siemens.com/gasturbines Best-in-class reliable, flexible, and service-friendly turbine packages E-class gas turbines from Siemens: SGT-PAC 2000E series
Transcript
Page 1: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

siemens.com/gasturbines

Best-in-class reliable, flexible, and service-friendly turbine packagesE-class gas turbines from Siemens: SGT-PAC 2000E series

Page 2: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

A whole package of advantages

As we developed the packages based on the SGT-2000E series for the 50 and 60 Hz market, we made it our mission to offer customers maximum benefit, regard-less of how they define it.

That is why the package components offer an inherently high degree of flexibility and performance and are per-fectly matched to each other and to your requirements.

2

Page 3: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

The SGT-2000E series packages:built-in competitive advantagesOur packages based on the SGT-2000E Siemens Gas T urbine series make your system planning as efficient as possible. The packages consist of a gas turbine, generator, and auxiliary systems. These components are optimally matched to each other, the interfaces function perfectly, and you get the right performance at precisely defined and transparent costs. Additionally, with a package from Siemens as the original equipment manufacturer (OEM), we are responsible for the core element of your system as an expert partner. You can rely on the comprehensive experience we have acquired since 1981 with over 350 turbines and additionally over 200 licensed turbines in operation worldwide – both in selecting the right technology and in commissioning the machine on schedule.

Cost efficient operation Best-in-class reliable technology, perfectly coordinated – with a service concept that is optimally matched to your needs. These are the hallmarks of packages based on the SGT-2000E series. They help you achieve your goals eco-nomically and thanks to our innovative technology and continual investment in ongoing technical development in our new unit and service business, you always enjoy the benefit of state-of-the-art technology with a package from Siemens.

Specific benefitsThe versatile SGT-2000E series forms the basis of our SGT-PAC 2000E series packages for simple cycle applica-tions and our dedicated Siemens combined cycle power plants (SCC-2000E series), which also include Siemens steam turbines. We intentionally exploit this flexibility in matching components to give you the greatest possible competitive edge. As a supplier of turnkey power plants, we understand the ins and outs of the interfaces from the package to the entire power plant – so that Siemens packages integrate precisely into your processes. For example, to improve process steam we customize the design of the steam turbine, whose performance, like the generator design, is dictated by the overall plant concept.

Our design philosophy• Continuous & ongoing development• Service-friendly maintenance concepts• Successful technology downloads, also from other

frames within Siemens portfolio• Design principle: All upgrades are retrofittable

3

Page 4: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

With a package based on the SGT-2000E series, you secure a wide variety of competitive advantages thanks to the smooth interaction of high-performance components. Whether you have a gas turbine power plant or a com-bined cycle power plant, our packages offer you the right technologies for your individual requirements. They combine the high-performance Siemens generator SGen-100A-2P series at the cold end of gas turbine with the right steam turbine and the centerpiece of the package: the SGT-2000E series gas turbine.

We offer you a highly efficient package using e.g. the SST-800 steam turbine for 1 x 1 configurations, and for example the SST-4000 series for 2 x 1 and larger configurations. The key selection criteria are the block configuration, the steam extraction requirements for diverse applications or back-pressure operation, and the cold end.

Efficient planningRight from the development phase of the plant concept, we ensure that all interfaces match perfectly and that the components can deliver optimal functionality – so that each one makes the best possible contribution to the performance of the overall package. This helps you realize even greater competitive advantages with reliable, highly available technology, minimized operating costs, and simplified maintenance.

Optimal technologies for best performance

4

Page 5: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

SCC-PAC 2000E series 2 x 1for combined cycle operation

We offer other package configurations depending on your individual requirements.

SGT-PAC 2000E series for simple cycle operation

SGT-2000E series SGen-100A-2P series

SCC-PAC 2000E series 1 x 1for combined cycle operation

SGT-2000E series SGen-100A-2P series

SGen-100A-2P seriesSST-800

SST-4000 series, SST-800

2 x SGT-2000E series 3 x SGen-100A-2P series

• Air intake system • Exhaust gas system • Control system • Electrical systems • Power control center (PCC)• Enclosures for generator and

auxiliaries• Gas turbine outdoor enclo-

sure (option)• Fire protection

Please note: In addition to this exemplary gas turbine package, we are highly flexible and can provide specific solutions to meet your individual requirements.

