe that there should be sufficient breadth anddepth in the proposed work to satisfy the requirements at the level chosen (final yearundergraduate). They recommend that the candidate consults the authenticator to ensure thatthe scope remains appropriate; and that attention is paid to the strategy and realisation of thedemonstrations that the final system is fit for its intended purpose.
7/31/2019 BCS Sample Project Proposal
17/17
Proposal Approved Re-submit Proposal
Date completed: 8 November 2011