BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE AND ECONOMIC DEVELOPMENT BUREAU COMMUNITY–LED ACCELERATED WASH (COWASH III) PROJECT 2009 EFY 3 rd QUARTER PERFORMANCE REPORT ASSOSA MAY,2017
Transcript
Page 1: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

BENISHANGUL GUMUZ NATIONAL REGIONAL STATE

FINANCE AND ECONOMIC DEVELOPMENT BUREAU

COMMUNITY–LED ACCELERATED WASH (COWASH III)

PROJECT

2009 EFY 3rd QUARTER PERFORMANCE REPORT

ASSOSA

MAY,2017

Page 2: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

TABLE OF CONTENT

TABLE OF CONTENT ................................................................................................................... 2

ACRONYMS................................................................................................................................ 4

1 Introduction ........................................................................................................................ 5

1. Introduction ........................................................................................................................ 5

2 Achievements in the quarter .................................................................................................. 6

2.1 Out come 1. Increased climate resilient community& institutional water supply access coverage

(GTP II standards, including water quality) in the target Woredas OFTHE Regions by 2019 ............... 6

2.1.1 Output 1.1 Human capacity to implement community and institutional water supply

enhanced............................................................................................................................. 6

2.1.1.1 Physical Capacity Building ............................................................................................. 6

2.1.1.2 Human Capacity Building ....................................................................................................... 8

2.1.2 Output 1.2 New safe and climate resilient community water supply schemes constructed as

per GTP II service level ....................................................................................................... 10

2.1.3 Output 1.3 New safe and climate resilient school water supply schemes constructed ...... 12

2.1.4 Output 1.4 New safe and climate resilient health facility water supply schemes constructed

12

2.1.5 Output 1.5 COWASH Phase III new water supply schemes screened for technical, social,

environmental & climate risks .............................................................................................. 13

2.1.6 Output 1.6 Water quality of woreda rural water supply schemes measured ................... 14

2.2 Outcome 2. Increased community, institutional sanitation & hygiene access coverage (GTP II),

in the target Woredas in 5 program Regions by 2019 ................................................................. 16

2.2.1 Output 2.1 Human capacity to implement sanitation and hygiene enhanced .................. 16

2.2.2 Output 2.2 Access to improved household and institutional latrines increased................ 16

2.3 Outcome 3. Increased functionality and sustainability (O&M) of built WASH facilities in the target

Woredas in 5 project Regions by 2019 ..................................................................................... 19

2.3.1 Output 3.1 Water supply schemes rehabilitated ......................................................... 19

2.4 Outcome 4. Increased Women’s empowerment, leadership and inclusion of people with

disabilities in the 9 project WOREDAS OF THE Regions by 2019 ................................................... 19

Page 3: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

List of Tables

Table 1.1.1: List of Materials Procured with the support of COWASH III, 3rd Quarter of 2009 EFY ......... 7

Table 2Table 1.1.2: No. of People Trained in CMP related trainings in the Regions, Zones and Woredas 9

Table 3Table 1.2.1: No. of Water Supply Applications Submitted to Woreda WASH Team (WWT) ....... 10

Table 4Table 1.2.2: No. of Community Water Supply Schemes Constructed with the support of COWASH

III as per GTP II Service Level ................................................................................................... 10

Table 5Table 1.3.1: No. of School Water Supply Schemes Constructed with the support of COWASH III

.............................................................................................................................................. 12

Table 6Table 1.4.1: No. of Health Facility Water Supply Schemes Constructed with the support of

COWASH III ............................................................................................................................ 12

Table 7Table 1.5.1: No. of COWASH III Supported WPs Screened for Technical, Social, Environmental 13

Table 8Table 1.5.2: No. of COWASH III Supported WPs with TSECR Management Plans .................... 14

Table 9Table 1.5.3: No. of COWASH III Supported WPs with TSECR Management Plans Implemented 14

Table 10Table 1.6.1: No. of Catchment based Water Safety Plans (WSP) implemented with the support

of COWASH III in selected woredas ............................................................................................ 15

Table 11Table 1.6.2: No. of Water Supply Schemes tested* with the support of COWASH III ............ 15

Table 12Table 1.6.3: No. of WPs tested with the support of COWASH III and found to be potable ...... 16

Table 13Table 2.2.1: No. of Institutional Latrine Applications Submitted to Woreda WASH Team (WWT)

.............................................................................................................................................. 17

Table 14Table 2.2.2: No. of Schools Having Access to Improved Latrine with the support of COWASH III

.............................................................................................................................................. 18

Table 15Table 2.2.3: No. of Health Facilities Having Access to Improved Latrine with the support of

COWASH III ............................................................................................................................ 18

