+ All Categories
Home > Documents > BIDDERS’ CONFERENCE IT-3981

BIDDERS’ CONFERENCE IT-3981

Date post: 03-Jan-2016
Category:
Upload: kamal-rosario
View: 29 times
Download: 0 times
Share this document with a friend
Description:
BIDDERS’ CONFERENCE IT-3981. Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity. Technical Specification. Technical Specification. Scope of the supply Delivery schedule Documentation Site activities. Scope of the Supply. - PowerPoint PPT Presentation
Popular Tags:
26
Transcript
Page 1: BIDDERS’ CONFERENCE IT-3981
Page 2: BIDDERS’ CONFERENCE IT-3981

2

BIDDERS’ CONFERENCE IT-3981Dismantling, Refurbishment, Replacement and Supply of Electrical

Overhead Travelling Cranes Over 10 Tons Capacity

January 14th-15th 2014 Handling Engineering Group

Technical Specification

Page 3: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 3

Technical Specification• Scope of the supply• Delivery schedule• Documentation• Site activities

January 14th-15th 2014

Page 4: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 4

Scope of the Supply• Following our planning, about 25 cranes are

foreseen to be subject to intervention in the next 5 years

• Dismantling, refurbishment or replacement of obsolete EOT cranes as well as the supply, installation and commissioning of new ones

• Five years blanket purchase contract• Definition of a catalogue of prices (IT-

3981_EN UPL)

January 14th-15th 2014

Page 5: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 5

Scope of the Supply

Catalogue of prices is structured as follows:

• Basic prices for interventions on cranes (A2 – F11)

• Prices for additional features (G1 – G18_F)• Price for different contexts of installation (H1

– H4)

January 14th-15th 2014

Page 6: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 6

Scope of the Supply

January 14th-15th 2014

Crane A B C D E F

Capacity [ton] 10 20 30 40 60 80

Span [mm]16300 ±

320016000 ±

400020250 ±

500016500 ±

400013000 ±

300014500 ±

1500

Lifting Height [mm]

6000 ± 2000 7250 ± 2750 6600 ± 200010000 ±

45007000 ± 2500

12000 ± 4000

Hoisting speed [m/min]

5 - 10 5 - 8 5 - 8 8 - 10 6 - 8 6 - 8

Cross travel speed [m/min]

8 - 15 12 - 15 15 - 20 12 - 15 8 - 12 8 - 12

Long travel speed [m/min]

20 - 30 15 - 20 25 - 30 25 - 35 15 - 25 15 - 20

Installation height [mm]

7000 ± 2000 8000 ± 3000 9000 ± 300010500 ±

35006000 ± 3000

12000 ± 2000

Example cranePR 712 (SD4)

PR 76 (bldg. 201)

PR 68 (bldg. 167)

PR 720 (UX85)

PR 82 (bldg. 168)

PR 725 (SX8)

Page 7: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 7

Scope of the Supply

January 14th-15th 2014

Category of intervention Ref. section of Tech. spec.

1 Dismantling of hoist trolley 2.2.1

2 Dismantling of a EOT crane 2.2.2

3 Replacement of rails 2.2.3

4 Replacement of electrical feeding line 2.2.4

5 Replacement of frequency converters 2.2.5

6 Replacement of PLC system 2.2.6

7 Replacement of electrical plant 2.2.7

8 Replacement of long travel mechanisms 2.2.8

9 New hoist trolley 2.2.9

10 New EOT crane 2.2.10

11 Replacement of hoist mechanisms 2.2.11

Page 8: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 8

Scope of the Supply

January 14th-15th 2014

Representative EOT crane

Category of intervention A B C D E F

1 Dismantling of hoist trolley   2 1 3 3 3

2 Dismantling of crane 1 1 0.5 2 0.5 0.5

3 Replacement of rails 0.25 0.25 0.25 0.25 0.25 0.25

4 Replacement of feeding line 3 5 3 5 2 3

5 Replacement of all frequency converters 1 1 1 1 1 1

6 Replacement of PLC system 1 1 1 1 1 1

7 Replacement of electric plant 1     1 1 1

8 Replacement of long travel mechanisms       1 1 1

9 New hoist trolley   2 1 2 1 2

10 New crane 3 3 2 2 1 1

11 Replacement of hoist mechanisms       1 1 1

Page 9: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 9

Scope of the Supply

January 14th-15th 2014

Additional Features Ref. section of Annex 1

1 Replacement of cabin 3.42 Lamp maintenance platform 3.73 Motorized hook 3.8.54 Fault diagnosis 4.215 Safety zones 4.226 Coupled operation 4.237 Camera system 4.248 Distance-assistance system 4.259 Sway reduction 4.26

