AGILE MARKETING : METHODOLOGIES AND PATTERNS FOR STRUCTURAL INNOVATIONSYLVAIN LOUBRADOUBET@LEADERSHIP ESCE CLASS 2
1
WHAT DO WE AIM TO LEARN?
2
1- The basis : agile methods for “How to do it”2- The creative start : design thinking for “Why we do it”3- The innovative loop : Lean Startup for “What we do”
Classes 1 and 2 : agile methodsClass 3 : exploreClass 4 : define, Business modelClass 5 : create and chooseClass 6 : prototype
WHERE ARE WE IN THE LEARNING ?
3
SPRINT 0FIND YOUR TEAM1. Move desks and chairs2. Take your board3. New team mates ? Write their name4. Check if you have a team name5. Build an auto evaluation sketch
4
YOUR WORK IN CLASS = YOUR EVALUATION• Collective note• Self-evaluation in team
Criterias :• Coordination meetings• Flow in board• Retrospective• Creativity in presentations• Task description• Risk taking• Participation of all members• Customer centric 5
SPRINT 1RECAP OF LAST SESSIÓNQ/A
6
Main Information• Kanban• Scrum• Daily Meeting• User Stories• Planification• Planning Poker• Demo• Retrospective• Product Owner• Scrum Master
SPRINT 1KANBAN
Main topics :• Visualization over “pull” flow• Each column = task status• Common columns are : To do / Next / Doing / Parking / Done• Transparency is the key factor success factor• Individual productivity control collapses the system • WIP (Work In Progress) must be limited limits in columns• Daily meeting imprescindible (15 minutes)• It can be priorized every day• Easy to learn• Hamster effect after a 6 months period 7
SPRINT 1SCRUM
8
Main Information• Kanban• Scrum• Daily Meeting• User Stories• Planification• Planning Poker• Demo• Retrospective• Product Owner• Scrum Master
SPRINT 1SCRUM
9
Main topics• Scrum is a 1 to 4 weeks loop• The team should be cross functional• Roles : Scrum Master / Product Owner• During the sprint, priorities don’t change• Powerful system after the 3 sprints learning curve• Continuous improvement• Continuous delivery• Very useful for projects or new products or services
design
SPRINT 1DAILY MEETING
10
Main topics• Stand up meeting in front of the board• Maximum 15 minutes• Si possible every day, otherwise min 1 per week• 3 questions :
• What have I done since last meeting• What will I do until Next meeting• What problem have I encountered
• Every team mate speaks about his/her achievements and moves his/her post-its or tasks
• The Scrum Master vigilates that every one can speak • Main issue : trying to solve the problem during the meeting will last too
much just point out the first step with a task• Have material available near the board
SPRINT 1USER STORIES
11
Main topics• The user stories help to express in a short and clear way the customer needs• Each user story contains a concrete result• The shorter the stories are, the more agile can be the team work• User stories elements:
• Title• Description : As a (functionality user) I want (something) so that (why)• It can contain requisits and assumptions, and expcted results• It can contain the cost and / or the value
• INVEST rules for User Stories• I : Independant, each user story can be delivered alone• N : Negotiable, we can negociate the contents• V : Valuable, creates value to the customer• E : Estimable, it is posible to define a cost of implementation• S : Scalable / Small, it is as small as posible, can not exceed a sprint• T : Testable, we can define how to check if done
SPRINT 1AGILE PLANNING MEETING
12
Main topics• Purpose : select the user stories to implement until the end of sprint• Steps :
• Write and comment the user stories• Add new user stories due to meetings with stakeholders or demos• Define a goal for the sprint• Define an effort or size for each story• Prioritize the stories regarding to the team capacity• Cut and set the sprint backlog
SPRINT 1PLANNING POKER
13
Main topics• Purpose:
• Help to define a shared value for the business value or effort of each Project or user story, especially when stakeholders disagree
• Ensure a great Exchange of information between team mates• How it Works:
• For each story, explain the user story to the team• Each team mate chooses a value from 0 (quite nothing to do)
to 100 (enormous amount of work)• The highest and lowest values explain why• Each one can change his/her card• The user story receives the average as effort or business value
• The public depends on the information you want to define
SPRINT 1PRODUCT OWNER
14
Main topics• Writes user
stories• Prioritizes user
stories in each sprint
• Controls the end results of user stories
• Comunicates with stakeholders
SPRINT 1SCRUM MASTER
15
SPRINT 1DEMO OR SPRINT REVIEW
16
SPRINT 1RETROSPECTIVE
17
• Some links for tools: • http://plans-for-retrospectives.com/?id=3-78-74-29-45• http://retrospectivewiki.org/index.php?title=Agile_Retr
ospective_Resource_Wiki• How it works:
• Visual format• Ask what has worked well or bad, what can be
improved• Discussion rules as « no reproaches » or « speak
about problems not guilt »• Set a frequency• Participants are the team + product owner +
some stakeholders• Expression leads to action choose and define
new improvements actions or rules for the team
SPRINT 1RETROSPECTIVE
18
SPRINT 1RETROSPECTIVE
19
SPRINT 2TEAM WORKEach team will choose 1 point to learn : • User Story or Product Owner or
Scrum Master or Planification or Retrospective or Stand up Meeting or Planning Poker or Demo
• User Story Roadmap or Electronic Boards or Scrumban or Scrum of Scrum or Burndown Chart or Agile Management or Change Management
Each team will have 40 minutes to look for information, synthetise and prepare a SHORT presentation of 3 minutes on the chosen topics.NO Power Point allowed
21
SPRINT 2BEFORE STARTING• Take post-its and pencils• Think about the tasks you have to implement, write them
and place it on the board• Define a team mate controlling time• Try every 10 minutes to have a short coordination meeting • Only 3 minutes means you must choose information (I’m
the teacher, I will add the possible missing information at the end no worries )
• 5 minutes break when you want
22
SPRINT 3TEAM PRESENTATIONSTake pictures
23
SPRINT 4EXAMPLES
24
Project of implementation of new products on a web portal4 departments, 10 people
SPRINT 4EXAMPLES
25
Operational Marketing campaigns (4 departments, 10 people, 4 weeks sprints)
SPRINT 4EXAMPLES
26
Scrum board for a web page improvement Project3 departments including IT, 9 people
SPRINT 5RETROSPECTIVEPer team :0- Check your evaluation sketch1- What has gone well / better2- What did not work3- What did we learn4- What have we missed or would expect for Next time ?
