Before Starting the Project Listings for the CoCPriority Listing
The FY2015 CoC Consolidated Application requires 2 submissions. Both this Project PriorityListing AND the CoC Consolidated Application MUST be submitted.
The FY 2015 CoC Priority Listing contains the following forms:
1. Reallocation Forms 2. Project Listings a. New Project Listing – will list the new project applications created through Reallocationand the Permanent Housing Bonus that have been approved and ranked or rejected by theCoC. b. Renewal Project Listing – will list all of the eligible renewal project applications thathave been approved and ranked or rejected by the CoC. c. UFA Costs Project Listing – applicable and only visible for those 4 CollaborativeApplicants that were designated as a Unified Funding Agency (UFA) during the FY 2015 CoCProgram Registration process. Only 1 UFA Costs project application is permitted. d. CoC Planning Project Listing – will list the CoC planning project application submittedby the Collaborative Applicant. Only 1 CoC Planning project per CoC is permitted. 3.Attachments: a. Final HUD-approved GIW b. HUD-2991 – Certification of Consistency with the Consolidated Plan
Things to Remember - The Priority Listing ranks the projects in order of priority all new project applications createdthrough Reallocation and the Permanent Housing Bonus as well as renewal project applicationsand identifies any project applications rejected by the CoC. - Collaborative Applicants are strongly encouraged to list all project applications on the FY2015CoC Ranking Tool located on the HUD Exchange to ensure a ranking number is used only once.The FY 2015 CoC Ranking Tool will assist the Collaborative Applicant during the rankingprocess among the four Project Listings. - Any project applications rejected by the Collaborative Applicant must select the reason forrejection. - Collaborative Applicants should notify all project applicants no later than 15 days before theapplication deadline regarding whether their project applications will be included as part of theCoC Priority Listing submission. - If the Collaborative Applicant needs to amend a project for any reason after ranking has beencompleted, the ranking of other projects will not be affected; however, the CollaborativeApplicant must be sure to rank the amended project once it is returned to the CoC Project Listingand verify that the rank number assigned has not been assigned to another project on a differentProject Listing. Only 1 CoC Planning project can be ranked on the CoC Planning Project Listing.
Only 1 UFA cost project can be ranked on the UFA Cost Project Listing.
Additional training resources are available online on the CoC Training page of the HUDExchange at: https://www.onecpd.info/e-snaps/guides/coc-program-competition-resources/
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 1 11/18/2015
1A. Continuum of Care (CoC) Identification
Instructions:The fields on this screen are read only and reference the information entered during the CoCRegistration process. Updates cannot be made at this time. If the information on this screen isnot correct, contact the HUD Exchange Ask A Question (AAQ) athttps://www.hudexchange.info/ask-a-question/.
Collaborative Applicant Name: Hawaii Department of Human Services
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 2 11/18/2015
2. Reallocation
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
2-1 Is the CoC reallocating funds from one ormore eligible renewal grant(s) that will expire
in calendar year 2016 into one or more newprojects?
Yes
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 3 11/18/2015
3. Reallocation - Grant(s) Eliminated
CoCs that intend to reallocate eligible renewal funds to create a newproject application (as detailed in the FY 2015 CoC Program CompetitionNOFA) may do so by eliminating one or more expiring eligible renewalprojects. CoCs that are eliminating projects entirely must identify thoseprojects on this form.
Amount Available for New Project:(Sum of All Eliminated Projects)
$252,544
Eliminated ProjectName
Grant NumberEliminated
Component Type AnnualRenewalAmount
Type of Reallocation
Ehiku FY2015 HI0054L9C001404 PH $53,988 Regular
Ka Hale A Ke Ola ... HI0005L9C001407 SSO $76,931 Regular
Ka Hale A Ke Ola ... HI0006L9C001407 SSO $39,024 Regular
KEO S+C FY2015 HI0053L9C001404 PH $47,309 Regular
Puamelia Group Ho... HI0012L9C001407 PH $35,292 Regular
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 4 11/18/2015
3. Reallocation - Grant(s) Eliminated Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
3-1 Complete each of the fields below for each grant that is beingeliminated during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered here is accurate.
