BELIEVING IN BELIEVING IN OUR FUTURE OUR FUTURE Partners in Nation Building
Transcript
Page 1: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

BELIEVING IN BELIEVING IN OUR FUTUREOUR FUTURE

Partners in Nation Building

Page 2: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

VISION To deliver to the client the best solutions and broaden activity base by diversifying into other infrastructure disciplines to sustain a healthy growth rate.

From le� to right:

Mr. Ramesh Chandra RekhiMr. Anand Bordia Mr. Charanbir Singh Sethi Mr. Rajendra Mohan Aggarwal Mr. Amrit Pal Singh Chadha Mr. Deepak Dasgupta

Page 3: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

MISSIONTo achieve our objectives in an environment of fairness and courtesy to our clients, employees, vendors, investors and the society.

Gen. N.C. VIJMr. Sanjay Gupta Mr. Rajbir Singh Mr. Tarlochan Singh Mr. Arun Kumar PurwarMr. Gurjeet Singh Johar

Page 4: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

A growing nation needs growing infrastructure. C & C Constructions Limited was built on a blueprint to partner India’s development eff orts. Incorporated in July 1996 by experienced infrastructure developers, we’ve come a long way since.

Highways, airports, telecom infrastructure and power transmission - many of the country’s ground breaking and innovative construction projects have been undertaken and completed by us. Our leading-edge capabilities cover every discipline of construction: civil, mechanical and instrumentation.

WE’VE PUT OUR FUTURE IN GOOD HANDS - OUR OWN.

A rapid turnover of exalted proportions and 29 projects across India and Afghanistan

is what defi nes us.

We are acknowledged as a company that continuesto empower India, enabling the nation to surge ahead in the core sectors. A rapid turnover of exalted proportions and 29 projects across India and Afghanistan is what defi nes us with an aggregate contract value of over Rs. 12,000 million, for clients like National Highways Authority of India, Airports Authority of India, UNOPS, Republic of Afghanistan and Rites Limited. Today, C & C is one of India’s fastest-growing infrastructure enterprises listed on both Bombay and National Stock Exchanges.

AREAS OF OPERATION• Roads and Highways• Concessions• Power & Telecom Transmission Towers• Commercial Buildings• Water Supply and Sanitation, Sewerage• Railway Infrastructure• Urban Infrastructure

THE CREATORS OF CONSTRUCTION.

Page 5: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

LEVERAGING SYNERGIES

FOR GROWTH.

At C & C, we have forged a network of excellence withpartners who have several decades of experience andimpeccable engineering expertise. The most recentbeing our partnership with Isolux Corsan, the Spanishengineering giant. The JV will help us take up projectsacross diverse geographies such as Asia, former SovietBloc (excluding Eastern European countries) and Africa.

The partnership presents us with abundant opportunitiesin terms of diversifying operations across verticals as wellas expanding geographical reach.

Our joint venture partners include BSCPL with whom we have been working for over 8 years.

In the coming years, C & C hopes to leverage many more alliances to gain access to technology and domain expertise.

INDIVIDUALLY, WE ARE ONE DROP. TOGETHER, WE ARE AN OCEAN.C & C recognizes that people are the real source of competitive advantage. It is through people that we deliver total customer satisfaction. Bold, determined, commi� ed and quality conscious at all times - these values are the driving force behind this organization, defi ning us and guiding us every step of the way. Quality for us is a beacon that inspires us in everything we do and a facet which is carefully nurtured at C & C throughout.

We employ the best minds in the country and they form the backbone of this company. C & C has a strong team of professionally qualifi ed hands-on entrepreneurs and executives. A highly coveted work place, C & C off ers the most conducive environment, the safest, most up-to-date technology, locations and valuable exposure to the latest in the fi eld of engineering.

Our project sites are amongst the

most sought-after training grounds for

young engineers.

Page 6: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

From runways in Port Blair and Amritsar, to road projects in Kabul, Kandahar,Guwahati and Kapurthala, we have demonstrated our strength and excellence in execution. Growing at a rapid pace, we have handled diversifi cation successfully – moving seamlessly from roads to railways, transmission, water and building projects.

