7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 1/26
CONTENTS
SL.NO.DESCRIPTION
01. COLDSTARTUP
02. INTEGRATEDSTARTUPPROCEDURECOLDSTARTUP
03. HOTANDWARMSTARTUPS.
04. INTEGRATEDSTARTUPPROCEDUREWARMSTARTUP
05. INTEGRATEDSTARTUPPROCEDUREHOTSTARTUP.
06. START UP BY CURVES FOR ABSOLUTE COLD START WITH HP/LP BYPASSSYSTEM.
07. START UP CURVES AFTER 48 HOURS SHAT DOWN WITH HP/LP BYPASSSYSTEM.
08. START UP PROCEDURE AFTER 8 HOURS SHUT DOWN WITH HP/LP BYPASSSYSTEM.
09. TECHNICAL DATA LIMIT CURVES FOR TURBINE VALVES WALL OF THECASINGSHAFTS.
10. WARMINGUPANDSTARTINGTHETURBINETEMPERATURECRITERIA.
11. TECHNICALDATAREACTIVECAPACITYCURVEFORTURBOGENERATORS.
COLDSTARTUP
(WithAuxSteamavailable)Acoldstartupisbydefinition,oneofwhichthemaximumofHPcasingandHPshaftislessthan1500C.Thisnormallymeansthattheunitisshutdownfromthemaximumloadformorethanfivedays.Ifmachineisstartedfromambienttemperature(HPC/HPshafttempapprox.400C),heatingupofcastingisrequired.Thisisaccomplishedbysoakingthemachineat360rpmatwarmingupsteamparameters(40kg/cm2,3600C),tilltheTSEmarginaresatisfactory.Therifleconstructionofthewaterwallcombinedwiththeboilercirculatingwaterpumpspermitsveryhighrateofpressurerisingofboiler.Anupperlimitof2000C/hrsaturationtemperaturegradientcanbeallowed,i.e.approximatelytheboilerpressurecanbebroughtto20kg/cm2withinanhourofcoldstartup.ButactualtemperaturegradientislimitedbythethickwalledYpieceprovidedinthemainsteamandHRHlines.Amainsteamlineheatingistobestartedasearlyaspossible(atapprox.4kg/cm2)asmaximumdifferentialtemperatureallowedbetweeninner(98%)andmidwalltemperature(50%)is400C.Soboilerloadingisaccordinglyregulated.ItmaybepreferablytostartonlytwoCCpumpsinordertominimiseflashingindowncomers(andsubsequentvibration)whentheboilerwaterisinrangeof850Cto1250C.Thethirdpumpshouldbestartedbeforedrumpressurereaches7kg/cm2tominimisethetemperaturetransientsexperiencedbythepumpcasing(thisistoavoidfastloadoutbackontheboilerintheeventofanyCCpumptripping).Togettherollingparameters,normallytwoelevationoilgunsaretakenwithapprox.70to80t/hrflowthroughHPLPbypass.AtthattimeM.S.parameterswouldbe40kg/cm2and3600C,HRHparameterswouldbe12kg/cm2and3600C.Assoonastheturbineloadinghasstarted,HP/LPbypassclosesandgetscompletelyclosedastheturbinereachestheboilerload.Firstmillisputintooperationaround10%ofgeneratorload.Secondmillisputintooperationaround25%whilethirdmillisat40%ofgeneratorload.Fourthandfifthmillsareputintooperationat60%and80%ofgeneratorloadrespectively.Sixthmillistakentoreachfullgeneratorload.DuringloadingtheRHoutletsteamtemperaturehastobekeptascloseaspossibletoSHoutletsteamtemperatureBurnertilt,SHspray,RHspraycontrolshastobeadjustedaccordingly.Theturbineloadingrateisdecidedbyaselectioncircuitwhichcomparestheexternalloadgradient,TSEmarginandtimedependantgradient(setinternally)andfrequencyinfluence.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 2/26
INTEGRATEDSTARTUPPROCEDURE
COLDSTARTUP
(AUXILIARYSTEAMAVAILABLE)
REF.DRGNO.20BPE691
STEP TIME UNITCONDITION OPERATION NOTES
0 .. Boilerpr.0kg/cm2(g)
andAmbienttemperature
ChargeAux.Steamheader16ata,2600C,fromexistingunits.
Chargesteamtofueloilpumphouse,atomisingsteamandtracingsteamdeaeratorwarmingup.
Allthesteamtracinglinesandelectricaltracingsinpumphouse&boilertobecharged.
StarttankheatingofLSHSoil.
StartoneLSHSpumponrecirculationassoonasthesufficientoiltemperatureatinletisachieved.
ChargeLSHStoboilerfrontandkeepitonlongrecirculation,withheaterscontrolsetonAutotomaintain1101290C.
Fillwaterindrumupto+200mm.
EnsurethatthesuctionanddischargevalvesofalltheCCpumpsareopenandthepumpsuctionanddischargelinesarevented.
StartBearingcoolingwatersystempumpsforBoiler,TurbineandTGauxiliaries.
Checkallcircuitshavesufficientflow.Beforestartingthepumps,theemergencycoolingwatertankleveltobecheckedandmadenormal.
StartinstrumentaircompressorandcheckthatallthelinestoBoilerandTGarecharged.
Checkthatallcircuitshavesufficientairpressure.
StartserviceaircompressorandfilltheairreceivertanksofSRAPH&PRAPHarefilled.
EnsurethatpurgeairtoHEAisopeninallcorners.
LineupAirandfluegascircuitsforstartup.Checkdampersandgatesregisterposition.
ESPreadyinallrespects.
Furnacebottomashsystemandsealthroughlinedup.
FSSSpanelreadyinallrespects.
EASTpanelreadyinallrespects.
Excitationpanelreadyinallrespects.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 3/26
Generatorprotectionpanelreadyinallrespects.
GeneratorH2gaspressureis
4kg/cm2CheckpurityofH2gasisnormal.
Generatorstatorwatersystemreadyinallrespects.Checkpurityofgeneratorstatorwaterisnormal.
H2coolingwatersystemreadyinallrespectswithSLCon.
LP&HPchemicaldozingsystemisready.
CheckforlevelinHydrazine,Ammoniaandphosphatepreparationtanks.
SADCpanelreadiness. Checkforairpressureinallthecornersandelevations.
PowersupplyforallthevalvesanddampersareON.EnsureAux.airdampersandmodulating.
SupplyforallauxiliariesofSG,TurbineandGeneratorisensured.
ReadinessofHPbypasspanelinallrespects.
