+ All Categories
Home > Business > Binh Duong New City Nov 2009

Binh Duong New City Nov 2009

Date post: 30-Oct-2014
Category:
Upload: guest631d77
View: 3,061 times
Download: 3 times
Share this document with a friend
Description:
The key project of Becamex
Popular Tags:
66
Welcome VIPs visit Becamex IDC (4/11/2009)
Transcript
Page 1: Binh Duong New City Nov 2009

Welcome VIPs visit Becamex IDC (4/11/2009)

Page 2: Binh Duong New City Nov 2009

Main Contents

• BinhDuong Province• Becamex IDC and its key projects

• Binh Duong New City

Page 3: Binh Duong New City Nov 2009

HanoiHanoi

TayTay NinhNinh

Binh PhuocBinh Phuoc

Binh DuongBinh Duong

Dong Dong NaiNaiHCMCHCMC

PopulationPopulationViet Nam: 86 mil., add. of 1.2 mil./year. 70% of population is under 35 yrs old.Ha Noi (expansion): 6.5 mil.Ho Chi Minh: 7.5 mil.Binh Duong: 1.5 mil.

Page 4: Binh Duong New City Nov 2009

§ Area : 2,695,5 Km2

§ Industrial land : 15, 000 ha

§ Population (people): 1,500,000 (as April.1,09)- Working forces : 700,000

§ Admin units : - Capital town, 06 districts, 89 communes & wards.

§ GDP growth per annum (1997-2007): 15%• 1st 6 months of Year 2009: ~ 7.1 %§ Domestic investment: ~ 8,000 projects with capital of VND 55,000 Bil.

§ Foreign investment : 1,940 projectswith capital of ~ US$ 12.8 Bil from 34 countries & territories .

By 8/2009: 3,555 By 8/2009: 3,555 expatsexpats working inside working inside IPsIPs..

BÌNH DÖÔNG PROVINCE

Page 5: Binh Duong New City Nov 2009

Industrial: 64,8%

Agri: 5.5%Services:

29,7%

15 Industrial 15 Industrial ParksParks

Economic Statistics 2008

13 Industrial 13 Industrial ParksParks

By 2020, 39 By 2020, 39 IPsIPs with total with total land of 20,000 haland of 20,000 ha

Page 6: Binh Duong New City Nov 2009

Gross Output of Industry at Constant Price Gross Output of Industry at Constant Price ( VND Billion)( VND Billion)--Southern Key Economic ZoneSouthern Key Economic Zone

375.892375.892328.781328.781TotalTotal168.927150.710Ho Chi MInh50.57049.274Ba Ria-Vung Tau76.32762.919Dong Nai80.06865.878Binh Duong

Year 2008Year 2008Year 2007Year 2007City/ProvinceCity/Province

Page 7: Binh Duong New City Nov 2009

Export/ Export/ InportInport( VND Billion)( VND Billion)--Southern Key Economic ZoneSouthern Key Economic Zone

46.794/ 33.49938.136/ 27.020Total

22.334/ 18.32618.342/ 27.020Ho Chi Minh

11.437/ 1.1539.258/ 1.024Ba Ria- Vung Tau

6.849/ 8.1465.475/ 6.360Dong Nai

6.173/ 5.8745.060/ 4.668Binh Duong

Year 2008Year 2008Year 2007Year 2007City/ProvinceCity/Province

Page 8: Binh Duong New City Nov 2009

ac

b

d

2

5

6

4

3

6 Main Districts:1. CENTER DIST.2. THỦ DẦU MỘT DIST.3. THUẬN AN DIST.4. DĨ AN DIST.5. BẾN CÁT DIST.6. TÂN UYÊN DIST.

4 Suburban Districts:a. DẦU TIẾNG DIST.b. PHÚ GIÁO DIST.c. BÀU BÀNG DIST. d. NORTHERN TÂN UYÊNDIST.

Year 2020Year 2020

Binh Duong ProvinceBinh Duong Province

Binh Duong CityBinh Duong City

1

Page 9: Binh Duong New City Nov 2009

12

5

4

3

6

MAJOR ROAD SYSTEM OF MAJOR ROAD SYSTEM OF BINH DUONGBINH DUONG

1 – NATIONAL ROAD 132 – HIGHWAY MYPHUOC -TANVAN3 – RING ROAD N4 4 – HOI NGHIA-ANTAY ROAD5 – HOCHIMINH ROAD6 – RING ROAD N5 Binh Duong New CityBinh Duong New City

