Exca v ations OregonOSHA Safe practices for small business owners and contractors
Transcript
Page 1: Benching for Excavation

Excavations

OregonOSHA

Safe practices for small business owners and contractors

Page 2: Benching for Excavation

How to dig your own grave

No protective system

Spoils too close

No means for entering or exiting

No hard hat

Excavator bucket over worker

www.orosha.org

Page 3: Benching for Excavation

SCB

D

About this document Excavations – Safe practices for small business owners and contractors is an Oregon OSHA Standards and Technical Resources publication.

Thanks to the following individuals for advice and technical assistance.• CraigHamelund,OregonOSHA• DiannaGray,OregonOSHA• GeorgeVorhauer,OregonOSHA• JerryMothersbaugh,OregonOSHA• MikeRiffe,OregonOSHA• RockyShampang,OregonOSHA• RonHaverkost,OregonOSHA• TimMarcum,OregonOSHA

Special thanks to Mike Parnell,president,WireRope&Rigging Consultants,foradviceonsaferiggingpractices.

Thankstothefollowingindividualsforcraftingthefinaldocument:• Layoutanddesign:PatriciaYoung,OregonOSHA• Editingandproofing:MarkPeterson,DCBSCommunications

WewantyoutounderstandwhatyoureadThisguidecomeswithaplain-languageguarantee!Letusknowifyou’[email protected] orcall503-947-7399.

Piracynotice.Reprinting,excerpting,orplagiarizinganypartof this publication is fine with us!PleaseinformOregonOSHAofyour intensionasacourtesy.

Page 4: Benching for Excavation

ContentsIntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Excavations and trenches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Plan before you dig . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

The role of the competent person . . . . . . . . . . . . . . . . . . . . . . . . . 9

How cave-ins occur . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

How soil is tested . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Protective systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Getting in and out of an excavation . . . . . . . . . . . . . . . . . . . . . . . 18

Materials and mobile equipment . . . . . . . . . . . . . . . . . . . . . . . . . 19

Hazardous atmospheres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Water accumulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

Working with hydraulic excavators and backhoe loaders . . . . . . 22

Working near high-voltage lines . . . . . . . . . . . . . . . . . . . . . . . . . . 26

Stability and adjacent structures . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Excavation requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Safe practices checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Important terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Oregon OSHA Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

Page 5: Benching for Excavation

5

IntroductionAcave-incantrapyouwithinsecondsandkillyouwithinminutes.

Twocubicyardsofsoilweighabout6,000pounds.Ifyou’reburied,you’llsuffocateinlessthanthreeminutes.Evenifyousurvive,theweightofthesoilislikelytocauseseriousinternalinjuries.

Butcave-insaren’ttheonlydangersinexcavationwork.Lackof oxygen,toxicfumes,explosivegases,andburiedpowerlinesarealsohazards.Unfortunately,manycontractorswhodoexcavationwork stillthinkthatit’stooexpensiveortakestoomuchtimetoprovide appropriate safeguards.

Twocubicyardsofsoilweighabout6,000pounds!

3,000 pounds

3,000 pounds

How much does soil weigh?

Page 6: Benching for Excavation

6

Excavations and TrenchesDigaholeinthegroundandyou’vemadeanexcavation.Excavationscanbeanysize:wide,narrow,deep,orshallow.

A trenchisanarrowexcavation,notmorethan15feetwideatthebottom.Ifyouinstallformsorotherstructuresinanexcavationthatreduceitswidthtolessthan15feet,measuredatthebottom,theexcavationisalsoconsideredatrench.

Ifyouworkinanexcavationthat’sfivefeetdeep(ordeeper)youmustbeprotectedfromacave-in.

Ifacompetent persondeterminesthatthere’sapotentialforanexcavationtocave-in,youmustbeprotectedregardlessofitsdepth.

Whatisanexcavation?Anexcavationisaman-madecut,cavity,ordepressionintheearth’ssurface.

Excavation

Open-faced excavation

Excavation cut into slope

Page 7: Benching for Excavation

7

Trench

• Deeperthanwide• Nomorethan 15feetwideat thebottom

Whatisatrench?Atrenchisdeeperthanitiswide–andnotmorethan15feetwideatthebottom.