Ensuretheoilunitisrunningandallthebypassandsprayvalvesareclosed.
StartoneoftheCCpumps.Ensuredrumlevelis+200mm,andthedrumairventsareclosed.
StartthesecondCCpump. Ensuredrumlevelisnormal. Startscannerairfan.
Startboththesecondaryairpreheaters.
Ensurethatalltheinletandoutletairgasdampersareopen.
Startboththeprimaryairpreheaters.Ensurethatthegasdampersareclosed.
StartonesetofIDandFDfans.
Adjust30%airflow,andfurnacedraftminus5to10mmWCL.
ChargesteamcoilpreheaterconcernedwiththerunningFDfans.
InitiateBoilerPurge(duration5minutes).
AfterpurgecompletionBoilertripvalveswillgetreset.
Also,afterpurge,adjustthewindboxdamperstoget3040mmWCL.Windboxdp.
Luboilsystemstopped. Startonevapourextractionfan,keepotherfanstandby. CheckoillevelinMOT.
LineupluboilcoolerandthrustbearingfilterStartoneAOP.
PutonSLCsforotherAOPandEOP.
CheckoutautostartofAOPandEOP.
Putluboiltemperaturecontrolleron.
StartoneJOP. PutonSLCsforotherJOPandDCJOP.
CheckoutautostartofJOP
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 4/26
andDCJOP.
PutoffSLCsJOP1,2&3.StoprunningJOP.
Opengatevalvegearing. SwitchonSLCgatevalvegearing.
StartoneJOPandswitchonSLCsforJOPs.
M/c.comesonbarring.MOTlevel50mmoiltemp.450CJOPheaderpr.140kg/cm2speed80100rpm.
ThesequentialoperationnarratedaboveonLuboilsystemstoppedisachievedbySGCmode.
Iftheprogrammegetsinterrupted,thestepandcriteriatobecheckedandtobefulfilledfortheprogrammetoproceedfurther.
M/conbarring. Startcentrifugewithbothheaters
FRFsysteminstoppedcondition. CheckFRFtanklevel. +200mm.
LineupFRFcoolerandduplexfiltersin32barsystemstartoneCEP.CheckautostartofstandbyCEP.
Establishcontrolfluidsupplytovariousservices. FRFtanklevelO(normal).
StartoneVEF.
StartonerecirculationpumpandincludeoneFiltersearthandultrafine.
SwitchonFRFheaterandkeepSLCONfortemperaturecontrol,andcontrolfluidpumps.
FRFtemperature550C.
SwitchONcontrolfluidSGC.
FRFsystem,SGCison.
ThesequentialoperationnarratedaboveinFRFsystemstoppedconditionisachievedbySGCFRFsystemonstartingprogrammemode.
Iftheprogrammegetsinterruptedthestepandcriteriatobecheckedandfulfilledfortheprogrammetoproceedfurther.
01 ooBoilerreadyforlightupandTurbineonTurninggear.
Start4burnersinABelevationwithLSHS.
CheckthatSH&RHventsareopen.
SH&RHdrainsareopen.
MSVsclosedanddrainsbeforeMSVopen.
Regulateoilpressureto810kg/cm2.
Ensureatomisingsteampressureabout6kg/cm2.
After30minutes,takeadditionalburners,soastoensureadrummetaltemperatureraiseofabout20C/min.
Insertfurnaceprobeandensurethatthetemperatureisbelow5350C.
Checkdrumlevelandgiveblowdown.
KeepopentheEco.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 5/26
recirculationvalvewhenthereisnofeedingtodrum.
Startmotordrivenfeedpumponrecirculation. Checkdeaeratorlevel.
Chargethefeedlineuptofeedcontrolstation.
ChargeheatingsteamtodeaeratorfromAux.PRDS.
Startcondensatepumpsandfeedtodeaeratorasandwhenrequired.
Checkhotwelllevel.
Starthotwellmakeuppumpsandfeedhotwellasandwhenrequired.
Aux.PRDSsteam15kg/cm2
(g)2600C
CWsystemischarged.
CWboxestoensureventilatingofwaterboxes.
Startoneglandsteamexhausterfan.
LineupvacuumpumpsandstartonebyoneGraduallyadmitglandsteamwhencondenservacuumreaches0.2kg/cm2(g).
Ensureglandsteamadmissiontemperatureisalwaysabove2000C.
VacuumbuildingcanbedonethroughSGCvacuumonstartingprogrammemode,glandsteamexhausterhastobestartedmanually.
Vacuum09kg/cm2(g).Openalldrainsconnectedtoflashtanksandflashboxesconnectedtocondenser.
OpenHPBPwarmupvalves. SwitchonSLCdrains.
02 60' Boilerpressure2kg/cm2 CloseSH&RHheadervents.
CloseSH&RHheaderdrains.
OpenMSVbypasslines. MS,HRH,&CRHlineswillgetwarmedup.
03 100 Boilerpressure5kg/cm2.SwitchonautomaticcontrolinterfaceofLPbypass.
Assoonasthefixedsetpointreaches12kg/cm2,itseizes.
OpenMainsteamvalves.
Automaticcontrolinterfacegetsswitchedoffwhenthehotreheatsteampressurereaches13kg/cm2i.e.aftersynchronisation.
OpenHPbypass.
StartthirdC.C.pumpwhenboilerpressurereaches9kg/cm2.
TakeadditionalgunsinCD&EFelevation.Airheatersootblowingtobecarriedout.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 6/26
CloseHPBPwarmupvalves.
AROLLINGTHROUGHHYDRAULICGOVERNOR
04 150
Boilerpressure:15kg/cm2
Temperature:1802000C
HRHPressure:812Kg/cm2
OpenHPESVs&IPESVsforwarmingupbyoperatingstartingdevicetoapproximately42%.
Checkandensurethatspeedsetpointiszeroandspeedergearis0%position.
EnsureTSEinfluenceisswitchedonandavailablemarginsaregreaterthan=300K.
05 300
M.S.Pr.50kg/cm2
M.S.temp.3500C
H.R.H.Pr.12kg/cm2
HRHtemp.:3500C
RaisethespeedsetpointofEHCto3200rpm
IftheoilsystemofEHCisisolatedatspeedGov.rack,speedsetpointneednotberaised.
Graduallyraisethestartingdevicetobringthespeedto360rpm
Startingdevicepositionapproximately56%.
TurbinereadyforRolling. Holdthespeedat360rpmforabout35to40mts.
Ensureclosureofgatevalvegearingat240rpm.Monitorbearingvibrations,shaftvibrations,TSEmargins,bearingtemperature&Turbosupervisoryreadingsat360rpm.