Table 16Table 3.1.1: No. of Water Supply Schemes Rehabilitated with the support of COWASH Phase I

.............................................................................................................................................. 19

Table 17 Major challenges Faced and Measures Taken during the Quarter ....................................... 21

Page 4: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

ACRONYMS

VIP VENTILATED IMPROVED PIT LATRINE

WWT WOREDA WASH TEAM

GTP GROWTH AND TRANSFORMATION PLAN

ODF OPEN DEFECATION FREE

WSP WATER SAFETY PLAN

SECRM SOCIAL,ENVIRONMENTAL,CLIMATE RISK MANAGEMENT

CR CLIMATE RISK

HDW HAND DUG WELL

SW SHALLOW WELL

SPD SPRING DEVELOPMENT

DW DEEP WELL

RWH RAIN WATER HARVESTING

CMP COMMUNITY MANAGED PROJECT

O&M OPERATION AND MAINTENANCE

WASHco WATER,SANITATION AND HYGIENE COMMITTEE

GPS GEOGRAPHICAL POSITIONING SYSTEM

Page 5: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

1 INTRODUCTION

1. INTRODUCTION

The global context for the CoWASH- III Programme is achieving the Sustainable Development Goals and

related targets set at the country level for their achievement including improved health, women ’s equal

access to and control over WASH management and related entrepreneurship in the programme areas by

2019.

The development objective is to contribute achieving Ethiopia’s Growth and Transformation Plan II

(July 2015-June 2020) targets for the WASH sectors in terms of water, sanitation and hygiene access

coverage and quality of service delivery in selected rural areas in five regions including Benishangul

Gumuze region. The GTP II focus is on improving service levels, its safety (water quality) and security

(sustainable supply).

Benishangul Gumuz Region is one of the 9 regional states of the Federal Democratic Republic of Ethiopia

that is committed to contribute towards attaining Growth and Transformation Plan II targets of the WASH

sectors. The region is bordered by the Regional State of Amhara, Oromia, Gambela and on the West

direction by South Sudan. The region has a land area of about 50,380 square kilometers. The Blue Nile

River splits the region into two. The region is divided into three zones, one town administration, 20

Woredas, of which one is a special Woreda, and 475 Kebeles.

According to the July 2017 population projection of BSGR BoFED, the population of BSGR was estimated

to be 1,066,001, of which 541,002 were males and 524,999 were females. Urban population was

230,000 while the rural population was 836,001.

About 16 person live in a square kilometer of the region, which is below the national average of 65

persons/km2. This indicates that, the population is very scattered to provide effective basic services in

the region. The major ethnic groups in the region are Berta (25.41%), Gumuz (20.88%), Amhara

(21.69%), Oromo (13.55%), Shinasha (7.72%), Mao (1.96%), Komo (1%), Tegra (0.71%) and Others

(7.08%).

In order to achieve the GTP II WASH targets, the Regional WIERDB has been working closely with various

stakeholders and partners on WASH programmes like World Vision Ethiopia, UNICEF and others. This

implies that the region is trying to achieve the objective of improving access to sustainable water supply,

sanitation and hygiene services for rural and urban users through improved capacity of the stakeholders

in the WASH sector.

In the same stratum, Community-Led Accelerated WASH in Ethiopia (COWASH) has also been supporting

to improve access to WASH services in Nine Woredas of BSGR (Bambasi, Oda Bildigilu, Agalomati,

Belojiganfoy,Bullen, Debati,Pawe,Mandura&Wombera) of three zones (Assosa ,Metekel and Kamashi

zones).

The project has started in the region through financial support from the Finland Government (for

Investment, Capacity building & Operational costs), BSGR Regional government (for investment, capacity

building and operational costs) and the community contribution (at least 15%) by cash, material and/or

labor.

The selection of the Zones, Woredas and Kebeles for the project was undertaken mainly by considering

low Water Supply, Sanitation and Hygiene access coverage. In 2009 EFY, a total of 43 new schemes

(HDW=23, SW=20) and 116 rehabilitations (HDW=104, SPD=11 & RPS=1) were planned to be

constructed. 88 Rural kebeles have benefitted from the project and of these kebeles 14 (16%) are

planned to be Open Defecation Free (ODF).