• Typicaltrench

• Trenchcreatedbyformwork

Page 8: Benching for Excavation

8

Plan before you digPlanningreducesthechancethatsomethingwillgowrongwhenyoustartajob.Considerthefollowingbeforeyoustartexcavating:

• Debrisneartheexcavationsitethatcouldcreateahazard

• Howemployeeswillgetinandoutoftheexcavation

• Howtoprotectpeoplefromfallingintotheexcavation

• Howtorespondtoemergencies

• Locationofoverheadpowerlinesandundergroundutilitylines (Call 811 from anywhere in Oregon for help in locating underground utility lines)

• Possibilityofatmospherichazardsintheexcavation

• Possibilityofwaterintheexcavation

• Stabilityofsoilattheexcavationsite

• Stabilityofstructuresadjacenttotheexcavationsite

• Vehiclesandothermobileequipmentthatwilloperatenear theexcavation

• Weatherconditions

Page 9: Benching for Excavation

9

The role of the competent personAdesignatedcompetentpersonwhohastraininginsoilanalysis, protectivesystems,andOregonOSHA’sDivision 3, Subdivision P, Excavationrequirementsmustbeonsitetoclassifythesoil,selectaprotectivesystem,overseeinstallation,andinspectthesystemafterinstallation.

Iftherearenoexistinghazardsthecompetentpersoncanleavetheexcavationsiteforashorttime,butmustbepresentwhenaprotec-tivesystemismoved.Soilconditionscouldchangeornewhazardsmayarisethatrequirethecompetentperson’sjudgment.

Thecompetentpersonmustbeknowledgeableaboutthetypeofsoilexcavatedandtheprotectivesystemusedandmustinspectthemdailyforsignsofinstability,damage,orotherhazards;thecompetentpersonmustapproveanychanges.Inspectionsarealsonecessaryafterheavyrainoractivitiessuchasblastingthatmayincreasetheriskofcave-in.

Thecompetentpersonmusthaveauthoritytoimmediatelycorrectthehazardsandtoorderemployeestoleavetheexcavationuntilthehaz-ardshavebeencorrected.Anemployeewhoistrainedandcanidentifyexcavationhazardsbutdoesn’thavetheauthoritytocorrectthemisnotacompetentperson.

Page 10: Benching for Excavation

10

How cave-ins occur Undisturbedsoilstaysinplacebecauseopposinghorizontalandverti-calforcesareevenlybalanced.Whenyoucreateanexcavation,youremovethesoilthatprovideshorizontalsupport.Soilwilleventuallymovedownwardintotheexcavation.Thelongertheface(asideoftheexcavation)remainsunsupported,themorelikelyitistocavein.

BulgingSliding Toppling

Howdocave-insoccur?Whenyoucreateanexcavation,youremovethesoilthatprovideshorizontalsupport.

Page 11: Benching for Excavation

11

Soilandstability

Somesoilsaremorestablethanothers.Thetypeofsoilisoneofthefactorsthatdeterminethechancethatanexcavationwillcavein.TherearethreebasicsoiltypesthatyoumayencounterinOregon:

• TypeA–verystable.Clayisanexample.

• TypeB–lessstablethantypeAsoil.Crushedrock,silt,andsoilsthatcontainanequalmixtureofsandandsiltareexamples.

• TypeC–lessstablethantypeBsoil.Gravelandsandareexamples.Soilhasotherqualitiesthataffectitsstability.Theseincludegranularity, saturation, cohesiveness, and unconfined compressive strength.

• Granularityreferstothesizeofthesoilgrains;thelargerthegrains,thelessstable the soil.

• Saturationmeanshowmuchwatersoilwillabsorb.

• Cohesivenessmeanshowwellsoilholdstogether;clayisacohesivesoil.

• Unconfinedcompressivestrengthisdeterminedbyatestthatshowshowmuchpressureittakestocollapseasoilsample.Forexample,typeAsoilmusthaveanunconfinedcompressivestrengthofatleast1.5tonspersquarefoot.

Page 12: Benching for Excavation

12

How soil is testedAcompetentpersonmustconductvisual and manual soil tests before anyoneentersanexcavation.Visualandmanualtestsareacriticalpartofdeterminingthetypeofprotectivesystemthatwillbeused.

Visual tests

Visualtestinginvolveslookingatthesoilandtheareaaroundtheexcavationsiteforsignsofinstability.Thecompetentpersonmightdovisualtestssuchasthefollowing:

• Observethesoilasitisexcavated.Soilthatremainsinlargeclumpswhenexcavatedmaybecohesive.Soilthatbreaksupeasilyisgranular.

