building design progress report, austin chinese church
Popular Tags:
15
建建建建建建 建建建建建建 建建建建 建建建建 Building Design Building Design Committee Committee Progress Report Progress Report 07/18/2010 07/18/2010
Transcript
Page 1: Bdc progress report 2010 07 18 final

建堂設計小組建堂設計小組進度簡報進度簡報

Building Design Building Design CommitteeCommittee

Progress ReportProgress Report

07/18/201007/18/2010

Page 2: Bdc progress report 2010 07 18 final

Progress Made進度

Modified Floor Plan調整了隔間Developed Brand New Building Exterior Plan重新設計了外型Concluded Schematic Design完成初步設計

Page 3: Bdc progress report 2010 07 18 final

Site Plan 地面圖

New Parking新停車場

New Bldg新堂 Morrison Hall

馬禮遜堂

Taylor Hall戴德生堂

Page 4: Bdc progress report 2010 07 18 final

Modified Floor Plan 隔間圖

5 Large Class Rooms五間大教室

Baptistery浸池

Sanctuary 敬拜廳 640 seats

Foyer 前廳

Page 5: Bdc progress report 2010 07 18 final

High Roof Perspective 高挑屋頂

Page 6: Bdc progress report 2010 07 18 final

Southeast Façade 東面外牆及入口

Page 7: Bdc progress report 2010 07 18 final

Entrance Eye Level 進口遮蓬

Page 8: Bdc progress report 2010 07 18 final

South Roof perspective 鳥瞰圖

Page 9: Bdc progress report 2010 07 18 final

North Entrance Close Up 西北面及入口

Page 10: Bdc progress report 2010 07 18 final

Road Map下一步

Programming/Master Planning (complete)

Schematic Design (complete)

Design Development 細部設計Contract Document

Bid and Award

Construction

Page 11: Bdc progress report 2010 07 18 final

Design Development 細部設計Finalizing Floor and Elevation PlansPreparing Detail DesignsSelecting Materials建築內外細節設計材料設備裝潢等Civil Plans - Parking, Utility, Drainage…Structural PlansMechanical, Electrical, Plumbing Plans Landscaping Plans土木結構水電空調庭院設計等

Page 12: Bdc progress report 2010 07 18 final

New Contract with SGA新的合同

Include all A/E services from detail design to construction completionTo be executed in phasesCovered under $250k raised funds合約包括所有逐步設計及監工直到建築完成 費用於 25 萬內

Page 13: Bdc progress report 2010 07 18 final

Budget Control Measures節省經費

Prepare West Parking Lot Design In-House 新停車場自行設計Provide Engineering Assistance to Consultants 提供其它設計援助Perform Certain Construction Admin. Tasks 幫助施工監督管理

Page 14: Bdc progress report 2010 07 18 final

Schedule Projection時間表

Design 設計 : 08/2010 - 04/2011

Permit 執照 : 05/2011 - 10/2011

Contract Doc 規範 : 09/2011 - 11/2011

Bid/Award 招標 : 12/2011 - 02/2012

Construction 施工 : 03/2012 - 08/2013

1.5 year preparation一年半籌備1.5 year construction 一年半施工

Page 15: Bdc progress report 2010 07 18 final

Build Up the Church Together

同心建造Check out the plans in Taylor, Morrison & ACC web site 瞭解設計Feedbacks and Comments 提供建議Prayers 禱告扶持

若 不 是 耶 和 華 建 造 房 屋 , 建 造 的 人 就 枉 然 勞 力 ; 若 不 是 耶 和 華 看 守 城 池 , 看 守 的 人 就 枉 然 警 醒 ( 詩 篇 一二七 )

Unless the LORD builds the house, its builders labor in vain. Unless the LORD watches over the city, the watchmen stand guard in vain. (Psalm 127)