06 360M.S.Pr.50kg/cm2/3500C.Turbinerunningat360rpm.
Raisethespeedupto2400rpmthroughstartingdeviceattherateof600rpm.
EnsuretrippingofJOPat540rpm.
Raisefurtherspeedupto3000rpmthroughspeedergear.
Startingdevicewillbeat90%.
Monitoringbearingtemperatureandvibrations,shaftvibrations,TSEmarginsandTurbovisoryreadings,Sealoil,Primarywaterandgastemperatures&Generatorwindingtemperature.
EnsuretrippinfofAOPat2950rpm.
Speedergearpositionwillbeapproximatelyat50to60%.
07 370
MSPr.50kg/cm2.Temperature:3500CTurbinerunningat3000rpm.
PutAVRonAuto.
Closefieldbreaker.
Setmanuallythegeneratorvoltagetogridvoltage.
Synchronisethegeneratorwithgrid.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 7/26
Pickup50MWloadbyoperatingspeedergear.
IncreaseHPBPsetpoint.EnsureclosureofHPBPsteamvalves&sprayvalves.
Closeotherdrains,M.S.HRH,keepingSLCdrainson.
DrainpotdrainsofMS,CRH&HRHandextractionsteamlineswilloperateaspertheactuationoflevelswitches.
BROLLINGTHROUGHEHC.
04 150'
MSPr.:15kg/cm2.Temperature:1802000CHRHPressure:8to12kg/cm2.
OpenHPESVs&IPESVsforwarmingupbyoperatingstartingdevicetoapproximately42%.
CheckandensurethatTSEinfluencesisswitchedonandavailablemarginsaregreaterthan300K.
Checkandensurethatspeedsetpointiszeroandspeedergearis0%position.
05 300'
MSPressure:50kg/cm2
MSTemperature:3500C
HRHPressure:12kg/cm2
HRHTemperature:3500C.
TurbineReadyforrolling
Raisethestartingdevicetoabout70%.
CheckandensureopeningofvalvesinHP/IPsecondaryfluidlinestoEHCatspeedcontrolrack.
Raisethespeedsetpointto360rpmandwatchtheactualspeed.
IftrackingdeviceisswitchedON,startingdevicepositionwillautomaticallytracktheEHCposition
Raisethespeedergearto100%
Holdthespeedat360rpmforabout35to40mts.Ensureclosureofgatevalvegearingat240rpm.
Monitoringbearingvibrations,bearingtemperatures,shaftvibrations,TSEmarginsandTurbovisoryreadings.
06 360'MSPressure:50kg/cm2
MSTemperature:3500C
Raisethespeedsetpointto3000rpm.
Ensuretrippingofjackingoilpumpat540rpm.
Turbinespeed:360rpm. Therateofaccelerationwillbe600to850rpm.
Monitorbearingvibrationandtemperatures,shaftvibrations,TurbovisoryreadingsandTSEmargins
Monitorandcontrol,SEALoiltemperatures,Primarywatertemp.Hydrogengastemperatureandwindingtemperature.
EnsuretrippingofAOPat2950rpm.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 8/26
07 370'
MSPressure:50kg/cm2
MSTemperature:3500C
Turbinespeed:3000rpm.
PutAVRonauto,CloseFieldBreaker.
Setmanuallygeneratorvoltagetogridvoltage.
Synchronisethegeneratorwithgrid.
Speedsetpointwillraiseautomaticallyby8rpmandloadwillbepickedupto20MW.
Raisethespeedsetpointandpickuptheloadto50MW.
IncreaseHPBPsetpoint.EnsureclosureofHPBPsteamvalves&sprayvalves.
CloseotherdrainsofMS,CRH,HRH,keepingSLCdrains'ON'.
DrainpotdrainsofMS,CRH,HRHandextractionsteamlineswilloperateaspertheactuationoflevelswitches.
CROLLINGTHROUGHSGCTURBINE.
04 150'
MSPressure:15kg/cm2
MSTemp.:1802000C
HRHPressure:12kg/cm2
SwitchonthestartupprogrammeofSGCTurbine.
EnsureTSEinfluenceisswitchedon.
Iftheprogrammeinterruptstheparticularstepandcriteriatobecheckedandcorrectedfortheprogrammetoproceedfurther.
AlloperationsasexplainedunderEHCrollingwillbecarriedoutbySHCTurbineprogrammesequentially.
05 300'
MSPressure:50kg/cm2
MSTemperature:3500C
HRHPressure:12kg/cm2
HRHTemp.:3500C.
TurbineReadyforrolling
Turbinespeedwillberaisedto360rpmthroughSGCProgramme.
Ensureclosureofgatevalvegearingat240rpm.
Monitorbearingvibration,bearingtemperature,shaftvibration,TSEmarginsandTurbovisoryreadings.
Toachievetheprogrammeasperthestartingcurve,themainsteamtemperatureshouldbemaintainedsteadilytillloadingupto50MW.
06 360'
MSPressure:50kg/cm2
MSTemperature:3500CTurbinespeedwillberaisedupto3000rpmthroughSGCprogramme.
EnsuretrippingofJOPat540rpm.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 9/26
Turbinerunningat360rpm.
EnsuretrippingofAOPat2950rpm.
Monitorbearingtempandvibrations,shaftvibrations,TSEmarginsandturbovisoryreadingssealoil,primarywater,HydrogengasandGeneratorwindingtemperatures.
07 370'
MSPressure:50kg/cm2
MSTemperature:3500C
Turbinespeed:3000rpm.
SGCprogrammewillswitchONfieldbreaker,putAVRonauto,synchroniseandpickuploadupto20MW.
EnsureSGCstartupprogrammeiscompleted.
Raisethespeedsetpointandpickuptheloadupto50MW.
IncreaseHPBPsetpoint.EnsureclosureofHPBPsteamvalvesandsprayvalves.
CloseotherdrainsofM.S.CRHandHRH,keepingSLCdrainsON.
DrainpotdrainsofMS,CRH,HRHextractionsteamlineswilloperateaspertheactuationoflevelswitches.
08 390'
Load:55MW
M.S.:54kg/cm2/3500C
HRH:12kg/cm2/3400C
StartsealairfanandPAfanandtakefirstmillinservice.
BeforestartingP.A.fan,ensurethatairandgasdampersofPrimaryAirPreheatersareopen.
ChargeESPfields EnsureAshhandlingsystemisready.
StartthesecondsetofID&FDfans.MakereadySH&RHspraysystems.
