www.pesa.org DIGITAL TRANSFORMATION
Transcript
Page 1: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

www.pesa.org

DIGITAL TRANSFORMATION

Page 2: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

Harnessing power of data to optimize operations

Page 3: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

-

20.00

40.00

60.00

80.00

100.00

120.00

April

2011

June

2016

January

2015

$109

$30

75% High/Low ∆

55% Plunge (‘14-’15)

6+ Major Swings in 5 yrs.

55%

Volatility drives demand for productivity &

new models

Page 4: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

OVERSUPPLY OF OIL MARKET VOLATILITY DIVERSE OPERATIONS WORKFORCE REDUCTION REGULATORY PRESSURE

WHY?

When an offshore well is out of

commission, lost revenue to

operators is

> $3 MM

PER WEEK

For a midsize LNG plant, the

average cost due to unplanned

downtime is

$150 MM

PER YEAR

We are living through the next global shift: a digital industrial revolution

USING DATA TO IMPROVE ASSET

PRODUCTIVITY

The Opportunity

Creating solutions for an industry in need

Page 5: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

By 2020

Industry must master data and insights ... at speed & scale

152MCars connect to the

internet…6 fold increase

10BInternet connected

light bulbs

+1BGrowth in the installed

Base of Smart Meters

10BTerabytes a day

generated by GE machines

Digital industrial revolution in full force

Page 6: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

ReliabilityCost

Reduction

Risk

Mitigation

Profitable

Growth

Increase availability and

longer asset life

Lower operating costs

with greater efficiencies

Greater operational control

yields greater profitsLower operations and

financial risk

Harnessing the industrial internet to drive…

Page 7: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

DESIGN BUILD OPERATE

Leading the digital

revolution from

reservoir to

refinery

O P E R A T I N G

S Y S T E M

SECURITY

Asset

Performance

Management

Production

Optimization

APM FOR

PIPELINE (IPS)

FIELD

PRODUCTION

OPTIMIZATION

)

APM FOR

LNG

APM FOR

OFFSHORE (BP)

Page 8: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

APM

Operating System

Operating System & Asset Performance

Management

The Yin and Yang of the Industrial Internet

Page 9: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

PROVIDING DIGITAL

PRODUCTS, SERVICES &

SOLUTIONS

DIGITIZING &

OPTIMIZING OUR

OPERATIONS

O p e r a t i n g s y s t e m

EXTERNAL INTERNAL

Connecting, monitoring and

optimizing our customers’

equipment and operations

Connecting and digitizing our

internal operations, from

commercial to engineering to

manufacturing and project

management

CONNECTED BY THE DIGITAL THREAD

ENGINEERING

PROJECT

MANAGEMENT

SUPPLY CHAIN

CUSTOMER

EQUIPMENT

SERVICES

COMMERCIAL OPS

Connecting data across our operations and

our customers’

Page 10: Beth Lemmons Presentation1 - PESA · 20.00 40.00 60.00 80.00 100.00 120.00 April 2011 June 2016 January 2015 $109 $30 75% High/Low ∆ 55% Plunge (‘14-’15) 6+ Major Swings in

23

MINDS & MACHINES 2015

powered by #IndustrialInternet

“The real opportunity for change… surpassing the magnitude of the consumer

Internet… is the Industrial Internet, an open, global network that connects people,

data, and machines. This is the Industrial Internet. It’s here and it’s real.“ Jeff Immelt

GE Chairman & CEO


Recommended