PRESENTATION ON DESIGN & CONSTRUCTION OF CIVIL STRUCTURES & TRACKS WORKS FOR EASTERN DFCC PRESENTED BY UTSAV TIWARI ROLL.NO- 111000155
Transcript
Page 1: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

PRESENTATION

ON

DESIGN & CONSTRUCTION OF CIVILSTRUCTURES & TRACKS WORKS

FOR EASTERN DFCC

PRESENTED BYUTSAV TIWARI

ROLL.NO- 111000155

Page 2: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

PROJECT PROFILECLIENT-DEDICATED FREIGHT CORRIDORS CORPORATION OF INDIA LIMITED(DFCCIL)

CONTRACTOR-TATA ALDESA (JV)

CONSULTANT-SAI TYPSA

ESTIMATED COMPLETION COST-Rs 3,300 CRORE.

ROUTE-BHAUPUR TO KURJA (337 KM DOUBLE TRACK LINE)

Page 3: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

PROJECT MAP

Eastern DFC

States KMs

Punjab 88

Haryana 72

Uttar Pradesh 1049

Bihar 93

West Bengal/Jharkhand 538

Total 1839

Page 4: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

UPGRADED DESIGN & DIMENSION FEATURESFeature Existing On DFC

Heavier Axle Loads    

Axle Load  22.9t/25t  32.5t/25t for Track Superstructure

Track Loading Density 8.67 T/M  12 T/M 

Maximum Speed Single Stack75 KMPH

Double Stack100 KMPH

Grade Up to 1 in 100 1 in 200Curvature Up to 10 degree Up to 2.4 degreeTraction Electrical(25 KV) Electrical(2x25 KV)

Station Spacing 7-10 Km 40 Km

Signalling Absolute/Automatic with 1 Km spacing

Automatic with 2 Kmspacing

Communication Emergency Sockets/Mobile Train Radio

Mobile Train Radio

Moving Dimensions

Height4.25 m 

7.1 m for Western DFC5.1 m for Eastern DFC

Width 3200 M  3600 M 

Container Stack Single Stack Double Stack

Train length 700 M   1500 M 

Train Load

Train Load 4,000 TON 15,000 TON

Page 5: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

SITE: MJ 2,ETMADPUR,TUNDLAENGINEER: VIRENDRA KUMAR

Page 6: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

MACHINERY

HYDRAULIC PILING RIG AUGER

LINER BENTONITE TANK TREMIE PIPE

Page 7: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

TRANSIT MIXERS BATCHING PLANT

SOME OTHER MACHINERIES:-

VERTICAL PUMP  DEWATERING PUMP (VERTICAL)  D.G. SET  BAR CUTTING MACHINE  SOUNDING MACHINE

 

Page 8: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

METHODOLOGY

1)PILE LOCATION:» THE WORKING PILES SHALL BE INSTALLED AT

LOCATIONS AS PER DRAWING. 

2)CASING DRAWING:» LINER OF 1m DIA WITH 8mm/6mm THICK WILL BE PLACED

IN THE POSITION AND PUSHED DOWN THE HAMMER ,SAME WILL BE CHECKED FOR VERTICALITY AND BORING WILL BE CONTINUED.

3)BENTONITE FOR PILING:» BENTONITE SHOULD BE USED IN THE PILING WORKS

CONFORMING TO THE FOLLOWING SPECIFICATIONS. 

» DENSITY OF MUD WILL NOT EXCEED:1.05 gm/cc-1.12 gm/cc

Page 9: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

» MARSH CONE VISCOSITY:30-40 sec» SWELLING INDEX:AS PER IS 6186-1986» PH VALUE:9.5-11.50» SAND CONTENT>.075mm: NOT MORE THAN 1%» LIQUID LIMIT:NOT LESS THAN 400%

» THE BENTONITE REQUIRED FOR PILING WILL BE MIXED 24 HRS IN ADVANCE AND STORED IN THE BENTONITE TANKS.

» THE SPECIFIC GRAVITY OF BENTONITE IS LESS THAN 1.2g/cc AT THE BOTTOM OF THE BORE BEFORE COMMENCING CONCRETING OPERATION. 

Page 10: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

4)BORING:» FOR BORING OF THE PILE SOIL AUGER AND BUCKET WILL BE USED.

5)REINFORCEMENT CAGE:

  a) FABRICATION:» REINFORCEMENT WILL BE CUT USING CUTTING MACHINES OR

MANUALLY AS REQUIRED. 

b)LOWERING OF CAGE:» THE APPROVED CAGE WILL BE LOWERED INTO THE BORE IN

SEGMENTS.CRANE OR HYDRA WILL BE USED TO HANDLE THE CAGE SEGMENTS.  

                     FABRICATION                                                                                       LOWERING OF CAGE

Page 11: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

6)FLUSHING:» THE PRE ASSEMBLED TREMIE PIPES SHALL BE LOWERED IN THE

BORE HOLE KEEPING THE BOTTOM 300mm ABOVE THE TERMINATION LEVEL.FLUSHING OF THE BORE WILL BE DONE WITH BENTONITE PUMP ATTACHED WITH TREMIE PIPE AND TREMIE .