You learn I learn
27
SPRINT 6RECAP OF THIS SESSION
28
Main Information• User Story Roadmap • Electronic Boards• Scrumban• Scrum of Scrum• Burndown Chart • Agile Management • Change Management
SPRINT 6SCRUM OF SCRUM
29
Main Information• Cultural way of scaling
agile• Easy to start• Easy to lose oversight• Scalable boards with
different meeting frequencies and stories precision
• Not used in classical companies (not enough methodology)
• More possibility to learn
SPRINT 6BURNDOWN CHART
30
Main Information• Degressive• Visual and easy to
maintain• Follows points
and/or user stories in status Done
• Link: http://guide.agilealliance.org/guide/burndown.html
• To implement at the sprint planning and refresh at daily stand up
SPRINT 6BURNUP CHART
31
Main Information• Progressive• Visual and easy to maintain• Follows points and/or user stories in
status Done in a Kanban• Link:
http://www.featuredrivendevelopment.com/node/515
• To implement at the month beginning and refresh at daily stand up
• Interesting to learn over team capacity within a year
SPRINT 6SCRUMBAN
32
Main Information• User Story Roadmap • Electronic Boards• Scrumban• Scrum of Scrum• Burndown Chart • Agile Management • Change Management
SPRINT 6SCRUMBAN
33
Main Information• Mix between Scrum (sprint planning, capacity, sprint and
release) for some projects and Kanban (daily priorization, new necesities not foreseen) for incidents, problems, comercial activity
• Gains : a team can work on projects and also operational issues without frustrating users ; allows measure the impact of no planned tasks and petitions to involve the stakeholders in the improvement ; iterative implementation ;-)
• Key factors : one single board, measure permanently the no planned tasks and leave space for the scrum planning (to avoid frustration for not reaching goals)
34
Main Information• Allows distant and distributed teams to work in an agile way• Free tools :
• www.trello.com• www.kanbanchi.com
• Other tools : Jira…• You can : define columns, add members, set timelines, annex
documents, set colours for task types, assign people to work…
SPRINT 6ELECTRONIC BOARDS
SPRINT 6USER STORY MAPPING
35
Main Information• Purpose :
• Organize user stories and tasks to reach a visual overview when number > 50
• Organize a separate loop with stakeholders to organize and prioritize the product backlog (every 2 or 3 months)
• Organization :• 2 axes to organize and order user stories• Timeline, dependencies, priorities, subject, involved team,
task blocks
SPRINT 6USER STORY MAPPING
36
Examples
SPRINT 6AGILE MANAGEMENT
37
The « agile » manager looks like a scrum master with 2 more habilities:
• Adding to the capacity of removing or solving obstacles and difficulties of the team
• Build and communicate a vision and a destination for the project and the team
• Manage and influence the capacity of the team to realize the projectMain missions of « agile » manager :
• Feed the team with data and KPIs to take collective decisions• Improve input quality for the team• Organize and dispose of free time for the team to realize
retrospectives and continuous improvement• Allow direct contacts between team members and stakeholders
References: Servant Leader / Steve Denning
SPRINT 6CHANGE MANAGEMENT
38
Main Information• 2 types of change : individual and collective• On collective level, 8 steps of Kotter apply very well:
• Create a sens of urgency• Build a team with active people• Build a Project or change visión (B point)• Communicate the visión (B point)• Remove obstacles• Create quickwins• Set up continuous improvement on change• Create routines and habits
SPRINT 6CHANGE MANAGEMENT
39
Main Information• 2 types of change : individual and collective• On collective level, 8 steps of Kotter apply very well:
• Create a sens of urgency• Build a team with active people• Build a Project or change visión (B point)• Communicate the visión (B point)• Remove obstacles• Create quickwins• Set up continuous improvement on change• Create routines and habits
SPRINT 6CHANGE MANAGEMENT
40
Main Information• On an individual level:
• Dan Pink tells us about the intrinsic motivation factors : purpose, autonomy, mastery
• William Bridges explains us the steps which each individual will go through at his/her pace
NEXT CLASSChoose a problem you would like to solveExplore this problem with tools