BIDDERS’ CONFERENCE IT-3981Dismantling, Refurbishment, Replacement and Supply of Electrical
Overhead Travelling Cranes Over 10 Tons Capacity
January 14th-15th 2014 Handling Engineering Group
Technical Specification
Handling Engineering Group 3
Technical Specification• Scope of the supply• Delivery schedule• Documentation• Site activities
January 14th-15th 2014
Handling Engineering Group 4
Scope of the Supply• Following our planning, about 25 cranes are
foreseen to be subject to intervention in the next 5 years
• Dismantling, refurbishment or replacement of obsolete EOT cranes as well as the supply, installation and commissioning of new ones
• Five years blanket purchase contract• Definition of a catalogue of prices (IT-
3981_EN UPL)
January 14th-15th 2014
Handling Engineering Group 5
Scope of the Supply
Catalogue of prices is structured as follows:
• Basic prices for interventions on cranes (A2 – F11)
• Prices for additional features (G1 – G18_F)• Price for different contexts of installation (H1
– H4)
January 14th-15th 2014
Handling Engineering Group 6
Scope of the Supply
January 14th-15th 2014
Crane A B C D E F
Capacity [ton] 10 20 30 40 60 80
Span [mm]16300 ±
320016000 ±
400020250 ±
500016500 ±
400013000 ±
300014500 ±
1500
Lifting Height [mm]
6000 ± 2000 7250 ± 2750 6600 ± 200010000 ±
45007000 ± 2500
12000 ± 4000
Hoisting speed [m/min]
5 - 10 5 - 8 5 - 8 8 - 10 6 - 8 6 - 8
Cross travel speed [m/min]
8 - 15 12 - 15 15 - 20 12 - 15 8 - 12 8 - 12
Long travel speed [m/min]
20 - 30 15 - 20 25 - 30 25 - 35 15 - 25 15 - 20
Installation height [mm]
7000 ± 2000 8000 ± 3000 9000 ± 300010500 ±
35006000 ± 3000
12000 ± 2000
Example cranePR 712 (SD4)
PR 76 (bldg. 201)
PR 68 (bldg. 167)
PR 720 (UX85)
PR 82 (bldg. 168)
PR 725 (SX8)
Handling Engineering Group 7
Scope of the Supply
January 14th-15th 2014
Category of intervention Ref. section of Tech. spec.
1 Dismantling of hoist trolley 2.2.1
2 Dismantling of a EOT crane 2.2.2
3 Replacement of rails 2.2.3
4 Replacement of electrical feeding line 2.2.4
5 Replacement of frequency converters 2.2.5
6 Replacement of PLC system 2.2.6
7 Replacement of electrical plant 2.2.7
8 Replacement of long travel mechanisms 2.2.8
9 New hoist trolley 2.2.9
10 New EOT crane 2.2.10
11 Replacement of hoist mechanisms 2.2.11
Handling Engineering Group 8
Scope of the Supply
January 14th-15th 2014
Representative EOT crane
Category of intervention A B C D E F
1 Dismantling of hoist trolley 2 1 3 3 3
2 Dismantling of crane 1 1 0.5 2 0.5 0.5
3 Replacement of rails 0.25 0.25 0.25 0.25 0.25 0.25
4 Replacement of feeding line 3 5 3 5 2 3
5 Replacement of all frequency converters 1 1 1 1 1 1
6 Replacement of PLC system 1 1 1 1 1 1
7 Replacement of electric plant 1 1 1 1
8 Replacement of long travel mechanisms 1 1 1
9 New hoist trolley 2 1 2 1 2
10 New crane 3 3 2 2 1 1
11 Replacement of hoist mechanisms 1 1 1
Handling Engineering Group 9
Scope of the Supply
January 14th-15th 2014
Additional Features Ref. section of Annex 1
1 Replacement of cabin 3.42 Lamp maintenance platform 3.73 Motorized hook 3.8.54 Fault diagnosis 4.215 Safety zones 4.226 Coupled operation 4.237 Camera system 4.248 Distance-assistance system 4.259 Sway reduction 4.26
10 Anti-collision system 8.6
11 Auxiliary hoist (fixed on trolley, 5 tons capacity, 10 m lifting height) -
12Auxiliary hoist (sliding on a monorail 15 m long, 5 tons capacity, 10 m lifting height)
-
13 Redundancy of all motors 8.2
14Redundancy of lifting motor and complete redundancy of horizontal drives
8.2
15 Emergency brake 8.3
16 Double of the lifting height (respect to the highest value of the range)8.4 (only if increased lifting height
exceeds 25 m) 17 Shaft crane (100 m of lifting height) 8.4, 8.518 Guide-rollers -
Handling Engineering Group 10
Scope of the Supply
January 14th-15th 2014
Context of Installation Ref. section of Tech. spec.