Eliminated Project Name: Ehiku FY2015
Grant Number of Eliminated Project: HI0054L9C001404
Eliminated Project Component Type: PH
Eliminated Project Annual Renewal Amount: $53,988
3-2 Describe how the CoC determined that this project should beeliminated. (limit 750 characters)
The CoC and Collaborative Applicant coordinated an extensive RFI applicationprocess, which objectively scored all renewal projects against HUD and CoCdefined criteria. The Ehiku FY2015 project fell outside of the Tier 1 fundingallocation, leading to the elimination and reallocation of its funding in favor of amore viable permanent housing solution. The decision to eliminate the projectwas reviewed and approved by the CoC's Evaluation Committee.
3. Reallocation - Grant(s) Eliminated Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
3-1 Complete each of the fields below for each grant that is beingeliminated during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered here is accurate.
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 5 11/18/2015
Eliminated Project Name: Ka Hale A Ke Ola Chemical DependencyProgram FY2015
Grant Number of Eliminated Project: HI0005L9C001407
Eliminated Project Component Type: SSO
Eliminated Project Annual Renewal Amount: $76,931
3-2 Describe how the CoC determined that this project should beeliminated. (limit 750 characters)
The CoC and Collaborative Applicant coordinated an extensive RFI applicationprocess, which objectively scored all renewal projects against HUD and CoCdefined criteria. The Ka Hale A Ke Ola Chemical Dependency ProgramFY2015 project fell outside of the Tier 1 funding allocation, leading to theelimination and reallocation of its funding in favor of a more viable permanenthousing solution. The decision to eliminate the project was reviewed andapproved by the CoC's Evaluation Committee.
3. Reallocation - Grant(s) Eliminated Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
3-1 Complete each of the fields below for each grant that is beingeliminated during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered here is accurate.
Eliminated Project Name: Ka Hale A Ke Ola Family Outpatient ProgramFY2015
Grant Number of Eliminated Project: HI0006L9C001407
Eliminated Project Component Type: SSO
Eliminated Project Annual Renewal Amount: $39,024
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 6 11/18/2015
3-2 Describe how the CoC determined that this project should beeliminated. (limit 750 characters)
The CoC and Collaborative Applicant coordinated an extensive RFI applicationprocess, which objectively scored all renewal projects against HUD and CoCdefined criteria. The Ka Hale A Ke Ola Family Outpatient Program FY2015project fell outside of the Tier 1 funding allocation, leading to the elimination andreallocation of its funding in favor of a more viable permanent housing solution.The decision to eliminate the project was reviewed and approved by the CoC'sEvaluation Committee.
3. Reallocation - Grant(s) Eliminated Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
3-1 Complete each of the fields below for each grant that is beingeliminated during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered here is accurate.
Eliminated Project Name: KEO S+C FY2015
Grant Number of Eliminated Project: HI0053L9C001404
Eliminated Project Component Type: PH
Eliminated Project Annual Renewal Amount: $47,309
3-2 Describe how the CoC determined that this project should beeliminated. (limit 750 characters)
The CoC and Collaborative Applicant coordinated an extensive RFI applicationprocess, which objectively scored all renewal projects against HUD and CoCdefined criteria. The KEO S+C FY2015 project fell outside of the Tier 1 fundingallocation, leading to the elimination and reallocation of its funding in favor of amore viable permanent housing solution. The CoC also felt that this projectconsistently under performed relative to other permanent housing projectswithin the CoC. The decision to eliminate the project was reviewed andapproved by the CoC's Evaluation Committee.
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 7 11/18/2015
3. Reallocation - Grant(s) Eliminated Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
3-1 Complete each of the fields below for each grant that is beingeliminated during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered here is accurate.
Eliminated Project Name: Puamelia Group Home 2015
Grant Number of Eliminated Project: HI0012L9C001407
Eliminated Project Component Type: PH
Eliminated Project Annual Renewal Amount: $35,292
3-2 Describe how the CoC determined that this project should beeliminated. (limit 750 characters)
The CoC and Collaborative Applicant coordinated an extensive RFI applicationprocess, which objectively scored all renewal projects against HUD and CoCdefined criteria. The Puamelia Group Home 2015 project fell outside of the Tier1 funding allocation, leading to the elimination and reallocation of its funding infavor of a more viable permanent housing solution. The CoC also felt that thisproject under performed relative to other permanent housing projects within theCoC. The decision to eliminate the project was reviewed and approved by theCoC's Evaluation Committee.
