+ All Categories
Home > Documents > Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being...

Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being...

Date post: 27-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
12
191 64 64 191 Gallatin River West Fork Gallatin River South Fork Gallatin River Dudley Creek Road 3. 2. 1. Little Coyote Road Lone Mountain Trail Lone Mountain Trail Big Sky Town Center VIRTUAL OPEN HOUSE
Transcript
Page 1: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

19164

64191

Gallatin River

West Fork Gallatin River

South Fork Galla

tin River

Dudley Creek Road

3.

2.

1.Little

Coyote Road

Lone Mountain Trail

Lone Mountain Trail

Big Sky Town Center

VIRTUALOPEN HOUSE

Page 2: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

BIG SKY BRIDGE DECKS PROJECT OVERVIEW

LITTLE COYOTE ROAD BRIDGE HIGHWAY 191 BRIDGE LONE MOUNTAIN TRAIL BRIDGE

The bridge decks have undergone regular maintenance for years and can no longer be patched for interim fixes.

The Montana Department of Transportation and Dick Anderson Construction will improve three bridge structures.

Page 3: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

19164

64191

Gallatin RiverWest Fork Gallatin River

South Fork Galla

tin River

Dudley Creek Road

3.

2.

1.Little

Coyote Road

Lone Mountain Trail

Lone Mountain Trail

Big Sky Town Center

PROJECT KEY

2. Lone Mountain Trail Bridge1. Little Coyote Road Bridge

3. Highway 191 Bridge

BIG SKY BRIDGE DECKS PROJECT MAP

Page 4: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

ABOUT BRIDGE DECKS

A bridge deck is the surface that vehicles drive on when on a bridge.

Decks have multiple layers.

Bridges have unique needs and cannot be treated the same way as roads.

ASPHALT SURFACE

DECK PLATE

CROSSBEAM

RIBGIRDER

Page 5: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

Built in 1979. Full bridge deck replacement needed.

Work on one side of bridge at a time. Minimal delays.

1 2 3

MT 64 - LITTLE COYOTE ROAD BRIDGE

Page 6: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

MT 64 / US 191- LONE MOUNTAIN BRIDGE

Built in 1972. Bridge deck is being repaired.

Repairs involve milling, filling in underlying layers, and paving.

1 2 3Work on one side of bridge at a time. 15-minute delays anticipated.

4

Page 7: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

US HIGHWAY 191 BRIDGE

Built in 1952. Bridge deck is being repaired.

Repairs involve milling, filling in underlying layers, and paving.

1 2Work on one side of bridge at a time. Delays up to 15-minutes during rush hour.

43

Page 8: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

PROJECT TIMELINE

Page 9: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

TRAVELER INFORMATION

Single-lane traffic with a traffic signal in-place.

24/7 traffic control.

Work hours: Monday –Friday during daylight hours.

Delays up to 15 minutes at each bridge.

Page 10: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

WIDE LOADS AND DETOURS

Wide loads restricted: Widths larger than 11 feet should take an alternate route.

No designated detour.

Page 11: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

VISION ZERO

Vision Zero: Goal of zero deaths and zero serious injuries on Montana roadways.

Watch for the “cone zone.” Slow down, pay attention, and be extra careful when in the work zone.

Fines double in work zones.

VISION ZERO

Page 12: Big Sky Bridge Decks - Virtual Open House - Slides - May ... · Built in 1952. Bridge deck is being repaired. Repairs involve milling, filling in underlying layers, and paving. 1

STAY IN THE KNOW

EMAIL: Contact Takami at [email protected] to subscribe.

TEXT: Text BIGSKYBRIDGES to 41411.*

PROJECT HOTLINE: 406-207-4484, Monday – Friday, 9 a.m. – 5 p.m.

WEBSITE: bitly.com/bigskybridges

*Please note that standard message and data rates may apply. We anticipate sending 1 update message per week and subscribers may request help by replying HELP or opt-out at anytime by replying STOP. Visit mdt.mt.gov/mdt/security_policy.shtml for terms and privacy policy.

RADIO: 96.7FM, 100.7FM, 103.5FM, 104.7FM


Recommended