Page 10: Binh Duong New City Nov 2009

GOOD TRANSPORTATION SYSTEM

1 – NATIONAL ROAD 13

2 – HIGHWAY MYPHUOC-TANVAN

3 – RING ROAD N3

4 - RING ROAD N4

5 – HOCHIMINH ROAD

6 – HOI NGHIA-ANTAY ROAD

1 2

5

3

46

HEÄ THOÁNG XE ÑIEÄN TRAMWAY

MyPhuoc-TanVanexpressway

Upgrade Hwy 13

Page 11: Binh Duong New City Nov 2009

TRANSPORTATIONTRANSPORTATION INFRASTRUCTURE INFRASTRUCTURE DEVELOPMENT

MY PHUOC – TAN VAN EXPRESS WAY

- 30 KMs

- VND 3,500 BIL., ( include 1,800 BIL. for construction cost)

- Aug.7,2009: Ground Breaking Ceremony, and will be finished in 4 years

BOT PROJECT HIGHWAY 13

•- 62 KM

•- VND 700 BIL

•- IPO in April 2007

•- COMPLETED IN 2007

Page 12: Binh Duong New City Nov 2009

MyPhuoc-TanVan highway ground breaking cermony_Aug. 7, 2009

Page 13: Binh Duong New City Nov 2009
Page 14: Binh Duong New City Nov 2009
Page 15: Binh Duong New City Nov 2009

Success : The trademark of VSIP has become the brand name of Vietnam and gained the prestige in the world market.

Development orientation: VSIP will continuously invest & developinto other provinces.

DEVELOPMENT ORIENTATION -VSIP

Marking the success : On 2006, VSIP organized the 10th anniversary of establishment with the presence of two Prime Ministers: Nguyen Tan Dung & Ly Hien Long.

Page 16: Binh Duong New City Nov 2009

LýQuang Diệu visited BinhDuong New City on April 14 .09

Page 17: Binh Duong New City Nov 2009

Bac Ninh Province (2)700 Ha Integrated Township and Industrial Park (launched in 2007)

Haiphong City (3)1,200 Ha Integrated Township and Industrial Park (MOU in Aug 2007)

VIET NAM - SINGAPORE INDUSTRIAL PARK

Binh Duong Province (1)VSIP I : 500 Ha (launched in 1996)VSIP II: 344 Ha (launched in 2005)VSIP II Exp: 1,000 Ha (launched in 2007)

Page 18: Binh Duong New City Nov 2009

Establishment year : 2005

VIETNAM - SINGAPORE INDUSTRIAL PARK 2Total area : 344 Ha (Phase 1) & 1,000 Ha (Phase 2)

Location : In Binh Duong New Township

Investment : 127 projects & USD 600 mil

Page 19: Binh Duong New City Nov 2009
Page 20: Binh Duong New City Nov 2009
Page 21: Binh Duong New City Nov 2009

PROFILE & ACTIVITIES

BECAMEX IDC CORPORATION

PROCESS & MANUFACTURING

CIVIL ENGINEERING, INDUSTRIAL CONSTRUCTION & TRANSPORTATION

INFRASTRUCTURE, INDUSTRIAL PARKS AND RESIDENTIAL AREAS

- JOINT VENTURE, JOINT STOCK & INVESTMENT

- BANKING & FINANCE

- SECURITIES AND STOCK EXCHANGE

- HEALTH CARE, EDUCATIONAL, CULTURAL & SPORTS PROJECTS

- COMMUNITY PROJECTS

FORM OF BUSINES : HOLDING INC.

