GIS and New Pipeline Construction: Best Practice for Validating GIS Data John W. Marino Plains All American Pipeline LP Jacob Ramirez BSD Consulting Inc. April 27, 2016 1
Transcript
Page 1: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

GIS and New Pipeline Construction:Best Practice for Validating GIS Data

John W. MarinoPlains All American Pipeline LP

Jacob RamirezBSD Consulting Inc.

April 27, 2016

1

Page 2: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Why does it matter?

Page 3: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Why does it matter?

Trust in GIS

Page 4: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

The Secret Sauce

Predictable Project Deliverable

Page 5: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Ensuring Predicable & Transparent GIS Data Deliveries

• Communication• Documented GIS Workflows• Automated Data QC and Reporting• Feedback to all systems/stakeholders

5

Page 6: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Communication is KEY!

Engineering

SurveyConstruction

&

Inspection

Standards

Schedule

Schedule

6

Page 7: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Project Pre-Planning

• Project kickoff meeting to issue required documents, files, and databases to survey contractors and convey expectations.– Survey Standard– Data Dictionary– Blue Sky Project Database Seed File– Procurement Data for Purchased Materials

7

Page 8: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Project Communication

Inspection Weld Map

Survey Weld Map

Inspection Material Inventory

Survey Feature Codes

Constant data QC and comparison

Constant data QC and comparison

8

Page 9: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Provide Feedback with Metrics• QC data for quality weekly/bi-weekly• Creates training opportunity between

operator and contractor.

9

Page 10: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Communication Breakdown Leads to Data Gaps

Engineering

SurveyConstruction

&

Inspection10

Page 11: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Construction and Survey Scheduling

Rode bore installation

Drag section pulled through

Survey missed weld shots

11

Page 12: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Communication BreakdownMissing Welder Stencil

Welder Initials

Girth Weld Data Points

12

Page 13: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Documented GIS Workflows:ESRI Workflow Manager

13

Page 14: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Blue Sky Project Database Validation• Verify survey data is delivered in format defined in survey

standard.

14

Page 15: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Duplicate Point Numbers Report

15

Page 16: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Centerline Checks

16

Page 17: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Centerline Topology:Spatial Check for self intersecting

centerline (2D Environment)

17

Page 18: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Corrected CenterlineA difference of 16 linear feet.

18

Page 19: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Offline Events Checks• Walk key subcode tables in ArcMap and remove

survey shots not located on the centerline

19

Page 20: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Address Offline Events

• Station is derived for all survey points and stored in the project database

• SQL Filters can help, but entire crossings can be filtered out

20

Page 21: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Offline Events Continued

• Offline weld data can cause errors when striking the centerline and loading data to PODS

21

Page 22: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

What does all the project management buy us??

22

Page 23: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Successful PODS Data Load

• Load data within 60 days of delivery of Final Approved As-built Point File from Survey Contractor

• Accurate centerline alignment and linear reference

• Records of compliance and due diligence

23

Page 24: Best Practices for Validating Pipeline GIS Data · 2016. 5. 10. · The Secret Sauce. Predictable Project Deliverable. Ensuring Predicable & Transparent GIS Data Deliveries • Communication

Questions?

24