Bill Austin, AICP MMMPO Executive Director Jing Zhang, AICP, PTP MMMPO Transportation Planner Kaken Dey, Ph.D. West Virginia University Beechurst Avenue Corridor Study
Transcript
Page 1: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Bill Austin, AICPMMMPO Executive Director

Jing Zhang, AICP, PTPMMMPO Transportation Planner

Kaken Dey, Ph.D.West Virginia University

Beechurst Avenue Corridor Study

Page 2: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Introduction

Existing Conditions and Proposed Alternatives

VISSIM Model

Page 3: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Transportation Network

Page 4: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

WV DOH Beechurst Ave Study (2003)

Page 5: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Falling Run and Beechurst Ave Connection Study

Page 6: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site

Page 7: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Land Use

Page 8: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Traffic Volume (AADT)

22,788

7,265

20,361

23,150

22,810

19,281

0

20

40

60

80

100

EB WB

0

100

200

300

400

SB NB

Page 9: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Crash

Page 10: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Pedestrian & Transit

Page 11: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Land Use

Page 12: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Past Planning Effort

Page 13: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Past Planning Effort

Page 14: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

8th Street

Campus Dr

Campus Dr

Hough St

Hough St

Fayette St

Fayette St

Walnut St

Walnut St

Pleasant St

Pleasant St

Foundry St

Foundry St

Hurley St

Existing Lane Configuration Transition

Page 15: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Existing Operation

1

1

2

2

3

3

4

4

Page 16: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Project Site. Existing Lane Configuration

Page 17: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Key Issue

Corridor Capacity • Northbound through movement • Intersection configuration

Multi-model Transport • Trail connection• Transit and pedestrian facility• PRT Station Transfer

Land Use • Infill/Redevelopment • Neighborhood Development • University Development

Page 18: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development

• Segment Alternatives

• Intersection Alternatives

• Scenarios

Page 19: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development, Segment

Page 20: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development, Segment

Page 21: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development, Intersection

Page 22: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development, Intersection

Page 23: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development, Intersection

Page 24: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development, Intersection

Page 25: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Alternative Development, Intersection

Page 26: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Scenario I, Minimum Impact

Alternative Development, Scenarios

Scenario II, Minimum Impact + Intersection Improvements

Scenario III, ROW Impact + Intersection Improvements

Scenario IV, ROW Impact + Significant Intersection Improvements

Scenario V, 4 lanes-3 lanes Mix + Intersection Improvements

Page 27: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Scenario I, Minimum Impact

No left-turn when

opposing traffic is

on green

1

1

1

Pleasant St

Fayette St

Campus Dr

8th

St

6th

St

3rd

St

Foundry St

Page 28: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Scenario II, Minimum Impact + Intersection Improvements

1

1

1

Pleasant St

Fayette St

Campus Dr

8th

St

6th

St

3rd

St

Foundry St

thSt

Page 29: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Scenario III, ROW Impact + Intersection Improvements

11

1

2 2

Pleasant St

Fayette St

Campus Dr

8th

St

6th

St

3rd

St

Foundry St

Page 30: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Scenario IV, ROW Impact + Significant Intersection Improvements

11

1

2 2

Pleasant St

Fayette St

Campus Dr

8th

St

6th

St

3rd

St

Foundry St

Page 31: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Scenario V, 4 lanes-3 lanes mix + Intersection Improvements

1

2

3

3

21

1

Pleasant St

Fayette St

Campus Dr

8th

St

6th

St

3rd

St

Foundry St

Page 32: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

What is VISSIM?

VISSIM is a microscopic, time step, and behavior based traffic simulation computer program

VISSIM models urban traffic and public transit operations

VISSIM can analyze traffic (cars, trucks, pedestrians) and transit (buses, trains, trams) operations under constraints such as lane configuration, traffic composition, traffic signals, transit stops, etc.

Page 33: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

VISSIM Microsimulation Applications

• Junction Geometry• Signal control• Traffic-actuated signal control• Multimodality

• Multimodal Systems

• Motorway Traffic

• Active Traffic Management

• Public Transport • Distribution-based dwell time

• Public transport priority

• Emissions Modelling

• Mesoscopic and Hybrid Simulation

• Virtual testing of autonomous vehicles

Page 34: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Beechurst Ave Study- Existing & Future Scenarios

Existing Condition

• Morning Peak network development• Geometric data- used Google Maps and field data

• Volume data- MMMPO provided

• Speed, travel time data, signal timing- MMMPO provided

• Evening Peak

Future Scenarios

• Scenarios- (1) to (6)

10/24/2017 34

Page 35: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Simulation Procedure

1) Model Development

2) Initial System Evaluation

3) Model Calibration

• System Calibration

• Operational Calibration

4) Model Evaluation

5) Model Validation

Page 36: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Morning Peak Simulation Run

Page 37: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Comparison between Existing scenario & Proposed Improvement scenarios

Performance Measurers

• Corridor Travel time

• Corridor Delay

• Queue length at intersection approaches

Page 38: Beechurst Avenue Corridor Study - WV Department of ... · West Virginia University Beechurst Avenue Corridor Study. Project Introduction Existing Conditions and Proposed Alternatives

Questions?

Thank You!