THERE ARE NO LIMITS TO GROWTH AS THERE ARE NO LIMITS TO HUMAN IMAGINATION, AND WONDER.

C & C has executed major road and highway projects across the globe. And everywhere, we have connected people to progress and prosperity. We have had to tread through some of the world’s most inhospitable terrains in the process. Everywhere, we have conquered the odds and laid out the fi nest roads to lead communities into the future. Focused on expanding business as well as concentrating on our core competencies, we know that road development is essential for sustaining India’s and the world’s economic growth. We have completed over 15 projects and another 24 projects are currently under execution.

AREAS OF EXPERTISE

• State and National Highways • City Roads • High Capacity Transport Corridors • Bridges and Culverts • Highway Safety Systems • Operation and Maintenance

SOME OF OUR KEY COMPLETED PROJECTS

• Resurfacing of existing runway, Taxi truck and Extension & Construction of runway Taxi tract & Apron, Amritsar International Airport.

• Building, designing and rehabilitation of Taloqan to Kishem Road, Afghanistan.

• Kandahar to Herat, highway improvement project, Afghanistan.

• Development of state highways in Nawada and Jamui Districts, Bihar.

SOME OF OUR KEY PROJECTS UNDERWAY

• Construction and maintenance of Zirakpur – Parwanoo Section of NH 22 including construction of Pinjore – Kalka – Parwanoo Bypass.

• Construction of package C-1 and C-2 for Yamuna Expressway.

• Widening and strengthening of Una – Barsar – Bhota – Bhamla – Kalkhar – Ner Chowk road project in Himachal Pradesh.

ROADS AND HIGHWAYSHighways and roads built by C & C connect people to progress.

Page 7: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

At C & C, we have executed over ten orders for our clients Bharti Infotel Limited and Tata Tele Services Limited for laying of Optical Fiber Cable. Our diverse expertise and talent enable us to off er to our clients the complete range of Engineering, Procurement and Construction services in this sector.

AREAS OF EXPERTISE

• Optical Fiber Cable (OFC) Backbone Projects

• Tower Foundation and Erection

• DG Foundation and Installation

At C & C, we take great pride in being part of the nation building eff ort through creating state-of-the-art infrastructure assets.

A few of the ongoing projects include:

HIGHWAYS • Kurali – Kiratpur Highway

Total investment of `4080 million with `1040 million equity.

• Mokama – Munger Highway Total investment of `4440 million with `890 million equity.

• Muzzaff arpur – Sonbarsa Highway Total investment of `6560 million with `1310 million equity.

• Patna – Bakhtiyarpur Highway Total investment of `7930 million with `1250 million equity.

URBAN INFRASTRUCTURE • Mohali ISBT Complex – Total investment of `4320 million.

Mohali Junction is India’s fi rst air-conditioned ISBT built on BOT basis. It comprises of an air-conditioned bus terminus coupled with commercial complexes, a luxury hotel with banquet facilities. Once complete, it would raise the profi le of the city of Mohali.

• Computerized Interstate Check Posts – Total investment of `456 million with `251 million equity.

TRANSMISSION • 1,500 kms. of 765 kV and 400 kV Transmission Lines

and 5 Substations – Total investment of `49510 million with `12820 million equity.

CONCESSIONSC & C takes great pride in building the nation, kilometre by kilometre, brick by brick.

POWER/TELECOM C & C believes in the transmission of positive energy.

Page 8: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

At C & C, we believe that the taller the building, the deeper the foundation to be laid. We off er the right mix of function and sophistication. Spacious and unclu� ered, the ambienceis designed to enhance user experience.

With skills and resources to develop and execute high value projects, we have ventured into the building sector and completed 3 major projects –• C & C Corporate Offi ce, • Warehouse in Hasanpur, • Transmission Tower Plant in Kala Amb, Himachal Pradesh

One of the most prestigious projects under execution is the building of the new Afghan Parliament and Chancery in Kabul.