CutinL.P.heaters2&3. Ensureswitchingonofloadcontrollerabove60MW.
CutoutheatingsteamfromAux.P.R.D.S.toDeaerator.
PegDeaeratorfromCRHsteamgraduallyupto2kg/cm2.
Cutinautocontrollers.
Load:55MW
M.S.:54kg/cm2/3500C
HRH:12kg/cm2/3400C
ChargeAux.PRDSstationfromCRH.Cutinsprayandmaintainatemperatureof2500C.
Ensureenergizingofsolenoidintrimmingdeviceatandabove100MWload.
PegDeaeratorgraduallyto4kg/cm2.
RaisethepressuresetpointofDeaeratorpressurecontrollergradually.
CutinIIndmillandcutinautocontrollers.
Startwithdrawingoilsupportgradually.Ensurefireballscannerhealthiness
Controlmainsteamandreheatsteamtemperaturesbyusingsprayifrequired.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 10/26
10 440'
Load:160MW
M.S.:90kg/cm2/3800C
HRH:20kg/cm2/3800C
Steamflow:580t/hr.
Increasethewindboxtofurnacedifferentialpressureto100mmW.C.byadjustingSADC.
ChargeH.P.heaters5A,5B,6Aand6B.
Putcontrollersonauto.
StartfirstTDBFP&secondCEP.
ChargeDeareatorpeggingsteamflowCRHtoExtractionaround200MWload.
EnsureDeareatorPressurecontrollerremainsasauto.
11 480'
Load:250MW
M.S.:120kg/cm2/4200C
HRH:26kg/cm2/3400C
Steamflow:820t/hr.
CutinIIIrdmillandcutinautocontrollers.
StartsecondP.A.Fan.BeforestartingP.A.fanensurethatairandgasdampersofPAPHsareopen.
12 510'
Load:320MW
M.S.:125kg/cm2/3500C
HRH:2830kg/cm2/3400C
Steamflow:1040t/hr.
CutinIVthmillandcutinautocontrollers.
Cutofoilsupportcompletely.Ensurehealthinessoffireballscanners.
13 550'
Load:405MW
M.S.:145kg/cm2/4600C
HRH:33kg/cm2/4600C
Steamflow:1310t/hr.
CutinVthmillandcutinautocontrollers.
CutinsecondTDBFPandswitchoffmotordrivenBFP.
14 590'
Load:500MW
M.S.:170kg/cm2/4750C
HRH:40.5kg/cm2/4750C
IffullloadisnotreachedcutinVIthmillalongwithitscontrollers.IncreasethesetpointofSH&RHspraycontrollerssuchthatratedparametesareachievedgradually.
15 670'
Load:405MW
M.S.:145kg/cm2/4600C
HRH:33kg/cm2/4600C
Steamflow:1310t/hr.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 11/26
WARMANDHOTSTARTUPS
(WithAux.SteamAvailable).
Awarmstartupis,bydefinition,onewhichthemaximumofHPcasing/HPshafttemperatureis
between1500Cand3500C.Thisnormallymeansthattheunitisshutdownfromthemaximumloadforone
to fourdays.Dependingupon theabsolute temperatureofHPcasingandHPshaft, steamparametersare
derived.AhotstartupisbydefinitiononewhichthemaximumofHPcasing/shafttemperatureismorethan
3500C.InthiscasetogettherollingparameterstwomillsaretakenintoservicekeepingHP,LPbypassin
operation. (Again the flowrate is restrictedby the Ypiecesconstraints i.e.,400C). Inboth the cases,
curves are given to derive the rolling parameters. In case when machine is rolled through EAST, curve
generators,calculateandgivepermissiveforrolling.
INTEGRATEDSTARTUPPROCEDURE
WARMSTARTUP(AFTER48HOURSSHUTDOWN).
STEP TIMEINMINUTES UNITCONDITION OPERATION NOTES.
OneCCpumpinoperationandscannerfaninoperation.
MotoroperatedBFPisrunasandwhenrequiredtomaintainthedrumlevel.
BothSAPHsandPAPHsinoperation.
TurbineonbearinggearwithAOP,JOPandsealoilpumpsinoperation.
Controlfluidsystemreadyinallrespects.Onecirculatingpumpinoperationwithoneearthfilterandultrafinefilterincircuit.
Generatorgassystem,sealoilsystemandprimarywatersysteminoperation.
Bearingcoolingwatersysteminoperation.
HTandLTauxiliariespowersupplyavailable.
HPbypasssystemreadyinallrespects.
ESPreadyinallrespects.
EASTpanelsreadyinallrespects.
Furnacebottomashsystemandsealtroughlinedup.
Vacuumpumpslinedupandreadyforoperation.
Glandsteamandleaksteamcontrollersarelinedupandreadyforoperation.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 12/26
Generatorprotectionpanelandexciterpanelsreadyinallrespects.
Boilerdrumpressure=0kg/cm2.SHtemperaturebetween1300Cand1500C.
1.Chargeauxiliarysteamheaderfromexistingunits.Pr.16atatemp.2600C.
2.Chargesteamtofueloilpumphouse,atomisingsteamandtracingsteam.
3.StarttankheatingofLSHSoil.
4.StartoneLSHSpumponrecirculationassoonassufficientoiltemp.atinletisachieved.
StartinstrumentoilcompressorandserviceaircompressorsandcheckthatalllinestoboilerandTGarecharged.
ChargeLSHSpumptoboilerfrontandkeepitonlongrecirculationwithheaterscontrolsetonautotomaintain1200C.
Startcirculatingwaterpumpforcondenseranddeaeratethecondenserwaterboxes.
StartsecondCCPump.EnsurerunningofmotordrivenBFPcontinuouslyformaintainingdrumlevel.
StartonesetofIDandFDfans.
Initiateboilerpurge.
StartoneCEPandkeepthehotwellmakeupinservice.
Startoneofthecontrolfluidpumpsandkeepthesecondasautostandby.
Keepthecontrolfluidtemperaturecontrolonauto.
Lineupmainsteam,CRHandHRHsteamlinesforchargingbyopeningrespectivelinedrains.
LineupFSSSpanelsinallrespects
ChargeheatingsteamlinetoDeaeratorfromAux.PRDS.
01 ooBoilerreadyforlightupandturbineonturninggear.
Start4burnersinABelevationwithLSHS.
CheckthatSH&RHventsareopen.
SH&RHdrainsareopen.
MSVsclosedanddrainsbeforeMSVopen.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 13/26
Ensureatomisingsteampressureofabout6kg/cm2
EnsuremotoroperatedBFPisinservice.