Page 6: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

2 ACHIEVEMENTS IN THE QUARTER

2.1 OUT COME 1. INCREASED CLIMATE RESILIENT COMMUNITY&

INSTITUTIONAL WATER SUPPLY ACCESS COVERAGE (GTP II STANDARDS,

INCLUDING WATER QUALITY) IN THE TARGET WOREDAS OFTHE REGIONS BY 2019

2.1.1 Output 1.1 Human capacity to implement community and institutional

water supply enhanced

2.1.1.1 PHYSICAL CAPACITY BUILDING

In 2009 EFY, the project has continued building the physical capacities of the project Woredas, Zones

and sector Bureaus in the region. In this respect, as it is depicted in table 1.1.1 below since Woredas,

Zones and Sector Bureaus have given priority to physical capacity building issues, a lot of the planned

materials were not yet procured up to this reporting period. To list some of the materials that were

procured during nine months period were; totally 9 laptop computers were procured for Agalomati(2)

,Bambasi(1),Belodjiganfoy(2),Mandura(1)&Pawi(3) with total estimated cost of 179,820 birr in the

reporting period .Similarly 4 file cabinets for Pawi(1), Belodjiganfoy(1) ,Bambasi(2), were procured with

total cost of 17,778 Birr. Purchase of one digital camera & one printer were also made with total cost of

3,800 & 6,990 birr respectively. Lastly 3 desktop computers for Pawi (1) & Mandura (2) were procured

with total cost of 44,544birr and procurement of 3 small diameter moulds were also made with total

cost of 16,100birr by Pawi Woreda.

Page 7: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Table 1.1.1: List of Materials Procured with the support of COWASH III, 3rd Quarter of 2009

EFY

This

Quarter

Cumulativ

eAnnual

This

Quarter

Cumulativ

e

1.1.27 Lap top computer No 12 12 9 9 179,820

1.1.47 Lap top computer No 1 1 0 0 0

1.1.66 Lap top computer No 8 8 0 0 0

1.1.68 Office furniture set 2 2

1.1.25 Digital camera No 5 5 1 1 3,800

1.1.45 Digital camera No 1 1

1.1.69 Digital camera No 1 1

1.1.26 Stabilizer No 21 21

1.1.46 Stabilizer No 5 5

1.1.70 Stabilizer No 2 2

4.1.52 ODF bill board No 10 10 10

1.1.48 LCD projector No 1 1

1.1.43 Printer No 4 4

1.1.20 Printer No 7 7 1 1 6990

1.1.42 Desktop computer No 3 3

1.1.19 Desktop computer No 12 12 3 3 44544

1.1.21 File cabinet No 10 10 4 4 17,778

1.1.50 Labtop bags (For Zow& ZoPF only)No 2 2

1.1.49 Photo Copy Machine (for ZoW) No 1 1

1.1.15 Artisan/Mason hand tools Set 21 21

1.1.16 Procurement of molds (small size)Set 11 11 3 3 16,100

1.1.17 Procure chain block (1 tone capacity)Set 4 4

1.1.24 handheld GPS No 1 1

1.1.29 Dewatering pump No 3 3

1.1.18 Procure spring construction tools/equipmentsSet 2 2

269032.0Total

Activity

Code

(AID)

List of Materials/Equipment Unit

Quantity Planned Quantity ProcuredTotal Cost

(in Birr)

Page 8: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

2.1.1.2 HUMAN CAPACITY BUILDING

In 2009 EFY, the project has also continued to build the human capacity of the Regional, Zonal and

Woreda sector offices so as to implement the project in a sustainable manner. In view of that as it is

depicted in table-1.1.2 below a lot of human capacity building trainings were planned to be given for

beneficiaries in the reporting period. Based on the plan capacity building trainings were given on water

supply and CMP related issues, Sanitation &Hygiene including Sanitation marketing, O&M and related

issues, women leadership in water supply management by WASHCO and gender and disability inclusion;

IR 1.1.1 Training on water supply and CMP related issues was planned to be given for 460

participants based on the plan it was given for 1,982(F=464) participants of this 20(F=8) were

disables and the achievement was 431%. This high achievement is because of the rolled over

trainings from the second quarter. When we compare annual plan with cumulative trainings given

until this quarter, it is 94.5% achievement.

IR 2.1.1 Training on Sanitation &Hygiene including Sanitation marketing was also planned to be

given for 314 trainees in the reporting period and it was given for 174(F=41) participants. As it

shown in the table 1.1.2 below none of the trainees were disables so the achievement was 55.41%.

IR3.2.1. Trainings on O&M and related issues was planned to be given for 820 trainees and hence

it was given for 473(F=106) and no disabled participants. Hence the achievement was 57.9%.

IR4.2.1 Women leadership in water supply management by WASHCO was planned to be given for

50 participants and it was given for 56(F=8) no disable trainees with achievement of 112%.

IR4.3.1 Trainings on Gender and disability inclusion was also planned to be given for 106

participants and hence it was given for 178(F=90) participants of this 25(F=8) were disables and

the achievement was 167.9%. This high achievement is because of rolled over activities from first

and second quarters.