Our transformation from a road-building organization to a large scale infrastructure company began as we forayed into water supply, sanitation and sewerage sector. We have made a modest beginning with an order `730 million for “providing, laying, and testing Trunk Sewer and Outfall Sewer” in Jabalpur. The key to meeting our clients’ goals on these challenging projects has been a thorough understanding of the stringent quality standards and specialized systems required for these high value assignments.

We aspire to take these new verticals to greater heights and enhance our capabilities and competence across all of them.

AREAS OF EXPERTISE • Water Sanitation Facilities

• Providing and Installing Sewerage Systems

• Water Sewerage Treatment Plants

• Irrigation Piping Networks

COMMERCIAL BUILDINGSAt C & C, architecture is a blend of imagination and mathematics as proven by state-of-the-art buildings.

WATER SUPPLY AND SANITATIONC & C works hard to raise living standards of India’s billions.

Page 9: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

Urban infrastructure is important in its own right and is in the nature of a public good. C&C is geared to support its vision for greater and be� er urban development. The organizational capacity and professional staff promise a signifi cant change in the urban scenario.

RAIL INFRASTRUCTUREC & C is commi� ed to laying an excellent network of rail roads that would take India into the future.

URBAN INFRASTRUCTUREC&C is poised to enable ‘Sustainable Urban Infrastructure’ leading India into a be� er tomorrow.

A state-of-the-art and effi cient railway network is the backbone of any country’s economy. At C & C, we are commi� ed to pulling out all the stops along India’s growth path by working on the world-class Dedicated Freight Corridor.

AREAS OF EXPERTISE

• Dedicated Freight Corridor

Page 10: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

WE ARE INFLUENCED BY NOTHING

BUT OUR CLIENTS’

INTERESTS.

Our Clients include prestigious names:

AIRPORTS, ROADS & HIGHWAYS

• NATIONAL HIGHWAYS AUTHORITY OF INDIA• AIRPORTS AUTHORITY OF INDIA• GOVERNMENT OF KERALA, PWD • GOVERNMENT OF PUNJAB, PWD• GOVERNMENT OF KARNATAKA, PWD• MILITARY ENGINEERING SERVICES

(SPECIAL CLASS)• NATIONAL PROJECT CONSTRUCTION

CORPORATION LIMITED (GOI UNDERTAKING)• PUNJAB SMALL INDUSTRIES AND EXPORT

CORPORATION LIMITED• ENGINEERING PROJECTS INDIA LIMITED• IRCON INTERNATIONAL LIMITED • GOVERNMENT OF ANDAMAN & NICOBAR, PORT BLAIR, PWD • GOVERNMENT OF MADHYA PRADESH, PWD• PUNJAB INFRASTRUCTURE BOARD• ASIAN DEVELOPMENT BANK • USAID • UNOPS • REPUBLIC OF AFGHANISTAN

TELECOM & TRANSMISSION

• BHARTI INFOTEL LIMITED• GAS AUTHORITY OF INDIA LIMITED (GAIL) • INDIAN OIL CORPORATION LIMITED (IOCL) • TATA TELESERVICES LIMITED • POWER GRID CORPORATION OF INDIA LIMITED

Page 11: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

bot PRoJECtS UndERwayPRoJECtS ConCESSIon

PERIod PRoJECt CoSt (` Mn)

GRant/ annUIty EtC.

totaL EQUIty (` Mn)

IndEPEndEnt/JV

InVEStMEnt by C&C tILL 30.09.2011

(` Mn)