StartGlandsteamExhauster.
Startonebyonevacuumpumps.
Admitglandsteamwhenvacuumreaches0.2kg/cm2.
Ensureglandsteamadmissiontemperatureisalwaysabove2000C.
VacuumbuildingcanbedonethroughSGCvacuumonstartingprogrammemode.Glandsteamexhausterhastobestartedmanually.
Openalldrainsconnectedtoflashtanksandflashboxesconnectedtocondenser.
Ensurecondenservacuumof0.8kg/cm2.
SwitchonSLCdrains.
CloseSH&RHheaderventsanddrains.Ensureboilerpressureis2kg/cm2.
OpenHPBPwarmingupvalves.
OpenMSVbypasslines.
SwitchAutomaticcontrolinterfaceofLPbypass.
Assoonasthefixedsetpointreaches12kg/cm2,itseizes.
Automaticcontrolinterfacegetsswitchedoffwhenthehotreheatsteampressurereaches13kg/cm2(i.e.)aftersynchronisation.
OpenMainsteamstopvalves.EnsureMS,CRH&HRHlinesgetwarmedup.
OpenHPbypassandclosetheHPBPwarmupvalves.EnsureBoilerpressureis5kg/cm2.
StartthirdCCpump. EnsureBoilerpressureis9kg/cm2.
PutHPbypasscontrolleronautoandvarythesetpointaccordingtothegradientofpipelinetemperatures.
EnsureBoilerpressureis10kg/cm2
PutHPbypassspraycontrolonauto.
Takeadditionalgunsaccordingtotherequirement.
Airheatersootblowingtobecarriedout.
AROLLINGTHROUGHHYDRAULICGOVERNOR.
02 180'
MS:50kg/cm2/3650C
HRH:12kg/cm2/3250C
Bypasssteamflow:170t/hr.
OpenHPESVandIPESVforwarmingupbyoperatingstartingdevicetoapprox.42%
Checkandensurethatspeedsetpointiszeroandspeedergearis0%.
EnsureTSEinfluenceis
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 14/26
switchedonandavailablemarginsaregreaterthan300K.
03 210'
MS:60kg/cm2/4000C
HRH:12kg/cm2/3500C
Bypasssteamflow:200t/hr.
RaisethespeedsetpointofEHCto3200rpm.
IftheoilsystemofEHCisisolatedatspeedGov.rack,speedsetpointneednotberaised.
Graduallyrisethestartingdevicetobringthespeedto360rpm.
Startingdevicepositionapproximately56%.
Holdthespeedat360rpmforabout5minutes.Ensureclosureofgatevalvegearingat240rpm.
Monitorbearingvibrations,shaftvibrations,TDEmargins,bearingtemp.&Turbovisoryreadingsat360rpm.
04 215' Turbinerunningat360rpm.
Raisethespeedupto2400rpmthroughstartingdeviceattherateof600rpm.
EnsuretrippingofJOPat540rpm.
Raisefurtherspeedupto3000rpmthroughspeedergear.
Startingdevicewillbeat90%.
Monitorbearingtemp&vibrations,shaftvibrations,TSEmarginsandTurbovisoryreadings.Sealoil,Primarywaterandgastemperatures&Generatorwindingtemperature.
EnsuretrippingofAOPat2950rpm.
Speedergearpositionwillbeapprox.at50to60%.
05 220' Turbinerunningat3000rpm PutAVRonauto.
Closefieldbreaker.
Setmanuallythegeneratorvoltagetogridvoltage.
Synchronisethegeneratorwithgrid.Pickup50MWloadbyoperatingspeedergear.
IncreaseHPBPsetpoint.EnsureclosureofHPBPsteamvalves&sprayvalves.
Closeotherdrains,M.S.HRH,keepingSLCdrainson.
DrainpotdrainsofMS,CRH,andHRHandextractionsteamlineswilloperateaspertheactuationoflevelswitches.
Furtherloadraisingwillbedonebyoperatingthespeedergearaccordingtothestartupcurve.
BROLLINGTHROUGHEHCMS:50kg/cm2/3650C
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 15/26
02 180'HRH:12kg/cm2/3250C
Bypasssteamflow:170t/hr.
OpenHPESVsandIPESVsforwarmingupbyoperatingstartingdevicetoapprox.42%.
CheckandensurethatTSEinfluenceisswitchedonandavailablemarginsaregreaterthan300K.
Checkandensurethatspeedsetpointiszeroandspeedergearis0%.
03 210'
MS:60kg/cm2/4000C
HRH:12kg/cm2/3500C
Bypasssteamflow:200t/hr.
Turbinereadyforrolling.
Raisethestartingdevicetoabout70%.
CheckandensureopeningofvalvesinHP/IPsecondaryfluidlinestoEHCatspeedcontrolrack.
Raisethespeedsetpointto360rpmandwatchtheactualspeed.
IftrackingdeviceisswitchedonstartingdevicepositionwillautomaticallytracktheEHCposition
Raisethespeedergearto100%.Ensureclosureofgatevalvegearingat240rpm.
Holdthespeedat360rpmforabout5minutes.
Monitorbearingvibrationsbearingtemperatures,shaftvibrations,TSEmargins&turbovisoryreadings.
04 215' Turbinerunningat360rpm. Raisethespeedsetpointto3000rpm.EnsuretrippingofJackingoilpumpat340rpm.
Monitorbearingvibrationsandtemps,shaftvibration,turbovisoryreadingsandTSEmargins.
EnsuretrippingofAOPat2950rpm.
05 225' Turbinespeed:3000rpm. PutAVRonautocloseFieldbreaker.
Setmanuallygeneratorvoltagetogridvoltage.
Synchronisethegeneratorwithgrid.
Speedsetpointwillberaiseautomaticallybyabout8rpm&loadwillbepickedupto20MW.
Raisethespeedsetpointandpickuptheloadto50MW.
IncreaseHPBPsetpoints.EnsureclosureofHPBPsteamvalvesandsprayvalves.
CloseotherdrainsofMS,CRH,andHRHkeepingSLCdrainsON.
DrainpotdrainsofMS,CRH,HRHandextractionsteamlineswilloperateaspertheactuationoflevelswitches.
CROLLINGTHROUGHSGCTURBINE.
02 180'
MS:50kg/cm2/3650C
HRH:12kg/cm2/3250C
Bypasssteamflow:
SwitchonthestartupprogrammeofSGCTurbine.
EnsureTSEinfluenceisswitchedon.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 16/26
170t/hr.