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 8 11/18/2015
4. Reallocation - Grant(s) Reduced
CoCs planning to use reallocation may do so by reducing one or moreexpiring eligible renewal projects. CoCs that are reducing projects mustidentify those projects on this form.
Amount Available for New Project(Sum of All Reduced Projects)
$37,273
Reduced ProjectName
Reduced GrantNumber
AnnualRenewalAmount
AmountRetained
Amount availablefor new project
Reallocation Type
Kulalani Group Ho... HI0011L9C001407 $38,463 $36,463 $2,000 Regular
Kukui FY2015 HI0010L9C001407 $479,579 $455,809 $23,770 Regular
Kaahele GroupHom...
HI0007L9C001407 $33,404 $21,901 $11,503 Regular
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 9 11/18/2015
4. Reallocation - Grant(s) Reduced Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
4-1 Complete each of the fields below for each eligible renewal grant thisis being reduced during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered on this form is correct.
Reduced Project Name: Kulalani Group Home 2015
Grant Number of Reduced Project: HI0011L9C001407
Reduced Project Current Annual RenewalAmount:
$38,463
Amount Retained for Project: $36,463
Amount available for New Project(s):(This amount will auto-calculate by selecting
"Save" button)
$2,000
4-2 Describe how the CoC determined that this project should be reduced.(limit 750 characters)
The reduction in funding for this project was due to a small transposition error inthe renewal funding request by the sub-recipient. The CoC and CollaborativeApplicant had to enforce the funding request because of the structure of the RFIprocess within the Hawaii Department of Human Services.
4. Reallocation - Grant(s) Reduced Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
4-1 Complete each of the fields below for each eligible renewal grant thisis being reduced during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered on this form is correct.
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 10 11/18/2015
Reduced Project Name: Kukui FY2015
Grant Number of Reduced Project: HI0010L9C001407
Reduced Project Current Annual RenewalAmount:
$479,579
Amount Retained for Project: $455,809
Amount available for New Project(s):(This amount will auto-calculate by selecting
"Save" button)
$23,770
4-2 Describe how the CoC determined that this project should be reduced.(limit 750 characters)
The reduction in funding for this project was due to a transposition error in therenewal funding request by the sub-recipient. The CoC and CollaborativeApplicant had to enforce the funding request because of the structure of the RFIprocess within the Hawaii Department of Human Services.
4. Reallocation - Grant(s) Reduced Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
4-1 Complete each of the fields below for each eligible renewal grant thisis being reduced during the FY 2015 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2015 Grant InventoryWorksheet to ensure all information entered on this form is correct.
Reduced Project Name: Kaahele Group Home 2015
Grant Number of Reduced Project: HI0007L9C001407
Reduced Project Current Annual RenewalAmount:
$33,404
Amount Retained for Project: $21,901
Amount available for New Project(s):(This amount will auto-calculate by selecting
"Save" button)
$11,503
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 11 11/18/2015
4-2 Describe how the CoC determined that this project should be reduced.(limit 750 characters)
The CoC and Collaborative Applicant coordinated an extensive RFI applicationprocess, which objectively scored all renewal projects against HUD and CoCdefined criteria. The Kaahele Group Home 2015 project fell partially outside ofthe Tier 1 funding allocation, leading to the reallocation of a portion of itsfunding in favor of more viable permanent housing solutions. The CoC also feltthat this project under performed relative to other permanent housing projectswithin the CoC. The decision to reduce the project was reviewed and approvedby the CoC's Evaluation Committee.
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 12 11/18/2015
5. Reallocation - New Project(s)
Collaborative Applicants must identify the new project(s) the CoC plans tocreate and enter the requested information for each project.