FInanCIaL CLoSURE StatUS

CURREnt StatUS

Highways

4-laning of 44 km of NH-21 from Kurali to Kiratpur

20 years 4160 NHAI Grant of ` 439.2 Million

1040 49:51 JV with BCSPL Infrastructure Limited

510 Achieved Date of Commencement 9th August 2011.

2-laning of 69 km of NH-80 from Mokama to Munger

15 years 4440 Semi Annuity of ` 399.4 Million

890 50:50 JV with BCSPL Infrastructure Limited

240 Achieved Appointed date received. Construction work in progress.

2-laning of 82 km of NH-77 from Muzaffarpur to Sonbarsa

20 years 6560 Semi Annuity of ` 524.0 Million

1310 50:50 JV with BCSPL Infrastructure Limited

580 Achieved Appointed date received. Construction work in progress.

4-laning of 51 km of NH-30 from Patna to Bakhtiarpur

18 years 9080 NHAI Grant of ` 1134.0 Million

1140 50:50 JV with BCSPL Infrastructure Limited

280 In Progress -

4-laning of 66 km of NH-235 from Meerut to Bulandshahr

17.5 years 5710 NHAI Grant of ` 290 Million

1480 Independent - In Progress -

Urban Infrastructure

Development of Inter State Bus Terminus (ISBT) along with commercial complex at Mohali

ISBT - 20 years, Commercial complex - 90 years

4320 14 lacs square feet BUA including basement

1250 Independent 1250 Achieved Entered MOU with Cinepolis, Big Bazar & Hyatt.

Development and Modernization of Computerized Interstate Check Posts

20.5 years 4560 Annual Premium of ` 810 Million

2510 Independent 10 In Progress -

transmission

1,500 kms of 765 kV and 400 kV Transmission Lines and 5 substations

35 years 49510 Levelised Tariff of ` 8700 Million

12820 26:74 JV with Isolux Corsan

- In Progress -

FInanCIaLSVERtICaLS C&C

IndEPEndEnt (` Million)

bSC C&C JV (` Million)

ISoLUX C&C JV (` Million)

C&C SE (` Million)

totaL (30.09.2011)

(` Million)

totaL (30.09.2010)

(` Million)

Roads & Highways 7060.5 1,5706.2 5840.0 - 2,8606.6 1,4573.4

Transmission 337.2 1023.0 1,1362.0 1,2722.2 109.6

Urban Infrastructure 7548.5 1503.8 - 9052.3 6715.1

Railway 3258.3 3258.3 3745.6

Water & Sewerage 1013.7 1013.7 1263.4

total 1,4946.2 2,1491.3 1,7202.0 1013.7 5,4653.1 2,6407.1

Page 12: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

bot PRoJECtS UndER wayPRoJECtS ConCESSIon

PERIodPRoJECt CoSt

(` Million)GRant/

annUIty EtC.totaL EQUIty

(` Million)IndEPEndEnt/JV

Highways

4-laning of 44 km of NH-21from Kurali to Kiratpur

20 years 4080 NHAI Grant of` 439.2 Million

1040 49:51 JV with BCSPLInfrastructure Limited

2-laning of 69 km of NH-80 from Mokama to Munger

15 years 4440 Semi-annuityof ` 399.4 Million

890 50:50 JV with BCSPLInfrastructure Limited

2-laning of 82 km of NH-77from Muzaffarpur to Sonbarsa

20 years 6560 Semi-annuityof ` 524.0 Million

1310 50:50 JV with BCSPLInfrastructure Limited

4-laning of 51 km of NH-30from Patna to Bakhtiarpur

18 years 9080 NHAI Grant of` 1134.0 Million

1140 50:50 JV with BCSPLInfrastructure Limited

Infrastructure

Development of Inter State Bus Terminus (ISBT) along with commercial complex at Mohali

ISBT - 20 years,Commercial

complex - 90 years

4320 14 lacs squarefeet BUAincludingbasement

1250 Independent

Development and Modernization of Computerized Interstate Check Posts

20.5 years 4560 AnnualPremium of ` 810 Million

2510 Independent

transmission

1,500 kms of 765 kV and 400 kV Transmission Lines and 5 substations

35 years 49510 Levelised Tariffof ` 8700 Million

12820 74:26 JV withIsolux Corsan

Page 13: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

Projects under wayProject client jV/direct contract Value

(c&c share- ` Million)

roads

2 Laning of Nongstoin to Shillong Section of NH-44 and Nongstoin- Rongjeng- Tura road in the state of Meghalaya under phase 'A' of SARDP-NE

