BDFA Temporary Facility - Functional Requirements 18 November 2016
Transcript
Page 1: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements

18 November 2016

Page 2: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional
Page 3: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

335092 1 1

Mott MacDonald

22 Station Road Cambridge CB1 2JD United Kingdom T +44 (0)1223 463500 F +44 (0)1223 461007 mottmac.com

BDFA Temporary Facility - Functional Requirements

18 November 2016

Page 4: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional
Page 5: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements

18 November 2016

Issue and Revision Record

Revision Date Originator Checker Approver Description

A 21 Oct 16 Peter Mallin Phil Harvey Steven Wilby Issue

A 18 Nov 16 Peter Mallin Phil Harvey Steven Wilby Issue

Information class: Standard

This document is issued for the party which commissioned it and for specific purposes connected with the above-

captioned project only. It should not be relied upon by any other party or used for any other purpose.

We accept no responsibility for the consequences of this document being relied upon by any other party, or being used

for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by

other parties.

This document contains confidential information and proprietary intellectual property. It should not be shown to other

parties without consent from us and from the party which commissioned it.

This report has been pr epared sol el y for use by the party which commissi oned it (the ‘Client’) i n connecti on with the capti oned proj ect. It should not be used for any other purpose. N o person other than the Client or any party who has expressl y agreed ter ms of r eliance with us (the ‘Reci pient(s)’) may rel y on the content, i nformati on or any vi ews expressed i n the repor t. We accept no duty of care, responsi bility or liability to any other r eci pient of thi s document. This r eport is confi denti al and contains pr opri etar y intell ectual property.

No representati on, warranty or under taki ng, expr ess or i mplied, is made and no responsi bility or liability is accepted by us to any party other than the Cli ent or any Reci pient(s), as to the accuracy or completeness of the i nformati on contai ned i n this r eport. For the avoidance of doubt this r eport does not in any way purport to i nclude any legal , in sur ance or fi nanci al advice or opi nion.

We disclai m all and any liability whether arising i n tort or contrac t or other wise which it might otherwise have to any party other than the Cli ent or the Reci pient(s), in r espect of this report , or any infor mation attri buted to i t.

We accept no r esponsibility for any error or omission i n the r eport which is due to an error or omission i n data, infor mation or statements supplied to us by other par ties incl udi ng the client (‘D ata’). We have not i ndependentl y verified such D ata and have assumed it to be accurate, complete, reli abl e and current as of the date of such infor mation.

Forecasts presented i n this document were pr epared usi ng Data and the report is dependent or based on D ata. Inevitabl y, some of the assumptions used to develop the for ecasts will not be realised and unantici pated events and circumstances may occur. C onsequentl y M ott MacDonal d does not guarantee or warr ant the concl usi ons contained i n the repor t as there are li kel y to be differ ences between the for ecas ts and the ac tual results and those di ffer ences may be material. Whil e we consi der that the infor mation and opini ons gi ve n i n this r eport are sound all parti es must rel y on their own skill and j udgement when making use of it .

Under no circumstances may this report or any extr act or summar y ther eof be used in connection wi th any public or pri vate sec urities offering i ncluding any rel ated memorandum or prospectus for any securities offering or stock exchange listing or announcement.

Page 6: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements

18 November 2016

Contents

1 Introduction 1

1.1 General 1

1.2 Location 1

1.3 Planning and Design 1

1.4 Clearance 1

1.5 Codes and Standards 1

2 Requirement of the Temporary BDFA Facility 3

2.1 Temporary Quay Facility 3

2.2 Services Requirements 6

2.3 Lighting 6

2.4 Perimeter Fencing and Signage 7

2.5 Personal Hygiene Amenities 7

2.6 Fork Lift Lock Ups 7

2.7 Parking Facilities 7

IN

Page 7: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 1

18 November 2016

1 Introduction

This specification covers the minimum functional requirements for the BDFA Temporary Facility.