SUBSIDIARIES/AFFILIATES : 30

REGISTERED CAPITAL : VND 2,500 BIL

EQUITY : VND 25,000 BIL

EMPLOYEE : 2, 500 STAFFs

CHAIRMAN & CEO : MR. NGUYEN VAN HUNG

Page 22: Binh Duong New City Nov 2009

SYSTEM OF SUBSIDIARIESBECAMEX IDC CORP.

FINANCIAL FIELD:1. The First Securities JS Company (FSC)2. Phương Nam commercial JS Bank (HCM City)CONSTRUCTION– TRADING–REAL SESTATE –

SERVICES FIELD:3. Construction & Transportation JS Company (BCC)4. Trading & Development JS Company (TDC)5. Trading & Development JS Company (ITC)6. Mineral & Construction Company 7. BD Environmental & Water Supply Company8. Urban development JS Company (Becamex UDJ)9. Technical-infra Development JS Co.,(Becamex IJC)10.Technology & telecommunication JS Co.(VNTT) 11.Investment consultant services JS Co.(Becamex ISC)12.Lien Viet JS company 13.Anh Sao Duong Communications JS companyPHARMACERTICAL FIELD :1. Binh Duong Pharmacertical & Health Material JS Co.,2. Savi pharmacertical JS Company (Savipharm)HEALTHCARE – EDUCATION:1. Binh Duong Hospital JS Company2. University of South-Eastern Region.

SUBSIDIARIES–JOINT EFFORT

Capital contribution of Becamex on Subsidiaries

913916

1,829

Becamex Share Other share holders

Total

Page 23: Binh Duong New City Nov 2009

SYSTEM OF SUBSIDIARIES

BECAMEX IDC CORP.

Projects – Subsidiaries

1. Viet Nam – Singapore IP

Residential & Industrial development

2. My Phuoc Industrial City3. Thoi Hoa Residential & IP4. Bau Bang Residential & IP5. Binh Duong New Township 6.Tan Uyen Residential & IP

844

3,429

2,200

956

4,196

1,850

VSIP MPIP Thoi Hoa BauBang

BD Township TanUyen

Page 24: Binh Duong New City Nov 2009

8234BAU BANG RESIDENTIAL & IP

5,049798TOTAL:

2604AN THANH INDUSTRIAL ESTATE

7807AN PHU INDUSTRIAL ESTATE

6316BINH CHUAN INDUSTRIAL ESTATE

2,800380MY PHUOC INDUSTRIAL CITY

2,000357VIETNAM-SINGAPORE IP

INVESTMENT CAPITAL

(MIL. USD)

NUMBER OF PROJECTS

FOREIGN INVESTMENT PROJECTS

INDUSTRIAL PARKS

Whole BinhDuong: 1,910 FDI projects,11,5 bil USD registered capital

INVESTMENT ATTRACTION OF BECAMEX IDC CORP.,

Page 25: Binh Duong New City Nov 2009

MY PHUOC RESIDENTIAL & INDUSTRIAL PARKMY PHUOC RESIDENTIAL & INDUSTRIAL PARK

Page 26: Binh Duong New City Nov 2009

1. Geography :

Located in Ben Cat District, 20 km northeast of TDM Town, 42 km north of HCMC.

2. Total area:+ Industry: 1,848 ha

+ Residential & Service: 2,500 ha

3. Investor :

Investment & Industrial Development Co. (BECAMEX IDC CORP.)

4. Establishment date: 12 / 06 / 2002

Location:

Page 27: Binh Duong New City Nov 2009

Master plan:Phase 1 :

Industry: 377 HaService : 53 Ha

Phase 2 :Industry : 471 HaService : 328 Ha

Phase 3: Industry : 1,000 Ha Service : 1,200 Ha

Phase 4 : Industry : 200 Ha Service : 756 Ha

KCN &ÑT MP2

KCN &ÑT MP3

KCN &ÑT MP1

KCN &ÑT THÔÙI HOØA

Page 28: Binh Duong New City Nov 2009

INVESTMENT CAPITAL (MIL USD)

