www.bhm-ing.com INSPECTION ASSESSMENT MEASURES SURVEILLANCE AUDIT WE OPTIMISE LIFE CYCLE AND MAINTENANCE COST Buildings BCA - BUILDING CONDITION ASSESSMENT and Infrastructure
Transcript
Page 1: BHM Point Building Condition Assessment 2018 D+E...lidl Mayr-Melnhof Mediaprint Metro Mondi Palm Paper Perlen PMt Procter & Gamble rauch Fruchtsäfte rigips austria Smurfit kappa Sofidel

www.bhm-ing.com

www.bhm-ing.com

Feldkirch • linz • Graz • Schaan • PraGue

inSPection

aSSeSSMent

MeaSureS

Surveillance audit

We oPtiMiSe liFe cycle and Maintenance coSt

Buildings

We design successful projects

austriachilechinacroatiaczech republicegypt FranceGermany Great BritainhungaryitalyJapanMalaysia

clientS excerPt agranaandritzarkhbum tissue GroupBachmann electronicBellmerBöhlerBorealisBurgo Groupdelfort Groupengel austriaessityFripaGmunder zementGoldmann zeitungsdruckhamburgerheinzel Grouphirschmann automotivehz inovaict tronchettiJcl logisticskolbleipalidl

Mayr-MelnhofMediaprintMetroMondiPalm PaperPerlenPMtProcter & Gamblerauch Fruchtsäfterigips austriaSmurfit kappaSofidelSpitzStora ensoumdaschuPMvajda PapirvalmetvoithWeig kartonWepazellstoffwerk PölszSG Stendal

MoroccoMexiconederlandsParaguayPoland romaniarussiaSlovakiaSouth africaSpainSwedenSwitzerlanduSa

BHM ingenieure - engineering & consulting Gmbh, www.bhm-ing.com

BcA - Building condition AssessMent

and

infrastructure

Page 2: BHM Point Building Condition Assessment 2018 D+E...lidl Mayr-Melnhof Mediaprint Metro Mondi Palm Paper Perlen PMt Procter & Gamble rauch Fruchtsäfte rigips austria Smurfit kappa Sofidel

BcA - Building condition AssessMent

www.bhm-ing.com

Bu

ild

in

G c

on d i t i o n a

SS

eS

SM

e

nt

BcA

© BhM 2018

client Benefitsimplementing proper planned and preventive maintenance measures makes sure that a facility can be used and managed over a long period of time.

audits are performed frequently at regular intervals to detect maintenance needs and to define the required investments.

in details, such audits imply:

• assessing/classifying building conditions in an objective manner• listing all refurbishment measures required for each building/site• Priority rating for refurbishment measures concerning each building/site• Forecast for refurbishment cost in budget planning• Maintaining a central database with the building data of all sites

life cycle of Buildings And infrAstructureBuildings and infrastructure of plants are constructed and used in accordance with their respective purposes.

therefore it is recommended to take suitable measures to ensure that the life cycle of each factory component is as long as possible.

Bca is a tool for surveying and assessing existing buildings and infrastructure.

services

Survey oF exiStinG FacilitieS• analysing as-build documents of buildings and infrastructure

on-Site aPPointMent

• inspecting• conducting visual condition surveys• outlining current areas of concern• documentation of refurbishment needs

urGent MeaSureS• Pointing out urgent required action for major defects

rePort• Preparing a report • assessing the condition and making recommendations for corrective actions• determining: Measures/Measures preview Priorities/risk cost estimation

oPtionS • Preparing of maintenance and refurbishment concept• listing current measures• creating integral plan across all disciplines and design steps • Supervising construction

Surveillance audit (re-audit)

ensuring agreed actions are taken• recurring audits• every 3 - 5 years• Providing feedback on actions and their efficiency

1 2

3

44a

5

uSaGe

extenSion oF liFe cycle By MeanS

oF Bca deMolition

ProJectdeveloPMent

conStructiondeSiGn

life cycleof

fActoryBuildings

Page 3: BHM Point Building Condition Assessment 2018 D+E...lidl Mayr-Melnhof Mediaprint Metro Mondi Palm Paper Perlen PMt Procter & Gamble rauch Fruchtsäfte rigips austria Smurfit kappa Sofidel

www.bhm-ing.com

www.bhm-ing.com

F e l d k i r c h • l i n z • G r a z • S c h a a n • P r a G u e

inSPection

aSSeSSMent

MeaSureS

Surveillance audit

We oPtiMiSe liFe cycle and Maintenance coSt

Buildings

We design successful projects

austriachilechinacroatiaczech republicegypt FranceGermany Great BritainhungaryitalyJapanMalaysia

clientS excerPt agranaandritzarkhbum tissue GroupBachmann electronicBellmerBöhlerBorealisBurgo Groupdelfort Groupengel austriaessityFripaGmunder zementGoldmann zeitungsdruckhamburgerheinzel Grouphirschmann automotivehz inovaict tronchettiJcl logisticskolbleipalidl

Mayr-MelnhofMediaprintMetroMondiPalm PaperPerlenPMtProcter & Gamblerauch Fruchtsäfterigips austriaSmurfit kappaSofidelSpitzStora ensoumdaschuPMvajda PapirvalmetvoithWeig kartonWepazellstoffwerk PölszSG Stendal

MoroccoMexiconederlandsParaguayPoland romaniarussiaSlovakiaSouth africaSpainSwedenSwitzerlanduSa

BHM ingenieure - engineering & consulting Gmbh, www.bhm-ing.com

BcA - Building condition AssessMent

and

infrastructure