• SGT-2000E series gas turbine • SGen-100A-2P series

air-cooled generator• Auxiliaries:

‒ Fuel gas system ‒ Fuel oil system (option) ‒ Water injection system (option)

‒ Hydraulic oil system ‒ Compressor cleaning system ‒ Turning device ‒ Lube oil system ‒ Hydraulic clearance optimization (HCO)

The SGT-2000E series packages – your advantages at a glance

• High investment protection Thanks to long-term availability of spare parts and qualified maintenance

• Minimized costs for engineering and project management Due to preconfigured packages and years of experience

• Shorter delivery times, faster commissioning With our standardized packages with predefined interfaces to the entire power plant and the use of proven components

• Design freedom for the plant Selection and adaptation of the components to specific requirements; broad technology spectrum

• Optimal adaptation to your specific requirements Numerous options for the components and auxiliary equipment

Scope of supply – SGT-PAC 2000E series includes:

5

Page 6: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Key

1 Generator coupling

2 Variable inlet guide vanes

3 Compressor section

4 Silo combustion chamber

5 Hybrid burner

6 Ceramic tiles

7 Mixing casing

8 Turbine section

9 Turbine exhaust casing

1

4

5

9

2

3

6

7

8

The SGT-2000E series: flexibility is its hallmark

We know that as a customer you have clear ideas about how to use your system profitably. But we also know that the requirements you face as an operator may change quickly, either for legal reasons or your use of alternative fuels. With the SGT-2000E series, you profit from our many years of experience with high-perfor-mance gas turbines. Our comprehensive expertise and the gas turbine’s solid technical foundation guarantee secure best-in-class, reliable, efficient, and flexible operation.

6

Page 7: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Outstanding performance for greater flexibility

SGT5-2000E SGT6-2000E

Only ~17.5 minutes to achieve full load• Full speed and synchronization

after ~ 4 minutes• ~ 15 MW per minute

start-up power• Option (30 MW/min)

available for very fast starts

Only ~10 minutes to achieve full load• Full speed and synchroni-

zation after ~ 3 minutes• ~ 17 MW per minute

start-up power• Option (27 MW/min)

available for very fast starts

Outstanding fleet start-up reliability of over 96.5 percent*

Availability value >94.9 percent*

Adherence to NOX and CO limit values even in 50 percent part-load operation

Fast change of power output in accordance with stringent network requirements for optimal frequency stabilization

Online fuel change over from gas to oil and vice versa

* 12-month rolling average as of July 2016

Perfect for many fuelsAbout three-quarters of the gas turbines in operation today are fired with natural gas, with fuel oil typically used as a backup fuel. The remaining one-quarter use alternative fuels such as residual oils from petroleum dis-tillation, low-caloric gases from natural gas liquefaction, or synthesis gases.

Arguments in favor of using alternative fuels include the benefit of utilizing locally available resources. This sources contain e.g. low calorific gases or gases containing CO2, H2S, and N2, as well as cruide oil and other liquid fuels with high viscosity. The SGT-2000E series gas turbines are also perfectly suited for burning these fuels.

The SGT-2000E series does not require cooling air holes in the blades. This means that it can also process ash- producing fuels like heavy fuel oils that would otherwise block the holes. The upstream external combustion chambers are maintenance-friendly and contribute to the high reliability of the hot gas components. A variety of burners are available depending on the composition of the fuel.

Optimal performance and availabilityThese are the essentials for competing successfully on the electricity markets: robust and flexible performance at a low price, with high availability and ease of mainte-nance, and technical properties that are optimally matched to the task at hand.

In short, what counts is the right turbine – with the perfectly matched modules of the SGT-PAC 2000E series package. The SGT-2000E series is regarded as the workhorse among the Siemens gas turbines. In addition to their high flexibility with respect to fuels and power output, the SGT-2000E series provides outstandingly low NOx and CO2 emission values, even in the part-load range.

7

Page 8: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Custom performance – in maintenance, too

A turbine as versatile as the SGT-2000E series also has more to offer with regard to maintenance cycles than other turbines. Our customers profit from our service specialists’ custom solutions that are designed to precisely meet your individual require-ments, from the maintenance-friendly design of the turbine and turbine components to customer- oriented maintenance concepts.