Iftheprogrammeinterruptstheparticularstepandcriteriatobecheckedandcorrectedfortheprogrammetoproceedfurther.
AlloperationsasexplainedunderEHCrollingwillbecarriedoutbySGCTurbineprogrammesequentially.
03 210'
MS:50kg/cm2/3650C
HRH:12kg/cm2/3250C
Bypasssteamflow:170t/hr.
Turbinereadyforrolling.
Turbinespeedwillberaisedto360rpmthroughSGCProgramme.
Ensureclosureofgatevalvegearingat240rpm.
Monitorbearingvibration,bearingtemp,shaftvibration,TSEmarginsandTurbovisoryreadings.
Toachievetheprogrammeasperthestartingcurve,themainsteamtemperatureshouldbemaintainedsteadilytillloadingupto50MW.
04 215'
MS:60kg/cm2/4000C
Turbinerunningat360rpm.
Turbinespeedwillberaisedupto3000rpmthroughSGCProgramme.
EnsuretrippingofJOPat540rpm.EnsuretrippingofA.O.P.at2950rpm.
Monitorbearingtemp&vibrations,shaftvibrations,TSEmarginandturbovisoryreadings,sealoil,primarywater,HydrogengasandGeneratorwindingtemperatures.
05 225'
MS:60kg/cm2/4000C
Turbinespeed:3000rpm.
SGCprogrammewillswitchONfieldbreaker,putAVRonauto,synchroniseandpickuploadupto20MW.
EnsureSGCStartupprogrammeiscompleted.
Raisethespeedsetpointandpickuploadupto50MW.
IncreaseHPBPsetpointEnsureclosureofHPBPsteamvalvesandsprayvalves.
CloseotherdrainsofM.S.,CRHandHRH,keepingSLCdrainsON.
DrainpotdrainsofM.S.,CRH,HRHandExtractionsteamlineswilloperateaspertheactuatoroflevelswitches.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 17/26
06 230'
Load:60MW
MS:60kg/cm2/4100C
HRH:14kg/cm2/3600C
CutinL.P.heaters2and3. Ensureswitchingonofloadcontrollerat60MW.
CutoutheatingsteamfromAux.PRDStoDeaerator.
PegDeaeratorfromCRHsteamgraduallyupto2kg/cm2.
Cutinallautocontrollers.
StartsealairfanandP.A.fan
BeforestartingP.A.fan,ensurethatairandgasdampersofPrimaryAirPreheatersareopen.
Cutinfurtheroilgunsforraisingparameters.
07 245'
Load:110MW
MS:80kg/cm2/4200C
HRH:19kg/cm2/3800C
Mainsteamflow:470t/hr.
TrimmingdeviceisinOFF.
Cutin1stcoalmillandcutinAutocontrollers.
MakereadySH&RHspraysystem.
ChargeESPFields. EnsureAshhandlingsystemisready.
ChargeAux.PRDSstationfromCRH.Cutinsprayandmaintainatemperatureof2500C.
PegDeaeratorgraduallyupto4kg/cm2.
RaisethepressuresetpointofDeaeratorpressurecontrollergradually
CutinH.P.heatersandputthelevelcontrolsonauto.
StartfirstTDBFPandsecondCEParoundaloadof170MW.
Increasethewindboxtofurnacediff.pressureto100mm.W.C.byadjustingSADC.
08 270'
Load:200MW
MS:100kg/cm2/4350C
HRH:19kg/cm2/4000C
Mainsteamflow:750t/hr.
CutinIIndmillandcutinautocontrollers.
Startwithdrawingoilsupportgradually.Ensurehealthinessoffireballscanners.
Controlmainsteamandreheatsteamtemperaturebyusingsprayifrequired.
ChangeDeaeratorpeggingsteamfromCRHto EnsureDeaeratorpressure
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 18/26
Extractionsteam. controllerremainsonauto.
CutinIIIrdmillandcutinautocontrollers.
StartsecondP.A.fan.
BeforestartingP.A.fanensurethatairandgasdampersofPAPHareopen.
09 300'
Load:320MW
MS:125kg/cm2/4500C
HRH:30kg/cm2/4300C
Mainsteamflow:1080t/hr.
CutinIVthmillandcutinautocontrollers.
Cutoffoilsupportcompletely.Ensurehealthinessoffireballscanners.
CutinVthcoalmillandcutinautocontrollers.
StartsecondTDBFPandswitchoffmotordrivenBFP.
CutinVIthcoalmillandcutinautocontrollers.
10 340'
Load:500MW
MS:170kg/cm2/4800C
HRH:40.5kg/cm2/4800C
Mainsteamflow:1620t/hr.
Checkallparametersatfullloadandensurethemwithinlimits.
IncreasethesetpointofSH&RHspraycontrollerssuchthatratedparametersareachieved.
11 420'
Load:500MW
MS:170kg/cm2/5350C
HRH:40.5kg/cm2/5350C
Mainsteamflow:1570t/hr.
INTEGRATEDSTARTUPPROCEDURE
HOTSTARTUP(AFTER8HOURSSHUTDOWN)
STEP TIMEINMINUTES. UNITCONDITION OPERATION NOTES.
TwoCCpumpsinoperationandscannerfaninoperation.
MotoroperatedBFPisrunasandwhenrequiredtomaintainthedrumlevel.IfnecessaryBFPshouldbekeptrunningcontinuously.
BothSAPHsandPAPHsinoperation.
Turbineonbarringgear
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 19/26
withAOP,JOPandsealoilpumpsinoperation.
Controlfluidpumpinoperation.Onecirculatingpumpinoperationwithoneearthfilterandultrafinefilterincircuit.
Generatorgassystem,sealoilsystemandprimarywatersysteminoperation.
Bearingcoolingwatersysteminoperation.
Condensercirculatingwatersysteminoperation.
Serviceairandinstrumentaircompressorsinoperation.
Onecondensatepumpinoperationandhotwellmakeupinservice.
Aux.steamheaderchargedfromexistingunits(16ata2600C).
LSHSpumpinoperationonlongrecirculationuptoboilerfrontwithheaterscontrolseton
HPbypasssystemreadyinallrespects.
LP&HPandchemicaldosingsystemready.
ESPpanelsreadyinallrespects.
EASTpanelsreadyinallrespects.
Furnacebottomashsystemandsealtroughlinedup.
Vacuumpumpslinedupandreadyforoperation.
Glandsteamandleaksteamcontrollersarelinedupandreadyforoperation.
Generatorprotectionpanelandexciterpanelsreadyinallrespects.
