3
OPTION 1: CURTAIN WALL SYSTEM WITH GLASS  COST $55.45/SF  QUANTITY 1964.66 SF  TOTAL COST $108,940.40 OPTION 2: STOREFRONT SYSTEM WITH GLASS COST $25.70/SF  QUANTITY 1964.66 SF  TOTAL COST $50,491.76  TOTAL SAVINGS FROM OPTION 1 $58,448.64 OPTION 3: STOREFRONT SYSTEM WITH POLYCARBONATE  COST $19.17/SF  QUANTITY 1964.66 SF  TOTAL COST $37,660.57  TOTAL SAVINGS FROM OPTION 1 $71,279.83  TOTAL SAVINGS FROM OPTION 2 $12,831.19 REINFORCEDCONCRET EMASONRYUNIT 12” X 8”X 16” ANCHORBOLT STANDI NGSEAMMETALPANEL MESHSCREEN CONTINUOUSCLIPFORFLASHING  TONGUEANDGROOV EWOOD11/4” X6” RAINWATERDOWNPIPE GRATING FLASHING METALGUTTER LININGPLATE L-ANGLEBOL TEDCONNECTION HYBRIDHEAV YTIMBERANDSTEELTRUSS STEELANGLE WATERPROOFINGMEMBRANE PURLINS RIGIDFOAMINSULAT ION STEELWIDEFLANGEBEAM CALEDONIA HARMONY RYAN MUR A | ALL IE S ALAS | MA RY S ANDER S | HANNA H WAYC AST ER S T U D I O F I R E S T A T I O N SOUTHWES TELEVATION SCALE 1/8” =1’ NORTHWESTELEVATION SCALE 1/8” =1’ NORTHEAST ELE VATION SCALE 1/8” =1’ SOUTHEAST ELE VATION SCALE 1/8” =1’  WALL SE CTION C ALL OUTC SECTION A A B A  A  B   C   D  E   F   G   H    I    K   J   A B C D E F G H I J K L LAYDOWNSPACE/ASSEMBLY SITEUTILIZATIONPLAN CRANE 24’X 11’ DUMPSTER 8’X 22’  TOILETS 45.5”X 46” CONCRETEMIX + BRICK& CMU STORAGE  TRAILER 8’X 32’ EMPLOYEEPARKING GATE / BARRICADE SINAGE; FLAG ME N PROJECT SIGN 3’X 4’ SAFETYFENCING / EROSION CONTROL CIRCULATION PROJECT SAFETYSINAGE J H K J F D E L L
Transcript
Page 1: BIA 2014 Honorable Mention Place Team