8

Page 9: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

41 MAC concept

Project specific concept

33 MAC concept

25 MAC concept

Focus on optimized availabilityIncreased service intervals reduce service outage time

Focus on optimized performanceHigher turbine inlet temperatures increase power output and efficiency

Serv

ice

inte

rva

ls

Power output / efficiency

Benchmark service flexibility: a variety of maintenance concepts to choose from

Less maintenance effort, fast repair As early as the design phase, Siemens stands out for the service friendliness of its gas turbines. The scope of maintenance work and the resulting outage times are established during the gas turbines' development.

Thanks to its robust construction, the SGT-2000E series is exceptionally reliable – and service-friendly by design. This begins with the ease of accessibility of all important components. For example, the two separate silo combus-tion chambers are readily accessible for service purposes, making it easy to inspect the hot gas path. Inspection and cleaning of the turbine blades can be easily performed thanks to easy accessibility. Another important benefit is the Siemens rotor design, it enables the de-stacking of the rotor on-site at the power plant ensures that no rotor transport is necessary during major outages.

What do you want to achieve?This is precisely the question that determines how you operate the flexible SGT-2000E series gas turbine. Its operating parameters in turn determine the thermal loading of the components – and hence the length of the mainte-nance intervals. If you want to maximize availability of the electricity supply for your customers, or need the turbine

to drive your equipment in the oil or gas business, you need a totally different maintenance concept than you would for operating a turbine for maximum energy efficiency.

We can provide you with an appropriate maintenance concept designed for your plant operation. For typical oil and gas applications, for example, there is the 41 MAC concept, with 41,000 equivalent operating hours (EOH) between two major inspections and with intermediate maintenance every 8,000 EOH. This keeps maintenance times down, with the direct benefit of higher availability – a different approach from applications where there is greater emphasis on energy efficiency. To meet the higher requirements of thermal stressing of the components and to deliver optimal performance at all times, the interval between two major inspections is reduced to 25,000 EOH – the 25 MAC concept. We continually work to optimize our turbine maintenance concepts, and we ensure as early as the design phase that future adaptations can be applied to today’s machines.

9

Page 10: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Turbine Power output up to

Pressure up to

Temperature up to

SST-800 250 MW 165 bar/2,393 psi 565° C/1,049° F

SST-4000 380 MW 105 bar/1,523 psi 550° C/1,022° F

Powering your success – steam turbines from Siemens

With more than 100 years of experience building steam turbines and in the continuous development of this tech-nology, Siemens is a proven partner whose expertise you can rely on. We have enhanced the performance of the SGT-2000E series with additional machines from our comprehensive portfolio so that we can offer you the most economical and efficient configuration for a large number of applications. The spectrum extends from upgrading gas turbine power plants to energy-efficient combined cycle power plants, and also includes applica-tions in which the steam can be used in other industrial processes.

Flexible portfolioOur steam turbines offer all the options for combined cycle operation, including flexible integration into existing infrastructures – for example, the steam connection or tap-off points. The output heat of the gas turbine flue gas is utilized to generate steam by passing it through a heat recovery steam generator (HRSG), so it can be used as input

heat to the steam turbine. Naturally, the decision in favor of a particular system is preceded by comprehensive consulting with our experienced specialists so that we can seamlessly integrate the steam turbine into your plant processes.

High availability Siemens steam turbines provide outstanding quality. State-of-the-art production technologies and strict quality controls guarantee the highest standards of reliability and quality, which are directly reflected in your power plant’s availability.

10

Page 11: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

The industrial steam turbine SST-800

Reliable and flexible: the SST-800 The Siemens SST-800 is a single-casing industrial steam turbine with center steam admission that covers the power range from approximately 40 to 250 MW, depending on the applicable live steam parameters. In the SGT-PAC 2000E series packages, it performs exceptionally well as a generator drive at 3,000 or 3,600 rpm with the outstanding efficiency, fast start-up times, and high availability and reliability that Siemens steam turbines are known to deliver. This is the result of using high quality and versatile standard modules optimally matched to each other.

Customer Benefits Features such as a horizontal casing split or the indepen-dently accessible bearings ensure easy and rapid mainte-nance. Additionally, the guide blade carriers enable easy maintainability or further modifications of the steam path. Stop valves and steam strainers as well as control valves are accommodated in the steam chest and can be removed without dismantling the piping.