• Examinetheparticlesizesofexcavatedsoiltodeterminehowtheyholdtogether.

• Lookforcracksorfissuresinthefacesoftheexcavation.

• Lookforlayersofdifferentsoiltypesandtheangleofthelayersinthefaceoftheexcavationthatmayindicateinstability.

• Lookforwaterseepingfromthesidesoftheexcavation.

• Lookforsignsofpreviouslydisturbedsoilfromotherconstructionorexcavationwork.

• Considervibrationfromconstructionactivityorhighwaytrafficthatmayaffectthestabilityoftheexcavation.

Page 13: Benching for Excavation

13

Manual tests

Manualtestinginvolvesevaluatingasampleofsoilfromtheexcavationtodeterminequalitiessuchascohesiveness,granularity,andunconfinedcompressivestrength.Soilcanbetestedeitheronsiteoroffsitebutshouldbetestedassoonaspossibletopreserveitsnaturalmoisture.

Examples of manual tests:

Plasticitytest.Shapeasampleofmoistsoilintoaballandtrytorollitintothreadsabout1/8-inchindiameter.Cohesivesoilwillrollinto1/8-inchthreadswithoutcrumbling.

Drystrengthtest. Holdadrysoilsampleinyourhand.Ifthesoilisdryandcrumblesonitsownorwithmoderatepressureintoindividualgrainsorfinepowder,it’sgranular.Ifthesoilbreaksintoclumpsthatarehardtobreakintosmallerclumps,itmaybeclaycombinedwithgravel,sand,orsilt.

Thumbpenetrationtest. Thistestroughlyestimatestheunconfinedcompressivestrengthofasample.Pressyourthumbintothesoilsample.IfthesampleresistshardpressureitmaybetypeAsoil.Ifit’seasytopenetrate,thesamplemaybetypeC.

Pocket penetrometers offermoreaccurateestimatesofunconfinedcompressivestrength.Theseinstrumentsestimatetheunconfinedcompressivestrengthofsaturatedcohesivesoils.Whenpushedintothesample,anindicatorsleevedisplaysanestimateintonspersquarefootorkilogramspersquarecentimeter.

Page 14: Benching for Excavation

14

Protective systemsThebasicmethodsforprotectionfromcave-insaresloping, benching, shoring,andshielding.Themethodyoushouldusedependsonfactorssuchassoiltypeandwatercontent,excavationdepthandwidth,thenatureofthework,andnearbyactivitiesthatcouldincreasetheriskofacave-in.Thecompetentpersonhastheresponsibilityforconsideringthesefactorsandfordeterminingtheappropriateprotectivesystem.

A registered professional engineermustdesignprotectivesystemsforallexcavationsthataremorethan20feetdeep.

Sloping and benching

Slopingandbenchingprovideprotectionbyremovingmaterialfromthefaceofanexcavationatanangletoitsfloor;ingeneral,theflattertheangle,thegreatertheprotection.Benchesarecutsintheslopethatgiveitastair-stepappearance.Therearetwotypesofbenches:simpleandmultiple.

Rain,vibration,andpressurefromheavyequipmentcanmakesoilun-stableandincreasetheriskofacave-in.Slopedorbenchedexcavationsthatshowsignsofcracks,bulges,orclumpsofsoilthatfallawayfromthefacesaredangerousandmustbeinspectedbyacompetentperson.Youmustimmediatelygetoutoftheexcavationandstayawayuntilthecompetentpersondeterminesitissafetoenter.

Aregisteredprofessionalengineermustdeterminetheangleofslopesinexcavationsthataredeeperthan20feet.

Page 15: Benching for Excavation

15

WhatdobenchedslopeslooklikeintypeA,typeB,andtypeCsoil?

• TypeAsoil:simpleandmultiplebenches

Simple Bench Excavation Multiple Bench Excavation

Simple Bench Excavation Multiple Bench Excavation

• TypeBsoil:simpleandmultiplebenches

• TypeCsoil:simpleandmultiplebenches

BenchingintypeCsoilrequiresaregisteredprofessionalengineer.

Page 16: Benching for Excavation

16

Shoring and shielding

Shoringandshieldingsystemscanpreventcave-insinexcavationswithorwithoutslopedorbenchedfaces.Thesafestwaytoinstallandremovethemisfromoutsidetheexcavation.