Page 9: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Table 2Table 1.1.2: No. of People Trained in CMP related trainings in the Regions, Zones and Woredas

M F T M F T M F T M F

IR 1.1.1: No. of people trained by

COWASH III in the regions as per

the training standard

460 2,259 2,387 12 8 20 1,041 456 1,497 12 8 20 1,453 509

IR 2.1.1: No. of people trained in

sanitation & hygiene (including

sanitation marketing) as per the

standard with the support of

COWASH III

315 545 545 - - - 133 41 174 - 133 41

IR 3.2.1: No. of People Trained on

O&M and related issues 820 1,451 1,451 - - - 367 106 473 - 367 106

IR 4.1.5: No. of People Trained in

Sanitation Marketing & O&M service

provider establishment and marketing

of WASH products in Pilot Woredas

as per the standard

- 70 70 - - -

IR 4.2.1: No. of People Trained on

Women Leadership in Water Supply

management by WASHCO

50 120 120 - 8 48 56 - 8 48

IR 4.3.1: No. of People Trained in

Gender and Disability Inclusion 106 446 471 17 8 25 71 82 153 17 8 25 71 82

With Disability With No Disability With Disability With No DisabilityOutput Level Indicator

Planned No. of Trainees Number Trained

This

Quarte

r

Cumula

tiveAnnual

This Quarter Cumulative

Page 10: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

2.1.2 Output 1.2 New safe and climate resilient community water supply schemes constructed as per GTP

II service level

In 2009EFY a total of 43 new safe & climate resilient community and institutional water points were planned to be constructed in the

project Woredas of Benishangul Gumuz Region. As it is shown in table 1.2.1 below 43 applications were made at community and

institutional level that shows their interest for water schemes construction and to go through CMP processes. So this indicates that

there is a high demand for clean water supply in the selected woredas of the region.

Table 3Table 1.2.1: No. of Water Supply Applications Submitted to Woreda WASH Team (WWT)

IR 1.2.1: No . o f C ommunity W a te r S upply

s che me cons truc tion a pplic a tions s ubm itte d to

W W T for COW AS H III imple me nta tion

23 23 23 100.0

IR 1.3.1: No . o f S choo l W a te r S upply s che me

cons truc tion a pplic a tions s ubm itte d to W W T for

COW AS H III imple me nta tion

11 11 11 100.0

IR 1.4.1: No . o f He a lth F a c ility W a te r S upply

s che me cons truc tion a pplic a tions s ubm itte d to

W W T for COW AS H III imple me nta tion

9 9 9 100.0

Total 43 43 43 100.0

Output Level Indicator

No. of WPs

Planned to be

Constructed

(Annual)

No. of Applications

planned to be

submitted

(Cumulative)

No. of WPs

Applications

submitted

(Cumulative)

% Achieved

As it is indicated in table 1.2.2 below in this fiscal year at community level a total 23 new WPS (HDW=14, SW=9) were

planned to be Constructed. In view of that 8 WPs (4=SWs at Agalometi, 3=SW at Belojiganfoy, 1=SW at Odabuldiglu)were

constructed and benefiting a total of 1,937 rural community in the reporting period. The remaining 9 WPs were on

processes to be completed in the 4th quarter of the fiscal year.

Table 4Table 1.2.2: No. of Community Water Supply Schemes Constructed with the support of COWASH III as per GTP

II Service Level

Page 11: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

This Quarter Cumulative Annual This Quarter Cumulative

HDW 14 14 14 SPD On Spot

SPD with CC

SW 3 9 9 8 8

DW

RWH

RPS from SP

RPS from DW

Expansion

Subtotal 17 23 23 8 8 -

IR 1.2.2: No. of safe & CR

Community WS schemes

constructed as per the designs by

COWASH as per GTP II service

level

Population

having access

within 1 km

radius of the

WPs (Total)

Output Level Indicator Type of Water Point(WP)

No. of WPs Planned to be ConstructedNo. of WPs Constructed with GTP

II Standard

Actual No of

People Using

the

Constructed

WPS

Page 12: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

2.1.3 Output 1.3 New safe and climate resilient school water supply schemes constructed

As it is indicated in table 1.3.1 below in this fiscal year a total 11 new WPS planned and out of this 3 shallow wells

completed(1=SW at Oda, 2SW at Belojiganfoye woredas). In view of that totally they are benefiting 1,753(F=746)

amount of students and school communities. The remaining 11 WPs were on processes to be completed in the 4th quarter

of the fiscal year.