SST-800 – your advantages at a glance• Outstanding efficiency• Fast start-up times• High reliability• Economic installation and operation• Flexibility for complex, industrial processes

11

Page 12: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

The large steam turbine SST-4000 series

Powerful and reliable: the SST-4000 seriesAlmost 40 turbines are already in operation or in the com-missioning stage, with a total installed capacity of approx-imately 7,200 MW. The SST-4000 series is our specialized model for dual-pressure, combined cycle applications for 50 and 60 Hz. With the specialized design of the blade path, the entire power range from 100 to 380 MW can be covered with the highest reliability and availability. Appro-priate condensers are also part of our portfolio. Thanks to their systematically modular design, we can easily adapt the SST-4000 series to the individual operating conditions and thermal cycle of your plant. In addition to its modern 3D blading, another factor that contributes to this turbine’s high energy efficiency is the optimized steam path. Another advantage is its fast installation, thanks to prefabricated, tested modules delivered ready for connection.

SST-4000 series – your advantages at a glance• Highest energy efficiency

Short start-up times, high efficiency of the compo-nents, state-of-the-art blade technologies, 3DV™ profile, blading of variable-reaction type

• Compact and low cost Low space requirement, low investment costs

• High versatility and reliability Proven designs for highly efficient, continuous operation

• Short project duration Standardized auxiliary equipment with short delivery, installation, and commissioning times

• Low-cost maintenance and high availability Long service intervals

12

Page 13: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

SGen-100A-2P series – your advantages at a glance• High energy efficiency of up to 98.9 percent• Low noise emissions• Low installation and commissioning costs• Perfectly adapted to a broad range of applications• Excellent serviceability• Long service life • Proven components• Power output range: 25 to 370 MVA

As one of the market leaders in the area of synchronous machines, we have many years of experience building generators. The SGen-100A-2P series air-cooled generators can be delivered with three types of cooling systems according to the requirement profile: TEWAC (Totally Enclosed Water-to-Air Cooling), TEAAC (Totally Enclosed Air-to-Air Cooling), or OAC (Open Air Cooling). With a power output of up to 370 MVA, they are ideally suited for a multitude of applications and significantly enhance the SGT-PAC 2000E series packages. Their high energy efficiency rate of 98.9 percent and their high reliability and availability values make them the first choice for all types of operations to cover the entire range from base-load to peak-load, in dedicated gas turbine power plants as well as in combined cycle applications.

The SGen-100A-2P series: reliable performance in a package

13

Page 14: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Auxiliary components – the ideal way to complete your package

In our packages, every detail has to be right. That is because we do not just supply perfectly coordinated core components – the auxiliary components also need to ensure reliable and economical operation. That includes a customized, maintenance friendly design and piping that is adapted to the application and easy to install.

14

Page 15: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Air intake systemOur air intake system comprises the filter housing, filter system, and inlet duct work. The filter housing offers weather protection and prevents large debris from entering the filter system, which removes both large particles and fine particulates from the air stream. Air flow is directed into the gas turbine’s compressor inlet manifold via the inlet air duct.

Exhaust gas systemAfter expanding through the combustion turbine, the gases pass through the exhaust gas diffuser that provides connection to a stack, a heat recovery steam generator, or a diverter and bypass stack.

Control systemThe control system is based on Siemens Power Plant Automation SPPA-T3000 and contains the necessary control, monitoring, and protection equipment. This includes the operation and monitoring system, the automation system, and the interface to the plant control system.

Electrical systemsThe electrical systems supply low-voltage power to the package loads, including battery and battery charger, to provide an uninterruptible direct current power supply. The electrical equipment also includes static exci tation equipment with transformer, starting frequency converter with transformer for static start-up of the gas turbine via the generator, and generator protection and synchroniza-tion equipment.

Power Control Center (PCC)Prefabricated and functional pre- commissioned PCC containers provide compact and weather protected accom-modation for the electrical and I&C (Instrumentation and Control) equipment. Redundant HVAC (Heating, Ventila-tion, and Air Conditioning) units also offer a controlled environment for sensitive equipment.

EnclosuresThis equipment provides noise abatement for the personnel at work via acoustic panels that are installed around the gas turbine.

Fire protectionFire protection includes fire detection and fire fighting and is provided for PCCs.