Shoresareverticalorhorizontalsupportsthatpreventthefacesofanexcavationfromcollapsing.Verticalshoresarecalleduprights.They’reeasytoinstall,relativelyinexpensive,andoftenusedinstablesoilorinshallowexcavationsthathaveparallelfaces.Verticalshoresmustbesizedfortheexcavation’sdimensionsandsoiltype.

Horizontalshoresarecalled walers.Walersareoftenusedwhenun-stablesoilmakesslopingorbenchingimpracticalandwhensheetingisnecessarytopreventsoilfromslidingintotheexcavation.

Shieldsprovideemployeesasafeworkareabyprotectingthemfromcollapsingsoil.Shieldsdon’tpreventcave-insbut“shield”workersifafacedoescollapse.Theyareusuallyplacedintheexcavationbyheavyequipment.

Shoringandshieldingsystemsareavailablefrommanufacturersinavarietyofdimensions,usuallyaluminumorsteel,ortheycanbecustom-builtfromtabulated data approvedbyaregisteredprofessionalengineer.Manufacturerswillalsoprovidetabulateddatawiththeirsystemsthatincludesengineeringspecifications,depthratings,specialinstructions,andsystemlimitations.Onlybycarefullystudyingandunderstandingthemanufacturer’stabulateddatacanthecompetentpersonchoosethecorrectprotectivesystem.

Page 17: Benching for Excavation

17

Whatdoshoresandshieldslooklike?

Vertical shore

Photo credit: Speed Shore Corp.Photo credit: Speed Shore Corp.

Horizontal shore

Photo credit: Speed Shore Corp.

Trench shield

Page 18: Benching for Excavation

18

Getting in and out of an excavationAnexcavationthathasadepthoffourfeetormoremusthavea meansforenteringandexiting—suchasastairway,ladder,or ramp—within25feetofemployees;theirsafetymaydependon howquicklytheycanclimbout.

Structuralrampsthatareusedtoenterandexittheexcavation musthavenonslipsurfacesandbedesignedbyacompetentperson.Acompetentpersonmustalsoevaluaterampsmadefromsoilthatareusedtoenterandexitanexcavation.

Page 19: Benching for Excavation

19

Materials and mobile equipmentExcavatedsoil,calledspoils,piledtooclosetotheedgeofanexcavationcancauseacave-in.Socanheavyequipment.Keepspoilsandheavyequipmentatleasttwofeetfromtheedge;whenpossible,useverticalshoresorshieldsthatextendabovethetopoftheexcavationtorestrainspoils.Spoilsandheavyequipmentthatexertanexcessiveloadongroundadjacenttotheexcavationcouldcauseacave-in.

Spoilsandheavyequipmentthatexertanexcessiveloadongroundadjacenttoanexcavationcouldcauseacave-in.

Whenarespoilshazardous?

Page 20: Benching for Excavation

20

Hazardous atmospheresHazardousatmospherescanoccurinexcavationsnearlandfills,sitescontaminatedbyleakinggaslinesorstoragetanks,insewers,andinotherconfinedspaces.Iftheseconditionsarepossible,acompetentpersonmusttestforoxygendeficiency(oxygenlevelslessthan19.5percent)andhazardousatmospheresbeforeyoucanenter.

Page 21: Benching for Excavation

21

Water accumulationWatermakessoilunstable.Youcan’tenteranexcavationwhenwaterhasbuiltupunlessyouareprotectedfromtheunstablesoil.Protectionincludesspecializedsupportsystemsandwater-removalequipment.Acompetentpersonmustinspecttheexcavationandmonitormethodsusedtocontrolwateraccumulation.

Page 22: Benching for Excavation

22

Working with hydraulic excavators and backhoe loadersYoucandiganexcavationwithahandshoveloranexcavator.Useahandshovelimproperlyandyouriskblisters.Useanexcavatorimprop-erlyandyouriskalife.Toomanyworkersarehurtbecausetheydon’tfollowsafepracticeswhentheyusehydraulicexcavatorsandbackhoeloaders.Mostaccidentshappenforthreereasons:

• Enteringtheexcavator’sswingarea

• Usingquick-couplingdevicesimproperly

• Usingunsaferiggingmethodstodragatrenchshield

Entering the excavator’s swing area

Beawareoftheexcavator’sswingareaandblindspots.Alwaysmaintainatleastthreefeetofunimpairedclearancebetweentheexcavator’sro-tatingsuperstructureandadjacentobjects.Keepothersoutsidetheareabymarkingitwithrope,tape,orasimilarbarrier,ifnecessary.

