DESIGN & CONSTRUCTION OF CIVILSTRUCTURES & TRACKS WORKS
FOR EASTERN DFCC
PRESENTED BYUTSAV TIWARI
ROLL.NO- 111000155
PROJECT PROFILECLIENT-DEDICATED FREIGHT CORRIDORS CORPORATION OF INDIA LIMITED(DFCCIL)
CONTRACTOR-TATA ALDESA (JV)
CONSULTANT-SAI TYPSA
ESTIMATED COMPLETION COST-Rs 3,300 CRORE.
ROUTE-BHAUPUR TO KURJA (337 KM DOUBLE TRACK LINE)
PROJECT MAP
Eastern DFC
States KMs
Punjab 88
Haryana 72
Uttar Pradesh 1049
Bihar 93
West Bengal/Jharkhand 538
Total 1839
UPGRADED DESIGN & DIMENSION FEATURESFeature Existing On DFC
Heavier Axle Loads
Axle Load 22.9t/25t 32.5t/25t for Track Superstructure
Track Loading Density 8.67 T/M 12 T/M
Maximum Speed Single Stack75 KMPH
Double Stack100 KMPH
Grade Up to 1 in 100 1 in 200Curvature Up to 10 degree Up to 2.4 degreeTraction Electrical(25 KV) Electrical(2x25 KV)
Station Spacing 7-10 Km 40 Km
Signalling Absolute/Automatic with 1 Km spacing
Automatic with 2 Kmspacing
Communication Emergency Sockets/Mobile Train Radio
Mobile Train Radio
Moving Dimensions
Height4.25 m
7.1 m for Western DFC5.1 m for Eastern DFC
Width 3200 M 3600 M
Container Stack Single Stack Double Stack
Train length 700 M 1500 M
Train Load
Train Load 4,000 TON 15,000 TON
SITE: MJ 2,ETMADPUR,TUNDLAENGINEER: VIRENDRA KUMAR
MACHINERY
HYDRAULIC PILING RIG AUGER
LINER BENTONITE TANK TREMIE PIPE
TRANSIT MIXERS BATCHING PLANT
SOME OTHER MACHINERIES:-
VERTICAL PUMP DEWATERING PUMP (VERTICAL) D.G. SET BAR CUTTING MACHINE SOUNDING MACHINE
METHODOLOGY
1)PILE LOCATION:» THE WORKING PILES SHALL BE INSTALLED AT
LOCATIONS AS PER DRAWING.
2)CASING DRAWING:» LINER OF 1m DIA WITH 8mm/6mm THICK WILL BE PLACED
IN THE POSITION AND PUSHED DOWN THE HAMMER ,SAME WILL BE CHECKED FOR VERTICALITY AND BORING WILL BE CONTINUED.
3)BENTONITE FOR PILING:» BENTONITE SHOULD BE USED IN THE PILING WORKS
CONFORMING TO THE FOLLOWING SPECIFICATIONS.
» DENSITY OF MUD WILL NOT EXCEED:1.05 gm/cc-1.12 gm/cc
» MARSH CONE VISCOSITY:30-40 sec» SWELLING INDEX:AS PER IS 6186-1986» PH VALUE:9.5-11.50» SAND CONTENT>.075mm: NOT MORE THAN 1%» LIQUID LIMIT:NOT LESS THAN 400%
» THE BENTONITE REQUIRED FOR PILING WILL BE MIXED 24 HRS IN ADVANCE AND STORED IN THE BENTONITE TANKS.
» THE SPECIFIC GRAVITY OF BENTONITE IS LESS THAN 1.2g/cc AT THE BOTTOM OF THE BORE BEFORE COMMENCING CONCRETING OPERATION.
4)BORING:» FOR BORING OF THE PILE SOIL AUGER AND BUCKET WILL BE USED.
5)REINFORCEMENT CAGE:
a) FABRICATION:» REINFORCEMENT WILL BE CUT USING CUTTING MACHINES OR
MANUALLY AS REQUIRED.
b)LOWERING OF CAGE:» THE APPROVED CAGE WILL BE LOWERED INTO THE BORE IN
SEGMENTS.CRANE OR HYDRA WILL BE USED TO HANDLE THE CAGE SEGMENTS.
FABRICATION LOWERING OF CAGE
6)FLUSHING:» THE PRE ASSEMBLED TREMIE PIPES SHALL BE LOWERED IN THE
BORE HOLE KEEPING THE BOTTOM 300mm ABOVE THE TERMINATION LEVEL.FLUSHING OF THE BORE WILL BE DONE WITH BENTONITE PUMP ATTACHED WITH TREMIE PIPE AND TREMIE .