Sum of All New Reallocated Project Requests(Must be less than or equal to total amount(s) eliminated and/or reduced)
$289,817
Current Priority # New ProjectName
ComponentType
Transferred Amount Reallocation Type
18 HIHR NEWPSH...
PSH $36,347 Regular
21 Eha 2 FY2015 PSH $117,480 Regular
22 Ehiku 2 FY2015 PSH $54,180 Regular
23 Eono 2 FY2015 PSH $81,810 Regular
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 13 11/18/2015
5. Reallocation - New Project(s) Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
5-1 Complete each of the fields below for each new project createdthrough reallocation in the FY 2015 funding process. For list of all eligibletypes of new projects that may be created through the reallocationprocess, see the FY 2015 CoC Program Competition NOFA.
FY 2015 Rank (from Project Listing): 18
Proposed New Project Name: HIHR NEW PSH FY2015
Component Type: PSH
Amount Requested for New Project: $36,347
5. Reallocation - New Project(s) Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
5-1 Complete each of the fields below for each new project createdthrough reallocation in the FY 2015 funding process. For list of all eligibletypes of new projects that may be created through the reallocationprocess, see the FY 2015 CoC Program Competition NOFA.
FY 2015 Rank (from Project Listing): 21
Proposed New Project Name: Eha 2 FY2015
Component Type: PSH
Amount Requested for New Project: $117,480
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 14 11/18/2015
5. Reallocation - New Project(s) Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
5-1 Complete each of the fields below for each new project createdthrough reallocation in the FY 2015 funding process. For list of all eligibletypes of new projects that may be created through the reallocationprocess, see the FY 2015 CoC Program Competition NOFA.
FY 2015 Rank (from Project Listing): 22
Proposed New Project Name: Ehiku 2 FY2015
Component Type: PSH
Amount Requested for New Project: $54,180
5. Reallocation - New Project(s) Details
Instructions:For guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.
5-1 Complete each of the fields below for each new project createdthrough reallocation in the FY 2015 funding process. For list of all eligibletypes of new projects that may be created through the reallocationprocess, see the FY 2015 CoC Program Competition NOFA.
FY 2015 Rank (from Project Listing): 23
Proposed New Project Name: Eono 2 FY2015
Component Type: PSH
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 15 11/18/2015
Amount Requested for New Project: $81,810
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 16 11/18/2015
6. Reallocation: Balance Summary
InstructionsFor guidance on completing this form, please reference the FY 2015 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/
6-1 Below is the summary of the information entered on the reallocatedforms. The last field "Remaining Reallocation Balance" should equal '0'. Ifthere is a positive balance remaining, this means that more funds arebeing eliminated or reduced than the new project(s) requested. If there isa negative balance remaining, this means that more funds are beingrequested for the new reallocated project(s) than have been reduced oreliminated from other eligible renewal projects.
Reallocation Chart: Reallocation Balance SummaryReallocated funds available for new project(s): $289,817
Amount requested for new project(s): $289,817
Remaining Reallocation Balance: $0
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 17 11/18/2015
Continuum of Care (CoC) New Project Listing
Instructions: Prior to starting the New Project Listing, Collaborative Applicants should carefully review the"FY 2015 CoC Priority Listing Detailed Instructions" and the "CoC Priority Listing InstructionalGuide," both of which are available at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources/.
To upload all new project applications that were created through Reallocation or the PermanentHousing Bonus that have been submitted to this CoC Project Listing, click on the "Update List"button. This process may take a few minutes based upon the number of new projects createdthrough reallocation that need to be located in the e-snaps system. The Collaborative Applicantmay update each of the Project Listings simultaneously. The Collaborative Applicant can wait forthe Project Listings to be updated or can log out of e-snaps and come back later to view theupdated list(s). To review a project on the New Project Listing, click on the magnifying glass nextto each project to view project details. To view the actual project application, click on the orangefolder. If there are errors identified by the Collaborative Applicant, the project can be amendedback to the project applicant to make the necessary changes by clicking on the amend icon.
Project Name DateSubmitted
Grant Term ApplicantName
BudgetAmount
Rank Comp Type
Eono 2FY2015
2015-11-1717:34:...
1 Year HawaiiDepartment...
$81,810 N23 PH
Ehiku 2FY2015
2015-11-1717:22:...
1 Year HawaiiDepartment...
$54,180 N22 PH
HOPEContinuumof...
2015-11-1716:29:...
1 Year HawaiiDepartment...
$149,957 B20 PH
WHW HousingProgr...
2015-11-1716:03:...