1.1 General

During the construction of the Boston Barrier, temporary berth and associated landside facilities

are required to accommodate the operations of the Boston and District Fisherman’s Association

(BDFA) fishing fleet. The facilities are required to be in place for use by the BDFA for the duration

of the construction of the tidal barrier structure, gate, and associated in-channel works.

The baseline functional requirements of the temporary BDFA facility have been developed

through consultation with representatives from the BDFA.

1.2 Location

The temporary facilities are to be positioned at the existing Grain and Lairage Quay’s at the Port

of Boston (PoB), immediately downstream of the proposed barrier structure. The location and

extent of the facility is governed by the area of land proposed for temporary lease for the BDFA

facility, and is shown on drawings IMAN001472-CIV-DR-050 and IMAN001472-CIV-DR-057. The

length and width of the temporary quay and associated area is approximately 300m x 15m. The

landside facilities are to be provided immediately adjacent to the quay frontage so as to minimise

encroachment into the PoB operational port area.

1.3 Planning and Design

The Contractor is responsible for the planning, design, supply, installation, and commissioning of

the temporary BDFA facility through liaison with the BDFA, the PoB and the Environment Agency

(EA) to accommodate the interests of all parties and meet the functional and performance

requirements of this Specification.

1.4 Clearance

The Contractor is required to clear the entire site to the satisfaction of the BDFA prior to handing

over the facility. The Contractor shall liaise and coordinate clearance works with the PoB with

regard to ownership and disposal requirements of materials and equipment that are currently

stored on the site to be cleared. The Contractor will gain in writing all items to be retained by the

PoB prior to commencement of clearance works.

1.5 Codes and Standards

The design, manufacture, provision, installation and construction of the works shall comply with

the latest editions of British (BS), European (EN) and international (ISO) Specifications, Codes of

Practice, and all statutory regulations including UK Building Regulations. A consistent, coherent

and compatible set of standards shall be used, appropriate to the form of construction and

environment.

As a guide, the following list represents some but not all design standards and guidelines to be

used by the Contractor for these works:

Page 8: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 2

18 November 2016

BS6349-1: Maritime Works – General (all relevant sub parts).

BS6349-2: Maritime Works – Code of practice for the design of quay walls, jetties and

dolphins.

BS6349-4: Maritime Works – Code of practice for design of fendering and mooring

systems.

HSE Safety in Docks 2014: Approved Code of Practice.

BS EN50132-7: Alarm systems - CCTV surveillance systems for use in security

applications.

Fishing harbour planning, construction and management – FAO Fisheries and

Aquaculture Technical Paper 539, 2010.

BS EN 806: Specifications for installations inside buildings conveying water for human

consumption.

BS EN ISO 4064: Water meters for cold potable water and hot water.

BS 7671: Requirements for Electrical Installations. IET Wiring Regulations.

Page 9: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 3

18 November 2016

2 Requirement of the Temporary BDFA

Facility

The sub-sections below set out the baseline requirements of the temporary BDFA facility.

2.1 Temporary Quay Facility

The existing Grain (Figure 1 and Figure 2) and Lairage (Figure 3) Quay’s are required to

temporarily accommodate the normal operations of the BDFA fishing fleet.

Figure 1 – Existing Lairage Quay

Page 10: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 4

18 November 2016

Figure 2 – Existing Lairage Quay

Figure 3 – Existing PoB Quay Side

Page 11: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 5

18 November 2016

The quay will be required to accommodate up to 24 fishing vessels moored alongside at any

one time. Raft (side by side) mooring is standard practice and will be implemented by the

vessel operators in the event that the available 300m quay length is insufficient. The 300m

quay length can provide a Not Always Afloat but Safely Aground (NAABSA) berth.

Particulars of the typical and maximum fishing vessels to be accommodated at the temporary

quay are shown in Table 1.