7)CONCRETING:» THE REQUIRED GRADE OF CONCRETE WILL BE PRODUCED AS
PER THE APPROVED DESIGN MIX AT THE CENTRALIZED BATCHING PLANT AND TRANSPORTED BY TRANSIT MIXERS.
» ENSURING A SLUMP RANGE OF 150mm TO 200mm AT SITE.
8) EXTRACTION OF TEMPORARY CASING:- ALL TEMPORARY CASINGS ARE TO BE EXTRACTED IMMEDIATELY AFTER COMPLETION OF CONCRETING.
»TEMPORARY BENCHMARK SURVEY
SITE:BARHAN,TUNDLA
ENGINEER:YASHPAL SINGH
A temporary benchmark in surveying is a control point that is set by a surveyor to base other points off of. They will assign it an elevation, and other points that are surveyed off of that point will have a relative elevation rather than an absolute elevation
» STEPS FOR LEVELLING THE STAFF:-
» FIND THE BENCH MARK.» PICK AN INITIAL PLACEMENT FOR
TRIPOD AND LEVEL.» LEVEL THE INSTRUMENT ON TOP
OF TRIPOD.» TAKE BACKSIGHT READING.» CALCULATE HEIGHT OF
INSTRUMENT(HI).» NOW TAKE FORESIGHT READING.» CALCULATE THE ELEVATION OF
GROUND AT SECOND LOCATION KNOWN AS A TBM.
ENGINEER:RAJESH KUMAR TIWARI
PRESSURE ON FORMATION & SUB SOIL:
BALLAST 3 KG/SQ.CM (MAXIMUM)
SUB SOIL 1 KG/SQ.CM (MAXIMUM)
DESCRIPTION OF SOIL QUALITY CLASS:
SOIL QUALITY W.R.T FINE PARTICLE
SQ1 >50%
SQ2 12%-50%
SQ3 <12%
» Functions :» A blanket/sub-ballast layer fulfils following important functions :
Primary Function :» Stress Reduction Function
» Secondary Function :» i) Separation Function
» ii) Drainage Function
» iii) Prevention of Mud Pumping
»LABORATORY TESTSENGINEER:MUKESH KUMAR
»CONCRETE TESTSLUMP TEST
» Slump test is very common test for and it is very important for consistency of concrete. It is not a suitable for very wet or very dry concrete. It is used convenient a control test and it gives uniformanity concrete. From the batch to batch.
» APPRATUS» 1) Slump cone» 2) Tamping rod » Dimension of slump cone :-
Bottom diameter – 20 cm
Top diameter – 10 cm
Height – 30 cm
» 150 x 150MM Cube Moulds Test
Purpose The moulds are used for making of concrete cubes as per IS :516 – 1959 – Methods of tests for strength of concrete. Apparatus Wheel barrow, sampling scoop, trowel cube moulds of 15 x 15 x15 cm size and tamping bar 16 mm in diameter, 0.6 m long and bulleted point at the lower end.
»DIGITAL COMPRESSION TESTING MACHINE
The digital compression – testing machine is used to determine the compressive strength of hardened concrete specimens.
»AGGREGATE TEST
AGGREGATE IMPACT TEST
The Impact value test generally used as alternative to its crushing strength to know quality of aggregate. It is also useful for to know the quality of aggregate this test is apply only 10mm metal. So as to decide its suitability for use in the desired concrete mix.
» SIEVE ANALYSIS FOR FINE AGGREGATE
The sieves are used for the determination of particle size distribution of fine aggregate by sieving (As per IS 2386 part I – Methods of test for aggregates for concrete)
» SIEVE ANALYSIS FOR COARSE AGGREGATE
CONCLUSIONIT WAS A WONDERFUL LEARING EXPERIENCE AT TATA ALDESA (JV),TUNDLA,FIROZABAD FOR FIVE WEEKS.I GAINED A LOT OF INSIGHT REGARDING ALMOST EVERY ASPECTS OF SITE.I WAS GIVEN EXPOSURE IN ALMOST ALL THE DEPARTMENTS AT THE SITE,BUT I WOULD LIKE TO HIGHTLIGHT THE AREAS OF SAFETY,QUALITY MANAGEMENT,MATERIAL MANAGEMENT ,FORMATION AND EXECUTION.
I HOPE THIS EXPERIENCE WILL SURELY HELP ME IN MY FUTURE AND ALSO IN SHAPING MY CAREER.
»APPENDIX
Satellite office,Tundla
Compaction of embankment near Aligarh
Concreting at Minor Bridge 301 (Lot 101), Reinforcement & Shuttering fixing for Minor photo taken on june 2014 for Eastern Corridor Bridge 301, photo taken on july 2014 .