2 Years HawaiiDepartment...
$139,860 B19 PH
CoordinatedEntry...
2015-11-0515:10:...
1 Year HawaiiDepartment...
$57,963 X SSO
HIHR NEWPSH FY2015
2015-11-1716:09:...
1 Year HawaiiDepartment...
$36,347 N18 PH
Eha 2 FY2015 2015-11-1717:46:...
1 Year HawaiiDepartment...
$117,480 N21 PH
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 18 11/18/2015
Continuum of Care (CoC) Renewal Project Listing
Instructions: Prior to starting the Renewal Project Listing, Collaborative Applicants should carefully review the"CoC Priority Listing Detailed Instructions" and the "CoC Priority Listing Instructional Guide,”both of which are available at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources/
To upload all renewal project applications that have been submitted to this Renewal ProjectListing, click on the "Update List" button. This process may take a few minutes based upon thenumber of renewal projects that need to be located in the e-snaps system. The CollaborativeApplicant may update each of the Project Listings simultaneously. The Collaborative Applicantcan wait for the Project Listings to be updated or can log out of e-snaps and come back later toview the updated list(s). To review a project on the Renewal Project Listing, click on themagnifying glass next to each project to view project details. To view the actual projectapplication, click on the orange folder. If there are errors identified by the CollaborativeApplicant, the project can be amended back to the project applicant to make the necessarychanges by clicking on the amend icon.
The Collaborative Applicant certifies thatthere is a demonstrated need for all renewalpermanent supportive housing and rapid re-
housing projects listed on the RenewalProject Listing.
X
The Collaborative Applicant does not haveany renewal permanent supportive housing
or rapid re-housing renewal projects.
Project Name DateSubmitted
Grant Term ApplicantName
BudgetAmount
Rank Comp Type
KaulanaGroup Hom...
2015-10-2815:27:...
1 Year SteadfastHousing...
$34,805 W14 PH
HMIS Analysis& D...
2015-11-1603:29:...
1 Year HawaiiDepartment...
$41,160 W2 HMIS
Hawaii HMIS$31,1...
2015-11-1603:06:...
1 Year HawaiiDepartment...
$31,131 W1 HMIS
PuameliaGroup Ho...
2015-11-1604:39:...
1 Year SteadfastHousing...
$35,292 X PH
KaaheleGroup Hom...
2015-11-1604:53:...
1 Year SteadfastHousing...
$21,901 T17 PH
Eha FY2015 2015-11-1605:59:...
1 Year HawaiiDepartment...
$462,777 W11 PH
Kulalani GroupHo...
2015-11-1617:59:...
1 Year SteadfastHousing...
$36,463 T12 PH
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 19 11/18/2015
Ehiku FY2015 2015-11-1621:19:...
1 Year HawaiiDepartment...
$53,988 X PH
Eono FY2015 2015-11-1621:02:...
1 Year HawaiiDepartment...
$123,900 W16 PH
Hawaii IslandHom...
2015-11-1623:55:...
1 Year HawaiiDepartment...
$36,347 W10 PH
FLC S+C 9aFY2015
2015-11-1623:12:...
1 Year HawaiiDepartment...
$63,769 W4 PH
FLC S+C 1FY2015
2015-11-1622:31:...
1 Year HawaiiDepartment...
$22,338 W3 PH
HIHRPermanentHo...
2015-11-1700:54:...
1 Year HawaiiDepartment...
$121,766 W7 PH
KEO S+CFY2015
2015-11-1702:26:...
1 Year HawaiiDepartment...
$47,309 X PH
Ka Hale A KeOla ...
2015-11-1703:47:...
1 Year Ka Hale A KeOla ...
$76,931 X SSO
Ka Hale A KeOla ...
2015-11-1704:03:...
1 Year Ka Hale A KeOla ...
$39,024 X SSO
TransitionsProje...
2015-11-1704:54:...
1 Year HawaiiDepartment...
$65,157 W8 SSO
Family LifeCente...
2015-11-1705:28:...
1 Year HawaiiDepartment...
$45,030 W9 PH
Family LifeCente...
2015-11-1705:49:...
1 Year HawaiiDepartment...
$12,570 W13 PH
Family LifeCente...
2015-11-1706:57:...