15

Page 16: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Az Zour, Kuwait

More than 350 engines working hard worldwide

The 50 Hz version of the SGT-2000E series was introduced in 1981 and its 60 Hz equivalent in 1989. With more than 350 units and additionally over 200 licensed turbines in operation worldwide to date, we have amassed more than 17 million equivalent operating hours (EOH) on the SGT5-2000E and nearly seven million EOH on the SGT6-2000E. At the same time, the fleet’s overall best-in-class reliability exceeds 99.5 percent.

16

Page 17: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Vuosaari, Finland Geregu II, Nigeria

References 60 Hz market

Hsinta, TaiwanTaiwan Power Company operates the Hsinta combined cycle power plant with a capacity of 2,200 MW. The plant comprises five 442 MW combined cycle units, each with three SGT6-2000E natural gas-fired gas turbines, three heat recovery steam generators, and one non-reheat condensing steam turbine. The gas turbines had accumulated more than 2 million operating hours at the end of 2015.

Shoaiba, Saudi ArabiaThe Shoaiba II combined cycle power plant, owned by Saudi Electricity Company, is located on the coast of the Red Sea in Saudi Arabia. With two symmetrical blocks, each consisting of five SGT6-2000E gas turbines and one SST6-4000 steam turbine, the plant achieves a power output of 1,200 MW, which makes it the most powerful and efficient crude oil plant in the world.

Manchester Street, United StatesManchester Street power station, operated by Dominion Inc., produces electricity and steam for industrial use. The power plant consists of three combined cycle units based on the proven SGT6-2000E gas turbine. Manchester Street power station is among the cleanest and most efficient fossil-fueled power plants in New England using Dry-Low-NOx combustors, and a selective catalytic reduction system to reduce emissions of nitrogen oxides.

References 50 Hz market

Vuosaari, FinlandVuosaari power plants, operated by Helen Ltd., have a total power output of 630 MW and deliver district heating and electricity to over half of the population of Finland’s capi-tal Helsinki. Vuosaari B, commissioned in 1998, is based on two SGT5-2000E gas turbines. With a total efficiency rate of more than 90%, Vuosaari is one of the most effi-cient and environmentally friendly power plants in Europe.

Az Zour, Kuwait The Ministry of Electricity and Water operates the 1.6 GW power plant consisting of eight SGT5-2000E gas turbines and two SST5-4000 steam turbines. The Az Zour power plant was constructed in 2004 in simple cycle configuration with 960 MW of power output and was transformed in 2010 into a combined cycle power plant. The power plant serves the energy needs of the growing population in Kuwait.

Geregu II, NigeriaThis 434 MW simple cycle power plant was built for the Niger Delta Power Holding Company (NDPHC). As part of the turnkey construction project, Siemens supplied three SGT5-2000E gas turbines. Geregu II has strategic impor-tance for grid stability and is a key project for the power supply in Nigeria, helping the country to meet its increas-ing power demands. Geregu II is a follow-up project to the Geregu I power plant, which is also based on three SGT5-2000E gas turbines.

17

Page 18: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

SGen-100A-2P 50 Hz 60 Hz

Designed for power factor

0.80 0.85

Speed 3,000 rpm 3,600 rpm

Terminal voltage 6.3 to 20 kV 6.3 to 20 kV

Efficiency Up to 98.9 % Up to 98.9 %

Apparent power 25 to 370 MVA 25 to 370 MVA

Coolant TEWAC (Totally Enclosed Water-to-Air Cooling), TEAAC (Totally Enclosed Air-to-Air Cooling) or OAC (Open Air Cooling, cooling air intake via filter)

Thermal classification Class F insulation system

Class F insulation system

Type of enclosure Suitable enclosures for indoor and outdoor application

Suitable enclosures for indoor and outdoor application

Excitation Brushless or static Brushless or static

Transport dimensions Suitable for rail trans-port in most countries

Suitable for rail trans-port in most countries

SGT-2000E 50 Hz 60 Hz

Physical dimensions

Approx. weight 189,000 kg (417,000 lb)

108,000 kg (239,000 lb)

Length 10.3 m (34 ft) 9.1 m (30 ft)

Height 4.0 m (13 ft) 3.3 m (11 ft)

Width 4.0 m (13 ft) 3.3 m (11 ft)