10 Anti-collision system 8.6

11 Auxiliary hoist (fixed on trolley, 5 tons capacity, 10 m lifting height) -

12Auxiliary hoist (sliding on a monorail 15 m long, 5 tons capacity, 10 m lifting height)

-

13 Redundancy of all motors 8.2

14Redundancy of lifting motor and complete redundancy of horizontal drives

8.2

15 Emergency brake 8.3

16 Double of the lifting height (respect to the highest value of the range)8.4 (only if increased lifting height

exceeds 25 m) 17 Shaft crane (100 m of lifting height) 8.4, 8.518 Guide-rollers -

Page 10: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 10

Scope of the Supply

January 14th-15th 2014

Context of Installation Ref. section of Tech. spec.

1 Installation in surface building with space constraints 6.2 of this document

2 Installation in underground areas 6.3 of this document

3 Installation in radiation areas 6.4 of this document

Page 11: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 11

Scope of the Supply• Items will be ordered by the means of

release orders• Each order will be accompanied by a

questionnaire specifying: Data of the crane subject to intervention Type of activity (refurbishment, replacement…) Additional features Context of installation

• Contractor will be required to confirm the price

January 14th-15th 2014

Page 12: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 12

Scope of the Supply

January 14th-15th 2014

Example:

Project type: Refurbishment

Capacity: 40 ton

Span: 20000 mm

Lifting height: 28000 mm

Hoisting speed: 8 m/min

Cross travel speed: 15 m/min

Long travel speed: 25 m/min

Installation height: 11 m

Length of rails: 40 m

Page 13: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 13

Scope of the Supply

January 14th-15th 2014

Example:

Items: Dismantling of hoist trolley → D1

Replacement of electrical plant → D7

Replacement of long travel mechanisms → D8

Supply of a new hoist trolley → D9

Replacement of electrical feeding line → D4

Double of the lifting height → G16_D

Price: D1 + D7 + D8 + D9 + D4*40/50 + G16_D

Page 14: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 14

Scope of the Supply• Prices for items which are not covered will

be extrapolated from the catalogue of prices• Negotiation before order• No committment to order

January 14th-15th 2014

Page 15: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 15

Delivery Schedule

January 14th-15th 2014

Category of interventionSubmission of design report (time after the

release order)

Delivery / installation(time after the release order)

Acceptance tests at CERN /

Completion of works(time after the release

order)

1 Dismantling of Hoist Trolley - - 6 weeks

2 Dismantling of a EOT Crane - - 6 weeks

3 Replacement of Rails 2 weeks 1 month 2 months

4 Replacement of Electrical Feeding Line 2 weeks 1 month 2 months

5 Replacement of Frequency Converters 2 weeks 6 weeks 2 months

6 Replacement of PLC system 2 weeks 2 months 3 months

7 Replacement of Electrical Plant 2 weeks 2 months 3 months

8Replacement of Long Travel Mechanisms

2 weeks 2 months 3 months

9

Supply of a New Hoist Trolley (capacity < 30 tons)

6 weeks 3 months 4 months

Supply of a New Hoist Trolley (capacity ≥ 30 tons)

6 weeks 5 months 6 months

10

Supply of a New EOT Crane (capacity < 30 tons)

6 weeks 3 months 4 months

Supply of a New EOT Crane (capacity ≥ 30 tons)

6 weeks 5 months 6 months

11 Replacement of Hoist Mechanisms 6 weeks 5 months 6 months

Page 16: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 16

Documentation

January 14th-15th 2014

Page 17: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 17

Documentation

January 14th-15th 2014

Page 18: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 18

Documentation

January 14th-15th 2014

Page 19: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 19

Documentation

January 14th-15th 2014

Page 20: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 20

Documentation

January 14th-15th 2014

Page 21: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 21

Site Activities

January 14th-15th 2014

Page 22: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 22

Site Activities

January 14th-15th 2014

Page 23: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 23

Site Activities

January 14th-15th 2014

Page 24: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 24

Site Activities

January 14th-15th 2014

Page 25: BIDDERS’ CONFERENCE IT-3981

Handling Engineering Group 25

Site Activities

January 14th-15th 2014

Page 26: BIDDERS’ CONFERENCE IT-3981

Recommended