1 Installation in surface building with space constraints 6.2 of this document
2 Installation in underground areas 6.3 of this document
3 Installation in radiation areas 6.4 of this document
Handling Engineering Group 11
Scope of the Supply• Items will be ordered by the means of
release orders• Each order will be accompanied by a
questionnaire specifying: Data of the crane subject to intervention Type of activity (refurbishment, replacement…) Additional features Context of installation
• Contractor will be required to confirm the price
January 14th-15th 2014
Handling Engineering Group 12
Scope of the Supply
January 14th-15th 2014
Example:
Project type: Refurbishment
Capacity: 40 ton
Span: 20000 mm
Lifting height: 28000 mm
Hoisting speed: 8 m/min
Cross travel speed: 15 m/min
Long travel speed: 25 m/min
Installation height: 11 m
Length of rails: 40 m
Handling Engineering Group 13
Scope of the Supply
January 14th-15th 2014
Example:
Items: Dismantling of hoist trolley → D1
Replacement of electrical plant → D7
Replacement of long travel mechanisms → D8
Supply of a new hoist trolley → D9
Replacement of electrical feeding line → D4
Double of the lifting height → G16_D
Price: D1 + D7 + D8 + D9 + D4*40/50 + G16_D
Handling Engineering Group 14
Scope of the Supply• Prices for items which are not covered will
be extrapolated from the catalogue of prices• Negotiation before order• No committment to order
January 14th-15th 2014
Handling Engineering Group 15
Delivery Schedule
January 14th-15th 2014
Category of interventionSubmission of design report (time after the
release order)
Delivery / installation(time after the release order)
Acceptance tests at CERN /
Completion of works(time after the release
order)
1 Dismantling of Hoist Trolley - - 6 weeks
2 Dismantling of a EOT Crane - - 6 weeks
3 Replacement of Rails 2 weeks 1 month 2 months
4 Replacement of Electrical Feeding Line 2 weeks 1 month 2 months
5 Replacement of Frequency Converters 2 weeks 6 weeks 2 months
6 Replacement of PLC system 2 weeks 2 months 3 months
7 Replacement of Electrical Plant 2 weeks 2 months 3 months
8Replacement of Long Travel Mechanisms
2 weeks 2 months 3 months
9
Supply of a New Hoist Trolley (capacity < 30 tons)
6 weeks 3 months 4 months
Supply of a New Hoist Trolley (capacity ≥ 30 tons)
6 weeks 5 months 6 months
10
Supply of a New EOT Crane (capacity < 30 tons)
6 weeks 3 months 4 months
Supply of a New EOT Crane (capacity ≥ 30 tons)
6 weeks 5 months 6 months
11 Replacement of Hoist Mechanisms 6 weeks 5 months 6 months
Handling Engineering Group 16
Documentation
January 14th-15th 2014
Handling Engineering Group 17
Documentation
January 14th-15th 2014
Handling Engineering Group 18
Documentation
January 14th-15th 2014
Handling Engineering Group 19
Documentation
January 14th-15th 2014
Handling Engineering Group 20
Documentation
January 14th-15th 2014
Handling Engineering Group 21
Site Activities
January 14th-15th 2014
Handling Engineering Group 22
Site Activities
January 14th-15th 2014
Handling Engineering Group 23
Site Activities
January 14th-15th 2014
Handling Engineering Group 24
Site Activities
January 14th-15th 2014
Handling Engineering Group 25
Site Activities
January 14th-15th 2014