1 Year HawaiiDepartment...
$45,030 W6 PH
Family LifeCente...
2015-11-1707:29:...
1 Year HawaiiDepartment...
$22,342 W5 PH
Kukui FY2015 2015-11-1723:35:...
1 Year HawaiiDepartment...
$455,809 T15 PH
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 20 11/18/2015
Continuum of Care (CoC) Planning Project Listing
Instructions: Prior to starting the CoC Planning Project Listing, Collaborative Applicants should carefullyreview the "CoC Priority Listing Detailed Instructions" and the "CoC Priority Listing InstructionalGuide," both of which are available at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources
To upload the CoC planning project application that has been submitted to this CoC PlanningProject Listing, click on the "Update List" button. This process may take a few minutes as theproject will need to be located in the e-snaps system. The Collaborative Applicant may updateeach of the Project Listings simultaneously. The Collaborative Applicant can wait for the ProjectListings to be updated or can log out of e-snaps and come back later to view the updated list(s).To review the CoC Planning Project Listing, click on the magnifying glass next to view the projectdetails. To view the actual project application, click on the orange folder. If there are errorsidentified by the Collaborative Applicant, the project can be amended back to the projectapplicant to make the necessary changes by clicking on the amend icon.
Only one CoC Planning project application can be submitted by a Collaborative Applicant andmust match the Collaborative Applicant information on the CoC Applicant Profile. Any additionalCoC Planning project applications must be rejected.
Project Name Date Submitted Grant Term Applicant Name Budget Amount Comp Type
HI-500 CoCPlanni...
2015-11-0815:50:...
1 Year HawaiiDepartment...
$57,693 CoC PlanningProj...
HI-500 BTGPlanni...
2015-11-1721:38:...
1 Year HawaiiDepartment...
$57,963 CoC PlanningProj...
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 21 11/18/2015
Funding Summary
InstructionsFor additional information, carefully review the "CoC Priority Listing Detailed Instructions" andthe "CoC Priority Listing Instructional Guide," both of which are available at:https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources
This page contains the total budget summaries for each of the project listings for which theCollaborative Applicant approved and ranked or rejected project applications. The CollaborativeApplicant must review this page to ensure the totals for each of the categories is accurate. The"Total CoC Request" indicates the total funding request amount the Collaborative Applicant willsubmit to HUD for funding consideration. As stated previously, only 1 UFA Cost projectapplication (for UFA designated Collaborative Applicants only) and only 1 CoC Planning projectapplication can be submitted and only the Collaborative Applicant designated by the CoC iseligible to request these funds.
Title Total Amount
Renewal Amount $1,642,295
New Amount $579,634
CoC Planning Amount $57,963
UFA Costs $0
Rejected Amount $368,200
TOTAL CoC REQUEST $2,279,892
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 22 11/18/2015
Attachments
Document Type Required? Document Description Date Attached
1. Certification of Consistencywith the Consolidated Plan
Yes HI-500 Certificat... 11/17/2015
2. FY 2015 HUD-approvedGrant Inventory Worksheet
Yes HI-500 Final GIW 10/22/2015
3. FY 2015 CoC Ranking Tool No
4. Other No
5. Other No
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 23 11/18/2015
Attachment Details
Document Description: HI-500 Certification of Consistency with theConPlan
Attachment Details
Document Description: HI-500 Final GIW
Attachment Details
Document Description:
Attachment Details
Document Description:
Attachment Details
Document Description:
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 24 11/18/2015
Submission Summary
Page Last Updated
Before Starting No Input Required
1A. Identification 10/22/2015
2. Reallocation 11/16/2015
3. Grant(s) Eliminated 11/17/2015
4. Grant(s) Reduced 11/17/2015
5. New Project(s) 11/17/2015
6. Balance Summary No Input Required
7A. CoC New Project Listing 11/17/2015
7B. CoC Renewal Project Listing 11/17/2015
7D. CoC Planning Project Listing 11/17/2015
Attachments 11/17/2015
Submission Summary No Input Required
Applicant: Hawaii Balance of State CoC HI-500Project: HI-500 CoC Registration FY2015 COC_REG_2015_122006
Project Priority List FY2015 Page 25 11/18/2015