Compressor

Type Axial flow Axial flow

Number of stages 16 17

Turbine speed 3,000 rpm 3,600 rpm

Inlet guide vanes Variable Variable

Combustion chamber

Type Hybrid burner Hybrid burner

Configuration Two accessible silo combustion chambers

Two accessible silo combustion chambers

Number 2 x 8 hybrid burners 2 x 6 hybrid burners

Fuel Natural gas, LNG, syngas, blast furnace gas, biogas, ethane, propane, condensate, distillate oil, heavy and crude oils, bio-diesel, alcohols, naphtha, kerosene

Turbine

Number of stages 4 4

Drive Cold end, directly coupled

Cold end, directly coupled

SST-800

Turbine series Combined high-pressure/intermediate-pressure (HI) modules and low-pressure (L) modules for 50 and 60 Hz

Output range Up to 250 MW in combined cycle applications

Main steam (typical parameters)

Temperature: up to 565° C / 1,049° F Pressure: up to 165 bar / 2,393 psi

SST-4000 series

Turbine series Intermediate-pressure (I)/low-pressure (L) modules for 50 and 60 Hz

Output range 100 to 380 MW in combined cycle applications

Main steam (typical parameters)

Temperature: up to 550° C/1,022° F Pressure: up to 105 bar/1,523 psi

Conclusive figures

Starting system

Starting system Static Frequency Converter (SFC)

Starting time* 50 Hz: ~17.5 min (very fast start option ~11.7 min) 60 Hz: ~10 min (very fast start option ~8.5 min)

* From turning gear to base-load

Recommended inspection intervals NOTE: Flexible or customized service intervals are available with an LTSA (Long Term Service Agreement)

Inspection type – gas fuel

Equivalent operating hours

25 MAC interval

33 MAC interval

41 MAC interval

Minor inspection After 8,333 After 8,250 After 8,000

HGPI (Hot Gas Path Inspection)

After 25,000 After 33,000 n.a.

eHGPI (extended Hot Gas Path Inspection)

n.a. n.a. n.a.

Major overhaul After 50,000 After 66,000 After 41,000

RCIE (Rotor Casing Inspection Evaluation)*

After 100,000 After 100,000 After 123,000

* Flexible and customized outage scope and planning

18

Page 19: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

SGT-PAC 2000E

ISO conditions, gross values

Configuration flexibility to meet power plant-specific needs

50 Hz 60 Hz

Power output [MW] 187 117

Efficiency [%] 36.2 35.2

Heat rate [kJ/kWh] 9,945 10,239

Heat rate [Btu/kWh] 9,427 9,705

Pressure ratio 12.8 : 1 12.0 : 1

Exhaust temperature [°C] 536 532

Exhaust temperature [°F] 997 990

Exhaust mass flow [kg/s] 558 368

Exhaust mass flow [lb/s] 1,230 811

NOX emissions [ppmvd]

≤ 25 at 15% O2 on fuel gas (without water injection for NOX control) ≤ 42 at 15% O2 on fuel oil (with water injection for NOX control)

SCC-PAC 2000E 2 x 1

ISO conditions, net values

Configuration flexibility to meet power plant-specific needs

50 Hz 60 Hz

Power output [MW] 551 347

Efficiency [%] 53.3 52.2

Heat rate [kJ/kWh] 6,755 6,901

Heat rate [Btu/kWh] 6,403 6,541

SCC-PAC 2000E 1 x 1

ISO conditions, net values

Configuration flexibility to meet power plant-specific needs

50 Hz 60 Hz

Power output [MW] 275 174

Efficiency [%] 53.3 52.2

Heat rate [kJ/kWh] 6,755 6,893

Heat rate [Btu/kWh] 6,403 6,533

19

Page 20: siemens.com/gasturbines Best-in-class reliable, … series make your system planning as efficient ... • Auxiliaries: ‒ Fuel gas system ... This is precisely the question that determines

Subject to changes and errors. The information given in this document only contains general descriptions and/or performance features which may not always specifically reflect those described, or which may undergo modification in the course of further development of the products. The requested performance features are binding only when they are expressly agreed upon in the concluded contract.

For more information, please contact our Customer Support Center. Phone: +49 180/524 70 00 Fax: +49 180/524 24 71 (Charges depending on provider)

E-mail: [email protected]

Article No. E50001-G210-A187-V1-4A00


Recommended