Public Works Department, Meghalaya

JV 6520

Six laning of Varanasi - Aurangabad Section of NH-2 in the State of Bihar

Isolux Corsan, India JV 5840

Four laning of Meerut-Bullandshahar Section of NH-235 in the State of Uttar Pradesh under NHDP Phase IV-B

National Highway Authority of India Direct 5060

Construction and maintenance of Zirakpur–Parwanoo Section of NH-22 from km 39.860 to km 67.00 including construction of Pinjore-Kalka–Parwanoo Bypass

Jaiprakash Associates Ltd. Direct 4990

Four laning of Patna-Bakhtiarpur section of NH-30 from km 181.300 to km 231.950 in the state of Bihar

Patna Bakhtiarpur Tollways Limited JV 3850

Construction of rigid pavement and granular layers for package C-1 (Km 0.500 to km 56.00) & C-2 (km 56.000 to km 110.00) for Yamuna Expressway (erstwhile Taj Expressway)

Jaiprakash Associates Ltd. Direct 3240

Two laning of Muzaffarpur Sonbarsa section of NH-77 from km 2.800 to km 89.000 in the state of Bihar

North Bihar Highway Limited JV 2800

Widening and strengthening of 4 lane of existing single/intermediate lane carriageway of National Highway No.57 section from km 155.00 (Kosi Western Ring Bund) to km 110.00 (Jhanjharpur) in the states of Bihar on East West Corridor under NHDP-Phase-II, Package No. C-II/BR-6.

National Highway Authority of India JV 2270

Improvement/upgradation of Jahanabad–Ghosi-Hajipur-Lalgunj-Vaisali-Manikpur–Paru-Baradaud Deoria-Sahebganj-Lalchhapra-Kesharia–Khajuria Areraj Road (SH-74) length 85.00 km

Public Works Department, Bihar Direct 2250

Widening and strengthening to 4 lane of existing single/intermediate lane carriageway of National Highway No.57section from km 69.80 to km 37.75 in the states of Bihar on East West Corridor under NHDP-Phase-II, Package No. C-II/BR-8

National Highway Authority of India JV 2170

Widening and strengthening of 4 lane of existing single/intermediate lane carriageway of National Highway No. 57 section from km 37.75 to km 0.00 in the states of Bihar on East West Corridor under NHDP-Phase-II, Package No. C-II/BR-9

National Highway Authority of India JV 2000

Gardez-khost Road Construction Project, Paktia Khost LBG B&V JV JV 1980

Two laning with paved shoulders of Mokama Munger section of NH-80 from km 1.430 to km 70.00 in the state of Bihar under NHDP III

Mokama Munger Highway Limited JV 1950

Widening & strengthening of existing 2 lane section of Kurali-Kiratpur section of NH-21 from km 28.600 to km 73.200 to 4 lane divided carriageway in the state of Punjab

BSC C and C Kurali Toll Road Limited JV 1840

Improvement/upgradation of Jahanabad–Ghosi-Islampur-Rajgir-Giriyak-Parwatipur Road (SH-71) length 85.00 km

Public Works Department, Bihar Direct 1680

Improvement/upgradation of Araria – Ranigunj-Jadia -Trivenijung-Piapara-Supaul–Bishunpur-Bhaptiyahi Road (SH-76) length 121.00 km

Public Works Department, Bihar JV 1620

Improvement/upgradation of Kursela–Pothia-Falka–Meerganj-Sarsi-Kalabalu-Ranigunj-Shaifgunj-Forbesgunj Road (SH-77) length 105.00 km

Public Works Department, Bihar JV 1390

Upgradation of Kharar-Landran-Banur-Tepla Road from km 0 to km 39.53

Public Works Department, Punjab Direct 1090

Widening and strengthening of Una–Barsar–Bhota–Bhamla– Kalkhar–Ner Chowk Road Project from km 45+000 to km 90+800 (Section Barsar–Bhota–Jahu

Public Works Department, Himachal Pradesh

Direct 950

(contd..)