Table 5Table 1.3.1: No. of School Water Supply Schemes Constructed with the support of COWASH III

M F T M F T M F T M F T

HDW 5 5 5 - - - - - -

SPD On Spot - - - - -

SPD with CC - - - - -

SW 3 6 6 3 3 - - - -

DW - - - - -

RWH - - - - -

RPS from SP - - - - -

RPS from DW - - - - -

Type of Water Point(WP)

No. of WPs Planned to be ConstructedNo. of WPs Constructed with GTP II

Standard

IR 1.3.2: No. of safe and

CR School WS schemes

constructed by COWASH

III as per the design

With DisabilityOutput Level Indicator

With No Disability

Number of People* Benefitting the Compled Water Supply Schemes

This Quarter Cumulative

This Quarter Cumulative Annual This Quarter CumulativeWith Disability With No Disability

2.1.4 Output 1.4 New safe and climate resilient health facility water supply schemes constructed

As it is indicated in table 1.4.1 below in this fiscal year a total 9 new WPS (HDW=4, SW=5) were planned to be Constructed

for Health institutions. In view of that 3 SWs were constructed at (1=SW at ODa, 1=SW at Belowjiganofy and 1=SW at

Agalometi woredas and benefiting a total of 74(F=27) in the reporting period. The remaining 6 WPs were on processes to be

completed in the 4th quarter of the fiscal year.

Table 6Table 1.4.1: No. of Health Facility Water Supply Schemes Constructed with the support of COWASH III

Page 13: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

M F T M F T M F T M F T

HDW 4 4 4 - - - -

SPD On Spot - - - - -

SPD with CC - - - - -

SW 1 5 5 3 3 - 3 3 6 - 3 3 6

DW - - - - -

RWH - - - - -

RPS from SP - - - - -

RPS from DW - - - - -

Expansion - - - - -

Subtotal 5 9 9 3 3 - - - -

With No Disability

Number of Health Facility staff Benefitting the Compled Water Supply Schemes

This Quarter Cumulative

This

Quarter

Cumulati

veAnnual

This

Quarter

Cumulati

ve

With Disability With No DisabilityType of Water Point(WP)

No. of WPs Planned to be

Constructed

No. of WPs

Constructed

IR 1.4.2: No. of safe and CR

Health Facility WS schemes

constructed by COWASH III as

per the design

With DisabilityOutput Level Indicator

2.1.5 Output 1.5 COWASH Phase III new water supply schemes screened for technical, social, environmental & climate

risks

The number of new water schemes screening for Technical, social, environmental and climate risks as per the screening

and management guideline , TSECR Management Plan and it’s implementation plan; it is not yet completed the format

by the woredas and they did not compiled the report. So the report will be incorporated in the annual report of the fiscal

year.

Table 7Table 1.5.1: No. of COWASH III Supported WPs Screened for Technical, Social, Environmental

& Climate Risks (TSECR)

Page 14: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

IR 1.5.1: No. of new COWASH III WS

schemes screened for Technical, Social,

Environmental & Climate Risks as per

the screening and management

guideline

43 43 43

Output Level Indicator

No. of WPs Planned to be Screened for

TSECR

No. of WPs Screened for

TSECR

This Quarter Cumulative Annual This Quarter Cumulative

Table 8Table 1.5.2: No. of COWASH III Supported WPs with TSECR Management Plans

Table 9Table 1.5.3: No. of COWASH III Supported WPs with TSECR Management Plans Implemented

IR 1.5.3: No. of COWASH III Technical,

Social, Environmental & Climate Risk

(SECRM) WS scheme management

plans implementation started at site

level

43 43 43

Output Level Indicator

This Quarter Cumulative Annual This Quarter Cumulative

2.1.6 Output 1.6 Water quality of woreda rural water supply schemes measured

When we look at number of Catchment based Water Safety Plans (WSP) implementation in selected woredas; totally 5 catchment

based water safety plans were planned at three piloted woredas namely at Bambassi three, at Pawi woreda for Ali spring water supply

system from its source up to consumer and at Mandura Woreda at Dafli water supply system. Now TOT training for three Woredas

IR 1 . 5. 2 : No. of COW AS H III

W S s c heme s with Te c hnic a l,

S oc ia l, E nvironmenta l &

C lima te R is k (TS E CR )

43 43 43

Output L e ve l Ind ic a to r

No . o f W P s P la nne d to ha ve

Ma na g e m e nt P la n

No . o f W P s w ith

Ma na g e m e nt P la n

Th is

Qua rte r

Cum ula tiv

eAnnua l

Th is

Qua rte r

Cum ula tiv

e

Page 15: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

already given and going to start their implementation in the coming fourth quarters period. In addition to this in the reporting period

practical water quality testing methodology was given for experts and provided the Kit for Bambassi and Oda Woredas. Hence during

the training totally 10 WPs(at Bambasi=5& at Oda=5) were tested for physico-chemical and bacteriological. hence based on the test

result at Bambai Woreda two water schemes are bacteriologically not potable and needs chlorination and disinfection while in case of

Oda Woreda only water schemes have coliform that needs disinfection and chlorination to make it potable for the communities. Out

of 10 water schemes tested for water quality, 7 of them are free of coliform and feceal contamination. All water schemes should have

to be chlorinated regularly to make them potable for communities. water quality test was done for last year water schemes constructed

by COWASH.