8122019 BIA 2014 Honorable Mention Place Team

httpslidepdfcomreaderfullbia-2014-honorable-mention-place-team 12

METALPANELSIDING

AIRCAVITY

RIGIDINSULATION

THERMALANDMOISTUREBARRIER

METALSTUD

58rdquoGYPSUMBOARD

WEEPHOLES

ANCHORBOLTS

3rsquoX2rsquo X1rsquo ISOLATEDFOOTINGS

EARTH

5rdquoCORRUGATED DECKING

18rdquoOPENWEBSTEELJOIST

EDGEBEAM

BRICKPATERN

6X 6rdquoCOLUMN

ATTACHEMENTPLATE

W 18X47

BOLT

AIRCAVITY

RIGIDINSULATION

THERMALANDMOISTUREBARRIER

BRICKTIE

58rdquoGYPSUMBOARD

STANDINGSEAMMETALPANEL

STEELANGLE

HYBRIDHEAVYTIMBERampSTEELTRUSS

STEELWIDEFLANGEBEAM

OPENWEBSTEELJOIST

REINFORCEDCONCRETEMASONRYUNIT12rdquoX 8rdquoX 16rdquo

ANCHORBOLTS

GUTTER

RIGIDFOAMINSULATION

L-ANGLEBOL TEDCONNECTION

STEELPLATE

PURLINS

58rdquoGYPSUMBOARD

FOOTING

CONCRETEFLOORSLAB

STEELANGLE

FURRINGSTRIP

RIGIDFOAMINSULATION

FURRINGSTRIPS

CONCRETEFLOORSLAB

OPTION 1 CURTAIN WALL SYSTEM WITH GLASS

COST983085 $5545SF

QUANTITY983085 196466 SF

TOTAL COST983085 $10894040

OPTION 2 STOREFRONT SYSTEM WITH GLASS

COST983085 $2570SF

QUANTITY983085 196466 SF

TOTAL COST983085 $5049176 TOTAL SAVINGS FROM OPTION 1983085 $5844864

OPTION 3 STOREFRONT SYSTEM WITH POLYCARBONATE

COST983085 $1917SF

QUANTITY983085 196466 SF

TOTAL COST983085 $3766057

TOTAL SAVINGS FROM OPTION 1983085 $7127983

TOTAL SAVINGS FROM OPTION 2983085 $1283119

REINFORCEDCONCRETEMASONRYUNIT 12rdquo X 8rdquoX 16rdquo

ANCHORBOLT

STANDINGSEAMMETALPANEL

MESHSCREEN

CONTINUOUSCLIPFORFLASHING

TONGUEANDGROOVEWOOD114rdquo X6rdquo

RAINWATERDOWNPIPE

GRATING

FLASHING

METALGUTTER

LININGPLATE

L-ANGLEBOL TEDCONNECTION

HYBRIDHEAVYTIMBERANDSTEELTRUSS

STEELANGLE

WATERPROOFING MEMBRANE

PURLINS

RIGIDFOAMINSULATION

STEELWIDEFLANGEBEAM

C A L E D O N I A

H A R M O N YRYAN MURA | ALLIE SALAS | MARY SANDERS | HANNAH WAYC ASTER

S T U D I OF I R E S T A T I O N

SOUTHWESTELEVATION SCALE 18rdquo =1rsquo

NORTHWESTELEVATION SCALE 18rdquo =1rsquo

NORTHEAST ELEVATION SCALE 18rdquo =1rsquo

SOUTHEAST ELEVATION SCALE 18rdquo =1rsquo

CDs COMPLETE

SCHEDULE MILESTONE

FOUNDATION POURED

STEEL amp CMU UP

FLOOR CONSTRUCTION

COMPLETE

BUILDING DRY IN

CONSTRUCTION COMPLETE

WALL SECTION C ALL OUTC

WALL SECTION B

WALL SECTION A

SECTION AA

C

B

A

A

B

C

D

E

F

G

H

I

K

J

A

B

C

D

E

F

G

H

I

J

K

L

LAYDOWNSPACEASSEMBLY

SITEUTILIZATIONPLAN

CRANE 24rsquoX 11rsquo

DUMPSTER 8rsquoX 22rsquo

TOILETS 455rdquoX 46rdquo

CONCRETEMIX + BRICKamp CMU

STORAGE

TRAILER 8rsquoX 32rsquo

EMPLOYEEPARKING

GATE BARRICADE

SINAGE FLAG MEN

PROJECT SIGN 3rsquoX 4rsquo

SAFETYFENCING EROSION CONTROL

CIRCULATION

PROJECT SAFETYSINAGE

J

H

K

J

F

D

E

L

L

8122019 BIA 2014 Honorable Mention Place Team

httpslidepdfcomreaderfullbia-2014-honorable-mention-place-team 22

BRICKTIE

POLYCARBONATE PANEL

BRICK VENEER

NET

BALLAST

METAL STUD

WASHER HEAD SCREW

2rdquo AIR GAP

ALUMINUM BASE

BRICK TIE

BRICK VENEER

THERMAL amp MOISTURE BARRIER

CONCRETE MASONRY UNIT 8 X 8 X16

2rdquoAIR GAP

BACKER ROD amp SEALANT

HORIZONTAL SUPPORT

STANDING SEAM METAL PANEL

14 - 14 HEX HEAD FASTENERS

12 GA STAINLESS STEEL

HIDDEN FASTENER CLIP

CONTINUOUS SILICONE SEALANT CORNER TRIM

14 - 14 HEX HEAD FASTENERS

POP RIVETS

WINDOW FRAME

STANDING SEAM METAL PANEL