Page 14: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

Projects under wayProject client jV/direct contract Value

(c&c share- ` Million)

urban infra

Development & Modernization of Computerized Interstate Checkposts On DBOT Basis

Punjab Infrastructure Development Boards

Direct 4130

Development of bus terminal cum commercial complex at Mohali on BOT Basis

C&C Towers Limited Direct 3170

Construction of Afghan Parliament and Indian Chancery building at Kabul, Afghanistan

Central Public Works Department JV 2920

Construction of conventional underground multilevel car parking at various sites in Delhi

Municipal Corporation of Delhi Direct 1190

Construction of conventional underground multilevel car parking at various sites in Delhi

Municipal Corporation of Delhi Direct 520

Building - Mudit Mudit Cements Direct 420

water & sewerage

Providing Sewerage System at Ludhiana under JNNURM Punjab Water Supply & Sewerage Board

JV 770

Providing, laying, jointing, testing and commissioning sewers lines in Jabalpur, Package WW/2 and WW/3

Ramky Infrastructure JV 400

Extension and augmentation of sewerage system for Patiala town, Zone II Part II

Punjab Water Supply & Sewerage Board

JV 220

railways

Design and construction of major/minor bridges RUB, ROB, ballast for Dedicated Freight Corridor on Mughal Sarai- Sone Nagar section of Eastern Corridor in the state of Bihar & Uttar Pradesh

Dedicated Freight Corridor Corporation of India Limited

JV 3910

transmission

765 kV S/C Mainpuri-Bara Line with 765 kV/400 kV AIS at Mainpuri and Associated Schemes/Works

Isolux Corsan, India JV 11180

Pile Foundation Package-P2 for (31 Locs.) 400kV D/C (Quad) Balipara-Bongaigaon T/L associated with North East-Northern/ Western Interconnector - I Project

Power Grid Corporation of India Limited

JV 450

Ex-Works Supply and Services Contract for Tower Package A4 under vendor development programme for transmission system associated with Pallatana GBPP Bongaigaon TPS in North Eastern Region

Power Grid Corporation of India Limited

Direct 340

Pile Foundation Package-P1 for fifteen river crossings (31 Locs.) for Biswanath Chariyali- Tangla- Kokrajhar- Barbasia(Assam Border) section of ± 800 kV HVDC Bipole Biswanath Chariyali - Agra Transmission Line associated with North East - Northern/Western Interconnector - I Project

Power Grid Corporation of India Limited

JV 330

Pile Foundation Package-P1 for (18 Locs.) 400kV D/C (Lapwing) Lower Subansiri- Biswanath Chariyali T/L - I & II and 400 kV D/C (Twin) Balipara- Biswanath Chariyali T/L associated with North East-Northern/Western Interconnector - I Project

Power Grid Corporation of India Limited

JV 240

400 kV DC Aligarh Sikandarabad Transmission Line and LILO of 400 kV SC Panki Muradnagar Line at Aligarh Substation

Isolux-Man JV JV 240

Turnkey tower package for transmission line at Shujalpur Power Grid Corporation of India Limited

Direct 190

Page 15: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

Key projects completed

project NAme cHAlleNGes/ HIGHlIGHtscoNtrAct

VAlUe(` million)

coNtrActVAlUe

(c&c sHAre)(` million)

clIeNtdAte oF

completIoN

Development of StateHighways under RSVYscheme. Pkg. No.17: Nawada & jamui dist

The project involved meticulousplanning due to logistically difficult terrains and inclement operating conditions.

610 310 Central PublicWorks Department

Mar, 2010

Improvement / upgradationfor existing road of StatesHighway into 2 lanes road in madhubani

The project was completed undervarious challenges like adverse flood conditions, logistically difficult terrains and inclement operating conditions.

720 360 Ircon InternationalLimited

May, 2010

Rehabilitation of Kapurthala -tarn taran Road

The project comprised of a 47.20 kms road stretch from Kapurthala to Tarn Taran in the state of Punjab.

550 550 Public WorksDepartment, Punjab

Dec, 2009

Construction works related to widening / upgrading of roads to convert the existing carriageway to multilane facility for the High capacity Bus system

The execution of such projects inDelhi was of a specialized naturesince construction activity was not possible during the day due to heavy traffic and can only be done during the night with requisite steel barricading.