• PostwarningsignsthatsayDANGER–STAYCLEAR on allsidesoftheexcavator.

• Don’tallowanyonetostandunderasuspendedloadortheboom,arm,orbucket.

• Keepthebucketasclosetothegroundaspossiblewhen workers are attaching loads.

• Lowertheboomtoasafepositionwiththebucketonthegroundandturnofftheexcavatorbeforegettingoff.

Page 23: Benching for Excavation

23

WheredoIpostthewarningsigns?PostwarningsignsthatsayDANGER–STAYCLEARonallsidesoftheexcavator [fromDivision 3, Subdivision O,437-003-0090(1)]

Don’tallowanyonetostandundertheboom,arm,orbucket!

Photo credit: Robert I. Carr, Ph.D., P.E.

Page 24: Benching for Excavation

24

Usingquick-couplingdevicesimproperly

Aftermarket“quick-coupling”devicesmakeiteasytochangebucketsorreplaceotherattachments.However,anumberofworkershavebeenkilledwhenthecouplingdeviceshavenotbeenlockedproperlyandthebucketshavedetached.Manufacturersofquickcouplersrecognizedthehazardandnewerdeviceshavelocksthatpreventbucketsfromdetach-ingunintentionally,butnotallusersmaybeawareoftheproblem.Retrofitlockingpinsareavailableforolderequipment.

• Followthemanufacturer’sinstructionsforusingpositivelocksonquick-disconnectequipment.

• Securelylatchattachmentssuchasquick-disconnectbucketsbeforebeginning work.

• Makefrequentvisualinspectionsofquick-disconnectsystems—especiallyafterchangingattachments.

Using unsafe rigging methods to drag a trench shield

Usinganexcavatortodragashieldthroughatrenchcanputtremen-dousforcesonriggingcomponents.Forexample,theforcerequiredtodraga10,000-poundtrenchshieldthroughanarrowtrenchwillincreasedramaticallywithresistancefromthetrenchwallsorfromplowingofthefrontoftheshield.Knowthesling’sratedcapacitiesandneverexceedthem.Thewhiplasheffectofabrokenorimproperlyriggedslingcankillanyoneinitspath.

• Followtheinstructionsintheoperator’smanualwhenusinganexcavatortoliftormoveanobject.

• “Liftanddrag”tomoveatrenchshieldhorizontallyinatrench;avoid“plowing”withthefrontoftheshield.Plowingsignificantlyincreases the tension on the slings.

• Somemanufacturersoftrenchshieldswarnworkerstostayoutofthe“box”whileitisbeingmoved.Alwayscheckthemanufacturers’requirements.

Page 25: Benching for Excavation

25

• Neverusedamagedchainsorfrayedcables,slings,straps,orropes.

• Useanappropriateliftingshackleforattachingcablesorslings.

• Neverstandinlinewith,ornextto,aslingthatisundertension.

Page 26: Benching for Excavation

26

Working near high-voltage linesBeforeyoudoanyworkwithin10feetofahigh-voltagepowerline,notifytheutilitythatcontrolsthelineatleasttwobusinessdaysbeforeyoubegin.Ifyoudon’tknowwhocontrolstheline,anyutilitycan helpyou.

You’llneedtotelltheutilitythelocation,whatworkyouneedtodo,andwhenyouneedtodoit.

Theutilitywillhelpyouwithtaskssuchasthefollowingtoensurethatyoudotheworksafely:

• Coordinateworkschedules

• Identifytemporarymechanicalbarriersthatprevent contact with the lines

• De-energizeandgroundthelines

• Temporarilyraiseormovethelines

What happens if you don’t notify the utility?

You’reresponsibleforalldamagesandcoststhatresultfromanelectri-calaccident.There’salsoapenaltyofupto$70,000foreachoffenseinadditiontothecostofinjuriesandrepairs.

Page 27: Benching for Excavation

27

Stability and adjacent structuresMakesurethatstructures,roadways,andsidewalksadjacenttotheexcavationareadequatelysupported.

• Useanappropriatesupportsystem–suchasshoringorbracing– iftheexcavationcouldaffectthestabilityofnearbybuildings,side-walks,androads.

• Don’texcavatebelowthebaseorfootingofanyfoundationthatmightendangeremployeesunlessyoudooneofthefollowing:

• Useasupportsystemthatprotectsemployeesandkeepsthestructure stable.

• Ensurethattheexcavationisinstablerock.