FSSSpanelreadyinallrespects.
BoilerdrumPr.75kg/cm2
SH.Temp.between4150Cand4300C.
Lineupmainsteam,CRHandHRHsteamlinesforchargingbyopeningrespectivelinedrains.
EnsureMSVisclosed.
Startoneglandsteamexhauster.
Startonebyonevacuumpumps.
Admitglandsteamwhenvacuumreaches0.2
Ensureglandsteamadmissiontemperatureis
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 20/26
kg/cm2. alwaysabove2000C.
VacuumbuildingcanbedonethroughSGCvacuumonstartingprogrammemode.Glandsteamexhausterhastobestartedmanually.
Openalldrainsconnectedtoflashtanksandflashboxesconnectedtocondenser.
Ensurecondenservacuumof0.8kg/cm2.
Ensurecondenservacuumof0.8kg/cm2.
OpenHPBPwarmingupvalves.
SwitchAutomaticcontrolinterfaceofLPbypass.
Assoonasthefixedsetpointreaches12kg/cm2,itseizes.
Automaticcontrolinterfacegetsswitchedoffwhenthehotreheatsteampressurereaches13kg/cm2(i.e.)aftersynchronisation.
StartthirdCCpump. Ensuredifferentialtemp.iswithinpermissiblelimits.
EnsurerunningofmotordrivenBFPcontinuouslyformaintainingdrumlevel.
StartbothID&FDfans Initiateboilerpurge.
ChargeheatingsteamlinetoDeaeratorfromAux.PRDS.
01 ooBoilerreadyforlightupandturbineonturninggear.
Start4burnersinABelevationwithLSHS.
Ensureatomisingsteampressureofabout6kg/cm2.
DrumPr.75kg/cm2
SH.Temp.4150Cand4300C.
EnsuremotoroperatedBFPisinservice.
OpendrainsbeforeMSV. OpenMSVbypasslines.
OpenMainsteamstopvalves.EnsureMS,CRH,HRHlinesgotwarmedup.
OpenHPbypassandclosetheHPBPwarmupvalves.
PutHPbypasscontrollersonautoandvarythesetpointaccordingtothegradientofpipelinetemperatures.
PutHPbypassspraycontrolonauto.
Takeadditionalgunsaccordingtotherequirement.
Airheatersootblowingtobecarriedout.
StartbothP.A.fansandsealairfans.
BeforestartingP.A.FansensurethatairandgasdampersofPrimaryair
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 21/26
preheatersareopen.
Lineupmillingsystemforstarting.
AROLLINGTHROUGHHYDRAULICGOVERNOR
02 40'
MS:85kg/cm2/4850C
HRH:12kg/cm2/4400C
Bypasssteamflow:280t/hr.
Cutinfirstcoalmill&cutinautocontrollers.
MakereadySHandRHspraysystem.
ChargeESPfields. EnsureAshhandlingsystemisready.
Increasethewindboxtofurnacediff.Pressureto100mmW.C.byadjustingS.A.D.C.
Cutinsecondmillandcutinautocontrollers.
PegthedeaeratorfromCRHgraduallyupto2kg/cm2.
OpenHPESVsandIPESVsforwarmingupbyoperatingstartingdevicetoapproximately42%.
Checkandensurethatspeedsetpointiszeroandspeedergearisat0%.
EnsureTSEinfluenceisswitchedonandavailablemarginsaregreaterthan300K.
03 50'
MSPressure:85kg/cm2
MSTemperature:5000C
HRHPressure:12kg/cm2
HRHTemperature:4500C.
Bypasssteamflow:360t/hr.
TurbineReadyforrolling
RaisethespeedsetpointofEHCto3200rpm.
IftheoilofEHCisisolatedatspeedGov.rack,speedsetpointneednotberaised.
Graduallyraisethestartingdevicetobringthespeedto360rpm
Startingdevicepositionapproximately56%.
Ensureclosureofgatevalvegearingat240rpm.
Monitoringbearingvibrations,shaftvibrations,TSEmargins,bearingtemp&Turbovisoryreadingsat360rpm.
04 52' Turbinerunningat360rpm.Raisespeedupto2400rpmthroughstartingdeviceattherateof600rpm.
EnsuretrippingofJOPat540rpm.
Raisefurtherspeedupto300rpmthroughspeedergear.
Startingdevicewillbeat90%.
Monitorbearingtempandvibrations,shaft
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 22/26
vibrations,TSEmarginsandturbovisoryreadings.SealoilPrimarywaterandgastemperaturesandGeneratorwindingtemperature.
EnsuretrippingofAOPat2950rpm.
Speedergearpositionwillbeapproximatelyat50to60%.
05 56' Turbinerunningat3000rpm PutAVRonauto.
Closefieldbreaker.
Setmanuallythegeneratorvoltagetogridvoltage.
SynchronisetheGeneratorwithgrid.Pickup50MWloadbyoperatingspeedergear.
IncreaseHPBPsetpoint.EnsureclosureofHPBPsteamvalves&sprayvalves.
Closeotherdrains,M.S.CRH,HRH,keepingSLCdrainson.
DrainpotdrainsofMS,CRH,andHRHandextractionsteamlineswilloperateaspertheactuationoflevelswitches.
Furtherloadraisingwillbedonebyoperatingthespeedergearaccordingtothestartupcurve.
BROLLINGTHROUGHEHC
02 40'
MSPressure:85kg/cm2
MSTemperature:4850C
HRHPressure:12kg/cm2
HRHTemperature:4400C.
Bypasssteamflow:280t/hr.
Cutinfirstcoalmill&cutinautocontrollers.
MakereadySH&RHspraysystems.
ChargeESPfields. EnsureAshhandlingsystemisready.
Increasethewindboxtofurnacediff.Pressureto100mmW.C.byadjustingS.A.D.C.
Cutinsecondmillandcutinautocontrollers.
PegthedeareatorfromCRHgraduallyupto2kg/cm2.
OpenHPESVsandIPESVsforwarmingupbyoperatingstartingdevicetoapproximately42%.
Checkandensurethatspeedsetpointiszeroandspeedergearisat0%.
EnsureTSEinfluenceisswitchedonandavailablemarginsaregreaterthan
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 23/26
300K.
03 50'
MSPressure:85kg/cm2
MSTemperature:5000C
HRHPressure:12kg/cm2
HRHTemperature:4500C.
TurbineReadyforrolling.Bypasssteamflow:360t/hr.
Raisethestartingdevicetoabout70%.
CheckandensureopeningofvalvesinHP/IPsecondaryfluidlinestoEHCatspeedcontrolrack.
