BELLE & MARLOWE COMMUNITY MEETING ONE LAKEWOOD PLACE 11/13/2018 City of Lakewood, Carnegie Management & Development, RDL Architects
ST. C
HARL
ES
MA
RLO
WE
BELL
E
GOALS TONIGHT:
• Communicate updates about the demolition and answer questions
• Gain feedback on how the proposed development, One Lakewood Place, integrates into the neighborhood
AGENDA - 7:00 – 8:15 pm
I. Demolition of former hospital – 20 minutes II. One Lakewood Place – 50 minutes
I. Orientation of proposed plans II. Break out sessions
I. What you value about your neighborhood? II. How to integrate the project with the
neighborhood? III. Wrap up – 5 minutes
I. Next steps II. Upcoming meetings III. Website
INTRODUCTIONS
• City of Lakewood – Bryce Sylvester – Katelyn Milius – Mike Molinski – David Baas
• Carnegie Management and Development Corp. – George
Papandreas – Rustom Khouri III
• RDL Architects – Margaret Kavourias – Greg Soltis – Terry White – Bob Reighard
• SAFECO Cleveland – Kate Baney
ABATEMENT AND DEMOLITION
• SafeCo Environmental – Kate Baney, Project Manager
ON-SITE CITY REPRESENTATIVES
EA Group Oversight of asbestos abatement
DLZ Construction Management Oversite of demolition and site preparation
TIMELINE
• November 2018 – July 2019
• Asbestos Abatement: November – March
• Demolition: March – May
• Site preparation: May – July
• Goal: New construction begins in fall 2019
TRAFFIC & PARKING
• Trucks are required to enter and exit
using Detroit, and will use W 117th to
enter and exit the city.
• Franklin will not be used for truck
traffic.
CONTRACTOR PARKING
Required to be on site, or at meters along Marlowe
ST. C
HARL
ES
MA
RLO
WE
BELL
E
• Any work outside (e.g. demolition) is required to
meet city code:
• 8 am – 9 pm, Monday – Saturday;
• No work on Sundays or holidays
• Work on the inside of the building can occur
outside these hours as long as the noise
ordinances are met
HOURS OF OPERATION
SURVEY & VIBRATION MONITORING
• The city has contracted with Edward Walter & Associates to conduct vibration monitoring
• Ensure that vibration limits for a residential neighborhood are not exceeded.
• For properties immediately adjacent to the hospital site
Belle & Marlowe sidewalks closed
Detroit sidewalks & bus stop remain open
SIDEWALK CLOSURES
SITE FENCING
Installed next week
MA
RLO
WE
BELL
E
What happens when an issue arises?
Alex Harnocz, Planner 216.529.5933 [email protected] Katelyn Milius, Planner 216.529.6634 [email protected] Bryce Sylvester – Director of Planning & Development 216.529.6635 [email protected]
Mark Papke – City Engineer 216.529.6807 [email protected]
Questions? www.OneLakewood.com/DowntownDevelopment
ST. C
HARL
ES
MA
RLO
WE
BELL
E
MA
RLO
WE
BELL
E
PROPOSED SETBACKS 5’
0’-10’
0’-20’
SOME COMMENTS TO DATE
• Welcoming space • Consider effects of traffic and vehicle
headlights on neighbors • Front porches or a similar feel should be
duplicated here • Front yard setbacks of residential
properties • Treatment and design of southern border • Overall height and massing of buildings
Breakout Question #1: What do you value about your neighborhood?
Breakout Question #2: How does the proposed design integrate with the adjacent neighborhood?
REVIEW
• What we’ve heard tonight
• Process Ahead
– December 6 at 7 PM Planning Commission
– December 13 at 5:30 PM Architectural Board
of Review
• Comment Cards