Table 10Table 1.6.1: No. of Catchment based Water Safety Plans (WSP) implemented with the support of COWASH III

in selected woredas

Table 11Table 1.6.2: No. of Water Supply Schemes tested* with the support of COWASH III

IR 1 .6.2 : No . o f W S s che me s te s te d

fo r W a te r Qua lity (phys ic a l &/or

m ic robio log ic a l) with the s upport o f

COW AS H III budge t

- - 159 10 10

Ou tpu t L e v e l In d ic a to r

No . o f WP s P la nn e d to b e te s te d No . o f WP s te s te d

Th is Qua rte rCum u la tiv

eA nnu a l Th is Qua rte r

Cum u la tiv

e

IR 1.6.1: No. of Catchment based Water

Safety Plans (WSP) implemented with the

support of COWASH III in selected

woredas

5 5 5 3 3

Output Leve l Ind i cator

No. of WSPs P l anned to be

Prepared and Impl emented

No. of WSPs

Impl emented

Th i s Quart erCumulat i v

eAnnua l

Th i s

Quart er

Cumulat i v

e

Page 16: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Table 12Table 1.6.3: No. of WPs tested with the support of COWASH III and found to be potable

2.2 OUTCOME 2.

INCREASED COMMUNITY,

INSTITUTIONAL

SANITATION & HYGIENE

ACCESS COVERAGE (GTP II),

IN THE TARGET WOREDAS IN 5 PROGRAM REGIONS BY 2019

2.2.1 Output 2.1 Human capacity to implement sanitation and hygiene enhanced

COWASH is working to improve sanitation and hygiene situation in project Woredas to increase access coverage

according to GTP II standard. Hence COWASH has planned to make 14 Kebeles ODF in this year project

implementation period in the woredas. Hence to facilitate its implementation, human capacity building is one of the

crucial tool and in view of that training on Sanitation &Hygiene including Sanitation marketing was planned to be

given for 314 trainees in the reporting period and hence it was given for 174(F=41) participants. As it was shown

in the table 1.1.2 above none of the trainees were disables and the achievement was 55.41%.

2.2.2 Output 2.2 Access to improved household and institutional latrines increased

Concerning the construction of new institutional latrines, 4 new institutional latrines were planned to be constructed in 2009 EFY at

Bambasi Woreda (1= school and 3= health institution). Accordingly, 1 application for schools, and 3 for health institutions were

submitted and all of the applications were desk and field appraised & approved by WWT in the reporting period (See table 2.2.1).

IR1.6.3: No. of Water Supplies Tested for

Water Quality (physical &/or

microbiological) and found to be potable

with the support of COWASH III budget

159 7 7

Output Leve l Ind i cator

No. of WPs t est ed (phsi c a &/or

bac t eriol ogi c a l )

No. of WPs found to be

potab l e

Th i s Quart erCumulat i v

eAnnua l

Th i s

Quart er

Cumulat i v

e

Page 17: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Table 13Table 2.2.1: No. of Institutional Latrine Applications Submitted to Woreda WASH Team (WWT)

School 8 1 1 100.0

Health Facility 10 3 3 100.0

Total 18 4 4 100.0

Institution

No. of Latrines

Planned to be

Constructed

(Annual)

No. of Latrine

Applications planned

to be submitted

(Cumulative)

No. of Latrine

Applications

submitted

(Cumulative)

% Achieved

Page 18: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Regarding the construction of institutional latrines including the rolled over institutional latrines in the fiscal year 18 institutional

latrines(Health=10 & School=8) were planned to be constructed out of these 11 of them were completed in Bambasi (1=school,

3=Health) , Belogiganfoy (2=school, 3=Health) , Odabildigilu Woreda(school=1,Health=1) up to the reporting period. The

beneficiaries of the completed school latrines were about 2,177 (F = 968) of this 8(F=3) were disable students including teachers and

administrative staffs, and that of health post latrines were about 21 (M=6) health post workers and administrative staffs (See table

2.2.2&2.2.3 below). At Agalometti Woreda out of three rolled over VIP latrines constructions, only one of it was more than 50%

completed. But the remaining two are less than 50% progress. This happen because of low performance of the contractor and weak

supervision and follow up by the Woreda. The remaining 4 institutional latrines in Bambasi Woreda (school=1&Health=3) were

approved by WWT and ready for construction in the reporting period.

