+ All Categories
Home > Documents > BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality...

BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality...

Date post: 07-Oct-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
14
BEEHIVE – Internal Quality Control
Transcript
Page 1: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

BEEHIVE –

Internal Quality Control

Page 2: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP2: National Benchmarking ReportsEvaluation of the Philippines Report (44 responses)

Page 3: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP2: National Benchmarking ReportsEvaluation of the Indonesia Report (14 responses)

Page 4: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP3: MOOCEvaluation of the MOOC Platform

Total number of registered learners – 4399 (target of 1000 students): Binus - 1057 Cebu - 1544 Mapua - 391 SLU - 1114 UI - 293 Other - 372

Total number of statements of accomplishment - 1584 (target of 200 students): Binus - 261 Cebu - 674 Mapua - 243 SLU - 341 UI - 32 Other – 33

Level of Overall Satisfaction: 4.41 out of 5 (about 88% satisfaction, well above the 60% satisfaction target)

Page 5: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP4: Setting Up the BEEHIVE Accelerators

Evaluation of the Workshop "Staff Training" (done-

presented)

Evaluation of 4th BEEHIVE meeting (Baguio, SLU) (done -

presented)

Evaluation of BEEHIVE Networking Events (feedback

expected from WP Leader)

Page 6: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP5 BEEHIVE Accelerators Piloting

Business Plans

Feedback based on the qualitative and quantitative criteria (e.g feasability criteria, innovation criteria etc) (feedback expected)

On – line logbooks

Team's performance evaluation based on team journals (feedback expected)

Institutional BEEHIVE Demo Days

Evaluation of the organisation and the content of the event (feedback expected)

Pitch Event

Feedback tools developed and distributed

Page 7: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP6 BEEHIVE Label

BEEHIVE Labelization Procedure Guidelines

Evaluation based on the webinar and final document

Dissemination of the document

Number of e-mails sent – mail recipients, number of media

publications (feedback expected)

BEEHIVE label Awards

At least 5 HEIs applying and at least 3 HEIs awarded with the

BEEHIVE label (process of certification currently on-going).

Label promotional event in Indonesia.

Page 8: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP6 BEEHIVE Label

BEEHIVE label promotional event

Page 9: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP7 Quality Assurance and Evaluation

Milestone Reports

Milestone reports to be developed (WP1, WP2 & WP3 completed,

the rest to be completed by the WP Leaders)

Page 10: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP7 Quality Assurance and Evaluation

Quality Control Workshop Evaluation

Page 11: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP7 Quality Assurance and Evaluation

Final Internal Quality Report

Final Internal Quality Report to be developed (based on Interim

Internal Quality Report, updated and finalised)

Page 12: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

WP8: Dissemination

BEEHIVE Application

Is there any feedback (likes, etc….)?

BEEHIVE Newsletters

At least 100 mail recipients per Newsletter (target)

(list of recipients sent from PC HEIs >100 – additional recipients

(if any) for the next newsletters)

Page 13: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

To Do List

Feedback on the evaluation of BEEHIVE Networking Events and demodays

Feedback based on the qualitative and quantitative criteria of thebusiness plans

Feedback on the team's performance evaluation (based on on-linelogbooks / team journals)

Feedback tool for the 7th partner meeting (to be completed andanalysed)

Feedback on dissemination activities for the Dissemination Report

Milestone reports to be developed by the WP Leaders (WPs 4 to 9)

Page 14: BEEHIVE Internal Quality Controlbeehive-erasmusplus.eu/...Internal-Quality-Control... · Quality Control Workshop Evaluation. WP7 Quality Assurance and Evaluation Final Internal Quality

Thank you for your attention !!!


Recommended