NUMBER OF PROJECTS

2,252301TOTAL17115OTHER COUNTRIES10

82FRANCE92205THAILAND8103HOLLAND7

33613USA6201ENGLAND5

16053VIETNAM420527JAPAN360574KOREA2487108TAIWAN 1

TIL 05/2008

NATION

RESULTS IN INVESTMENT ATTRACTION OF MPIPRESULTS IN INVESTMENT ATTRACTION OF MPIP

Page 29: Binh Duong New City Nov 2009

SAFETY SAFETY INVESTMENTINVESTMENT

Page 30: Binh Duong New City Nov 2009

STABILITY & SUSTAINABLE

DEVELOPMENT FOR INVESTORS & LOCAL

PEOPLE

Page 31: Binh Duong New City Nov 2009

THE DEVELOPMENT OF MY PHUOCTHE DEVELOPMENT OF MY PHUOC

Myõ Phöôùc caùch ñaây 04 naêm

Page 32: Binh Duong New City Nov 2009

AIF – USA BONFIGLIOLI - ITALYSAB-MILLER - USA

ORION - KOREAECS - HOLLAND COLGATE PALMOLIVE - USA

Page 33: Binh Duong New City Nov 2009

TA TUNG -TAIWAN SUPOR – CHINAAPI – Japan & Indonesia

YAZAKI EDS – JAPAN XERIUM – USA MIDEA –CHINA

Page 34: Binh Duong New City Nov 2009

BECAMEX CITY CENTER- 6ha- 2,500 bil. VND project

Page 35: Binh Duong New City Nov 2009

ECOLAKES, My PhuocSetiaBecamex@Ecolake

• 226 ha development at My Phuoc -Value of 839 mil. USD( 10,000 units of all kinds)

• Villas, link house, condominium, commercial center, medical center, water features…

New Projects in Binh Duong ProvinceNew Projects in Binh Duong Province

MyPhuoc

Page 36: Binh Duong New City Nov 2009

EASTERN INTERNATIONAL UNIVERSITY EASTERN INTERNATIONAL UNIVERSITY (26 HA(26 HA-- 24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)

Page 37: Binh Duong New City Nov 2009
Page 38: Binh Duong New City Nov 2009
Page 39: Binh Duong New City Nov 2009

BECAMEX INTERNATIONAL HOSPITAL-1,000 BEDS/ 12.7 HA OF LAND

Page 40: Binh Duong New City Nov 2009

(금호타이어 MOU 체결식) (오리온제과 투자 계약식)

GS RETAIL DEPARTMENT STORE & SERVICE ( 9ha)

Page 41: Binh Duong New City Nov 2009

7

INDUSTRIALINDUSTRIAL

1. DONG AN 2: 158 Ha

2. PHU GIA: 133 Ha

3. VSIP 2: 344 Ha

4. KIM HUY: 237 Ha

5. SONG THAN 3: 533 Ha

6. DAI DANG: 274 Ha

7. BINH DUONG NEW CITY 7. BINH DUONG NEW CITY

1,011 Ha1,011 Ha8. SERVICES : 567 ha

-GOLF - HORSE RACING- MOVIE STUDIO- UNIVERSITIES

TOTAL: 4,196 Ha

12

3

4

5

6

8

BinhDuongBinhDuong New Township (4,196 ha)New Township (4,196 ha)

Page 42: Binh Duong New City Nov 2009

2.000Ha:IP Development

900 Ha : Services Development

1.000Ha: New BinhDuong city

IP Area

Residential Area

Services Area

BinhDuong New Township (4,196 ha)

Page 43: Binh Duong New City Nov 2009

fr design research 2008

MASTER PLAN

.Binh Duong New City, Vietnam ▪ master plan review and urban design | BECAMEX IDC

Page 44: Binh Duong New City Nov 2009

binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008

MASTER PLANMASTER PLAN

Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

You are here

Page 45: Binh Duong New City Nov 2009

binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008

MASTER PLANMASTER PLAN

Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

Political & Admin Centre

Commercial / Mixed Devt

Central Biz / Financial District

High Tech Biz Park

Residential -Apartments

Residential -Low Rise

Residential –Street Row

Houses

Cultural Centre

Eastern International

University (EIU)