  7)CONCRETING:» THE REQUIRED GRADE OF CONCRETE WILL BE PRODUCED AS

PER THE APPROVED DESIGN MIX AT THE CENTRALIZED BATCHING PLANT AND TRANSPORTED BY TRANSIT MIXERS.

» ENSURING A SLUMP RANGE OF 150mm TO 200mm AT SITE. 

Page 12: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

8) EXTRACTION OF TEMPORARY CASING:- ALL TEMPORARY CASINGS ARE TO BE EXTRACTED IMMEDIATELY AFTER COMPLETION OF CONCRETING.

Page 13: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

»TEMPORARY BENCHMARK SURVEY

SITE:BARHAN,TUNDLA

ENGINEER:YASHPAL SINGH

A temporary benchmark in surveying is a control point that is set by a surveyor to base other points off of. They will assign it an elevation, and other points that are surveyed off of that point will have a relative elevation rather than an absolute elevation

Page 14: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

» STEPS FOR LEVELLING THE STAFF:-

» FIND THE BENCH MARK.» PICK AN INITIAL PLACEMENT FOR 

TRIPOD AND LEVEL.» LEVEL THE INSTRUMENT ON TOP 

OF TRIPOD.» TAKE BACKSIGHT READING.» CALCULATE HEIGHT OF 

INSTRUMENT(HI).» NOW TAKE FORESIGHT READING.» CALCULATE  THE  ELEVATION OF 

GROUND AT SECOND LOCATION KNOWN AS A TBM.

Page 15: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

ENGINEER:RAJESH KUMAR TIWARI

Page 16: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)
Page 17: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

PRESSURE ON FORMATION & SUB SOIL:

BALLAST 3 KG/SQ.CM (MAXIMUM)

SUB SOIL 1 KG/SQ.CM (MAXIMUM)

DESCRIPTION OF SOIL QUALITY CLASS:

SOIL QUALITY W.R.T FINE PARTICLE

SQ1  >50%

SQ2 12%-50%

SQ3 <12%

Page 18: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

» Functions :» A blanket/sub-ballast layer fulfils following important functions :

Primary Function :» Stress Reduction Function

» Secondary Function :» i) Separation Function

» ii) Drainage Function

» iii) Prevention of Mud Pumping

Page 19: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

»LABORATORY TESTSENGINEER:MUKESH KUMAR

Page 20: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

»CONCRETE TESTSLUMP TEST

» Slump test is very common test for and it is very important for consistency of concrete. It is not a suitable for very wet or very dry concrete. It is used convenient a control test and it gives uniformanity concrete. From the batch to batch.

» APPRATUS»  1) Slump cone» 2) Tamping rod » Dimension of slump cone :-

Bottom diameter – 20 cm

Top diameter – 10 cm

Height – 30 cm

Page 21: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)
Page 22: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

» 150 x 150MM Cube Moulds Test

Purpose The moulds are used for making of concrete cubes as per IS :516 – 1959 – Methods of tests for strength of concrete. Apparatus Wheel barrow, sampling scoop, trowel cube moulds of 15 x 15 x15 cm size and tamping bar 16 mm in diameter, 0.6 m long and bulleted point at the lower end.

Page 23: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

»DIGITAL COMPRESSION TESTING MACHINE

The digital compression – testing machine is used to determine the compressive strength of hardened concrete specimens.

Page 24: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

»AGGREGATE TEST

AGGREGATE IMPACT TEST

The Impact value test generally used as alternative to its crushing strength to know quality of aggregate. It is also useful for to know the quality of aggregate this test is apply only 10mm metal. So as to decide its suitability for use in the desired concrete mix.

Page 25: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

» SIEVE ANALYSIS FOR FINE AGGREGATE

The sieves are used for the determination of particle size distribution of fine aggregate by sieving (As per IS 2386 part I – Methods of test for aggregates for concrete) 

Page 26: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

» SIEVE ANALYSIS FOR COARSE AGGREGATE

Page 27: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

CONCLUSIONIT WAS A WONDERFUL LEARING EXPERIENCE AT TATA ALDESA (JV),TUNDLA,FIROZABAD FOR FIVE WEEKS.I GAINED A LOT OF INSIGHT REGARDING ALMOST EVERY ASPECTS OF SITE.I WAS GIVEN EXPOSURE IN ALMOST ALL THE DEPARTMENTS AT THE SITE,BUT I WOULD LIKE TO HIGHTLIGHT THE AREAS OF SAFETY,QUALITY MANAGEMENT,MATERIAL MANAGEMENT ,FORMATION AND EXECUTION.

I HOPE THIS EXPERIENCE WILL SURELY HELP ME IN MY FUTURE AND ALSO IN SHAPING MY CAREER.

Page 28: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

»APPENDIX

Satellite office,Tundla

Page 29: BEST PPT ON TRAINNING ON CONTRUCTION AT INDIAN RAILWAY (DFCC)

                                                                                              Compaction of embankment near Aligarh  

 

Concreting at Minor Bridge 301 (Lot 101),                           Reinforcement & Shuttering fixing for Minor                                               photo taken on june 2014 for Eastern Corridor                    Bridge 301, photo taken on july 2014 . 