+ All Categories
Home > Documents > Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P....

Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P....

Date post: 18-Jan-2016
Category:
Upload: maximilian-mccoy
View: 218 times
Download: 0 times
Share this document with a friend
Popular Tags:
6
Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 irfu y a l c a s irfu y a l c a s D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans , W. Wang
Transcript
Page 1: Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.

Beam test July 2012

LCTPC WP Phone meeting 154 July 19, 2012

i r f u

yalcas

i r f u

yalcas

D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans , W. Wang

Page 2: Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.

• Thanks to our DESY colleagues of Ties’s team for their support at T24.

• Jan, Thierry, Carleton team and Saclay team participated in this beam test.

• Everything went well during data taking.

Page 3: Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.

• We finally mounted six modules on the endplate (5 just manufactured and one from 2011).

• The whole detector works smoothly. We took cosmic-ray and beam events with 1T magnet.

• Data analysis is on-going using MarlinTPC.

Page 4: Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.

Data taking summary

• Z Scan (2.5cm-57cm)• Drift Field Scan(Standard field:230V/cm and

low field:140V/cm)• Gain Scan • X Scan (upper and lower crack)• Phi Scan (angle: 0-15)• Peaking Time Scan (100ns-700ns)• Cosmics and beam, B=0 and 1T

Page 5: Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.
Page 6: Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.

Recommended