• Havearegisteredprofessionalengineerdeterminethatthestructurewillnotbeaffectedbytheexcavationwork.

• Havearegisteredprofessionalengineerdeterminethatthe excavationworkwillnotendangeremployees.

Page 28: Benching for Excavation

28

Excavation requirementsOregonOSHA’sDivision 3, Subdivision P, Excavationrequirementsapplytoallopenexcavations.

• 1926.650—Scope,application,anddefinitions

• 1926.651—Specificexcavationrequirements

• 437-003-0096—Undergroundinstallations

• 1926.652—Requirementsforprotectivesystems

• AppendixA—Soilclassification

• AppendixB—Slopingandbenching

• AppendixC—Timbershoringfortrenches

• AppendixD—Aluminumhydraulicshoringfortrenches

• AppendixE—Alternativestotimbershoring

• AppendixF—Selectionofprotectivesystems

Page 29: Benching for Excavation

29

1. Adesignatedcompetentpersonattheexcavationsiteunderstandsvisualandmanualtestmethods,useofprotectivesystems,thehazardsofexcavationwork,andtherequirementsofOregonOSHA’sexcavationstandards.

2. Adesignatedcompetentpersoninspectstheexcavation,adjacentareas,andprotectivesystemsdailybeforeworkbegins,asnecessarythroughouttheshift,andafterrainorotherconditionsthatcouldincreasetheriskofahazard.

3. Adesignatedcompetentpersonhasauthoritytoimmediatelycorrecthazardsandtoorderemployeestoleavetheexcavationuntilthehazardshavebeencorrected.

4. Sewer,telephone,fuel,electric,orwaterlinesnearthesitehavebeenlocatedandclearlymarked.ContacttheOregonUtilityNotificationCenterforhelpinlocatingundergroundutilitylines–call811fromanywhereinOregon.

5. Hardhatsarerequiredwheneverthereareoverheadhazards.

6. Debrisandotherunnecessarymaterialhavebeenclearedfromthesite.

Safe practices checklist Allyouranswersshouldbe“Yes!” Yes No

Page 30: Benching for Excavation

30

7. Employeeswhoareexposedtovehicletrafficareprovidedwithandwearhigh-visibilitygarments.

8. Excavationsatremotesiteshaveappropriatewarningbarriers.

9. Employeesareprotectedfromlooserockorsoilthatcouldfallintotheexcavation.

10. Employeesareprohibitedfromworkingorstandingundersuspended loads.

11. Employeesarerequiredtostandawayfromvehiclesthatare being loaded or unloaded.

12. Employeesareprohibitedfromworkingonthefacesofslopedorbenchedexcavationswhenotheremployeesarebelowthem.

13. Mobileequipmentoperatorshaveaneffectivewayofknowingwhentheyaretooclosetotheedgeofanexcavation.Examplesincludebarricades,handormechanicalsignals,stoplogs,orgradingawayfromtheexcavation.

14. Spoils,equipment,andtoolsareatleasttwofeetfromtheedgeoftheexcavation.

15. Walkwaysthatcrossoverexcavationsmorethatsixfeetdeep have standard guard rails and toe boards.

Yes No

Page 31: Benching for Excavation

31

16. Undergroundinstallationsareprotected,supported,orremovedwhentheexcavationisopen.

17. Excavationsthathaveadepthoffourfeetormorehaveladdersorothermeansofsafeaccesswithin25feetofemployees.

18. Laddersaresecuredandextendthreefeetaboveedgeoftheexcavation.

19. Adesignatedcompetentpersondesignsthestructuralrampsthatemployeesusetoenterandexittheexcavation.

20. Structuralrampshavenonslipsurfaces.

21. Employeesareprohibitedfromenteringanexcavationthatshowssignsofwateraccumulationunlesstheyareprotectedfromtheriskofacave-in.

22. Acompetentpersonmonitorsthemethodsusedtocontrolwaterfromaccumulatinginanexcavation.

23. Surfacewaterorrunoffisdivertedawayfromtheexcavation.

24. Theatmosphereinanexcavationistestedwhenthepossibilityofahazardousatmosphereexists.

25. Employeesareprotectedfromhazardousatmospheresoratmospherescontaininglessthan19.5percentoxygen.

Yes No

Page 32: Benching for Excavation

32

26. Emergencyrescueequipmentisavailablewhenhazardousatmospherescouldexistinanexcavation.

27. Employeeswhoworkinexcavationsaretrainedtouseappropriatepersonalprotectiveequipment.

28. Adesignatedcompetentpersonhasclassifiedsoilattheexcavationsitewithatleastonemanualtestandone visual test.

29. Materialsandequipmentusedforprotectivesystemsattheexcavationsitearechosenbaseduponsoilanalysis,excavationdepth,andexpectedloads.