1290 650 RITES Limited Nov, 2009

Upgradation of tarn taran -chabbal - Attari Road

The project comprised of a 40.50 kms road stretch from Tarn Taran to Attari in the state of Punjab.

450 450 Public worksDepartment, Punjab

Aug, 2009

Build, Design andRehabilitation of taloqan to Kishem Road, Afghanistan

The construction projects inAfghanistan required mobilization of machinery and technical work force from India and materials from Pakistan and India. We dealt with continuous security threat due to terrorists activities and logistics issues due to excessive snowfall and rain.

900 450 Ministry of PublicWorks, Afghanistan

May, 2008

Reconstruction of jalalabad-Asmer Road, Afghanistan (From km 0 to 121.5)

The scope of the project comprised reconstruction of the project road including construction of culverts,causeways and other drainage works.

1570 790 Ministry of PublicWorks, Afghanistan

Apr, 2007

Kandahar to Herat highwayimprovement project,Afghanistan (km 456 to 557)

This project involved construction of a stretch on the Kandahar-Herat road to the city of Herat along the Iranian border in eastern Afghanistan.

2410 1210 Louis Berger Group, Inc

Oct, 2006

Design, Build andRehabilitation of lashkarGah ring road, Afghanistanfrom km 00 to 43+00

The scope of the work includedconstruction of culverts, causeways and other drainage works and falls in southern Afghanistan.

590 300 UNOPS July, 2006

Design & Build Contract for Rehabilitation of Kandahar- spin Boldak highway, Afghanistan (Funded by ADB)

This project was also in a sensitive area of Afghanistan and involvedconnecting the major Afghanistan city of Kandahar to the border of Pakistan. There were numerous operating challenges inspite of which the project was completed in November 2005.

1070 530 Ministry of Public Works, Afghanistan

Nov, 2005

(contd..)

Page 16: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

Key projects completed

project NAme cHAlleNGes/ HIGHlIGHtscoNtrAct

VAlUe(` million)

coNtrActVAlUe

(c&c sHAre)(` million)

clIeNtdAte oF

completIoN

Construction of Kandahar -trin Kot Road Project,Afghanistan

The project was strategicallyimportant for alliance forces working in Afghanistan and was exposed to security threats.

980 490 UNOPS Oct, 2005

Design & Build Contract for Rehabilitation of 85 Km.stretch from km 262 to km 347of Kabul- Kandahar highway,Afghanistan

Since this was a pioneer project of USAID and the first in Afghanistan, we were exposed to a difficult working environment and security threats. Despite this, we completed this project within a short span of seven months.

2070 1030 Louis Berger Group, Inc

June, 2005

Four Laning of km 146.00 toKm 156.00, Guwahati Bypass,NH-37

The Bypass was constructed around the city of Guwahati and was situated in a security sensitive area.

610 180 National HighwaysAuthority of India

June, 2004

Resurfacing of existingrunway, Taxi track andExtension & Construction of Runway, Taxi track & Apron,Amritsar

The project involved both flexible and rigid pavement construction. The project was completed under strict restraints of operational and strategic defence issues.

210 110 Airport Authority of India

Nov, 2003

Extension of runway by 5000 ft, port Blair Airport

There were logistics and scheduling challenges since all major materials, viz. Bitumen, Cement and Steel, etc.had to be transported from the main land at a distance of more than 1,200 kms.

410 210 Airport Authority of India/ BSCPL

Jan, 2002

Page 17: BELIEVING IN OUR FUTUREcandcinfrastructure.com/images/Corporate_ Brochure.pdf · 2020. 6. 24. · Construction of runway Taxi tract & Apron, Amritsar International Airport. • Building,

Partners in Nation Building

C & C Constructions LimitedPlot No. 70, Sector 32, Gurgaon-122001 (Haryana) Phone: + 91 124 4536666 | Fax: +91 124 4536799 Email: [email protected]: www.candcinfrastructure.com thei

dea

wor

ks@

gm

ail.c

om •

psp

ress

gro

up@

gm

ail.c

om


Recommended