Table 14Table 2.2.2: No. of Schools Having Access to Improved Latrine with the support of COWASH III

Table 15Table 2.2.3: No. of Health Facilities Having Access to Improved Latrine with the support of COWASH III

M F T M F T M F T M F T

1 8 1 4 4 3 7 510 356 866 4 3 7 1,200 964 2,164

With No

Disabi l i tyWith Disabi l i ty With No Disabi l i ty

No. of School Latrines

Planned to be

Constructed

Number of Bneficiaries of the Schools Latrines Constructed

Cumu

lative

Annu

al

This Quarter Cumulative

With Disabi l i ty

No. of

School

Latrines

Constructed

This

Quart

er

Cum

ulati

ve

Page 19: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

2.3 OUTCOME 3.

INCREASED

FUNCTIONALITY AND

SUSTAINABILITY

(O&M) OF BUILT

WASH FACILITIES IN

THE TARGET

WOREDAS IN 5

PROJECT REGIONS BY

2019

2.3.1 Output 3.1 Water supply schemes rehabilitated

In 2009EFY a total of about 116 old water points were planned to be rehabilitated in 9 COWASH III woredas of the region and based

on that since woredas have given priority for the construction of new water points, and none of them were completed and their

implementation will be completed in the in the upcoming quarter.

Table 16Table 3.1.1: No. of Water Supply Schemes Rehabilitated with the support of COWASH Phase I

Co m m un ity In s titu tio n a l C o m m un ity In s titu tio n a l

IR 3 . 1 . 1 : No . o f C ommunity/Ins titutiona l

W S s che me s R e ha bilita te d with

COW AS H III s upport a s pe r G TP II

s e rv ic e le ve l & C lima te R e s ilie nc e

re quire me nts

31 116 116 1 1 2753 2599

Output level Indicator

No . o f WP s P la nn e d to b e R e h a b ilita te d No . o f WP s R e h a b ilita te d A c tu a l No o f

P e o p le Us in g

th e

R e h a b ilita te d

C o m m un ity

WP s

No . o f P e o p le

Ha v in g A c c e s s to

th e C o m m un ity

WP s

R E HA B IL ITA TE D

A s P e r G TP II

S ta n d a rd

Th is Qua rte r Cum u la tiv e A nnu a l

Th is Qua rte r Cum u la tiv e

2.4 OUTCOME 4. INCREASED WOMEN’S EMPOWERMENT, LEADERSHIP AND INCLUSION OF PEOPLE WITH

DISABILITIES IN THE 9 PROJECT WOREDAS OF THE REGIONS BY 2019

M F T M F T M F T M F

IR 2.2.5: No. of Health

Facilities having Acess

to Improved Latrines

constructed as per the

standard of MoH with

the support from

- 3 10 1 7 - - - 6 15 21 - - - 6 15

With No

Disabi l i ty

With

Disabi l i ty

With No

Disabi l i ty

Output Level

Indicator

No. of Health

Faci l i ty Latrines

Planned to be

Number of Health Faci l i ty Staff Bnefi ting from the Health

Faci l i ty Latrines Constructed

This

Quart

er

Cumu

lative

Annu

al

This Quarter Cumulative

With Disabi l i ty

No. of

Health

Faci l i ty

This

Quart

er

Cum

ulati

ve

Page 20: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Increased women empowerment, leadership and inclusion of people with disability was one of the components of COWASH III,

regarding to this as it is depicted in table 1.1.2 above Women leadership in water supply management by WASHCO was planned to

be given for 50 participants and it was given for 56(F=8) trainees none of them were disables with achievement of 112%. Similarly

trainings on Gender and disability inclusion was also planned to be given for 106 participants and hence it was given for 178(F=90)

participants of this 25(F=8) were disables and the achievement was 167.9%. This high achievement is because of the rolled over

activities from the second quarter.

Page 21: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

3 FINANCIAL UTILIZATION

3.1 Investment, capacity Building (PHYSICAL & HUMAN) & operational budget

planned, transferred and utilized in 2009EFY 3rd quarter from GoF

The fund allocated from Government side was used for activities i) Construction of water schemes (Spring

Development, rehabilitation of existing water schemes) ii) institutional latrines construction, iii) capacity

buildings both human and physical, and operational cost. Budget from Finland government was planned for

construction of hand dug wells, capacity building and operation cost.

Investment budget planned for the nine month from Gof was about 1,590,000 ETB .The budget utilized during

the nine month was 579,085.57 ETB which is 36% achievement.

The Physical capacity building (PCB) budget planned for the nine month was 138,000.00ETB, and

77,710.00ETB was utilized for PCB activities which is 56% achievement.

Human capacity building for the nine month was planned about 2,206,772 ETB and out of this, 1,772,852.05

Birr was utilized which is 80% achievement.

Similarly 1,127,680.00 ETB was planned for operation costs for the nine month, and hence total expenditure

is just about 1,371,050.84 ETB which is 113% achievement.