Sports Centre

Central Park

Commercial (Office & Retail) :

1.25 mil sqm (excl High Tech Biz Park)

Residential :

4.25 mil sqm

Admin Centre, Public / Residential Facilities :

1.2 mil sqm

YEAR 2020YEAR 2020

600,000 to 1 Million 600,000 to 1 Million PeoplePeople

(working & living)(working & living)

Page 46: Binh Duong New City Nov 2009

binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008

GREEN AND BLUE PLANGREEN AND BLUE PLANurban design analysis

Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

Page 47: Binh Duong New City Nov 2009

PEDESTRIAN NETWORK PLANPEDESTRIAN NETWORK PLAN

urban design analysis

binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

arcaded walkway

cantilevered walkway

covered galleria

Page 48: Binh Duong New City Nov 2009

COMMUNICATION CENTRECOMMUNICATION CENTRE

Page 49: Binh Duong New City Nov 2009

binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

Page 50: Binh Duong New City Nov 2009

•Under construction:•IJC Aroma hi-rise apartments ( 17-20

stories- ~ 80,000 m2 GFA; 499 units)

OnOn--going projects in BDNCgoing projects in BDNC

Page 51: Binh Duong New City Nov 2009

OnOn--going projects in BDNCgoing projects in BDNC•Under construction:

•TDC Plaza- hi-rise apartments ( 18-20 stories,

133,740 m2 GFA, 799 units)

Page 52: Binh Duong New City Nov 2009

•Under construction: • BCC Shopping/House

complex-73,157 m2 GFA; 168

units of 4-5 stories

OnOn--going projects in BDNCgoing projects in BDNC

Page 53: Binh Duong New City Nov 2009

•Under Construction• Eastern International University( 26 ha, 24,000 students,

~ 250,000 m2 GFA). Ground Breaking on Aug.13, 2009

OnOn--going projects in BDNCgoing projects in BDNC

Page 54: Binh Duong New City Nov 2009

•Under Arch. Design Selection process:• Admin. and Political Centre( City Hall of BinhDuong

Province/City); ~ 240,000 m2 GFA

OnOn--going projects in BDNCgoing projects in BDNC

Page 55: Binh Duong New City Nov 2009

•Under Arch. Design process ( 1/500 approved)• High Tech City by MapleTree of Singapore ( 75 ha), ~ 710.000

GFA (m2), up to 20 stories

OnOn--going projects in BDNCgoing projects in BDNC

Page 56: Binh Duong New City Nov 2009

•Under Arch. Design:• International School- KinderWorld Singapore- SIS

(Kindergarten to High School)- 2.6 ha

•Opening in Aug. 2010( phase 1)

OnOn--going projects in BDNCgoing projects in BDNC

Page 57: Binh Duong New City Nov 2009

•Under detailed arch. Design:• Office, commercial, entertainment, subway• Designed by Ong & Ong (Singapore)

OnOn--going projects in BDNCgoing projects in BDNC

Page 58: Binh Duong New City Nov 2009

•Under detailed Arch. Design:•Cultural Centre project ( 7 ha)•Designed by Cendes International (Singapore)

OnOn--going projects in BDNCgoing projects in BDNC

Page 59: Binh Duong New City Nov 2009
Page 60: Binh Duong New City Nov 2009
Page 61: Binh Duong New City Nov 2009

Need more joint efforts/cooperation from international and local

investors and partners to make this BinhDuong New City come true SOONSOON

Page 62: Binh Duong New City Nov 2009
Page 63: Binh Duong New City Nov 2009
Page 64: Binh Duong New City Nov 2009

binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

PERSPECTIVESCEREMONIAL AXIS

Page 65: Binh Duong New City Nov 2009

binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

PERSPECTIVESCIVIC AXIS

Page 66: Binh Duong New City Nov 2009

THANK YOUTHANK YOU

the New Destination for Allthe New Destination for All……

Contact: Le Simon Contact: Le Simon QuocQuoc--Hung; BusinessHung; Business Development Director. Email: Development Director. Email: [email protected]@becamex.com.vn. . 09176622880917662288


Recommended