HORIZONTAL SUPPORT

HOLLOW STRUCTURAL SECTION COLUMN 8 X 8 X 12

CONCRETE MASONRY UNIT 8 X 8 X 16

12 GA STAINLESS STEEL HIDDEN FASTENER CLIP

CONTINUOUS SILICONE SEALANT

14 - 14 LOW PROFILE THROUGH FASTENER

FRAMED OPENING

CUSTOM CUT CONCRETE MASONRY UNIT

FLOOR CONSTRUCTIONPRE CONSTRUCTION FOUNDATION ROOF CONSTRUCTION EXTERIOR

FINISHES

INTERIOR CONSTRUCT ION POST

CONSTRUCTION

S U B S T R U C T U R E

G E N E R A L C O N D I T I O

N S

S I T E W O R K E Q U I P M E N T S E R V I C E S

SHELL

ELL

SUBSTRUCTURE

E X T E R I O R E N C L O S U R E S

R O O F I N G

I N T E R

I O R C O

N S T R

U C T I O

N

S T A I R S I N

T E R I O R F

I N I S H E

S

A

B

A

B

UP

0rsquo 20rsquo 40rsquo

D N

SECOND FLOOR 18rdquo = 1rsquoFIRST FLOOR 18rdquo= 1rsquo

0rsquo 20rsquo 40rsquo

W

D

W

D

OPENT

O BELOW

OPENTO BELOW

MENrsquoS

BUNK ROOM

WOMENrsquoS

BUNK ROOM

FITNESS AREA

WOMENrsquoS

SHOWER ROOM

MENrsquoS

SHOWER ROOM STORAGE

STORAGE

APPARATUS BAY

RECORDOFFICE

TRAINNING ROOM

KITCHEN

DAY ROOM

STORAGE

STORAGESAFE

ROOM

LAUNDRY

ROOM

RESTROOM

HVACAND

GENERATOR

CHIEFrsquoSOFFICE

FIRSTFLOOR PLANSCALE 18rdquo =1rsquo

CO NSTRUCTION SCHEDULE

BUDGETBREAKDOWN

SECOND FLOOR PLANSCALE 18rdquo =1rsquo

PLAN CALL OUTA

SECTION B

POLYC ARBONA TE - BRICK DETAIL

PLAN CALL OUTB

Page 2: BIA 2014 Honorable Mention Place Team

8122019 BIA 2014 Honorable Mention Place Team

httpslidepdfcomreaderfullbia-2014-honorable-mention-place-team 22

BRICKTIE

POLYCARBONATE PANEL

BRICK VENEER

NET

BALLAST

METAL STUD

WASHER HEAD SCREW

2rdquo AIR GAP

ALUMINUM BASE

BRICK TIE

BRICK VENEER

THERMAL amp MOISTURE BARRIER

CONCRETE MASONRY UNIT 8 X 8 X16

2rdquoAIR GAP

BACKER ROD amp SEALANT

HORIZONTAL SUPPORT

STANDING SEAM METAL PANEL

14 - 14 HEX HEAD FASTENERS

12 GA STAINLESS STEEL

HIDDEN FASTENER CLIP

CONTINUOUS SILICONE SEALANT CORNER TRIM

14 - 14 HEX HEAD FASTENERS

POP RIVETS

WINDOW FRAME

STANDING SEAM METAL PANEL

HORIZONTAL SUPPORT

HOLLOW STRUCTURAL SECTION COLUMN 8 X 8 X 12

CONCRETE MASONRY UNIT 8 X 8 X 16

12 GA STAINLESS STEEL HIDDEN FASTENER CLIP

CONTINUOUS SILICONE SEALANT

14 - 14 LOW PROFILE THROUGH FASTENER

FRAMED OPENING

CUSTOM CUT CONCRETE MASONRY UNIT

FLOOR CONSTRUCTIONPRE CONSTRUCTION FOUNDATION ROOF CONSTRUCTION EXTERIOR

FINISHES

INTERIOR CONSTRUCT ION POST

CONSTRUCTION

S U B S T R U C T U R E

G E N E R A L C O N D I T I O

N S

S I T E W O R K E Q U I P M E N T S E R V I C E S

SHELL

ELL

SUBSTRUCTURE

E X T E R I O R E N C L O S U R E S

R O O F I N G

I N T E R

I O R C O

N S T R

U C T I O

N

S T A I R S I N

T E R I O R F

I N I S H E

S

A

B

A

B

UP

0rsquo 20rsquo 40rsquo

D N

SECOND FLOOR 18rdquo = 1rsquoFIRST FLOOR 18rdquo= 1rsquo

0rsquo 20rsquo 40rsquo

W

D

W

D

OPENT

O BELOW

OPENTO BELOW

MENrsquoS

BUNK ROOM

WOMENrsquoS

BUNK ROOM

FITNESS AREA

WOMENrsquoS

SHOWER ROOM

MENrsquoS

SHOWER ROOM STORAGE

STORAGE

APPARATUS BAY

RECORDOFFICE

TRAINNING ROOM

KITCHEN

DAY ROOM

STORAGE

STORAGESAFE

ROOM

LAUNDRY

ROOM

RESTROOM

HVACAND

GENERATOR

CHIEFrsquoSOFFICE

FIRSTFLOOR PLANSCALE 18rdquo =1rsquo

CO NSTRUCTION SCHEDULE

BUDGETBREAKDOWN

SECOND FLOOR PLANSCALE 18rdquo =1rsquo

PLAN CALL OUTA

SECTION B

POLYC ARBONA TE - BRICK DETAIL

PLAN CALL OUTB