Finally overall financial plan for the nine month was about 15,333,344ETB out of this budget Birr

5,410,965.36 was utilized which is 35.28% of achievement.

Page 22: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Annex 5.1 COWASH Funds Utilization Performance in the Reporting Period

Region: BG Budget Year: 2009 EC Quarter: 3rd

1 2 34 =

(3)/(2)*1005 6

7 =

(6)/(5)*1008 9 10

11 =

(10)/(9)*112 13

14 =

(13)/(2)*10

Plan Utilized % Utilized Plan Utilized % Utilized Plan Utilized % Utilized Plan Utilized % Utilized

Investment 4303227 4098311 579085.57 14% 1590000 579085.57 36% 4984350 4747000 165000

HCB 7353289 6930753 1772852.05 26% 2206772 1772852.05 80% 208192 208192 140000

PCB 1590660 1590260 77710 5% 138000 77710 56% 141808 141808 28808

OP 3551610 2714020 2981317.74 110% 1217680 1371050.84 113% 2473124 1813514 971750

BOFED

Treasury &

Contingen

cy

Total ######### 15,333,344 5,410,965 2 5,152,452 3,800,698 3 ###### ####### - - 1,305,558 - -

15 =

(1)+(8)*10

0

16 = (2) + (9) 17 = (3) + (10)

18 =

(18)/(17)*1

00

19 =

(5)+(12)*10

0

20 =

(6)+(13)*10

0

21 =

(20)/(19)*10

0

Plan Utilized % Utilized Plan Utilized % Utilized

Investment ####### 8,845,311.00 579,085.57 6.55 ######### ######## 0.32996329

HCB ####### 7,138,945.00 1,772,852.05 24.83 ######### ######## 0.75544282

PCB ####### 1,732,068.00 77,710.00 4.49 ######### 77,710.00 0.46586495

OP ####### 4,527,534.00 2,981,317.74 65.85 ######### ######## 0.6262136

BOFED

Treasury &

Contingen

cy

- - - #DIV/0! - - #DIV/0!

Total ####### 22,243,858.00 5,410,965.36 24.33 ######### ######## 0.58852471

GOF + GOE

Plan (Annual)Cumulative This Quarter

Category

Category

GoF GoE

AnnualCumulative This Quarter

AnnualCumulative This Quarter

Page 23: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Annex 5.2: Total COWASH Funds (in Birr) Received and Utilized in BG Region to date

Received (%)Transferred

(%)

GoF 15,408,456.54 6,605,978.46 5,410,965.36 853,750.96 35.1 81.9

GoE 4,750,000.00 4,550,000.00 0.0 0.0

Total 20,158,456.54 11,155,978.46 5,410,965.36 853,750.96 26.8 48.5

Usage from Budget

Source

Received from

Source to Date

(in Birr)

Transferred to

Beneficiaries to

Date (in Birr)

Utilized by

Beneficiaries to

Date (in Birr)

Balance from

Received to Date

(in Birr)

Note: GoF funds leftover from 2008 EFY shall be included in the in the ‘Received from Source to Date (in Birr)’ Column

of GoF budget source.

Page 24: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL
Page 25: BENISHANGUL GUMUZ NATIONAL REGIONAL STATE FINANCE … · ASSOSA MAY,2017 . TABLE OF CONTENT ... O&M OPERATION AND MAINTENANCE WASHco WATER,SANITATION AND HYGIENE COMMITTEE GPS GEOGRAPHICAL

Table 17 Major challenges Faced and Measures Taken during the Quarter

S/N Major challenge(s) faced Measure(s) taken

1 The updated WASHco

procurement and asset

management guideline not

approved and sent to

Woredas

It was agreed to send the updated guideline for

woredas that is going to used for coming years of

COWASH project implementation

2 VIP latrines construction at

AgaloMetti Woreda is delayed

more than expected because

of low performance and

support by Woreda Education

and Water office and also low

performance of the

contractor

Woreda advisor already recruited and he took

mandate to support and follow up strictly based

on problems faced. The woreda is going to cancel

the agreement with the contractor and to give for

other contractors

3 Remaining GOF fund for this

year not requested

Agreed to request as fast as possible by sending

both the audit report and this nine months report

4 Gesengesa solar pump

system is not functioning

and giving service for

communities

WASHco already wrote letter for Bureau and

contractor to give immediate solution. If the

contactor going to deny the maintenance work,

WASHco will use the retention payment for

maintenance and for other solutions

5 Dibatie and Pawe Woredas

did not get artisians or

masons having TIN number.

Even denied to come to

assosa and process the

number

Direction was given to use artisans or masons

from nearby woredas having TIN Number.


Recommended