+ All Categories
Home > Documents > BIM Overview Stacy Scopano. AEC is a fragmented industry.

BIM Overview Stacy Scopano. AEC is a fragmented industry.

Date post: 24-Dec-2015
Category:
Upload: iris-martin
View: 222 times
Download: 1 times
Share this document with a friend
Popular Tags:
19
BIM Overview Stacy Scopano
Transcript

BIM Overview

Stacy Scopano

AEC is a fragmented industry

Traditional Process

DOC DOC DOC DOC DOC

andi
This isn't necessarily a 2d document. It could be a DProfiler feasability model which is quite populare in the industry. Some even do this with Revit + Innovaya

Conceptual Phase

Schematic Phase

Design Development

Construction Documents

Construction Phase

Fabrication

As-RequiredRequirements

As-DesignedDesign

As-PlannedImplementation plan

As-BuiltImplementation in construction.

As-MaintainedFacility Management

Greatest Industry Challenges:

• Data Recreation

• Error due to Human Interpretation

As-RequiredRequirements

As-DesignedDesign

As-PlannedImplementation plan

As-BuiltImplementation in construction.

As-MaintainedFM

Greatest Industry Challenges:

• Data Recreation

• Error due to Human Interpretation

$15.8 billion in annual interoperability costs were quantified for thecapital facilities industry in 2002. Of these costs, two-thirds are borne byowners and operators, which incur most of these costs during ongoingfacility operation and maintenance (O&M). In addition to the costsquantified, respondents indicated that there are additional significantinefficiency and lost opportunity costs associated with interoperabilityproblems that were beyond the scope of our analysis. Thus, the $15.8billion cost estimate developed in this study is likely to be a conservativefigure.

Key BIM Concepts

Phases of Adoption

DOC DOC DOC DOC DOC

BIM as “deliverable”

BIM process

Lonely BIMDrawing based process

BIM based process

andi
This isn't necessarily a 2d document. It could be a DProfiler feasability model which is quite populare in the industry. Some even do this with Revit + Innovaya

2008 BIM Adoption Report

BIM Continuing Development

Challenges & Opportunities

BIM software

Native data (Master)

BIM software

Native data (Master) BIM software

Native data (Master)

The ”Cloud”

Future “Transactions”

Visual Transaction Example Coordinate

mechanical & structural designs

Penetration request– MEP designer creates

request

– Structural designer approves request and creates penetration

– MEP engineer modifies design

– Modifies the penetration request

– Structural designer recognizes the change and adjusts

An innovative case

New Meadowlands Stadium

InternetInternet

TabletPC with RFID Reader

Manufactured1

RFIDTag

2 Ready to ship

RFIDTag

Received on Site3RFIDTag

Erected4

RFIDTag

VelaSystems Servers(Vela Hosting Facility)

3D Model

Reports

Factory Jobsite

Visualizing the Supply Chain


Recommended