30. Materialsandequipmentusedforprotectivesystemsareinspectedregularlyandingoodcondition.

31. Damagedequipmentisremovedfromserviceimmediately.

32. Protectivesystemsareinstalledwithoutexposingemployeestotheriskofcave-ins.

33. Structures,roadways,andsidewalksadjacenttotheexcavationareadequatelysupported.

34. Excavationsarebackfilledwhenprotectivesystemsareremoved.

Yes No

Page 33: Benching for Excavation

33

35. Appropriatesloping,shoring,orshieldingprotectsemployeeswhoworkinexcavationsfiveormorefeetdeep.

36. Adesignatedcompetentpersondeterminesthetypeofshieldusedatasitebyconsideringfactorssuchasthenatureofthework,excavationdimensions,soilcharacteristics,andequipmentusedtolowerorpositionthe shield.

37. Employeesinexcavationsmorethan20feetdeepareprotectedbyasystemdesignedbyaregisteredprofessional engineer.

38. Shieldsareinstalledsothattheydonotmovelaterally.

39. Employeesarenotallowedinshieldsthataremovedvertically.

Yes No

Page 34: Benching for Excavation

34

Important termsAdjacent Theareawithinahorizontaldistancefromtheedgeofavertical-sided

excavationequaltothedepthoftheexcavation.

Aluminumhydraulicshoring Apre-engineeredsystemofaluminumhydrauliccylinders(crossbraces)andverticalrails(uprights)orhorizontalrails(walers).Designedtosupportthefacesofanexcavation.

Benching Amethodofslopingthesidesofanexcavationbyformingaseriesofsteps.

Cave-in Theseparationofamassofsoilorrockfromthefaceofanexcavationintoanexcavation.

Competent person Apersoncapableofidentifyingexistingandpredictablehazardsinthesurroundingsorworkingconditionsandwhohasauthorizationtotakepromptcorrectivemeasurestoeliminatethehazards.

Cross brace Horizontalmemberofashoringsysteminstalledperpendiculartothesidesofanexcavation,theendofwhichbearsagainstuprightsorwales.

Excavation Aman-madecut,cavity,ordepressionintheearth’ssurface.

Face Thesideofanexcavation.

Hazardousatmosphere Anatmospherethatcouldcauseaninjuryorillness.Examples:explosive,flammable,poisonous,corrosive,oxidizing,irritating,oxygendeficient,ortoxic.

Previouslydisturbedsoil Soilthathasbeendisturbedfromexcavationworkorotherdigging.SoilcannotbeclassifiedtypeAifithasbeenpreviouslydisturbed.Usevisualteststoidentifypreviouslydisturbedsoil.

Protectivesystem Asystemdesignedtoprotectworkersinexcavations.Slopingandbenching,shores,andshieldsareexamplesofprotectivesystems.

Ramp Aninclinedwalkingorworkingsurfaceconstructedfromearthorfromstructuralmaterialssuchassteelorwood.

Page 35: Benching for Excavation

35

Registeredprofessionalengineer A professional engineer registered in the state where the work is performed.Aprofessionalengineerregisteredinanystatecanapprovedesignsformanufacturedprotectivesystemsortabulateddatausedininterstatecommerce.

Sheeting Componentofashoringsystemthatpreventssoilfromslidingintoanexcavation.

Shield Astructureabletowithstandforcescausedbyacave-in.Shieldscanbemanufacturedorcustom-builtinaccordancewith1926.652(c)(2)-(c)(4).Shieldsarealsocalledtrenchboxesandtrenchshields.

Shore Astructurethatsupportsthesidesofanexcavationandpreventscave-ins.

Sloping Amethodofincliningthefaceofanexcavationtominimizetheriskofacave-in.Themaximumallowableslopevarieswithsoiltype,environment,andworkdoneattheexcavationsite.

Soil Weatheredrock,gravel,sand,orcombinationsofclay,silt,andloam.

Stable rock Naturalsolidmineralmaterialthatcanbeexcavatedwithverticalsidesandwillremainintactwhileexposed.

