BIM PROJECT EXECUTION PLANNING
Thursday, January 13, 2011
Ralph KreiderGraduate Research AssistantCIC Research ProgramPenn State University
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GBIM Project Execution Planning Procedure
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
“Begin with the end in mind.”
Identifying BIM Goals and Uses
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GBIM Goals
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GIdentifying BIM Goals and Uses
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GIdentifying BIM Goals and Uses
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GFrequency and Benefit of Uses
3D Coordination
Design Reviews
Design Authorin
g
Constructi
on Syste
m Design
Existi
ng Conditions M
odeling
3D Control a
nd Planning
Programming
Phase Plan
ning (4D M
odeling)
Record M
odeling
Site Utiliza
tion Planning
Site Analysis
Structu
ral Analys
is
Energy
Analysis
Cost Esti
mation
Susta
inability LE
ED Evaluation
Building Syst
em Analysis
Space
Manage
ment / Tr
acking
Mechanica
l Analysis
Code Validati
on
Lighting A
nalysis
Other Eng. A
nalysis
Digital F
abric
ation
Asset M
anag
ement
Building M
aintenance
Schedulin
g
Disaste
r Plan
ning 0%5%
10%15%20%25%30%35%40%45%50%55%60%65%
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6FrequencyBenefit
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GBIM Use Selection Worksheet
Proceed?
Value
Responsible Party
Capabilities & Resources
BIM Use
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GDesign BIM Project Execution Process
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GLevel Two Process Maps
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GDevelop Information Exchanges
INFOEXCHANGE
INFO
EXCHANGE
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GInformation Exchange Worksheet
= Output Inadequacy (Revise Information) OR= Input Inadequacy (Revise Responsible Party)
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GSupporting Infrastructure
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GPlan Template
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
SurveysCase Studies
Project (7)Organizational (3)Academic (2)
Focus GroupsIndustry and User Feedback
Validating the Planning Procedure
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
OrganizationalUS Army Corps of EngineersPenn State UniversityLos Angeles Community College District (Draft)
University Health Systems - San AntonioMillennium Science BuildingPoff Courthouse2nd Data Center ProjectMoore Building RenovationHenderson Bridge
Projects
AcademicIntegrated BIM Design StudioIntegrated BIM ThesisBIM Project Execution Planning
Case Study Implementation
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
Need BIM Champion(s)Owner Involvement is CriticalNeed team Buy-in and TransparencyThe Planning Procedure should allow for Adaptations
by the Project TeamThe Project Execution Plan must be considered a
Living DocumentPlanning takes Resources and it is Critical that
Resources are Available
Lessons Learned
BIM PRO
JECT EXECUTIO
N PLAN
NIN
GSponsors: The Charles Pankow Foundation The Construction Industry Institute (CII) Penn State Office of Physical Plant The Partnership for Achieving Construction Excellence (PACE) Industry Partners:
LACCD USACE Balfour Beatty
Whiting Turner Clark Construction Group Jacobs
Barton Malow GSA MA DCAM
Dana ‘Deke’ Smith Mark Butler Derek Cunz Mark Falzarano
Ed Gannon Greg Gidez Francois Grobler Steve Hagan
Steve Hutsell Mark Konchar Soad Kousheshi Rob Leicht
Kurt Maldovan Victor Sanvido Alexander Zolotov
Craig Dubler Shane Goodman Colleen Kasprzak
Ralph Kreider Eric Nulton
Chitwan Saluja Nevena Zikic
Chimay Anumba Sam Hunter John Messner
Advisory Board Members
PSU Research Team Students:
Faculty:
ACKNOWLEDGEMENTS
BIM PROJECT EXECUTION PLANNING
Download the Guide at:www.engr.psu.edu/
bim? Ralph KreiderGraduate Research AssistantCIC Research ProgramPenn State University
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
Create a PxP TemplateAdd sections on decision makingMap BIM Process
Level 1 and Level 2Map Design Process
Level 1 – Project TeamLevel 2 – Individual Process
Information ExchangesWhat information is required
What to do for this class
BIM PRO
JECT EXECUTIO
N PLAN
NIN
G
http://www.youtube.com/watch?v=24pvMspaSCE
http://www.youtube.com/user/BentleySystems
Projectwise