Raisethespeedsetpointto360rpmandwatchtheactualspeed.
IftrackingdeviceisswitchedonstartingdevicepositionwillautomaticallytracktheEHCposition.
Raisethespeedergearto100%.Ensureclosureofgatevalvegearingat240rpm.
Holdthespeedat360rpmforabout5minutes.
Monitorbearingvibrations,bearingtemperatures,shaftvibrations,TSEmarginsandturbovisoryreadings.
04 52' Turbinereadingat360rpm.Raisethespeedsetpointto300rpm.
EnsuretrippingofJackingoilpumpat540rpm.
Therateofaccelerationwillbe600to800rpm2.
Monitorbearingvibrationsandtemperatures,shaftvibration,turbovisoryreadingsandTSEmargins.
Monitorandcontrol,sealoiltemperatures,primarywatertemperature.Hydrogengastemperatureandwindingtemperature.
EnsuretrippingofAOPat2950rpm.
05 56' Turbinespeed:3000rpm. PutAVRonautoClosefieldbreaker.
SetManuallygeneratorvoltagetogridvoltage.
Synchronisethegeneratorwithgrid.
Speedsetpointwillberaisedautomaticallybyabout8rpmandloadwillbepickedupto20MW.
Synchronisethegeneratorwithgrid.
IncreaseHPBPsetpoint.EnsureclosureofHPBPsteamvalvesandsprayvalves.
CloseotherdrainsofMS.CRHandHRH,keepingSLCdrainsON.
DrainpotdrainsofMS,CRH,HRHandextractionsteamlineswilloperateaspertheactuationoflevelswitches.
CROLLINGTHROUGHSGCTURBINE.MS:85kg/cm2/4850C
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 24/26
02 40' HRH:12kg/cm2.
Bypasssteamflow:280t/hr.
Cutinfirstcoalmill&cutinautocontrollers.
MakereadySH&RHspraysystems.
ChargeESPfields. EnsureAshhandlingsystemisready.
Increasethewindboxtofurnacediff.Pressureto100mmW.C.byadjustingS.A.D.C.
Cutinsecondmillandcutinautocontrollers.
PegthedeaeratorfromCRHgraduallyupto2kg/cm2.
SwitchonthestartupprogrammeofSGCTurbine.EnsureTSEinfluenceisswitchedON.
Iftheprogrammeinterrupts,theparticularstepandcriteriatobecheckedandcorrectedfortheprogrammetoproceedfurther.
AlloperationsasexplainedunderEHCrollingwillbecarriedoutbySGCTurbineprogrammesequentially.
03 50'
Turbinereadyforrolling.
MS:85kg/cm2/5000C
HRH:12kg/cm2/4500C
Bypasssteamflow:360t/hr.
Turbinespeedwillberaisedto360rpmthroughSGCprogramme.
Ensureclosureofgatevalvegearingat240rpm.
Monitorbearingvibration,bearingtemperature,shaftvibration,TSEmarginsandTurbovisoryreadings.
Toachievetheprogrammeasperthestartupcurve,themainsteamtemperatureshouldbemaintainedsteadilytillloadingof50MW.
04 52' Turbinereadingat360rpm.
Turbinespeedwillberaisedupto3000rpmthroughSGCprogramme.
EnsuretrippingofJOPat540rpm.
EnsuretrippingofAOPat2950rpm.
Monitorbearingtemperatureandvibrations,shaftvibrations,TSEmargins,Turbovisoryreadings,sealoil,primarywater,HydrogengasandGeneratorwindingtemperatures.
Turbinespeed:3000rpm.
MS:85kg/cm2/5000C SGCProgrammewillswitch
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 25/26
05 56' HRH:12kg/cm2/4500C
Bypasssteamflow:360t/hr.
ONfieldbreaker,putAVRonautosynchroniseandpickuploadupto20MW.
EnsureSGCstartupprogrammeiscompleted.
Raisethespeedsetpointandpickuploadupto50MW.
IncreaseHPBPsetpoint.EnsureclosureofHPBPsteamvalves&sprayvalves.
CloseotherdrainsofM.S,CRHandHRH,keepingSLCdrainsON.
DrainpotdrainsofMS,CRH,HRHandExtractionsteamlineswilloperateaspertheactuationoflevelswitches.
06 60'
LOAD:60MW.
MS:85kg/cm2/5000C
HRH:16kg/cm2/4700C
CutinL.P.heaters2and3. Ensureswitchingonofloadcontrollerat60MW.
CutoutheatingsteamfromAux.PRDStoDeaerator.
Raisethegeneratorpressurefrom2kg/cm2to4kg/cm2.
RaisethepressuresetpointofDeaeratorpressurecontroller.
Cutinautocontroller.
Startwithdrawingoilsupportgradually.Ensurehealthinessoffireballscanners.
07 65'
LOAD:150MW.
MS:100kg/cm2/5000C
HRH:20kg/cm2/4800C
Mainsteamflow:1620t/hr.
TrimmingdeviceisinOFF.
ChargeAux.PRDSstationfromCRH.Cutinsprayandmaintainatemperatureof2500C.
CutinH.P.heatersandputthelevelcontrolsonauto.
StartfirstTDBFPandsecondCEParoundaloadof170MW.
Controlmainsteamandreheatsteamtemperaturebyusingsprayifrequired.
ChangedeaeratorpeggingsteamfromCRHtoExtractionsteam.
EnsureDeaeatorpressurecontrollerremainsonauto.
CutinIIIrdmillandcutinautocontrollers.
08 70'
LOAD:230MW.
MS:120kg/cm2/5000C
HRH:20kg/cm2/4950C
Mainsteamflow:820t/hr.
CutinIVthmillandcutinautocontrollers.
7/15/2015 TechnicalServices
http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm 26/26
Cutoffoilsupportcompletely.
Ensurehealthinessoffireballscanners.
CutinVthcoalmillandcutinautocontrollers.
StartsecondTDBFPandswitchoffmotordrivenBFP.
CutinVIthcoalmillandcutinautocontrollers.
09 86'
LOAD:500MW.
MS:170kg/cm2/5000C
HRH:40.5kg/cm2/5000C
Mainsteamflow:1620t/hr.
Checkallparametersatfullloadandensurethemwithinlimits.
IncreasethesetpointofSH&RHspraycontrollerssuchthatratedparametersareachieved.
10 135'
LOAD:500MW.
MS:170kg/cm2/5000C
HRH:40.5kg/cm2/4800C
Mainsteamflow:1570t/hr.
********************