Structural ramp Arampmadeofsteelorwood,usuallyforvehicleaccess.Rampsmadefromsoilorrocksarenotconsideredstructuralramps.

Supportsystem Asystemthatsupportsanadjacentstructure,undergroundinstallation,orthefaceofanexcavation.

Surcharge Aloadexertedongroundadjacenttoanexcavation.

Tabulated data Tablesandcharts,approvedbyaregisteredprofessionalengineer,usedtodesignandconstructaprotectivesystem.Atleastonecopyofthedataandthenameoftheengineerwhoapproveditmustbekeptatthesitewhilethesystemisconstructed.

Trench Anexcavationthatislongerthanwide.Ingeneral,thedepthisgreaterthanthewidthbutthewidthmeasuredatthebottomofthetrenchisnotgreaterthan15feet.

Upright Theverticalmemberofashoringsystem.

Page 36: Benching for Excavation

36

Notes

Page 37: Benching for Excavation

37

Notes

Page 38: Benching for Excavation

38

ServicesOregonOSHAoffersawidevarietyofsafetyandhealthservicestoemployersandemployees:

Portland 1750 NW Naito Parkway, Ste. 112 Portland, OR 97209-2533 503-229-5910 Consultation: 503-229-6193

Salem 1340 Tandem Ave. NE, Ste. 160 Salem, OR 97303 503-378-3274 Consultation: 503-373-7819

Eugene 1140 Willagillespie, Ste. 42 Eugene, OR 97401-2101 541-686-7562 Consultation: 541-686-7913

Bend Red Oaks Square 1230 NE Third St., Ste. A-115 Bend, OR 97701-4374 541-388-6066 Consultation: 541-388-6068

Medford 1840 Barnett Road, Ste. D Medford, OR 97504-8250 541-776-6030 Consultation: 541-776-6016

Pendleton 721 SE Third St., Ste. 306 Pendleton, OR 97801-3056 541-276-9175 Consultation: 541-276-2353

Formoreinformation,calltheOregonOSHAofficenearestyou.

SalemCentralOffice 350 Winter St. NE, Rm. 430Salem, OR 97301-3882Phone: 503-378-3272

ConsultativeServices• Offersno-coston-sitesafetyandhealthassistancetohelp

Oregonemployersrecognizeandcorrectworkplacesafetyand health problems.

• Providesconsultationsintheareasofsafety,industrialhygiene,ergonomics,occupationalsafetyandhealthprograms,assistancetonewbusinesses,theSafetyandHealthAchievementRecognitionProgram(SHARP),andtheVoluntaryProtectionProgram(VPP).

Enforcement• Offerspre-jobconferencesformobileemployersin

industriessuchasloggingandconstruction.• Providesabatementassistancetoemployerswhohave

receivedcitationsandprovidescomplianceandtechnicalassistancebyphone.

• Inspectsplacesofemploymentforoccupationalsafetyandhealthhazardsandinvestigatesworkplacecomplaintsandaccidents.

Appeals,InformalConferences• Providestheopportunityforemployerstoholdinformal

meetingswithOregonOSHAonconcernsaboutworkplacesafety and health.

• DiscussesOregonOSHA’srequirementsandclarifiesworkplacesafetyorhealthviolations.

• Discussesabatementdatesandnegotiatessettlementagreementstoresolvedisputedcitations.

Standards & Technical Resources• Develops,interprets,andprovidestechnicaladviceon

safety and health standards.• ProvidescopiesofallOregonOSHAoccupationalsafety

and health standards.• Publishesbooklets,pamphlets,andothermaterialstoassist

in the implementation of safety and health standards and programs.

• OperatesaResourceCenterwithvideolendinglibrary,books,technicalperiodicals,andconsensusstandards.

PublicEducation&Conferences• Conductsconferences,seminars,workshops,andrule

forums.• Coordinatesandprovidestechnicaltrainingontopics

suchasconfinedspace,ergonomics,lockout/tagout,andexcavations.

• Providesworkshopscoveringmanagementofbasicsafetyandhealthprograms,safetycommittees,accidentinvestigation,andjobsafetyanalysis.

• ManagestheSafetyandHealthEducationandTrainingGrantProgram,whichawardsgrantstoindustrialandlaborgroupstodeveloptrainingmaterialsinoccupationalsafetyandhealth for Oregon workers.

Toll-free: 800-922-2689 Fax: 503-947-7461en Español: 800-843-8086Web site: www.orosha.org