Table 1 – Maximum Fishing Vessel Particulars

Parameter Typical Fishing Vessel Maximum Fishing Vessel

Displacement 45 tonnes 90 tonnes

Length Overall 10.0 m 14.0 m

Beam 5.0 m 6.0 m

Maximum Draft 1.4 m 1.6 m

In addition to the fishing vessels, the port area fronted by the quay and bounded by the landside

boundary agreed with the PoB shall be capable of accommodating the landside operations of the

BDFA. Landside operations will result in the following site wide loads:

General surcharge of 10kN/m2.

Commercial vehicles/vans of maximum gross weight of 5 tonnes.

Front lift fork trucks of maximum lift capacity of 2.5 tonnes.

The Contractor shall asses the condition and capacity of both the quay structure and existing

pavements for these operational loads. The paving shall provide a smooth uninterrupted

surface suitable for use by the vehicles set out above and pedestrians. Should modifications or

upgrades to the existing paving or quay be required to meet these operational requirements, the

Contractor shall design and construct such modifications as necessary.

Recessed galvanised steel mooring rings shall be fixed to the face of the existing cope structure

over the full 300m length of quay. The maximum spacing of mooring rings shall be 2.5m. The

elevation (height) of the rings shall be agreed with the BDFA with consideration to the capacity

and dimensions of existing cope structure (to be assessed by the Contractor) to which they are

attached. The clear internal diameter of the rings shall be 100 mm, and their capacity shall be

determined by the Contractor assuming the maximum design vessel set out in Table 1 moored

in environmental conditions resulting from a 1 in 50 year event. The existing mooring bollards

along the quay shall be retained.

The Contractor shall install alternating safety ladders 15 m maximum intervals and handholds to

the existing quay face at 30 m maximum intervals. Both ladders and handholds shall extend

from the top of the quay cope down to river bed level. Rubbing strips force to be provided on

either side of the ladder and at 5m intervals between each ladder. The configuration and details

of the ladders and handholds shall meet the requirements of BS6349-2. In addition, ladders

shall be protected by timber facing or extruded rubber fendering to prevent damage to vessels

that may accidently make contact with the ladder.

Page 12: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 6

18 November 2016

Signage shall be provided at regular intervals along the quay stating that the temporary facility is

for the sole use of the BDFA, prohibiting general access to the public.

Power, water and life-saving facilities shall be provided along the quay as set out in sub-section

2.2.

The Contractor shall ensure the removal of temporary provision as may be required to ensure

the effective installation of any permanent works constructed after the temporary berthing quay

is no longer required.

2.2 Services Requirements

The Contractor shall design, supply, install and commission the electrical supply to the

temporary BDFA facility in accordance with all regulatory by-laws. The Contractor shall liaise

with the PoB to agree the nearest and most suitable electrical supply connection point to the

facility. The electrical supply shall be metered at the point of connection to the PoB network

within a new main distribution board. The main distribution board shall be complete with a

lockable cover and incoming integral isolating switches, and with a full complement of

MCB/RCBO units and blanking plates. All power cables throughout the designated area shall

be installed below ground in accordance with all regulatory by-laws.

The Contractor shall design, supply, install and commission potable cold water supply to the

temporary BDFA facility in accordance with all regulatory by-laws. The Contractor shall liaise

with the PoB to agree the nearest water connection point. If required an application for the new

connection shall be made to Anglian Water Services Ltd. The connection shall be complete

with isolating valves, strainer, double check valve, water meter, back flow prevention and drain

valve. The new water connection and supply bore shall be sized accordingly in order to ensure

adequate flow rate and low pressure loss in the system. The water supply network within the

temporary facility shall be installed below ground.

A total of 2 number electrical connection points shall be provided and distributed evenly along

the full length of the existing quay. The connection points shall take the form of 750mm high

marina type pedestals suitable for the port environment. Each pedestal shall comprise a

minimum of two number 220V/240V 16 amp RCD protected single phase sockets. The

Contractor’s design shall assume that all quayside power outlets can be in use at any one time.

A minimum of three number pedestals, distributed evenly along the 300m quay, shall also

provide cold only potable water supply for use on the fishing vessels and general quayside use.

The type of potable water tap shall be agreed with the BDFA. In addition, a minimum of two

pedestals shall be provided with life-saving equipment so as to have no more than 100m

between each pedestal. Pedestals with life-saving equipment shall be clearly marked and shall

comprise lifebuoys and throwing lines.

2.3 Lighting

The entire quay length and landside area of the temporary facility shall have lighting to allow

night time BDFA operation. The minimum maintained illuminance by area shall be as set out

below with a minimum maintenance factor (MF) of 1.25 and minimum uniformity ratio (Uo) of

0.4:

Quay side: 50 lux

Entrance gates: 50 lux

Land side area: 20 lux

Page 13: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 7

18 November 2016

Existing lighting may be used to provide the required illuminance and supplemented is required

with new temporary lighting installations.

2.4 Perimeter Fencing and Signage

The full perimeter of the landside boundary between the temporary fishing facility and the PoB

shall be fenced. A temporary security fence such as Heras fencing with a minimum height of

2.0m above finished ground levels shall be provided. The landside boundary is indicatively

shown on drawing IMAN001472-CIV-DR-057. The temporary fencing shall meet the security

requirements of the PoB.

A lockable main access gate suitable for two way vehicle access shall be provided. The location

of the gate shall be agreed with both the BDFA and the PoB.

Immediately adjacent to the main access gate a pedestrian only lockable access gate shall be

provided. The gate shall meet the security requirements of the PoB.

Signage directing BDFA traffic to the temporary facility main access gate shall be provided by

the Contractor within the confines of the PoB. The entrance point into the PoB and internal

traffic route shall be agreed with the PoB and the extent and type of signage agreed with both

the PoB and the BDFA.

2.5 Personal Hygiene Amenities

The Contractor shall provide and maintain portable toilets and hand washing facilities for all

BDFA personnel. As a minimum the following shall be provided:

10 individual self-contained portable toilets.

6 urinals in one self-contained portable block.

10 hand wash basins with cold water and instantaneous hot water in a single self-

contained portable block.

The location of these amenities within the temporary facility shall be agreed with the BDFA. A

provisional location is provided on drawing IMAN-001472-CIV-DR-020. The Contractor will be

responsible for arranging and providing maintenance, servicing and provisioning of the portable

facilities to the satisfaction of the BDFA and the PoB for the full duration that the designated

area is occupied by the BDFA.

2.6 Fork Lift Lock Ups

The Contractor shall design and install 2 number minimum size of 1.1m by 2.4m secure lock up

enclosures for the BDFA front lift fork trucks. The enclosures shall be constructed from secure

wire mesh and galvanised steel posts with a lockable twin leaf entrance gate at one end. The

enclosures shall also have a secure wire mesh roof with galvanised steel support frame as

required.

The location and dimensions of the enclosures shall be agreed with the BDFA.

If demonstrated by the Contractor’s design to be adequate, the existing pavement may be used

as the platform for parking of fork trucks within the enclosures.

2.7 Parking Facilities

The Contractor shall mark out a dedicated car parking area for BDFA personnel vehicles within

the temporary facility. A minimum of 16 car parking spaces for parking shall be provided. The

Page 14: BDFA Temporary Facility - Functional Requirements · BDFA Temporary Facility - Functional Requirements 2 ... BS EN 806: Specifications for ... BDFA Temporary Facility - Functional

BDFA Temporary Facility - Functional Requirements 8

18 November 2016

location of the parking area shall be agreed with the BDFA. The minimum dimensions of each

parking bay shall be 2.5m wide x 5.0m long. A provisional location is provided on drawing

IMAN-001472-CIV-DR-020.